OCGT CCWP START-UP CHECK LIST FOR FIELD

Ensure the demi water make-up pumps A B C any one pump breaker is
energized.
Demi water make-up pump A 415V WT/WWT SWGR, POO BHI INCOMER-1
FEEDER NO 3 H.
Demi water make-up pump B 415V WT/WWT SWGR, POO BHJ INCOMER-2
FEEDER NO 13 G.
Demi water make-up pump C 415V WT/WWT SWGR, POO BHJ INCOMER-2
FEEDER NO 14 H
Ensure OCGT CCWP A B any one pump breaker is energized.
OCGT CCWP A 11KV BSDG SERVICE SWGR A (POOBBE) FEEDER POO BBE
A 04.
OCGT CCWP B 11KV BSDG SERVICE SWGR B (POOBBF) FEEDER POO BBF
B 04.
Ensure Demi water storage tank level.
Ensure OCGT over head tank level control station control valve instrument air
supply is available.
Ensure OCGT over head tank level control station upstream motorized valve
power supply available. Breaker location
Ensure OCGT Over head tank level control station drain valve should be close
condition.
Ensure OCGT CCWP supply line initial filling manual isolation valve full open
condition.
Check OCGT CCW supply and return isolation valves should be open
condition.
Check OCGT all CCW drains should be close condition.
Ensure OCGT lube oil cooler, generator cooler vent valves should be open
condition.
Ensure OCGT supply and return header vent valves should be open condition.
Location - CCGT-1 final chance filter top side pipe rack.
Ensure OCGT CCWP Plate Heat Exchanger A B any one in service condition.
Ensure OCGT CCWP Plate Heat Exchanger inlet and outlet CCW line drains
should be class condition.
Ensure OCGT CCWP Plate Heat Exchanger inlet and outlet vent valves should
be open condition.
Ensure OCGT CCWP discharge header vent, pump vent, pump suction
isolation valve, and discharge isolation valve full open condition.