You are on page 1of 10

Replenishment Using Stock Transfer

Orders (Plant to Plant)


Use
You use the stock transfer order as a replenishment strategy if the material required in a
plant is stored in another plant of the same company. Here, when a kanban is set to
EMPTY, a purchase order is generated, which requests the other plant to deliver the
material required.

Features
When the kanban is set to EMPTY, a purchase order is created in the receiving location
and a release order in the delivering plant. The release order is procured and then posted
using the goods movement type 351. In the receiving location posting takes place with
movement type 101. However, instead of posting the goods receipt, the status can also
be set to FULL (then goods receipt takes place in the background).

SPRO for KANBAN

Material for stock transfer

Activate additional function for control cycles

Replenishment strategy for external procurement

You might also like