Reliability Study
Reliability Study
Efficiency
A. SOx removing efficiency =
B. NOx removing efficiency =
C. Solid (PPM) removing efficiency =
2. Reliability Study
2.1Availability of system
A. System consist of Scrubber, NaOH feed Pump, Furnace Vent Gas Blower.
B. Pump continuous operating hours are 4000 and intermittent is 1500 hr.
C. Blower continuous operating hours are 4000 and intermittent is 1500 hr.
D. Furnace continuous operating hours are 4000 and intermittent is 1500 hr
2.2Environmental concern
Sr No
Parameter
Caustic
Pump fails
1. Untreated
Furnace gas will
escape to atm.
Furnace
Vent Gas
Blower fails
1. No Gas to
scrubber.
High
Furnace Gas
vent temp
1. High Stack
temperature
Consequence
Safeguard
One Stand by
pump with
10% capacity
is available to
feed NaOH for
1 hrs.
Pressure
gauge
provided, in
case no gas
flow, no any
impact.
Temperature
gauge
provided, in
case high
temperature,
NaOH reacts
with gas and
reduce the
temperature,
no
environmental
concern.
Recommend
ation
Reliability
Factor is RT
= 0.99