You are on page 1of 32

LEGEND

. .... ,

v-

_11-

,-

45

---I I, m

IrpliV 2.
sa
_._rsiii
1 *IMB mint*
IIMan

10

I .

PHASE1 BOUNDARY

45A

-4..
1

38,

Total Street Length.590 km


Length> 0.35 .73 83km

;, :15:
...MN

20,0

i
200
T1 05.0

Mill 111111110.1011KW 100


,

Ito

p0.0
35
.1111

n
i
li
Mi
ll
1101
t

: :

IN um Vil .s ssA
Nu sum sts _
ilalliftiglali# 11,
1111111W I
'
I M1.111110.01
L, 11111401.14.111/11 ,
41
I filliFirli
irlil

111111---w
-1-1-11g
_Ill

ir

Wil

Inn
i

,
istAlliiii

1. II
S 14.41
tn.
_ rogrupoirgosiglionsorsi,
r
until ohm i isiminuotimi-6 Iry
sr
!HMI DPI Ilidourrni,,7 .4 , ......
i illilm=h1111 116
AITI ,
.,,

ro

Aiiin
Hi
1111_4 t
IKU ili
-1P1I. Pli.
ant% rui- iir IN

- ej_
ig CC W

OMNI, i
.
ANL

rm iiii r
1

i
117141
_.

ll
N
I

s, am 1

-al 111 ia-

' '.
S)
'

EA
B .II

0 ._ .

id

44?

HIM

1,

ra ussr. us
AM(

,
.ei
Alielli

VIII.10

'

'4'17
,,"
-

, , ... ttlo _

1
,f ei
..
...

' 4211 III

tail

ENN
161wmi
. r

11MAI

0.;)11

i' . f
la

kico?,,
4N,t,

\1

WIN

-P.-00
0140"

i
ri

50

GL 1" II**

fiSt
f
i
l

Pi INIIIII ."...e"
IN
I 414

c---II

II

Pending 03plh

1
111-k ,.-Y iti
Oltli
i r iiii$Wiik
11111111filno .. ,
L I

AV

Prepared By

1111

led A L

I I:5
1er
:1 w

11111

4
,
in, --.46.- -AN%
wim
labIlm
....
.
Lii. art
Miii
man
i
mi.
sw 1.....a.11'
.v.
INV=
V% 1

LIU

Ed

III

1
1
10,..:
Ila

. ,..

ae
t er ri 12 inc.

31500,1002540631 , Edmonton, AIberle T6J 103


Ph (730)432-2557,Fax (180)1112-2533

THE CITY OF

Mi- ,...ktCITY-WIDE FLOOD MITIGATION ASSESSMENT


(PHASE 1)
.
SURFACE PONDING 1:100 YEAR EVENT

Seale

g,1Le)

1:40,000

7.6

tEl
_LD

!
- ,--

.--..

I.

VI '1'i.

lift
0
1
II
IIEs
1

..

.IlL
Nim iki

...,.1

11
.

pp

,
21111:11

il

N.
_
- _Mem
7==re.,,,,,-,,=_
Jim 011111111111H lig
posalgui riiiiindc r,_1
NENIIIIINI Ifni 07;
11111110 _ is IIII i .1

Viiii

.
"

SAYE Ill

'

.,

-.,,,

MOO id BIN MIIIIII1_ I L __, 1


, iu -24 .
Cti=i7m
,

=Jr - __

.11.

aM t.

--

ig i - '

7114 IPPLIIIV

mium.:11111 1
1
111111111i

III

3501/ 0

1 III

lk

I %,

c,0 113
-

-a

I
,

,j
rn

.i _

ti = d
I

t.4911111 n-

,,

I i

,_

twe.

TO

Ibi"11
_4

_,

"
35.50 an

hil

030

50.65 cm
65.90 cm
Pending Depth

0.09
>90 cm

-*
iiiiiiisiim sm. ogli I. (

1114111.
il

CMIIII I I

BM Ilillike I I 1 I

_ 1,

i NO II
Ill MU
01111411:
-VI ' -I4teg
.*tt
,
itita.11
`.
011111J11
r
lil ' 1 till 11111 ,/i---7
/
- MI 111,0
a

jI

repared By:

11

12.2

pliiiiiivo
- WOO

___

4.

I )

N , i 11
I.

i 15.00
110.00
5.00
On

E 111L-611

MI6

II

I t

III Iggi

01111i1 - .8, in

f
I

-11 iiiPkf

MI III i

-61
11

.11 I
--

._

Total Street Length= 530 km


Length> 035 = 16.44 km

....
1:50:::.

4.0,j,

Illi

J1 I
a

45.00
40.

Admog_irti;

ift
VI
------

I II= I
PHASE 1 BOUNDARY
PROPOSED STORM PIPE
SVVMF IN SURPLUS SCHOOL SITE
MP IN GREEN SPACE

Irf

lb.

II

ak

-----.1...
reet.
-'

..._
11A IM
rl
imitia I

---------F
------.--

NE

itah
WM

Ari

p
__.----- ,,,.
-----

/SI

Ell

--21:

pa

Ili-

It

NW

61500.10015.105 SI.. Edmonton. Alberts T6J 103


Ph: (780)462-3557. Fax: (780)432-15311

rf i
il , oar Eq.!
imm

witcrizate-...-71IIIA.
1....E.
......
.sz Lima
..m
_Li

114OM

I Iter wateer nt bgeir nword .

C RH

CITY-WIDE FLOOD MITIGATION ASSESSMENT


(PHASE 1)

Ma ,

ainimi E.,

1102

ill

EdiiiToFnto0

Tille:
_

SURFACE PONDING CONDITIONS-PROPOSED


SYSTEM (OPTION 1) - 1:100 YEAR EVENT
Scale:
Fla
1:40,000
9-1

LEGEND
... ,
nit,

lam

ilk N
Nei ''

\T

II

ET

likt
bilk+
V

PR

....cl

'

,
,------

1111111111..

...I 1 .-- ..

i iii
-

la 7a
WW1
at .

ERI Pik

.00
III----, r
11.0

,IM. EMI _
._11-Qirjai

M
:WV
MU
NU
s
t
s IiMiliMAT: AP
,
11b111111,116 Be IV.
ll
Illitiff l
I

irmili

t pug, all .1. i

, r,

iiiii

Um2' r ir-Pvitt,il
I
11Irk

1
1 i I, ' i91
-.
II

tvw i El
,
-,41r

kkil
rzG ..

1
_

I___
.t.-.....,_
.

'S 15.00 t 10.00 ,

.4"
- ainibiii
ii
111 illinill

'''

NM
1111

.,..1

,.

, ..,..
OM

impugn
i '00
,111

, 10141111111%

-,a----,- ,'/ Mir

12.23
3.33

5.00
0.00

35501m

0.80

0.08

50-65 cm

65-90 cm
Fending Depth

40 cm

fl

- ",sv
_1.--",

Nimg.
-

6orow,

i ott* WA!'
IOW tror sii '
11 grillin
i ii 1 il.
III_
- 111 I
:I
o
,,,-,
i
it I
-1-ottoff _ 0
11/ \\
RINI 111
1111_114w, , N
11119
*
'
11P11 77----__
110.100
"t4, 4, 4

II
omit
NIMIIIIN
,4
-- 111FAAIV.
....M
_

AtiVi
%II

II
i ij-

I.

Blogii

iiikinii .likih lek


11101- -..drizOU

-.0,_,., 4.-, _

1
ll

1.1111 IVO

...1

'4
-

Total Street Length= 590 km


Length> 0.35.16.44 krn

g
r,

- unigiv i writ

iii_ 11-020,1
'r
^ ,
I 111 MS - 'Trig
BEI!III 0 10
in x No II 111.,104,_

dr

ma

t.

