FDT Form

You might also like

You are on page 1of 1

DESCRIPTION

Lab No

Date Testing

Material

Test No

Layer No.

Result

Gen. Data

Field Test No.

Chainage

1
746+890

746+616-746+916

Distance to centre line

10m L/S

Depth of hole

d=15.24

Wt. Wet soil

W0
(g)

7635

Initial Wt. Of sand + cont


+

W1
(g)

10577

Residual Wt. Of sand+cont


+

W2
(g)

3080

Wt. Of used sand

W3=W2-W1

Wt. Of sand to fill cone

W4=1795

Wt. Of sand to fill hole

W5=W3-W4

Unit Wt. Of sand

p0=1.485 (g/cm3)

Volume of Hole

V=W5/p0

Wet Density

P1=W0/V (g/cm3)

Moisture Content

M=

Dry Density

P2=P1/(1+M)
(g/cm3)

Max. Dry Density

P=

(cm)

(g)
(g)
(g)

(cm3)

(%)

20.5

7497
1781
5716
1.472
3883.4
1.966
11
1.771

(g/cm3)

1.94

OMC

OMC=

(%)

12.6

Compaction Obtained

P3=P2/P

(%)

91.3

Compaction Required

90

(%)

90

Remark

You might also like