Professional Documents
Culture Documents
V2500 Turbofan
Boeing 787
Trent1000 Turbofan
Industrial Robot
Ninja 1400GTR
Two-stroke marine
diesel engine
Submarine
LNG Carrier
Gas Engine
Kawasaki Gas Turbine places importance on "Efficient Energy Use", "Eco-friendly" and
"Reliable Product Care for Total Life Cycle" as a philosophy of our products.
To enhance this philosophy,
we have introduced a new title for our products......."GREEN Gas Turbines".
Introduction
1.2
3.4
5.6
7.8
9 .10
11
12
13 . 14
15 . 16
Kawasaki Techno-Net
17
Installation Examples
18
2007
2009
2010
1,000
0
'92
'93
'94
'95
'96
'97
'98
'99
'00
'01
'02
'03
'04
'05
'06
'07
'08
'09
4
Baseload Model
The Kawasaki GPB Series is designed for baseload applications, for both parallel operation with the grid and
island mode operation. In addition, the Kawasaki GPB Series is able to operate in Co-generation service,
supplying both electricity and heat (steam, hot water, direct heat) by collecting waste heat with a heat
recovery steam generator (HRSG), heat exchanger, or dryer, and in Combined Cycle with a steam turbine
generator. With high total thermal efficiency, the Kawasaki GPB Series is capable of very efficient operation.
The Kawasaki GPB Series is capable of automatic operation.
Basic Specifications
Engine Series
M1A-13A
M1A-13D
M1A-13X
M1A-17
M1A-17D
M1T-13A
M1T-13D
GPB15
GPB15D
GPB15X
GPB17
GPB17D
GPB30
GPB30D
kWe
kJ/kWe-hr
Thermal Efficiency
x10 kg/hr
ppm
1,490
1,490
1,430
1,690
1,690
2,930
2,930
14,880
15,030
15,260
13,550
13,550
15,100
15,240
24.2
24.0
23.6
26.6
26.6
23.8
23.6
521
531
524
521
521
521
531
29.1
28.8
28.6
29.1
29.1
58.2
57.6
25
2.5
25
25
25
11
17.2
11.5
22
x103 kg
: 15 C
: 101.3 kPa
: No Duct Loss
: Natural Gas (100% CH4)
: 35.9MJ/Nm3
Co-generation
Amount
cedar
per year:
Amount
oneone
cedar
sinkssinks
per year:
about about
14kg of14kg
CO2 of CO2
: Environment
Ministry Japan)
(source(source
: Environment
Ministry Japan)
Co-generation
Reduction
22,600TONS
of CO2
CO2
36,200TONS
Boiler
Steam 15.7th
Boiler
19,900t-CO2
Reduction
38% of CO2
electricity 7.3MW
Steam 15.7th
GPB60
GPB15D
M7A-01D
M7A-02
M7A-02D
M7A-03
M7A-03D
L20A
GPB60
GPB60D
GPB70
GPB70D
GPB80
GPB80D
GPB180D
5,530
5,400
6,800
6,740
7,450
7,440
18,420
12,140
12,300
11,870
11,890
10,870
10,880
10,530
29.6
29.2
30.3
30.2
33.1
33.1
34.2
545
542
516
513
510
509
542
78.3
78.3
97.2
97.2
98.3
98.2
215.3
35
25
15
11.5 x 2.8 x 3.6
54
65
25
17.2 x 3.5 x 3.4
131
65
M7A-03
M1A-17
COMBUSTOR
OUTPUT SHAFT
THRUST BEARING
No.1 BEARING
DIFFUSER
INLET AIR
COMPRESSOR
COMBUSTOR
SCROLL
No.2 BEARING
TURBINE
No.2 BEARING
L20A
EXHAUST
TURBINE
Installation Example
GPB70
2 x GPB180 + 1 x STG CCPP System
GPB15/15D
GPB15
GPB15D
:0m
: 15 C
: 0.98 kPa
: 2.45 kPa
: 35.9MJ/Nm3
Maximu
GPB15X
m Outp
ut
Heat Rate
: 0.83 MPaG
: 177 C
: 80 C
:0%
kJ/kWe-hr
kJ/kWe-hr
1,450
1,090
730
1,450
1,090
730
1,390
1,040
700
15,130
16,500
19,750
15,280
16,660
19,900
15,530
17,000
20,470
524
441
368
534
448
374
527
444
372
28.8
29.2
29.6
28.5
29.0
29.4
28.3
28.8
29.3
5.0
3.8
2.8
5.1
3.9
2.8
4.9
3.8
2.8
