BOQ PENATAAN PAGAR MONGGONAO

Pjg Pgr = 88.00 M


Jml Klm = 46.00 M

35

Pondasi Pagar
GALIAN
Galian Pondasi
Pjg Pondasi Pgr Biasa =
Luas Galian Pond. Pgr =
Volume Gal. Pondasi =
Galian Pondasi
Vol. Galian 1 Pondasi =

50

50
30

30
30
40

30

30

20

50

GALIAN

50

30

Pot Melintang Pond. Klm

Pondasi Klm Pagar

9.861 M3
Pgr
Pjt Total Pgr - (Lbr Pondasi Klm x Jml
Lebar X Tgg
Pjg X Luas Galian
Pgr
Lbr X Tgg X Pjg X Jml

### M3
= 88.00
= 0.35
= 74.20

X
X

(0.30
0.30
0.11

###

= 74.20 M
= 0.11 M2
= 7.79 M3

(0.30

0.30)

0.50

46.00 =

PONDASI PAS. BATU


Pas. Batu Pd Pgr
Pjg Pondasi Pgr Biasa = Pjt Total Pgr - (Lbr Pondasi Klm x Jml = 88.00 - (0.30 X ### = 74.20 M
Luas Pond. Pgr = (Lebar X Tgg) + (Lbr X Tgg)
= (0.30 X 0.30) + (0.25 X 0.50) =
Volume Gal. Pondasi = Pjg X Luas
= 74.20 X 0.22 =
16 M3
Pas. Batu Klm Pgr
Luas Pondasi = ### X ### + ### X
0.50) = 0.36 M2
Volume Pondasi 1 Klm = Luas X Pjg
= 0.36
X ###
= 0.11 M3
Volume Pondasi 46 Klm = Volume Pondasi 1 Klm X Jml Kl 0.11 X 46.00 = 5.00 M3
SIARAN PONDASI
Plasteran Pas. Batu Pd Pgr
Vol. Plasteran = Pjg Pgr X [(2xTgg)+Lbr Ats]
Plasteran Pas. Batu Pd Klm
Vol. Plasteran 1 Klm = Pjg Pgr X [(Tgg)+Lbr Ats]
Vol. Plasteran 46 Klm = Vol. Plasteran 1 Klm X Jml Klm

### M3
2.07 M3

(1.00

0.20)

=
=

X
X

(0.50 + 0.35) = 0.26


46.00 = 11.73 M2

= 89.04 M2

###

M2

5.00 M3

11.73 M2
0.30
0.26

M3

0.22

89.04 M2
= 74.20

###
15.95 M3

BOQ PENATAAN PAGAR MONGGONAO


Pjg Pgr
Jml Klm
Dimensi Klm

15

=
=
=

88.00 M
46.00 Bh
0.15 X 0.15

50

35

30
Batu Alam

Batu Alam

30

30

50

50

10

50

30

Pek. Batu Alam


BETON KOLOM
Pd Kolom
Volume Beton =

Pd Topi
Volume Beton =

0.639 M3
### M3
Pjg X Lbr X Tgg X Jml Klm =0.15 X

0.15 X 0.50 X 46.00 =

0.52 M3

Pjg X Lbr X Tgg X Jml =

0.21 X 0.06 X 46.00 =

0.12 M3

### M3
0.21 X

Pembesian Kolom
Tulangan Utama
Pjg 1 Besi Tul Utama Kolom = Tgg Klm + Pjg Masuk Pondasi
jg Besi Tul Utama 1 Kolom = Pjg 1 Besi X Jml
Pjg Besi Tul. Utama 46 Klm = Pjg 1 Klm X Jml Klm
Besi Yg dipakai Diameter =
10 mm
Berat Besi = Pjg Besi X Berat Besi D10
Tulangan Sengkang
Bjg Besi 1 Sengkang = (Lbr Klm - 0.04) X 4
Jml Sengkang 1 Klm =
(1.00 / 0.15)
Jml Sengkang 46 Kolom =
(7.00 X ###
Total Pjg Besi Sengkang =
322 X 0.44
Besi Yg dipakai Diameter =
6 mm
Berat Besi = Pjg Besi X Berat Besi D10

