Date

From Starting to 23-April


24-April to 29-April
07-May to 12-May
13-May
21-May to 24-May

24-May to 28-May
2-Jun
Total Time
Total time in hour x 25

Hour

Detail
Work & meeting time included. Since We talked
about this that I worked on scratch paper I don't
think that I have to count that work time so total
3:30 - 2:50 time (3:30) - work time (2:50) = Meeting time
= 0:40 (0:40)
Research over internet for any existing tech. for
2:20 repairing & 35 minute Meeting time
Research for maping technology for slit using
1:25 sensors
0:25 Meeting at the Student Union
Dimensions of track and calculations of PSI &
2:40 Meeting at Peanuts
Got the drawing of the theoretical dimensions
from James & started calculations according to
that about PSI & looked over which kind of
Pneumatic piston we are using & calculated load
3:10 capacity
0:50 Meeting at Peanuts
11:30 11.5 Hour