MUM

gi i_

II
.....if
aril,
_I1
ral 1

-[---ra..-1
_in 11 .'L

45.00
90 00

7: 35.0o
30.00
25.00
6
,1-20.00

II
Virg_
it ,F
1
ill
_
.,
s
III IIIIM
IN ' 2i0 11111"
_

-i'roil"
A
...,11 ,, , ,
i

',--

lila

t.- lir,

11111W
'
a
1
4
I

.
I

MEM 13, 1 dill

......r_ r.

ll
7
N,Th'W

LI I

di

PHASE I BOUNDARY
PROPOSED STORM PIPE
SWMF IN SURPLUS SCHOOL SITE
SWMF IN GREEN SPACE

NM

.mi ke

--

NEIII

NIMEN

1,
1 lo
i, 'Wm

Prepared By:

/ 15tIr waS Rgeir rw'


or:i .
-I
/ 1

.4
i1
- --arab.... 102.11
..t=1
22 ..
MEM Rijn MI=11
a
mail, a p
Asa
_ Ili
m=1
-

Il
Dip
I
Int
Li
imm

01500,10026-106 sl.. Edmonton, Albarla ICU 1G3


Ph: (700)402-2557, Fax: (780)482-2538

Client:

cd THE CITY OF
id

ini

CITY-WIDE FLOOD MITIGATION ASSESSMENT


(PHASE 1)
ilt:SURFACE PONDING CONDITIONS - PROPOSED
SYSTEM (OPTION 2) 1:100 YEAR EVENT
Seale:
jg trir.
1:40,000
9-2

LEGEND
1W-,

--m-

-,0-aim

-11 NBIll

Il

II Ik

li

PHASE 1 BOUNDARY
PROPOSED STORM PIPE
SVVMF IN SUFIPLUS SCHOOL SITE
SWMFIN GREEN SPACE

im..r.r

'
110111.
ITIMIrmilM1
tr---1-%-ill
i
Rik -iiiiT'llrali-llitantych.
inp%im
l Ns
io

, k I 11=1.
ill P11111111111111
guars
Mai'
1.---_
1

MA

.._LL.L

i
L,,L
.
L
._!'

to 1 ii
i

iv i
T i
i 1 1

3040
r3 25.00

.-=

.
.-

OM
III

1i 1i
III ip,

leF3 1

_
fi
-im,, I Liii

111
."...
11ffillit
IIIIMIA

1111111.14

ilic

quipts- : , .,.

711
'1111
11
18
e
II
I
MK
11

1 1 im

_ 45"
..f.:ra,

Map
I [
II

Immo Egilli1111111110111111111,0,
111111,1111111111111511111 ,

-1-/

BABE IU

11111111

b-Tb
.....

iniunlimaina

Tata Mr. t Length= 590 krn


Length> 0.3S =16.44 kin

i tont,

.. soo,
no.

1 11116i ti-10111111

iligooll lip Ng
11111111 illirg
IOW

3 33
25.50 cm

a BO

0 08

50.65 cm
6543 cm
Pending Depth

>90 cm

ill gin mins

# '00
:

it.:

in

1 ni

IN 111111..v.. #

...4

,...r
......,
.
-.I.'
,
11
0,1,
.
.

itt
u
n
-,
.
.
:1:
i
i Jot41.011-,..
.
_
Ni ii.Jr ile.,it, ...
.
iii

1
II
I
lora
i1/4
ffiemoglo _.

N Ifni* II 1

re4111 i

7.-1---J=
_

_.

1111412 mi

ailing!!!ni

11.1

41 ID
4,411,41,
di

46116.

..,

,
I

0 %II ,--,
131 ii.

s
t

1 illuminati tit -10--

350- t3

NW

1-derrico ,.. a
_

ilk 1

- mu. 1
441

a_ I Jar

)ple- 1111

Millilinilli I 111 g i

ge

al
A
MI=
/UM

111111til

----------,/

IIIMMINIIIIMIN

, sameng inc.

, better water 1 bener world

61500, 1002,106 St , Edmonton, Alberla TEJ 1G3


Ph. (760)482.5E7, Ems (780)411.638

MilI0411

IIIIII=
wiwzi
L
N as.
BHA 1 ,,,N
, ., _
siBEN-R-i-i" rinzi-ii......11 __Areara-zarailmw.
mil ma 2
'kii
,11Elgill
Etc.
1
7
1
*Car
i
.212
.
II
m
mi
nimmi
..ri tai
.. 4rJ ais
/ AZZIAllig'il
gi
=
aliirmEil
m
_.,
ifinories
nu
tin
ia
.... 111.01th,
,'
r'-?

Prepared

iglrejli

:I/

it-

j
i
lli
I1
rE
4
1
A -21 4.-

-o,,-

11
WI

6.3
41 1.11111.111101.

- -

L_

liWIP

111111.444.4 0
,
4
,4
FA=

MI

Lrin

12

1 juition *

Client
THE CIT T OF
(d

ittOn

ino

MM1111111

lig

CITY-WIDE FLOOD MITIGATION ASSESSMENT

(PHASE 1)
TWe:

SURFACE PONDING CONDITIONS - PROPOSED


SYSTEM (OPTION 3) -1:100 YEAR EVENT

&MT

Figure.

1:40,000

9-3

Legend

LOCAL AREA BOUNDARY


Pending Deplh

I
I

- .11

0.05- 0.15 m PONDING


0.15 - 0.35 m PONDING
0.35 -0.50 m PONDING
0.50 - 0.75 m PONDING
0.75 - 1.00 m PONDING
1.0 - 1.25 m PONDING
81.25 m BONDING

--71
111-

, 7y

Akin
CLOW

sameng inc.
ra better water I better wodd
OHO. 10025-106 01 Edmonton, Ataxia T6J 103
Ph: (7801482-2557, Fax: (780)452-2538
Emaasenelces@samengam

CdiliOnton
.;
ef )
x106'

14'C'

FLq2
.
CITY WIDE FLOOD MITIGATION ASSESSMENT
PHASE 2 (AREA C)
Tille:
CALLINGWOOD AREA HYDRAULIC RESULTS - EXISTING SYSTEM 1:100 YEAR 4-HOUR RAINFALL (SURFACE)
Seale:

agim:

1:20,000

7-6

LOCAL AREA BOUNDARY

Pending Depth

MIMM1 0.05 0.15 m P0501146


0.15- 0.35 m P0001146
EininiM
0.35- 0.50 m P0001146
MEM. 0.50 0.75 m PONDING
0.75-1.00 m PONDING
1.0 1.25 m PONDING
> 1.25 m PONDING

,aaam>

RIVER
VALLEY
TERWILLEGAR

Prepared By.

E
sameng inc.
ra better water I better world
P1500, 1505-106 Si, Edmonton, Alberta TSJ 1G3
Ph: (780)4112-2557, Fax: (780)4132-253B
EnvaltaelvIcas@samang.com

Client

CdriiOnton
Latal

c(71

CITY WIDE FLOOD MITIGATION ASSESSMENT


PHASE 2 (AREA C)
IVERBEND AREAHYDRAULIC RESULTS - EXISTING SYSTEM 1:100 YEAR 4-HOUR RAINFALL (SURFACE)
ENL_
He
1:25,000
7-12

LOCAL AREA BOUNDARY


Pondlnq Depth

0.05 - 0.15 m PONDING


0.15 - 0,35 m PONDING
0.35 0.50 m PONDING
0.50 - 0.75 m PONDING
0,75 - 1.00 m PONDING
1.0 - 1.25 m PONDING
1.25 m FUNDING

Prepared By:

sornen9 inc.

;a better water I be ter world

31500, 10026-105 51., Edmonton, nada T5J 153


Ph: (780)982-2557, Fax: (780)452-2535
Emalksondces@sameng.com

Edmonton
12/kg;

CITY WIDE FLOOD MITIGATION ASSESSMENT


PHASE 2 (AREA C)
SOUTHWEST AREA HYDRAULIC RESULTS - EXISTING SYSTEM 1:100 YEAR 4-HOUR RAINFALL (SURFACE)
"9_, --BagEtwigus=

fgytyj

1:21,000

7-18

LOCAL AREA BOUNDARY


Pondinq Depth

0.05 0.15 m PONDING


0.15 - 0.35 m PONDING
0.35 - 0.50 m POND1NG
0.50 - 0.75 m PONDING
0.75 - 1.00 m PONDING
1.0 - 1.25 m PONDING
1.25 m PONDING

sameng inc.
rA better water I better world

cd

#1500,10025-100 Si, Edmonton, Alberta TEJ 109


Ph: (780)0132-2557, Fax: (780)4132-2539
Ematsayilees@sameng.cam

Chent

THE CITY OF t

CITY WIDE FLOOD MITIGATION ASSESSMENT


PHASE 2 (AREA C)
STRATHCONA / U OF A AREAHYDRAULIC RESULTS - EXISTING SYSTEM MOD YEAR 4-HOUR RAINFALL (SURFACE)
Egt

1:25,000

7-24

LJUL_LW,LILL1

IAREI
LOCAL AREA BOUNDARY
Pending Depth

10k1
4
10
14,

I
- I

MINIM

0.05 -0.15 m PONDING


0.15 -0.35 m PONDING
0.35 -0.50 m PONDING
0.50 - 035 m PONDING
0.75. 1.00 m PONDING
1.0 - 1.25 m PONDING
> 1.25 m PONDING

.ant
D

lifli 1L
310 ME-E
- -L. ISEMITIeGal

._

Prepared By;

sameng inc.

