You are on page 1of 2

Lucas

Cover page
Contact information
Table of contents
Terms of reference
- Introduction
- Rational
-

Kimberley and Joni


- Scope
-

Lucas
- Project plan
-

Joni
-

Who our client is


What they want
What their current situation is
What our objective is
Describe existing system
Why the project is needed

Objectives
Constraints
Cost estimation
Roles, skills, knowledge
- Roles
- Required skills
- Knowledge/resources at our disposal

Methodologies (e.g. SCRUM, Waterfall)


- Research them
- Provide justification for chosen methodology

Work Breakdown Schedule (WBS)


- MUST go into exact detail like resource allocation, duration etc.

Quality assurance
- How will we control quality
- Requirements
- How to solicit them
- Validation and verification
- We could develop a set of our own KPIs to
determine how well were doing
- Peer review
- Client review

Deliverables
Communication plan

Risk management
Glossary
References
Disclaimer (which is on AUT Online)