You are on page 1of 1

LEGEND

POLE/NUMBER

THREE-PHASE LINE

514m
POLE TO POLE DISTANCE

POLE/NUMBER
3-PHASE DISTRIBUTION LINE

(THRU POLE E198-E229)

6'R

DEFLECTION

500m
490m
480m
470m
460m
450m
440m
430m

PLAN

420m

SCALE 1:2000

410m

400m
390m
380m
370m
360m
350m
340m
330m
320m
310m

ELEVATION

300m
290m
E216

280m
E207

270m

E215

260m
250m
E214

240m
E205 E206

230m
220m
E204

E211

200m

E218

E212

E209

190m

E220

E210

E203

180m

E217

E213

E208

210m

E221

E222

E219

E224
E223

170m
160m
150m

PROFILE

E202

TOTAL EQUIVALENT DISTANCE= 16.4kMs

SCALE 1:2000

E198

E225

140m
E201

130m
120m

E226
E227

E199

110m
100m

E200

E228

E229

90m
80m
70m
60m
50m
40m
30m
20m
10m

8.1 kM

DESIGNER:

PROFESSIONAL ELECTRICAL ENGINEER:


CESAR JOSEPH R. BALOLOY

WELLA JOY B. BAUTISTA

16.4kM

PROJECT TITLE:

SHEET CONTENT:

POWER PLANT AND TRANSMISSIONLINE DESIGN

WJBAUTISTA ELECTRICAL COMPANY

ADDRESS

IHAI SUBD., PUROK PAG-ASA, SAN JOSE, PUERTO PRINCESA CITY , PALAWAN

CONTACT NUMBER

+63916 7369 275 / +63909 4690 443

EMAIL ADDRESS

WHEI.BAUTISTA@GMAIL.COM

PRC NO:

0070

VALIDITY:

03/04/2016

VALIDITY:

01/12/2013

ISSUED ON:

01/28/2013

ISSUED AT:

PPC

PTR NO:

0145671

BORAC SUBSTATION TO
BUENAVISTA SUBSTATION

ADDRESS:
BUSUANGA ISLAND

SHEET #:

E
13