CA better water I better world

51500,10025.106 Si, Edmonton. Alberta T6J 163


Ph: (780)482-2557, F.: (780)482-2538
EmalkservIc.semeng.com

111653

INS
11111
A11111 Mb
EOM

@hi:Onion
FE_
gq
CITY WIDE FLOOD MITIGATION ASSESSMENT

PHASE 2 (AREA C)
Title:

BONNIE DOON I GOLD BAR AREA HYDRAULIC RESULTS - EXISTING SYSTEM -

1:100 YEAR 4-HOUR RAINFALL (SURFACE)


Scale:
1:25,000

7-30

LJ

UJLJLJ LIU

LOCAL AREA BOUNDARY

11

Pending Depth

0.05 - 015 m PONDING


0.15- 035 m PONDING
0.35 - 0.50 m PONDING
- 0.75 In PONDING
0.75 - 1.00 In PONDING
1.0 - 1.25 m PONDING
1.25 m PONDING

RIVER
/
VALLEY
LESSARD /
NORM

RIVER
VALLEY
LBW

atpAeL_y_
lB

ra

#1500,10025-105 SI., Edmonton, Albmiu T6J 153


Ph: (71301482-2551, Fax: (780)4E12-2535
EmellmervIces@semeng.com

!lent

CdiliOnton

'.4

oe

Nkt.

sar-neng inc.

better water better world

CITY WIDE FLOOD MITIGATION ASSESSMENT


PHASE 2 (AREA C)
Title.
CALLINGVVOOD AREA HYDRAULIC RESULTS - IMPROVED SYSTEM 1:100 YEAR 4-HOUR RAINFALL SURFACE
Scale:

agm
1:20,000

9-5

10

btalrLI
LOCAL AREA BOUNDARY
Pending Depth

-ceg4'1'

I
11111

0.05 -015 m PONDING


0.15 - 0.35 m PONDING
0.35 - 0.50 m PONDING
0.50 .0.75 m PONDING
0.75 - 1.00 m PONDING
1.0 - 1.25 m PONDING
51.25 m PONDING

Prepared By:

sameng inc.
ra better water I better world
#1500, 10025-105 St., Edmonton, Alberta TSJ 153
Ph, 1780)482-2557, Fes: (700)452-2538
Emell:servIces@sameng.com

Client:

Cdiiionton
CITY WIDE FLOOD MITIGATION ASSESSMENT
PHASE 2 (AREA C)
RIVERBEND AREAHYDRAULIC RESULTS- IMPROVED SYSTEM 1:100 YEAR 4-HOUR RAINFALL (SURFACE)
Scale:

Haure:

1:22,000

9-10

11

emecimin

!Agit

-LOCAL AREA BOUNDARY

tto

Pendia Depth

Nil

0.05 - 0.15 m PONDING


015 - D.35 m PONDING
0.35 - 0.50 m PONDING
0.50 0.75 m PONDING
0.75 - 1.00 m PONDING
1.0 -1.25 m PONDING
> 1.25 m PONDING

WESTBROOK
ESTATES

30 AVENUrRI5HT-0F45Y

ERIlaIESRN
,1

Prepared By:

sarneng inc.

rai belterwater I better wodd

01500,10025-105 SL, Edmonton, Alberta T6J 103


Ph: (780)482-2567, Fax: (780)452-2538
Emalassaficas@sameng.com

Client

CciiiiOnton
CITY WIDE FLOOD MITIGATION ASSESSMENT
PHASE 2 (AREA C)
Tale;
UTHWE T AREA HYDRAULIC RESULTS IMPROVED SYSTEM 1:100 YEAR 4-HOUR RAINFALL SURFACE
41111101

Scale:

Figure:

1:21,000

9-15

12

LOCAL AREA BOUNDARY


Pondlnq Depth
I

I
I

- 1

0.05 - 0.15 m PONDING


0.15 - 0.35 m PODDING
035- 0.50 m PODDING
0,50- 0.75 m PODDING
0.75 -1.00 m PONDING
1.0 -1.25 m PONDING
> 1.25 m PODDING

sameng inc.
gm better water I belter world
01800,10025-106 St., Edmonton, Alberta T6,1103
PSI (780)462-2557, Fa: (1801452-2530
Emaltsenelces@sameng.com

CditilOnton
flT

CITY WIDE FLOOD MITIGATION ASSESSMENT


PHASE 2 (AREA C)
Title:
HCONA I UOFAAREAHYDRAULIC RESULTS -IMPROVED SYSTEM
1:100 YEAR 4-HOUR RAINFALL (SURFACE)
Scale:

1:25,000

9-20

13

ULU

.000
1",
001.0.
eg
ivo
10,40-0
00
I

low-44

so

Lige_r11.

LOCAL AREA BOUNDARY

Pondinq Depth
i

.40

TCFIZIYAnn
. ..av46."..0
.11.

oo'

0.05 -0.15 m PONDING


0.15 - 0.35 m PONDING
0.35 - 0.50 m PONDING
0.50 -0.75 m PONDING
0.75 -1.00 m PONDING
1.0 - 1.25 m PONDING
> 1.25 m PONDING

liNER VALLEY
IINERSLOE

O
r
0
17

-i=

man wimmi
1.35E0ING113

th

042

l'afr,_WM
Ina

la la MI Ell
MEM Ellif NM

91,11
,1111=1011M11

aldia
Ma=

laill I
al I
MN MI

a II

MI id

E sameng inc.

LA better water I better world

_tIMAWa.d

admodiddad =mod
MI MEI I&11111111MINI
'=
111Mi
OP4l=111

MINEll
Ell III 51111149.1a
al=PH
11111111111
dial NI FilIN
aladd
112111111
=MalaMIN 111b,
1
1111111alla
MEE
11

IM 11_

Prepared By:

INNEN

Milan

MIMI NMI NMI MP'


----_p maim

51500,10025-105 St., Edmonton, Albetta TSJ 103


Ph: (780)482-2W, Fax: 0801482-2538
Emall:servIces@aartlx.9..aa

Client:

Edits:563n

110=11111ala

_pips1
Pr

Title:

4te\

CITY WIDE FLOOD MITIGATION ASSESSMENT


PHASE 2 (AREA C)
BONNIE DOOM / GOLD BAR AREA HYDRAULIC RESULTS IMPROVED SYSTEM 1:100 YEAR 4-HOUR RAINFALL (SURFACE)

Scale:

1:25,000

9-25

14

LEGEND
Storm Conveyance
Major Level of Service
Depth (m)
> 0.35
0 - 0.15

SCALE:

1:45,000
Z015-3390

PROJECT NO.
DRAWN
DESIGNED
CHECKED
APPROVED
PROJECTION:

INITIAL DATE
EA
16-03-31

3TM 114 HAD 83

Assoc i ated
GLOBAL PERSPECTIVE.
Engineering mu FOCUS.

e'
TiiiiTYOF
i

iin on

CITY-WIDE
FLOOD MITIGATION ASSESSMENT
(PHASE 2 - AREA B)

STORM
DUSTING CONDITION RESULTS
MAJOR SYSTEM LEVEL OF SERVICE
100-YEAR 4-HOUR STORM
8

DRAWING NUMBER

REV. NO.

SHEET

FIGURE ES-2

15

LEGEND
Storm Conveyance
Major Level of Service
Depth (m)
> 0.35
0 - 0.15

SCALE:
PROJECT NO.
DRAWN

1:45,000
2015-3390

DESIGNED
CHECKED
APPROVED
PROJECTION:

INITIAL DATE
EA
16-03-31

3T14 144 P96063

t
f
,
Associated

GLOBAL PERSPECTIVE.

