PLINTH LEVEL
12000
6000
2995
T.O.C. OF
PLINTH BEAM
3005
OTHERWISE SPECIFIED.
2. GRADE OF CONCRETE MIX SHALL BE M20
CONFORMING TO IS-456-2000. UNLESS
600
F.G.L.
OTHERWISE NOTED.
(CENTER-LINE LVL. OF
NEAREST ROAD)
CONFORMING TO IS-432-1960.
5. CLEAR COVER TO REINFORCEMENT:
B1
B2
B4
E.G.L.
C3
1750MM
C2
C4
50
800
8#@
100C/C
8#@
100C/C
4575
C1
(LOWEST EXISTING
GRUND LEVEL)
BEAM = 25MM.
COLUMN = 40MM.
SLAB = 19MM.
3150
T.O.C. OF
TIE BEAM
DRAWINGS.
8. RE-INFORCEMENT DETAIL IN COLUMN AS PER
IS-456-2000 & IS-13920
9. FINISH G.L. +0
10. S.B.C. OF SOIL SHOULD NOT BE LESS THAN 10T/SQ.M.
900
9150
8#@
125C/C
A4
1.2M(AVERAGE DEPTH)
A2
4575
A1
300
T.O.C. OF PLINTH
BEAM 40MM DOWN
FROM PLINTH LEVEL
PLINTH LEVEL
50
F.G.L.
S.NO.
(CENTER-LINE LVL. OF
NEAREST ROAD)
DATE
REVISIONS
PLINTH BEAM
REVISIONS
d
100MM THK.
P.C.C(1:3:6)
75MM THK. FLAT
BRICK SOLING
REINFORCEMENT
T.O.C. OF
TIE BEAM
SECTION - A-A
SCHEDULE OF COLUMN
SL.
COLUMN NO.
NO.
REINFORCEMENT
TYP. SECTION
PROJECT
PROPOSED CONSTRUCTION OF
ADDITIONAL INFRASTRUCTURE
AT CISF TOWNSHIP
TIE BEAM
(LOWEST EXISTING
GRUND LEVEL)
400X350
400
4-16# +
4-12#
BAR
50
JOB NO.
SCALE
DEALT BY
CHECKED BY
50
CLIENT'S SIGN
D
150
d
100MM THK.
P.C.C(1:3:6)
80
C3
1750MM
BAR
80
8#@ 75C/C
500
8-16#
500X350
8# AS DETAILED
IN COL. LONG &
CROSS SECTION
A1,A2,A4,B1,B2,B4,C1,C2,C4
350
2.
LINK
BRAHMAPUTRA CRACKER
AND POLYMER LIMITED
X-Y MM
350
1.
SIZE
E.G.L.
CLIENT
1.2M(AVERAGE DEPTH)
300
150
PLAN
TYPICAL DETAILS OF
ISOLATED FOOTING
SCHEDULE OF FOOTING
SL.
FOOTING NO.
NO.
ARCHITECT'S SIGN
SIZE OF
FOOTING
X-Y MM
FOOTING REINFORCEMENT
X-DIR
TOTAL DEPTH
MIN. DEPTH
ARCHITECTS, ENGINEERS,
Y-DIR
1.
A1,A4,C1
1700X1700
12#@125C/C
12#@125C/C
450
150
2.
C3
1800X1800
12#@125C/C
12#@125C/C
450
150
3.
A2,B1
1900X1900
12#@110C/C
12#@110C/C
500
150
4.
B2,B4,C2,C4
2000X2000
12#@110C/C
12#@110C/C
500
150
GUWAHATI- 781003
RAJKHOWAS
AARCHI
DRAWING TITLE
LAYOUT OF COLUMN & FOOTING
DRAWING NO.
RAA / CISF / Q. MASTER / T / ST- 01