79.2
73.6
65.4
79.7
74.2
66.1
79.1
73.7
65.8
1,620
1,450
1,120
1,630
1,450
1,116
1,580
1,390
1,060
14,690
15,130
16,880
14,810
15,280
17,140
14,980
15,530
17,600
516
524
547
526
534
559
518
527
553
30.9
28.8
25.2
30.7
28.5
24.8
30.6
28.3
24.7
5.2
5.0
4.8
5.3
5.1
4.9
5.2
4.9
4.7
76.5
79.2
82.4
77.8
79.7
82.8
77.3
79.1
82.4
M1A/T-13 Series
Standard Package Configuration
Enclosed Package
- Carbon Steel Common Base Frame
- Outdoor Carbon Steel, Acoustic Enclosure
- Noise Level: 85 dBA at 1 m to the side of Enclosure
- Forced Ventilation Fan with Filter and Inlet Screen
- Maintenance Stage, Ladder, Beam (Option)
Intake Silencer & Filter
- Carbon Steel Outdoor
- 2 Stage Filter with Insect Screen
- Pulse Self Cleaning Filter (Option)
- Noise Level: 85 dBA in front of Filter
Exhaust Silencer and Stack (Option)
Controls
- Microprocessor Based PLC
(CPU, Power Module: Option Redundant)
- Gas Turbine and Generator Control
GT start / shutdown Control
Speed / kW / Power Factor Control
Auto Synchronizing and Auto Sharing
- Touch Panel Operation
- Industrial Ethernet
- Remote Monitoring (Option)
Graphics Monitoring
Historical Trend & Event Logger
Daily and Monthly Reports
20.0
GPB17/17D
Maxim
um O
utpu
Maximum Output
18.5
GPB30/30D
GPB30
GPB30D
17.0
15.5
14.0
Heat Rate
Heat Rate
12.5
11.0
M1A-17D
GPB17
GPB17D
1,630
1,220
820
1,630
1,220
820
2,850
2,140
1,430
2,850
2,140
1,430
13,870
15,320
18,640
13,870
15,320
18,640
15,350
16,800
20,190
15,510
16,960
20,370
526
448
383
526
448
383
523
441
370
534
449
375
28.8
29.4
29.9
28.8
29.4
29.9
57.6
58.5
59.2
57.0
58.0
58.8
5.0
3.9
3.0
5.0
3.9
3.0
9.9
7.6
5.6
10.2
7.8
5.7
80.1
74.9
67.7
80.1
74.9
67.7
78.8
73.3
65.2
79.3
73.9
65.9
1,910
1,630
1,200
1,910
1,630
1,200
2,945
2,850
2,210
2,950
2,850
2,190
13,160
13,870
15,910
13,160
13,870
15,910
15,150
15,350
17,209
15,290
15,510
17,475
511
526
560
511
526
560
485
523
547
492
534
559
31.5
28.8
24.4
31.5
28.8
24.4
62.1
57.6
50.3
61.7
57.0
49.7
5.2
5.0
4.8
5.2
5.0
4.8
9.4
9.9
9.5
9.6
10.2
9.7
77.8
80.1
83.6
77.8
80.1
83.6
73.4
78.8
82.1
75.7
79.3
82.5
M1A-17 Series
Standard Package Configuration
M1A Gas Turbine
- Industrial Single-Shaft
- Rotor Speed: 22,000 rpm
Compressor
- 2 Stage Centrifugal
- Pressure Ratio: 10.5 (-17,-17D)
Combustor
- Single Can Combustor
- Single Ignition
- Conventional Diffusion (-17)
- DLE (Dry Low Emission) (-17D)
- Available Fuel: Natural Gas
Turbine
- 3 Stage Axial Turbine
Coupling Shaft & Cover
- Flexible Coupling with Shear Pin and Cover
Reduction Gear Box
- Epicyclic
- Output Speed: 1,500 / 1,800 rpm (50/60 Hz)
Enclosed Package
- Carbon Steel Common Base Frame
- Outdoor Carbon Steel, Acoustic Enclosure
- Noise Level: 85 dBA at 1 m to the side of Enclosure
- Forced Ventilation Fan with Filter and Inlet Screen
- Maintenance Stage, Ladder, Beam (Option)
Intake Silencer & Filter
- Carbon Steel Outdoor
- 2 Stage Filter with Insect Screen
- Pulse Self Cleaning Filter (Option)
- Noise Level: 85 dBA in front of Filter
Exhaust Silencer and Stack (Option)
Controls
- Microprocessor Based PLC