Engineering

@ono

Locae win.

na on

Map Ric DAOry of Edmonton\Wor ld

CITY-WIDE
FLOOD MITIGATION ASSESSMENT
(PHASE 2 - AREA B)

STORM
EXISTING CONDITIoN RESULTS
MAJOR SYSTEM LEVEL OF SERVICE
100-YEAR 4-HOUR STORM
DRAWING NUMBER

FIGURE 7-6

REV. NO.

SHEET

..---------

16

LEGEND

PHASE I BOUNDARY

im
, I

1-7-

!-

I l'

lek
l .' '
==,

--_ , ,

mon.

soft

imi L.1

11
Jelilii
ra ratiiiiiiiii
- lp 111,iiriMill
if

allj
5

.__i__

NW

r i

II

II OA

1I

H.

....
filtallnal
,
OIS M

or-m.44w
/new
Olin I

-,

-1

a _ ''
__ a
'

041

.--

1. c---v ' _,

;
4., ::: -

20.3
312

10.0 35
11=

0.0
Pending 06pth

..

4'

vox

won'
v.
11
Ot
okoii:
,
KOS AK kitA , Illili riminirsitimmitiCas
___,
. gmlis ilvor
i- _ p._zoi Mil 16
ile.*
MINER 1.110111
..,,
15. vii
11 CA,C1116
A4
,
mingle!
L
illi1111111%
,
wipple

inn
MUM.

,,,,

Inia
gi7
il i - r_

74#

NM _001
WAm

atial OP.
-
r
iiiffil
dill *i

V ' 41DI

1
111.,_

LZ
,L.,,,,

PA

Whil

11--1V

-11II Aillr
rig

1 E%S

TotalStreetLength= 590 km
Lengths 0.35=73.83 km

20 0 ^
.13 35 .0

lulr.: 14-.
..7

.1111 1110,it

., ....
...ft...
., ,
....,
..
.

,
.
.

.
IV
'111
11111111 uljni

__.II

33,7

i
I

-9

--41 1 MI
I INMAN
!.? VII 11 H1111011

_-_

wpi

"0%

--'4&
W"

L
u
ll! 1111111111

1 40.0

r,35.0 -

11111111111111 11 1111 A
ALI 11_ i rupiii

WARN

MB
I

,
'

V
A

___r

imm

45.0
-

osmium a i iHI I pi
ill11111,111111111111111111s
1.17p i i

"AO ,
libleVII

sa -

,
15, _

,.....
...1.
.....0.2
.%.
,--.-.,m .....I
,..,_,__-#
.
biELi
i - -

--

Irl
111

ff
i.m
II

rowed By.

, sameng
inc.
- betterwaler
f betterworld
IMOD, 10023-106 53, Edmonton, Albedo T6J 103
Ph M0)4624057. F.. (760)432.2638

I ..

Ng

omit
4

il

.or
="
.1m,_
m22.1Sam
..,..:1k...,_dm_

,.

li
,_

Cbenl.

EdTHE errr oF

inon on

. , , , ,st
CITY-WIDE FLOOD MITIGATION ASSESSMENT
(PHASE 1)

- .,..

er
e-

Mi

SURFACE PONDING 1:100 YEAR EVENT

Scale.

EgLIre__
1:40,000

ES-2

17

I=
p -It11 111111
n.ili--Ir i
dniaimo
l k
g

+
I
1
immi.millimmu%mNsg.ui
mtaul
an

sinzirwshoroFpwrimitim

SAINfinial
l ..%.111MI Ilinal

lipt.4mmoluirsml

4"0
ilign
Or
1101111
fil

litim

IggL81
LOCAL AREA BOUNDARY
Pending Depth

I
r_

MILISVII

I
I

T 11 I
r
P
I 11111

SO:
m Ar:

igtrA
nalEgraw:mb;INE
!inn
j
rif
i- I PPM' IIIIIMUMir 11"In MINNimiN}1111*
Mir
I iiii Mil I EZoilint gir - Milluirvid-Tioriffilitifr
rural. IIrwileillitir ih. Imp Wm illilismiroc:
y
OEM. __-_,. d I 1 11111 -,.. iitrialni,
allill Mill illitilin iiVitritiiii==nmilogivOmk- ---mo imitmlinsi
_IN -
ro nmillwriguil
, ,..4,
miltralogsrI MIFIMIlir
illiMigt.
to
is imam
In- i
ssionimillirr.
6 ,m
i
I
I
I
ErinSIES
--TrillfillIn

045 - 0.15 m PONDING


0.15 - 0.35 m PONDING
0.35- 0.50 m PONDING
0.50 - 0.75m PONDING
0.75- 140 m PONDING
1.0-1.25 m FORDING
> 1.2521 PONDING

.
ran iiipllia
i
6141011101it
isiratql'Ar Ali I,I
vIstrittii.L-35maro dr
-Jill

_ 4,, FAA \e'

_ -ii, Illtrev
w --

Prepared By:

sameng
inc.
T i better
water I better world

cdrnonfon
01500, 10025-106 51., Edmonton, Alberta T6J 153
Ph: (760)482-2557, Fox (780)482-2535
Em88840.4822@sameng.com

Client

THE CITY OF

Praja:

CITY WIDE FLOOD MITIGATION ASSESSMENT


PHASE 2 (AREA C)
EXISTING SYSTEM SURFACE PONDING -

1:100 YEAR 4-HOUR DESIGN EVENT


Scale:

Eigm

1:60,000

E8-3

18

LEGEND
LOCAL AREA BOUNDARY
NEIGHBOURHOOD BOUNDARY

SITE BOUNDARY
EXISTING STORM SEWER
PROPOSED STORM SEWER
MIME
PROPOSED SWMF IN SURPLUS SCHOOL SITE
PROPOSED SWMF IN GREEN SPACE / SCHOOLYARD
POTENTIAL STORAGE AREA

CW2
Callingwood North
22,000

Pond ID
Neighbourhood
Site Area (m2)
Potential Storage Area (m2)

21,000

Pond Storage Potential (m3)**

38,500

Total Excavation Required (m3)


Total Estimated Costs*

40,000
8,136,000

FORDING DEPTH (EXISTING 100 Hi' 4hr RAINFALL EVENTI


- I
0.05 - 0.15 m PONDING
t
0.15 - 0.35 m PONDING

0.35 -0.5 m PONDING


0.50 - 0.75 m PONDING
0.75 - 1.0 m PONDING
1.0 - 1.25 m PONDING
> 1.25 m PONDING

Price/Storage ($/m3)
211
$
Main purpose of SWMF: Surge pond for 76 Avenue storm
trunk. Should be designed as dual-use facility.
*Cost estimate includes pond construction and
related infrastructure, land acquisition,
75% contingency, 15% Engineering and 11% City Overhead.
**Pond storage assumes 2 m water depth with 5:1 side
slopes

PROPOSED SWMF IMPROVEMENTS AND PONDING DEPTHS


SCALE: MOO

I
I

L.

!
I

CW21,

If

69 AVENUE

CALLINGWOOD NORTH

Prepared By:

,,

sameng inc.
gm better water l better world

CAlLINGWOOD RD

/ --"'N

I
--.

--,-'

/P1500,10025.106 9., Edmonton: Alberta TPI I G3


Ph: (780)4EI29057, Fez: (7BM:32-2538
EmalkservIces@sameng.com

ti

Client:

Edmonton
arAggi
CITY WIDE FLOOD MITIGATION ASSESSMENT
PHASE 2 (AREA C)
Tina:

PROPOSED SWMF
CW2 IN CALLINGVVOOD AREA
Scale:
POND SITE AREA
12000

KEY PLAN: CALLING WOOD AREA

ERL
.iriL

AS SHOWN

C-2

5CALE:1:40E00

19

LEGEND

Pond ID
Neighbourhood
Site Area (mz)

GP1
Gariepy

' OVERLAND REGRADE


AND INLET/OUTLET

36,000

Potential Storage Area (m3)


INLET/OUTLET
1N-375

LOCAL AREA BOUNDARY


NEIGHBOURHOOD BOUNDARY
SITE BOUNDARY
EXISTING STORM SEWER
PROPOSED STORM SEWER
PROPOSED SWMF IN SURPLUS SCHOOL SITE
PROPOSED SWMF IN GREEN SPACE / SCHOOLYARD
POTENTIAL STORAGE AREA

34,500

Pond Storage Potential (m3)**

56,900

Total Excavation Required (m3)


Total Estimated Costs*

103,000
15,244,000

PONDING DEPTH (EXISTING 100 yr - 4hr RAINFALL EVENT)

1
I

11=11;312M1

268
Price/Storage ($/m3)
$
Main purpose of SWMF: Surge Pond for 57 Avenue storm
trunk. Should be designed as dual-use facility.

