You are on page 1of 4
sub 3 Copies To Appropie Dist. State of New Mexico Form C-103 Paper acray, Minerals and Natural Resowrees, | -— May 27,2008 {GSPN re D, Hobs, M20 5 ae 38%; ee satel cess vad wn OIL. CONSERVATION DIVISION binges 30-005 — To set 1220 South St. Francis Dr. Oe Eel 4 Tt ra Ane 410 Sean Pe, Nha 87508 eee {i508 Fase Dr, SFM Hae 505 ‘SUNDRY NOTICES ANE: KEPORTS ON WELLS 7. Tease Name or Unit Agreement Name (@ONOT Use THis FORM FOR PROPOSALS TO DILLL OR TO DEEPEN OR PLUG BACK TOA SDUPERENT RSSERVOM, USE"APPLICATON FOR. FAT” FORM 10 FOR SUCH I Type of Welk OiWolt [] Gas Well [Hf omer Brainy, Wain Beef Oper V9 Te ob na at 3. Address of Oper Bor Raye S02 | Hobbs, Dm eet | Satedo [Well Location Unit Lene fF SpC feet fom the 1 ———tincand_ 2382 fect fromthe Line Section ale Township (gy Range 396 __NMPM. County Lee ieee [re re. Dep0 ta Groundwater____Distance va eatest fies wateewell__ Distance fom noes sarfice water Pi Lner Tekness i)___Redo rade Task: Volume ote: Comscaction Matai 12, Check Appropriate Box to Indicate Nature of Notice, Report or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: PERFORM REMEDIAL WORK [] PLUG AND ABANDON [] | REMEDIAL WORK ALTERING casinG TEMPORARILY ABANDON [] CHANGEPLANS — [}_ | COMMENCE DRILLING OPNS.]. PANDA 0 PULLORALTERCASING [] MULTIPLECOMPL [] | CASINGICEMENTJOB =] omer: ae o 13, Destibe proposed or compleiad op wations, (Clearly stat al petinont dole, ad give patina dat, cluding tinned date of starting any proposed work). SEE RULE 1103. For Multiple Completion: Attach wellbore diagram of proposed completion ‘0¢ recompletion. See CMea! ‘Thereby cerity thatthe information above is irc and complete to the bet oF my ‘and belie. trther erty tt up or blow sade a ha been be consracted or ened cording tw NMOCD pletion [genera parm eran atacbe) shureatiee OCD apprved ae Cl. arvnoven ay, — re FUYk MIRE HY onsen 7/092 6 HRC, Inc. PO Box 5102 Hobbs, NM 88241 393-6662 Hobbs State #10 Brine Well 2005 Annual pressure test 12/21/05 7.00 AM Begin to pressure up formation by squeezing partially shut low line (tubing) valve at wellhead and conti-wing to run triplex pump. 8:30 AM Pressure at 290 #, call Oil Conservation Department to witness test (Sylvia Dickey and Paul Sheeley) 9:00 AM Install chart recorder (12 hour chart speed) 9:30 AM Oil Conservation Department witness’s pressure build up. Shut down pump; close casing valve (tubing valve already closed), begin pressure observation test. 1:49 Witness test complete with Oil Conservation Department representatives bled pressure to O# pressure chart removed and given to Sylvia Dickey and Paul Sheeley. cee ‘Leng ahe Clay Hobby “ HID _ lene cS 4 ld ; ee Ooo, os & oe

You might also like