(CPU, Power Module: Option Redundant)
- Gas Turbine and Generator Control
GT start / shutdown Control
Speed / kW / Power Factor Control
Auto Synchronizing and Auto Sharing
- Touch Panel Operation
- Industrial Ethernet
- Remote Monitoring (Option)
Graphics Monitoring
Historical Trend & Event Logger
Daily and Monthly Reports
1890
2550
4620
2070
(Reference)
100
6000
1050
500
1850
1000
:0m
: 15 C
: 0.98 kPa
: 2.45 kPa (GPB60/60D)
3.43 kPa (GPB70/70D)
2.94 kPa (GPB80/80D)
LHV of Natural Gas Fuel (100% CH4) : 35.9MJ/Nm3
Typical Steam Condition
Steam Pressure
Steam Temperature (Saturated)
Feed Water Temperature
Blowdown from HRSG
Maxim
um O
u
tput
GPB60/60D
GPB70/70D
GPB80/80D
Heat Rate
: 0.83 MPaG
: 177 C
: 80C
: 0%
kJ/kWe-hr
kJ/kWe-hr
5,410
4,060
2,700
5,280
3,960
2,640
6,590
4,940
3,290
12,300
13,470
15,900
12,460
13,660
16,210
12,070
13,190
15,870
548
475
405
545
473
404
519
450
390
77.6
77.3
77.1
77.6
77.4
77.1
95.8
95.4
95.1
14.5
11.6
8.8
14.4
11.5
8.7
16.4
13.0
10.1
82.5
78.5
72.1
82.3
78.2
71.8
80.0
75.9
69.9
5,950
5,410
3,910
5,800
5,280
3,830
7,130
6,590
5,060
11,970
12,300
13,900
12,130
12,460
14,050
11,980
12,070
13,230
539
548
585
537
545
582
514
519
541
81.3
77.6
64.9
81.3
77.6
64.8
99.7
95.8
85.3
14.8
14.5
13.7
14.7
14.4
13.5
16.7
16.4
15.9
80.6
82.5
87.2
80.4
82.3
87.0
77.7
80.0
85.0
M7A Series
Standard Package Configuration
M7A Gas Turbine
- Industrial Single-Shaft
- Rotor Speed: 14,000 rpm (-01/-01D)
- Rotor Speed: 13,790 rpm (-02/-02D,-03D)
Compressor
- 12 Stage Axial Flow (-01/-01D)
- 11 Stage Axial Flow (-02/-02D,-03D)
- IGV & 3 Stage VSV
- Pressure Ratio: 13:1 (-01/-01D)
16:1 (-02/-02D/-03D)
Combustor
- 6 Can Combustors
- Dual Ignition System
- Conventional Diffusion (-01,-02)
(Option De-NOx: Steam Injection Type)
- DLE (Dry Low Emission) (-01D,-02D,-03D)
- Available Fuel: Natural Gas, Diesel Oil (-01/-01D/
-02/-02D)
Turbine
- 4 Stage Axial Turbine
Coupling Shaft & Cover
- Flexible Coupling with Shear Pin and Cover
Reduction Gear Box
- Epicyclic
3430
GPB60/70/80
Package Layout : mm
(Reference)
Enclosed Package
- Carbon Steel Common Base Frame
- Outdoor Carbon Steel Acoustic Enclosure
- Noise Level: 85 dBA at 1 m to the side of Enclosure
- Forced Ventilation Fan with Filter and Inlet Screen
- Maintenance Stage, Ladder, Beam (Option)
Intake Silencer & Filter
- Carbon Steel Outdoor
- 3 Stage Filter with Insect Screen
- Pulse Type Self Cleaning Filter (Option)
- Noise Level: 85 dBA in front of Filter
Exhaust Silencer Stack (Option)
Controls
- Microprocessor Based PLC
(CPU, Power Module: Option Redundant)
- Gas Turbine and Generator Control
GT start / shutdown Control
Speed / kW / Power Factor Control
Auto Synchronizing and Auto Sharing
- Touch Panel Operation
- Serial Link User Interface (Option)
- Remote Monitoring (Option)
Graphics Monitoring
Historical Trend & Event Logger
Daily and Monthly Reports
3270
3900
( )Dimension : GPB70/GPB80
10400
(11450)
1300
3600
Ventilation
Intake
Turbine
Exhaust
6250
Turbine
Air Intake
1980
(2750)
14
20
Nominal Performance
Elevation