0.05 - 0.15 m PONDING


0.15 - 0.35 m PONDING
0.35 - 0.5 rn PONDING
0.50 - 0.75 m PONDING
0.75 - 1.0 m PONDING
1.0 - 1.25 m PONDING
> 1.25 m PONDING

*Cost estimate includes pond construction and


related infrastructure, land acquisition,
75% contingency, 15% Engineering and 11% City Overhead.
**Pond storage assumes 2 m water depth with 5:1 side
slopes

flF
PROPOSED SWMF IMPROVEMENTS AND PONDING DEPTHS
SCALE: Inah

1
1

GARIEPY

.0 ga INI-Sx

CALLINGWOOD PO

. ,..._.

-40.1 lie

,s

, I I

-41,1

....

I.

Ednionton

N.

/11500. 10025.15S St, Edmonton, AlbartaTSJ 103


Ph: (780)482-557. Fax: (/80)482-2538
Em Close Mae sesameng.corn

E
W

. .......
.00

sameng inc.
ra better water I better world

...J

- - I

1.: " '


I

(_

..1

GPI . -

' #
* ak
* m

I, '

Prepared By:

'4*.

1i

. \

-,. ...-

CITY WIDE FLOOD MITIGATION ASSESSMENT


PHASE 2 (AREA C)
Tille:

_. ,
N'..... i ,

PROPOSED SWMF
GPI IN CALLINGWOOD AREA

1"- ) .

POND SITE AREA


SCALE:1E500

Scale:

KEY PLAN: CALLING WOOD AREA


SCALE: NEM

fig .rre:

AS SHOWN

C-3

20

LEGEND

11

AG1
Aspen Gardens

Pond ID
Neighbourhood
Site Area (m2)

39,000

Potential Storage Area (m2)

30..
..
'
OVERLANDREGRADE
I
375
ST, 1418

450

LOCAL AREA BOUNDARY


NEIGHBOURHOOD BOUNDARY
SITE BOUNDARY
EXISTING STORM SEWER
PROPOSED STORM SEWER
PROPOSED SWMF IN SURPLUS SCHOOL SITE
PROPOSED SWMF IN GREEN SPACE I SCHOOLYARD
POTENTIAL STORAGE AREA

37,500

Pond Storage Potential (m3)**

60,300

Total Excavation Required (m3)


Total Estimated Costs*

138,000
19,969,000

Price/Storage ($/m3)
$
Main purpose of SWMF: Surge pond for local sewer.
Should be designed as dual-use facility.

OVERLAND RED

FORDING DEPTH (EXISTING 100 yr - 411r RAINFALL EVENT)

I
I

331

0.05. 0.15 m PONDING


0.15 -0.35 m PONDING
0.35 -0.5 m PONDING
0.50 - 0.75 m PONDING
0.75 - 1.0 m PONOING
1.0 - 1.25 m PONDING
> 1.25 m PONDING

*Cost estimate Includes pond construction and


related infrastructure, land acquisition,
75% contingency, 15% Engineering and 11% City Overhead.
**Pond storage assumes 2 m water depth with 5:1 side
slopes

IRWAYBRIV

PROPOSED SWMF IMPROVEMENTS AND PONDING DEPTHS

SCALE:1:8000
J

,:r.11.' roI.- i
r t -i r, )
r.ti
_..
_
I ,i) 'rc_;.4(011ELLIILDRIVEla-44.FTIF;
.
i

.1

/A"

...
r.:

- , --, .

/ i 14644,
a
qv: .
, 1
.
AG1 I, '
r*,
"Or .... y. I
li,
..-..r,
I...
/
ASPEN GARDEliS

I 1 , II

;I

11
.1 0
I

Prepared By:

E sarneng inc.

Th

I
"

.1
I i j .

r.= .-.:

' -:
-47f.
)

_4:3-21

,!--1

'

igii

La better water I better world

#1500.10025.106 a, Edmonlon, AlbarLa 185 153


Ph: (7801482-0057, F65: (780)482-2538
Emaltsarylces@samang.oarn

I
yERN ON DAN FORD

Cdillonton

,JUNIOR HIGH SCHOOLS


U.: rr

ers
CITY WIDE FLOOD MITIGATION ASSESSMENT
PHASE 2 (AREA C)
I..: I

.;.
Tr"-,
170

-._

'&04.101A hgc,
POND SITE AREA

SCALE 15500

-,

Me:

PROPOSED SWMF
AG1 IN SOUTHWEST AREA

Scale:

mrrroeyKEY PLAN: SOUTHWEST AREA

agin

AS SHOWN

C-4

SCALE 1:40.000

21

LEGEND

750

Min

47(nd_rot(M_

375
VENUE So 250.

.600

GF1
Greenfield

Pond ID
Neighbourhood
Site Area (m2)

INLET/OUTLET
39A 0E1406

66,000

Potential Storage Area (m2)

57,500

Pond Storage Potential (m3)**

72,800

Total Excavation Required (m5)


Total Estimated Costs*

270,000
27, 644, 000

PONDING DEPTH (EXISTING 100 yr 4hr RAINFALL EVENT)

MEE1Mi1 0.05 - 0.15 m PONDING


=CM= 0.15 - 0.35 m FORDING
0.35-0.5 m PONDING
MM..
0.50 - 0.75 in PONDING
I
0.75 - 1.0 m PONDING
MM..
1,0- 1.25 m PONDING
>1.25 in PONDING

$
Price/Storage ($/m3)
380
$
Main purpose of SWMF: Surge pond for 40 Avenue and
112A Street storm sewers. Should be designed as dual-use
facility.

).1
KANO REGRADE
D INLET/OUTLET

LOCAL AREA BOUNDARY


NEIGHBOURHOOD BOUNDARY
SITE BOUNDARY
EXISTING STORM SEWER
PROPOSED STORM SEWER
PROPOSED SWMF IN SURPLUS SCHOOL SITE
PROPOSED SWMF IN GREEN SPACE / SCHOOLYARD
POTENTIAL STORAGE AREA

*Cost estimate includes pond construction and


related infrastructure, land acquisition,
75% contingency, 15% Engineering and 11% City Overhead.
**Pond storage assumes 2 m water depth with 5:1 side
slopes

PROPOSED SWMF IMPROVEMENTS AND PONDING DEPTHS


60556: 1:850

GREENFIELD

j"

Prepared By:

....
...

, lee

sameng inc.
Ka better water I betterworld

1:( it

'

01500, 10025406 9., Edmonton, Albedo T6J 1033


Ph: (7801402-2557, Pox: (780)482-2538
E ma Ihoe mice 500 sameng,com

Client:

-1
-71

Cdtilionton

CITY WIDE FLOOD MITIGATION ASSESSMENT


PHASE 2 (AREA C)

TUN;

1 71

PROPOSED SWMF
GFI IN SOUTHWEST AREA

, I ,4
(

Ei

Scale:

Arrieotn,

POND SITE AREA

KEY PLAN;
PLAN: SOUTHWEST AREA

SCALP 1:5000

SCALE: 540,000

AS SHOWN

C-5

22

LEGEND

525 _

JITIOUTLET

..60

1-`

Pond ID
Neighbourhood
Site Area (m2)

001
Duggan
61,000

Potential Storage Area (m3)


INLET/OUTLV
0

o
. 750

.3sxaciat8E .

OVERLAND REGRADE,
AND INLET/OUTLET

V7773

59,000

Pond Storage Potential (m3)**

105,800

Total Excavation Required (m3)


Total Estimated Costs*

151,000
22,263,000

PONDING DEPTH (EXISTING 100 vr - 4hr RAINFALL EVENT)


1
0.05 - 0.15 m PONDING
0.15 - 0.35 m PONDING
CIESUM1
0.35 -U.S m PONDING
0.50 - 0.75 m PONDING
035 - 1.0 m PONDING
1.0 - 1.25 m PONDING
> 1.25 m PONDING

210
Price/Storage ($/m3)
$
Main purpose of SWMF: Surge pond for 40 Avenue and 106
Street storm trunks. Should be designed as dual-use
facility.