###

Kg

###

M2

###

M2

###

M2

###

M2

### Kg
= 0.50 + 0.50 = 1.00
= 1.00 X 4 Bh = 4.00
= 4.00 X ### = ###

M
M
M

= ### X ### = ### Kg


31.42 Kg
= (0.15 - 0.04) X 4.00
= 6.67 7.00 Bh
= 322 Bh
= ### M

0.44 M

= ### X ### = 31.42 Kg

Bakesting Kolom
Luas Bakesting 1 Klm =
Luas Bakesting 46 Klm =

Keliling Klm X Tgg


Luas 1 Klm X Jml Klm

= 0.60 X 0.50 = 0.30 M2


= 0.30 X ### = 13.80 M2

Plasteran Kolom
Luas Plasteran 1 Klm =
Luas Plasteran 46 Klm =

Keliling Klm X Tgg


Luas 1 Klm X Jml Klm

= 0.60 X 0.50 = 0.30 M2


= 0.30 X ### = 13.80 M2

Pengecatan Kolom
Luas Pengecatan 1 Klm =
Luas Pengecatan Klm =

Keliling Klm X Tgg


Luas 1 Klm X Jml Klm

= 0.60 X 0.50 = 0.30 M2


= 0.30 X ### = 13.80 M2

PEK. BATU ALAM


Luas Batu 1 Klm =
Luas Batu Alam 46 Klm =

Lbr X Tgg
Luas 1 Klm X Jml Klm

= 0.50 X 0.52 = 0.26 M2


= 0.26 X ### = 11.96 M2

BOQ PENATAAN PAGAR MONGGONAO


GALIAN
Pjg Pgr
Jml Klm
Dimensi Klm

=
=
=

88.00 M
46.00 Bh
0.15 X

0.15

200
185

Bagar Besi (Pipa D2")


PAGAR BESI
Pjg Pgr Besi =

###
Pjg Pgr - (Lbr Klm X Jml) = 88.00 -

(0.15 X ###

= 81.10 M

PENGECATAN PAGAR BESI


Keliling Lingk Dia 5.08cm =
Keliling 2 Pipa =
Loas Pengecatan 2 Pipa =

X Dia
Kllng 2 Pipa X Pjg Pgr Besi

### M2
= 3.14 X 0.03 = 0.08 M
= 0.08 X 2 Bh = 0.16 M
= 0.16 X ### = 12.94 M2

BREAK DOWN BIAYA LANSIR


Dgn Kondisi Jalan Mendaki dan Jalan Batu dan Jarak 100m Diperkirakan Biaya Lansir Bahan
Bahan
Biaya
225,000 /Truk
Pasir
90,000.0
Batu
175,000 /Truk
70,000.0
Kerikil
200,000 /Truk
80,000.0
Semen
1,500 /Zak
1,500.0
Bata
200 /Bh
200.0
Koef
Volume
Pas. Batu Kosong
3.952
Batu
1.2
4.74
Pasir
0.432
1.71
Pas. Batu
Batu
Pasir
Semen
Beton
Semen
Pasir
Kerikil
Plasteran
Semen
Pasir
Pas. Bata
Bata

Semen
Pasir

Total Biaya Lansir


Batu
Pasir
Semen
Kerikil
Bata

5.187
1.2
0.544
2.72

6.22
2.82
14.11
4.096

6.52
0.542857143
0.762222222

26.71
2.22
3.12
80.88
8.39
2.10

0.104
0.026

19.54
1,367.80
3.78
0.88

70.000
0.194
0.045

10.97
9.73
52.98
3.12
1,367.80

70,000
90,000.0
1500
80,000.0
200
Jml
Overhead

767,676.00
876,124.34
79,474.71
249,764.98
273,560.00
2,246,600.03
224,660.00

Total

2,471,260.03

/M3
/M3
/M3
/Zak
/Bh

Break Down Pek. Pagar Besi


Uraian
Hitungan Sat Volume
Pipa Hollow 4x4cm =
Pipa Hollow 4x2cm =
Biaya Tenaga Las =
Kawat Las
Listrik dan Lain2

2.00 M
10.00 M
LS
LS
LS

2.2
11
1
1
1

Harga Sat
20,833.33
15,750.00
150,000.00
15,000.00
10,000.00
Jml
Overhead
Total

Jml Harga
45,833.33
173,250.00
150,000.00
15,000.00
10,000.00
394,083.33
39,408.33
433,491.67