Inlet Air Temperature
Inlet Air Pressure Loss
Exhaust Gas Pressure Loss
LHV of Natural Gas Fuel
(100% CH4)
:0m
: 15 C
: 0.98 kPa
: 3.43 kPa (GPB180/180D)
: 35.9MJ/Nm3
Ma
xim
um
Ou
tpu
Heat Rate
: 0.83 MPaG
: 177 C
: 80 C
: 0%
6,530
4,890
3,260
7,310
5,480
3,650
7,250
5,440
3,620
17,970
13,470
8,980
12,090
14,660
18,780
10,970
11,780
13,910
11,010
11,830
14,020
10,690
11,510
13,200
443
516
487
494
512
436
372
512
437
373
545
517
95.8
91.2
87.2
97.2
96.8
96.8
96.8
96.4
96.3
213
188
182
16.2
14.2
13.8
16.2
12.4
9.3
16.2
12.4
9.3
39.7
32.5
24.5
79.8
72.8
74.1
82.1
77.5
70.4
82.1
77.6
70.4
84.0
82.4
77.7
15
40
7,070
6,530
5,010
7,850
7,310
5,800
7,800
7,250
5,750
19,320
17,970
15,080
12,000
12,090
13,280
10,820
10,970
11,840
10,850
11,010
11,910
10,500
10,690
11,380
511
516
538
507
512
536
507
512
536
538
545
565
99.7
95.8
85.3
100.4
97.2
83.5
100.0
96.8
83.1
221
213
193
16.5
16.2
15.8
16.5
16.2
15.3
16.4
16.2
15.3
40.2
39.7
38.8
77.5
79.8
84.8
80.5
82.1
84.7
80.5
82.1
84.6
82.5
84.0
86.7
L20A Series
Standard Package Configuration
L20A Gas Turbine
- Industrial Single-Shaft
- Rotor Speed: 9,420 rpm
Compressor
- 11 Stage Axial Flow
- IGV & 4 Stage VSV
Combustor
- 8 Can Combustors
- Dual Ignition System
- Conventional Diffusion (GPB180)
(Option De-NOx: Steam Injection)
- DLE (Dry Low Emission) (GPB180D)
- Available Fuel: Natural Gas
Turbine
- 3 Stage Axial Turbine
Coupling Shaft & Cover
- Flexible Coupling with Shear Pin and Cover
Reduction Gear Box
- Parallel Shaft
Starting and Turning System
- VFD Motor
6100
10950
Ventilation Air
4700
3450
8900
Enclosure
Vent.Air outlet
G/T Exhaust
gas outlet
17250
19100
3500
10
Generator sets
Fuel tank
Black out
97
Normal start-up
93
No Black out
49
Start-up failures
4
Easy operation
High Expandability
Environmental-friendly
Kawasaki's Standby Gas Turbine has the ability to meet Various iDC facility's demand.
Kawasaki has a 95% share for iDC in Japan.
Components of iDC Facility
Typical Arrangement
of iDC Components
Cooling tower
(N+1units)
1.
2.
3.
4.
5.
6.
7.
8.
Power Receiving
Standby Generator
UPS
PDU
Server
Air Conditioning
Fire Fighting
Grounding
PDU
(system A)
Communication and
power cable rack
Server cabinet
(2100H to 2400H)
Grounding
equipment
Power cable rack
Fire extinguishing
equipment
Electric Room
UPS
UPS
N+1units ))
(( N+1units
DC-PLANT
Sub station
Oil tank
(24 hours
operation capacity)
Outdoor installation
6,000kVA x 3units
Roof-top installation
6,000kVA x 3units
3,000kVA x 3units
12
Basic Specifications
GPS750
GPS1250
GPS1500
GPS2000
600
1,000
1,200
1,600
Within 40-sec.
100% (Resistive load)
Within 4.5% (with 100% block load on and off)
Within 0.3%
Kerosene, Diesel oil
305
525
620
695
S2A-01
M1A-01
M1A-03
M1A-23
22,000
1,500 (50 Hz), 1,800 (60 Hz)
1.48
3.0
3.5
Synthetic oil/Shell/ASTO-500, Mobil jet II, Castrol AERO 5000, DP BPTO 2380
66
100
210
0.08
0.16
1,250
1,500
2,000
4.9
5.4
1.6
1.7
1.8
2.1
2.5
2.6
6.8
10.5
11.4
14.7
13
Gear box
Coupling
Alternator
Skid
GPS2500
GPS3000
GPS4000
GPS5000
GPS6000
2,000
2,400
3,200
4,000
4,800
Within 40-sec.