1200

I{ 37

LOCAL AREA BOUNDARY


NEIGHBOURHOOD BOUNDARY
SITE BOUNDARY
EXISTING STORM SEWER
PROPOSED STORM SEWER
PROPOSED SWMF IN SURPLUS SCHOOL SITE
PROPOSED SWMF IN GREEN SPACE / SCHOOLYARD
POTENTIAL STORAGE AREA

*Cost estimate includes pond construction and


related infrastructure, land acquisition,
75% contingency, 15% Engineering and 11% City Overhead.
**Pond storage assumes 2 m water depth with 5:1 side
slopes

PROPOSED SWMF IMPROVEMENTS AND PONDING DEPTHS


$CALE 130

;-_--,

I
I I

3111

LI

7-1

Prepared By:

(e,

sarneng inc.

, IP/
-t te

.)

Ea better water I better world


........

#1500, 10025.108 3., Edmonton, Matta TBJ 103


Ph: 080)482-0057. Fax: 0813482-2538
Emaltsondoes@sameng.com

;(
e.4.z.,

-0

'

I- 2

Ediiionlon

J7t vr--

)..

I.n.
1

.t ....3i 1 i

h.

f Ly)

(i ,

is
' niriaceiy

.__

5:
411 '',-

14%-cJ
i

pol
k: ., l'
i.. .1., .....'
(

mut
CITY WIDE FLOOD MITIGATION ASSESSMENT
PHASE 2 (AREA C)
PROPOSED SWMF
DG1 IN SOUTHWEST AREA

j.i:.."

...E1111138ffHEN0A141.1'1:1

POND SITE AREA

KEY PLAN: SOUTHWEST AREA

SCALE:1.M

SCALE I:40.030

Scale:

ijgrre

AS SHOWN

C-6

23

LEGEND

Mil NMI

Pond ID
Neighbourhood
Site Area (m9
311,0
OVERLAND
REGRADE

3D9
450

375

INLETIOUTIET
'155

SH1
Steinhauer
45,000

Potential Storage Area (m2)

44,000

Pond Storage Potential (m3)**

81,800

Total Excavation Required (m3)


Total Estimated Costs*

85,000
15,446,000

(77727..

PURSING DEPTH (EXISTING 100 yr - 4hr RAINFALL EVENT)


0.05- 0.15 m PONDING
0.15 - 0.35 m PONDING
1
0.35 -H.5 m FUNDING
0.50 - 0.75 m FUNDING
I
0.75 - 1.0 m PONDING
1.0 - 1.25 m PONDING
> 1.25 m PONDING

Price/Storage ($/m3)
189
$
Main purpose of SWMF: Surge pond for 32A Avenue storm
trunk. Should be designed as dual-use facility.

31 AVaVUE

,OVERLAND
tIREGRADE

LOCAL AREA BOUNDARY


NEIGHBOURHOOD BOUNDARY
SITE BOUNDARY
EXISTING STORM SEWER
PROPOSED STORM SEWER
PROPOSED 51NMF IN SURPLUS SCHOOL SITE
PROPOSED SWMF IN GREEN SPACE / SCHOOLYARD
POTENTIAL STORAGE AREA

*Cost estimate includes pond construction and


related infrastructure, land acquisition,
75% contingency, 15% Engineering and 11% City Overhead.
**Pond storage assumes 2 m water depth with 5:1 side
slopes

LEVOUYLV

PROPOSED SWMF IMPROVEMENTS AND PENDING DEPTHS


SCALE 1:8000

I
1
y;7-9"

-'
P.

IF
_ .

' Ii

Fl t

K iNEJ!VE

SH1

O m 11

Prepared By:

sameng inc.
Ea better water I beter world

I
'

STEINHAUER ;
;

#1600,10025.106 9.. Edmonton: Alboda 76J 1003


Ph: (780)482.057, Fax: 178014132-2538
Emalseplces@samen tom

Client

Edmonton

--

CITY WIDE FLOOD MITIGATION ASSESSMENT


PHASE 2 (AREA C)
I

PROPOSED SWMF
SH1 IN SOUTHWEST AREA

d.

Akixoi&

..rervol

,A1/01067:11E110A011

POND SITE AREA

KEY PLAN: SOUTHWEST AREA

SCALE 1A000

SCALE: 1.50.COS

Scale:

EskrE

AS SHOWN

C-7

24

LEGEND

wr.r.
Cr

ADDIBACKROA

D .90
___,22.2161M _

INLET/OUTLET
IA

INERLAND
REGRADE I

Pond ID

BQ1

Neighbourhood

Blue Quill

=MEI
zzzz,

Site Area (m1)

LOCAL AREA BOUNDARY


NEIGHBOURHOOD BOUNDARY
SITE BOUNDARY
EXISTING STORM SEWER
PROPOSED STORM SEWER
PROPOSED SWMF IN SURPLUS SCHOOL SITE
PROPOSED SWMF IN GREEN SPACE / SCHOOLYARD
POTENTIAL STORAGE AREA

47,500

Potential Storage Area (rn2)

46,000

Pond Storage Potential (m3)**

76,100

Total Excavation Required (m3)

173,000

Total Estimated Costs*

24,452,000

Price/Storage ($/m3)

321

PONDING DEPTH (EXISTING 100 yr - 411/RAINFALL EVENT)

0.05 - 0.15 m PONDING


0,15 - 0.35 m PONDING
0.35 - 0.5 m PONDING
0.50- 0.75 m PONDING
0.75 -1.0 m PONDING
1.0- 1.25 m PONDING
>1.25 m PONDING

Main purpose of SWMF: Surge pond for local sewers.


Should be designed as dual-use facility.
*Cost estimate includes pond construction and
related infrastructure, land acquisition,
75% contingency, 15% Engineering and 11% City Overhead.
**Pond storage assumes 2 m water depth with 5:1 side
slopes
75Cl ZOO

PROPOSED SWMF IMPROVEMENTS AND PONDING DEPTHS


SCALE 1:0000

---'
.

11.111

Lf

"
le/

Irttamecy
l

sameng inc.
ra bet ler water I better world

r.fitte -)r

BLUE QUILL

55505.10028.106 a, Edmonton, Albano "SW 1G3


Ph:17801412057, Fen: 1801452-253E1
GmallmonIces@sOnto2om

ow)

BQ1

Client:

Edmonton
FILO
CITY WIDE FLOOD MITIGATION ASSESSMENT
1,4j

II

PHASE 2 (AREA C)

if

PROPOSED SWMF
BQ1 IN SOUTHWEST AREA

r-

,to.Hote2A.T.t.f.ifygivw3=oh
POND SITE AREA
SCALE: 02000

KEY PLAN: SOUTHWEST AREA


SCA.: 130S00

Scale:

Estre:
AS SHOWN

C-8

25

LEGEND
...
I
OyERLAr,(O REGRADEAND
: INLET
c91,
i (CONNECT !r 0 EXIS
:
FUTURE STORM S
___49(610
, , .
B7WEN
OVERLAND '
. REGRADE
j

-
I,

NNW 1111

OVIMITNI.e

Pond ID

PA1

Neighbourhood

Parkallen

Site Area (ma)

15,000

LOCAL AREA BOUNDARY


NEIGHBOURHOOD BOUNDARY
SITE BOUNDARY
EXISTING STORM SEWER
PROPOSED STORM SEWER
PROPOSED SWMF IN SURPLUS SCHOOL SITE
PROPOSED SWMF IN GREEN SPACE / SCHOOLYARD
POTENTIAL STORAGE AREA

VENU
es

-11

INLETIOUTLET

'/ 205

rep
375

---?59-2- - L3"

Potential Storage Area (m2)

14,000

Pond Storage Potential (m3)**

24,400

Total Excavation Required (m3)

29,000

Total Estimated Costs*

lawamsI

6,088,000

Price/Storage ($/m3)

65 20251D

PONDING DEPTH (EXISTING 100 yr - 4hr RAINFALL EVEN11

Flgallial

250

$
Main purpose of SWMF: Surge pond and major drainage

0.05 - 0.15 m PONDING


0.15 - 035 m PONDING
0.35 - 0.5 m PONDING
0.50 - 0.75 m PONDING
0.75 - 1.0 m PONDING
1.0 - 1.25 m KWH,*
> 1.25 m PONDING

overflow. Should be designed as dual-use facility.


g200
AR

*Cost estimate includes pond construction and


related infrastructure, land acquisition,
75% contingency, 15% Engineering and 11% City Overhead.
**Pond storage assumes 2 m water depth with 5:1 side
slopes

