PROYECTO
ACTIVIDAD
FECHA
ITEM
02.01
: 02.00 PAVIMENTOS
Jun-12
PARTIDA
: Reposicin de afirmado
UNIDAD METRADO
m3
12,670.32
TOTAL
12,670.32
MANTENIMIENTO PERODICO
PROYECTO
ACTIVIDAD
FECHA
02.01
: Reposicin de afirmado
12,670.32 m3
METRADO AFIRMADO
Progresiva
Area
Area S/A
Area Total
Vol. Total
Inicio
Final
m2
m2
m2
m3
223+900
222+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
222+900
221+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
221+900
220+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
220+900
219+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
219+900
218+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
218+900
217+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
217+900
216+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
216+900
215+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
215+900
214+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
214+900
213+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
213+900
212+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
212+900
211+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
211+900
210+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
210+900
209+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
209+900
208+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
208+900
207+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
207+900
206+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
206+900
205+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
205+900
204+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
204+900
203+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
203+900
202+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
202+900
201+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
201+900
200+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
200+900
199+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
199+900
198+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
198+900
197+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
197+900
196+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
196+900
195+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
195+900
194+900
1,000.00
4.050
0.10
4,050.00
100.00
4,150.00
415.00
194+900
193+356
1,544.00
4.050
0.10
6,253.20
100.00
6,353.20
635.32
123,703.20
3,000.00
126,703.20
12,670.32
TOTAL
30,544.00
PROYECTO
ACTIVIDAD
FECHA
02.01
: Reposicin de afirmado
12,670.32 m3
METRADO AFIRMADO
Progresiva
Area
Area S/A
Area Total
Vol. Total