Professional Documents
Culture Documents
Crawl Beam
Crawl Beam
Drawing No.
50
50
63503 - [1860]
Top View
6 286 (HN300*150*6.5*9 x 6254)
6 254
1860 ( H732 )
16
90
60
H156
90 60 10
16
H156
Front View
16
H156- FL16*180
6 22
Part Front View
A
1
320
70
29.10.2015
22.10.2015
Revision Description
Date
6 254
100
H732 - HN300*150*6.5*9
40
180
Rev
90
H156- FL16*180
6 22
NCP SHAPE
SUB-ASSEMBLY
CREATED:
CREATED:
CHECKED:
CHECKED:
2015
P.O. BOX 20
31 NICOLAY ROAD, PORT LOUIS, MAURITIUS
E-mail
: fteng@intnet.mu
Tel
: ( +230) 206 5200
Fax
: ( +230) 240 7159
COPYRIGHT AND USE RESERVED
BY FORGES TARDIEU LTD
Tekla Structures
REFINERY BUILDING Material list for 1 Crawl Support assembly marked 1860 - only 1 is required
Mark
No Profile
H156
2 FL16*180
H732
1 HN300*150*6.5*9
Total for 1 assembly
Length Grade
320 S355JR
6254 S355JR
Paint area
Mass
0.3
7.4
7.7
14.5
229.7
244.1
SCALE :
DRAWN :
Issued
1:10
Marlon M.
22.10.2015
Crawl Support
PROJ. LEADER :
DRAWING No.
63503 - [1860]
PROJ. ADMIN. :
63503
REV: A
FTA1L-04