.12-5504.prt --- 250


44-r
r -

SO
PROPOSED SWMF IMPROVEMENTS AND PONDING DEPTHS
SCALE: 1:8000

ili-1-Cyr

r
- - --- - .t ' bLi-.-'1.-2:);
r1.-7,140.j I

''''s ' 1 1-1


-1_
.
0

, .,. i

1/ ' ' 'r

117,' if 1 ----.1 1-h- :. --;7::--. 7-- I- \


- 17.1
- ,1 I I ' 117:14:'
-t--=
1 1i i '
__FLi- -:',C I
.1_812pErcf-i__ ,---,--' =I:LIT _ .t,_ _L:1_f_l_....,....
/ i_.E- -1
, O q- _r__1:7
__
...... _ ,ENu
......
,

Prepared By:

sameng inc.
LAI better water I better world

P1500, 10025.108 9.: Edmonton. *00000 157103


Ph: 080)4132-0057, '00: 17801482-2538
EmaltramIces@sameng.com

UM:
THE

dritiOnton
f
"

U-711

"-

;:"r"..1.:( I

1 1Till '1

EJft 37-1;22-TE
POND SITE AREA
SCALE: 03000

KEY PLAN: STRATHCONA U OF A AREA


SCALE: 1.60,000

j- -1
1

CITY WIDE FLOOD MITIGATION ASSESSMENT


PHASE 2 (AREA C)

r
Tub:

PROPOSED SWMF
PA1 IN STRATHCONA / U OF A AREA

vP DO/

flgm

Scale:

AS SHOWN

C-9

26

LEGEND

MOI

RI=
opaFiellvl

Pond ID
Neighbourhood
Site Area (m2)

FH1
Forest Heights

En

is
OEM
,

21,500

Potential Storage Area (mz)

20,500

Pond Storage Potential (m3)**

31,300

Total Excavation Required (m3)


Total Estimated Costs*

59,000
9,935,000

POND/CU DEPTH (EXISTING 100 lir 4hr RAINFALL EVENT).


-i
0.05- 0.15 m P0//DING

i
LI
I

Price/Storage ($/m3)
317
$
Main purpose of SWMF: Surface overflow storage. SWMF
for future sewer separation.

LOCAL AREA BOUNDARY


NEIGHBOURHOOD BOUNDARY
SITE BOUNDARY
EXISTING STORM SEWER
PROPOSED STORM SEWER
PROPOSED SWMF IN SURPLUS SCHOOL SITE
PROPOSED SWMF IN GREEN SPACE / SCHOOLYARD
POTENTIAL STORAGE AREA

0.15 -0.35 m PONDING


0.35 - 0.5 m FORDING
0.51) 0.75 m PONDING
0.75 - 1.0 m P0//DING
1.0 - 125 m P0//DING
'1.25 m P0//DING

*Cost estimate includes pond construction and


related infrastructure, land acquisition,
75% contingency, 15% Engineering and 11% City Overhead.
**Pond storage assumes 2 m water depth with 5:1 side
slopes

INLET/OUTLET
'I (CONNECTED TO
FUTURE SEWER)

--triLat

z!.
G

8r.
PROPOSED SWMF IMPROVEMENTS AND P0//DING DEPTHS
SCAE:

Prepared By:

sarneng inc.
betterwater betterworld

#1600, 10025.105 9.. Edmonton, /klub T6J 1G3


Ph: (78())482.Z57, Fax: (780)482-2531
Ear altaardCas@SaMeng Cara

Cdthonton
p,,j(1
01
CITY WIDE FLOOD MITIGATION ASSESSMENT
PHASE 2 (AREA C)
PROPOSED SWMF
FH1 IN BONNIE DOON I GOLD BAR AREA
Scale:
POND SITE AREA

KEY PLAN: BONNIE DOOR/GOLD BAR AREA

SOME: 2500

SCALE: 1:60,000

AS SHOWN

C-10

27

LEGEND

01111M1.1

Pond ID
Neighbourhood
Site Area (m2)

OW1
Ottewell

MUM
1////i

38,500

Potential Storage Area (m2)

37,500

Pond Storage Potential (m3)**

63,100

Total Excavation Required (m3)


Total Estimated Costs*

PONDING DEPTH (EXISTING ISO Or- 4hr RAINFALL EVENT).


643=6"z*44
0.05 - 0.15 m PONDING
1
0.15 0.35 m PONDING
limmoi
0.35 - 0.5 m PONDING
0.50 -015 m PONDING
IMMIIMMI
0.76 - 1.0 m FORDING
1.0 1.25 m PONOING
> 1.25 m PONDING

122,000
24,339,000

Price/Storage (Um)
$
Main purpose of SWMF: SWMF for future sewer
separation. Should be designed as dual-use facility.

LOCAL AREA BOUNDARY


NEIGHBOURHOOD BOUNDARY
SITE BOUNDARY
EXISTING STORM SEWER
PROPOSED STORM SEWER
PROPOSED SWMF IN SURPLUS SCHOOL SITE
PROPOSED SWMF IN GREEN SPACE / SCHOOLYARD
POTENTIAL STORAGE AREA

386

*Cost estimate includes pond construction and


related infrastructure, land acquisition,
75% contingency, 15% Engineering and 11% City Overhead.
**Pond storage assumes 2m water depth with 5:1 side
slopes

PROPOSED SWMF IMPROVEMENTS AND PONDING DEPTHS


SCALE:13000

Prepared Dy:

vi sameng inc.
better water I better world

111500 10025.106 S.. Edmonton, Alberta T6J 103


Ph: (780)432-357, Fax: (030)452-2638
Emallmenicas@sartieng.corn

Cdriiontor
CITY WIDE FLOOD MITIGATION ASSESSMENT
PHASE 2 (AREA C)
Tilly:

PROPOSED SWMF
OW1 IN BONNIE COON / GOLD BAR AREA
Scale:
POND SITE AREA

KEY PLAN BONNIE DOOR / GOLD BAR AREA

SCALE: P4000

SCALE: 1:60X3

AS SHOWN

C-11

28

LEGEND

Pond ID
Neighbourhood
Site Area (m9

STORM SEWER
CONNECT TO FUTURE STORM
SEWER ON 70STREETto

INLETIOUTLET
-

IW1
ldylwylde

DIVE101.1
!=l1E=MI=M.

30,500
15,500

Potential Storage Area (m2)


Pond Storage Potential (m)**

24,300

Total Excavation Required (m4)


Total Estimated Costs*

43,000
8,864,000

LOCAL AREA BOUNDARY


NEIGHBOURHOOD BOUNDARY
SITE BOUNDARY
EXISTING STORM SEWER
PROPOSED STORM SEWER
PROPOSED SWMF IN SURPLUS SCHOOL SITE
PROPOSED SWMF IN GREEN SPACE / SCHOOLYARD
POTENTIAL STORAGE AREA

PONDING DEPTH (EXISTING 100 yr- 4hr RAINFALL EVENT)


kr,

Price/Storage ($/m')
365
$
Main purpose of SWMF: SWMF for future sewer
separation (Surge pond but could be designed as wetpond)
Allows downstream pipes to be sized for 1:5 yr event
instead of 1:100 yr event.

(
I
1

0.05 - 0.15 m PONDING


0.15 - 0.35 m PONDING
0.35 - 0.5 m PONDING
0.50 - 0.75 m PONDING
0.75 - 1.0 m PONDING
1.0 - 1.25 m PONDING
> 1.25 m PONDING

*Cost estimate includes pond construction and


related infrastructure, land acquisition,
75% contingency, 15% Engineering and 11% City Overhead.
**Pond storage assumes 2 m water depth with 5:1 side
slopes

:L.L1

200:.

PROPOSED SWMF IMPROVEMENTS AND FUNDING DEPTHS


5CA1E14000

1.