100% (Resistive load)
Within 5.0%
1,245
1,390
1,835
2,050
M1T-01S
M1T-03
M1T-23
M1T-33A
M1T-33
22,000
1,500 (50 Hz), 1,800 (60 Hz)
5.7
6.4
13.5
Synthetic oil/Shell/ASTO-500, Mobil jet II, Castrol AERO 5000, DP BPTO 2380
160
240
360
0.2
0.16
3-phase, open screen-protected, brushless, self-ventilated, synchronous
2,500
3,000
4,000
5,000
6,000
7.7
6.2
3.0
2.5
3.6
2.9
19.7
20.8
36.6
24.6
39.0
ON
ON
ON
OPEN
OPEN
OPEN
OPEN
*10 Hr
Rated
95%
No load run
300 sec.
Ready to re-start
**55%
22%
5%
40 sec.
Rated
95%
***170~360
sec.
Load run
30 sec.
UTILITY SUPPLY
UTILITY FAILURE
Complete
stop
Release
stop com
Stop
MCB off
Time lag
60 sec.
Utility
recovery
MCB on
2 sec.
Pre-excitation
Start
Time lag
2 sec.
Utility
failure
RPM
VOLT.
GENERATOR VOLT.
TURBINE SPEED
Starter motor
Ignition plug
Main fuel valve
Bypass fuel valve
Start fuel valve
Bypass fuel
valve close
Note:
Supplied with GPS1250
or larger model.
70% rpm for GPS250
and GPS500
70 sec. for GPS250
and GPS500
14
Particular Advantages
1. Developed with vast field experience
3. Compact integration
Cab-over
Van-type truck
Fuel tank
Battery
15
Common bed
Fuel filter
(Opposite sides)
Control panel
Switch gear panel
MGP
750
MGP
1000
MGP
1250
(kW) 40 C
600
800
1000
Item
output
MGP
2000
TGP
2500
TGP
3000
TGP
4000
1,200
1,600
2,000
2,400
3,200
Fuel
Within
Within
Kerosene
Fuel
Consumption (l/h) Diesel Oil
Truck / Trailer
MGP
1500
320
490
555
655
735
1,125
1,310
1,465
305
465
525
620
695
1,065
1,245
1,390
Type
Truck
Dimensions
Including
Truck
Trailer
11.0
12.0
2.5
4.5%
0.3%
Less
than 20
tons
3.6
Less
than 25
tons
(dBA)
85
Note
(*1) Output : Up to 40 C of ambient temp., 150 m sea level
(*2) Other models are available. Output range is between 150 kW and 3,200 kW.
Installation Example
16
Kawasaki Techno-Net
Full Time Support
Maintenance Management
Predictive services based on trending data and asset maintenance management
What to do
When to do it
How to do it
Who's to do it
Maintenance management
KHI-ME
( Middle East FZE )
KMS
( Shanghai Rep.Office )
17
Installation Examples
Kawasaki Gas Turbine has been installated to....
Data Center
Paper Mill
Food Process
College Campus
Tire Manufacturer
District heat & cooling
Hospital
Oil & Gas
AND MORE!!!
GUIANA HIGHLANDS
GPB30 Venezuela ( Oil and Gas )
RAKAPOSHI PEAK
GPB70D Pakistan ( Paper Mill )
SCHWARZWALD
GPB80 Germany ( Paper Mill )
GPB180 Portugal ( Electrical Power Company )
NAZARETH
18
www.khi.co.jp/gasturbine/index_e.html
Kawasaki Heavy Industries, Ltd. Gas Turbine Division
Phone: +81-3-3435-2232 Fax: +81-3-3435-2592
Kawasaki Machine Systems, Ltd. (Asia Division)
Phone: +81-3-3435-2977 Fax: +81-3-3435-2592
Kawasaki Gas Turbine Asia Sdn Bhd : (KGA)
Phone: +60-3-5569-2882 Fax: +60-3-5569-3093
www.kga.com.my
Kawasaki Gas Turbine Europe GmbH : (KGE)
Phone: +49-6172-7363-0 Fax: +49-6172-7363-55
www.kawasaki-gasturbine.de
Kawasaki Gas Turbines-Americas : (KGT-A)
Phone: +1-281-970-3255 Fax: +1-281-970-6465
www.kawasakigasturbines.com
Kawasaki Machine Systems, Ltd. (Shanghai Rep.Office)
Phone: +86-21-3366-3500 Fax: +86-21-3366-3505
Kawasaki Heavy Industries Middle East FZE : (KHI-ME)
Phone: +971-4-214-6727 Fax: +971-4-214-6729