# 1 Bill of Quantity Asnake
# 1 Bill of Quantity Asnake
SUMMARY
A. SUB STRUCTURE
1. Excavation and Earth Work
ETB
3. Concrete work
ETB
2. Masonry work
ETB
Sub Total A
97,758.
00
3.50
45,450.
00
ETB
145,31
288,521
.50
B. SUPER STRUCTURE
1. Concrete work
ETB
171,36
4.60
Sub Total B.
ETB
Total A + B
ETB
171,36
4.60
459,886
.10
Item No
Description
Unit
Qty.
1.1
A. SUBSTRUCTURE
1. Excavation & Earth work
Clear of the site to remove top soil to an average depth
of 20cm from NGL
m2
250.0
0
1.2
m3
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.1
Rate
Amount
14.
3,500.0
0
350.0
0
70.0
0
24,500.0
0
m3
25.0
0
80.0
0
2,000.0
0
-
m3
23.2
5
80.0
0
1,860.
00
-
m3
15.
00
250.
00
3,750.0
0
m3
44.0
0
30.0
0
250.
00
250.
00
11,000.
00
7,500.0
0
m3
350.0
0
100.
00
35,000.0
0
m3
00
1.11
2.1
2.2
m3
75.2
0
115.
00
8,648.0
0
97,758.0
0
m2
30.0
0
130.
00
3,900.0
0
2,600.
00
2,600.
00
2,600.
00
260.
00
22,750.0
0
3,952.0
0
17,550.
00
19,552.
00
185.
00
185.
00
185.
00
2,849.0
0
4,662.0
0
6,752.5
0
38.0
1,140.
2.3
m3
m3
1.5
c. In grade beam
m3
m2
a. To isolate footings
m2
b. To foundation column
m2
c. Grade beam
m2
2.4
6.7
5
75.2
0
15.
40
25.2
0
36.5
0
kg
30.0
m3
500mm thick ditto but above N-G level one side roughly
dressed
m3
0
564.0
0
216.
00
635.0
0
222.0
0
0
38.0
0
38.0
0
38.0
0
38.0
0
00
21,432.
00
8,208.0
0
24,130.
00
8,436.0
0
145,313.
50
18.
00
9.0
0
1,650.
00
1,750.
00
29,700.0
0
15,750.
00
45,450.0
0
4.0
2,650.
00
2,650.
00
2,650.
10,600.
00
39,458.5
0
31,800.
m3
m3
0
14.
89
12.
00
1.2
00
d. in stare case
Supply cut in size and fix in position sawn zigba wood
form work for :a. Elevation columns
m2
b.in 150mm floor slab
m2
c. In upper tie beam & lintel
m2
00
68.0
0
99.2
6
90.2
0
185.
00
185.
00
185.
00
12,580.
00
18,363.
10
16,687.
00
20.0
0
535.0
0
547.0
0
1,530.
00
38.0
0
38.0
0
38.0
0
38.0
0
760.0
0
20,330.0
0
20,786.0
0
58,140.
00
171,364.
60