VIMY RIDGE
ACADE Y

-I
'

--I

l u--L 1
l
4ASELLNEFLOAD'

Prepared By:

sameng inc.
ra better water I better world
P1500,10025.106 a, Edmonton. Alberta TI3J1G3
Ph: (780)482.0057. Fax: (780)4824560
Emallservices@sameng.com

011."
Client

Edmonton

13,01';11:411,i

CITY WIDE FLOOD MITIGATION ASSESSMENT


PHASE 2 (AREA C)

Tills

PROPOSED SWMF
IWI IN BONNIE DOON / GOLD BAR AREA
.1

Scale:

POND SITE AREA

KEY PLAN BONNIE DOON (GOLD BAR AREA

SCAM 12000

SCALE 110.000

Esm

AS SHOWN

C-12

29

LEGEND

INN

L.. 11,477.
6!;"--.

t
.:;:saaveNuE

Pond ID

KW1

Neighbourhood

Kenilworth

Site Area (ma)

60,000

Potential Storage Area (m2)

34,000

Pond Storage Potential (m3)**

52,700

Total Excavation Required (m3)

110,000

Total Estimated Costs*


,

71/

avaaaao

IS1111111111111
I

PURSING DEPTH (EXISTING 100 yr 4hr RAINFALL EVENT).


L;_,
- I
0,05 - 0.15 m PONDING
0.15- 0.35 m PONDING
[Z.1
0.35 - 0.5 m PONDING
I=M1
I
0.50 - 0,75 m PONDING
0.75- 1.0 m PONDING
1.0 - 1.25 m PONDING
> 1.25 m PONDING

19,494,000

Price/Storage ($/m3)

$
Main purpose of SWMF: SWMF for future sewer

370

separation (surge pond). Should be designed as dual-use

I
INCETIO, ,
(CONNEOTEDiTO
STORM SBWE
.

LOCAL AREA BOUNDARY


NEIGHBOURHOOD BOUNDARY
SITE BOUNDARY
EXISTING STORM SEWER
PROPOSED STORM SEWER
PROPOSED SWMF IN SURPLUS SCHOOL SITE
PROPOSED SWMF IN GREEN SPACE / SCHOOLYARD
POTENTIAL STORAGE AREA

facility.

*Cost estimate includes pond construction and


related infrastructure, land acquisition,
75% contingency, 15% Engineering and 11% City Overhead.
'faLar:.

**Pond storage assumes 2 m water depth with 5:1 side

slopes

PROPOSED SWMF IMPROVEMENTS AND PONDING DEPTHS


SCALE:1:6000

;21

Prepared

sameng inc.

LAI better water I latter world

#1509, 10025-106 9., Edmonton, Alberta T6J 193


Ph: (180)482.557, F25: (780/402-2591
Ernaltsaalses@sameng.corn

Client:

Cdirionton
.12r2

L 71: ji 1_

CITY WIDE FLOOD MITIGATION ASSESSMENT


PHASE 2 (AREA C)

" _4-

7.7 po

Tills:

PROPOSED SWMF
KW1 IN BONNIE DOON / GOLD BAR AREA

ii2111111.,;PIL
Scale:
POND SITE AREA

KEY PLAN: BONNIE DOON / GOLD BAR AREA

SCALE: 1,350

SCALE:1:9Ln

AS SHOWN

C-13

30

LEGEND

MEM

900

Pond ID
Neighbourhood
Site Area (m2)

11

e opp,441

LT3
Lambton Industrial
41,500

Potential Storage Area (m2)

11,500

Pond Storage Potential (m3)**

14,200

Total Excavation Required (m3)


Total Estimated Costs*

40,000
3,831,000

LOCAL AREA BOUNDARY


NEIGHBOURHOOD BOUNDARY
SITE BOUNDARY
EXISTING STORM SEWER
PROPOSED STORM SEWER
PROPOSED SWMF IN SURPLUS SCHOOL SITE
PROPOSED SWMF IN GREEN SPACE / SCHOOLYARD
POTENTIAL STORAGE AREA

PONDING DEPTH (EXISTING 100 yr. 4hr RAINFALL EVENT)

0.05 - 0.15 m PONDING


0.15 - 0.35 m PONDING
0.35 - 0.5 no PONDING
0.50 -0.75 m PONDING
0.75- 1.0 m PONDING
1.0- 1.25 m POKING
> 1.25 m PONDING

Price/Storage ($/m3)
270
$
Main purpose of SWMF: Expansion of existing SWMF
(Lambton Facility #1 and #2). Surge pond for 50 Street
storm trunk.
*Cost estimate includes pond construction and
related infrastructure, land acquisition,
75% contingency, 15% Engineering and 11% City Overhead.
**Pond storage assumes 2 m water depth with 5:1 side
slopes
525

\,

PROPOSED SWMF IMPROVEMENTS AND PONDING DEPTHS


SCALE:1 IMP
mew

T-FF I

'1

Tr-

IVA
if
"1" :11.:41

,
4.44.Aity-..!

;'1,
,,,amilajuiwir

1
-

1_

,
.. \ - - .. i:11 :11 I- il:1111,J,4 --wciti;;i
. -3- T711 irs4rt
_I- ' 'i 11
'''171-: :-: J
, I_I 1

4,... ,...

';-41-1711.,I.LL_10.11
(,'

'''l LI 1-1 ir
.
-.:17fr-,--ii-AUEr

kcti t:11
i

'-... "\r."'.:/

..

1"..'-

:ii I I

[j...f

- ' l' ,'I

1
-,

7 ._I

t.-.,.: ,
1

--' 1,rli .1 .,571.,

:
0

pf Aug
L'El-b;f1

'7

4-

.._

E sameng inc.

01500.100254 OS SC, Edmonton, Alboda 76J 163


Ph: (780)482-0057, Vac (780)482-2538
EmalksonIces@sameng.com

E. better water I better world

C:7
71. A L.
13117
01,1
INDUSTRIAL

Client:

Edmonton

,
..:

I
L

0-7-1 ,.1,9,
7 ,t...! ' ..A_-1,. ,
1:- ;
:..:71 1-1 _1 1 '--' 27
i
,i
go
. ."-- -450;
a

.
.
.I
4.4

.
. .t1

Prepared B

.,,

- ;. '..
_-.

-4

\ 1 i'
u ,. , V
j-

4
----

CITY WIDE FLOOD MITIGATION ASSESSMENT


PHASE 2 (AREA C)

91

PROPOSED SWMF
LT3 IN BONNIE DOON / GOLD BAR AREA
Scale:

-=4
POND SITE AREA

KEY PLAN: BONNIE SOON IDOLS BAR AREA

SCALE: 12100

SCALE: 1:60,000

AS SHOWN

C-14

31

LEGEND

tml

111m1 NM MI

DIMELER.

. 600

.81 MENU

KE1
King Edward Park

Pond ID
Neighbourhood
Site Area (e)

450

9,000

Potential Storage Area (m2)

LOCAL AREA BOUNDARY


NEIGHBOURHOOD BOUNDARY
SITE BOUNDARY
EXISTING STORM SEWER
PROPOSED STORM SEWER
PROPOSED SWMF IN SURPLUS SCHOOL SITE
PROPOSED SWMF IN GREEN SPACE / SCHOOLYARD
POTENTIAL STORAGE AREA

8,500

Pond Storage Potential (m3)**

10,400

Total Excavation Required (m3)


Total Estimated Costs*

24,000
6,547,000

PONDING DEPTH (EXISTING 100 yr - 4hr RAINFALL EVENTI


- I
0.05 - 0.15 m PONDING

I
-

630
Price/Storage ($/m3)
$
Main purpose of SWMF: SWMF forfuture sewer
separation (surge pond). Allows downstream sewer pipe
to be designed to convey 1:5 yr flows.

0.15 - 0.35 m PONDING


0,35 -0.5 m PONDING
0.50 - 0.75 m PONDING
0.75 -1.0 m PONDING
1.0 -1.25 m PONDING
> 1,25 m PONDING

*Cost estimate includes pond construction and


related Infrastructure, land acquisition,
75% contingency, 15% Engineering and 11% City Overhead.
**Pond storage assumes 2 m water depth with 5:1 side
slopes

PROPOSED SWMF IMPROVEMENTS AND PONDING DEPTHS


SCALE: 1,8003

Ilepael

E
sameng inc.
ra better water I better world
81500,10005.108 9., Edmonton, Atborto T6J 153
Ph: (780)482-2557, Fax: (78D)482-2535
Emall:seplcas@samong.corn

Cdthonton
CITY WIDE FLOOD MITIGATION ASSESSMENT
PHASE 2 (AREA C)
PROPOSED SWMF
KE1 IN BONNIE DOON / GOLD BAR AREA
ENU
FOND SITE AREA

KEY PLAN: BONNIE DOOR GOLD BAR AREA

SCALE: 12000

SCALE: 1:60.010

Scale:

atm

AS SHOWN

C-15

32

You might also like