The below table represents all material and the total unit cost for the
construction of the DM8001. The total construction cost for the came to an
estimate total of RM80. The greater part of the total cost was primarily
composed of two aluminium rods and electric-operated clamp.
Materials
Aluminium rod
Compression spring
PVC
Electric operated
clamp
Wooden plane
Screw nut
DM8001
Quantity
Usage
Unit of
Measure
Unit
cost
Dm8001
Usage Cost