You are on page 1of 4

OEE: Overall Equipment Effectiveness

Name:
Program Name:

Todays Date:
OEE Study Range:
Program Part Numbers:

% Total

#DIV/0!

to
1

Equipment/Cell Description:

Availability:

11/16/2016

Equipment/Cell Number:

Shifts/Day:

Work Days/Week:

Weeks:

Assumptions Made/Shift (includes changeovers, downtime, breaks)


minutes/shift

minutes/shift

Lunch

25

Planned Down

Minutes Possible

Other Breaks

20

Paper Work

Other Downtime

Minutes Out/shift

Unscheduled Maint.

45

Changeovers

10

Performance:
% Total

Ideal
Cycle Time

Program Name:
0
0
0
0
0

#DIV/0!

Weighted calculation based


on run time.

3
5

Actual
Cycle Time

sec

sec

sec

sec

sec

sec

sec

sec

sec

sec

#DIV/0!

Ideal cycle time includes part load & unload.

Quality:
% Total

#DIV/0!

Program Name:

First Time
Through Parts

Parts for
Rework

Scrap

0
0
0
0
0

1
2
3
4
5

Totals:

Scrap includes startup and test/verification parts.

Actual #DIV/0!
OEE:

0.0%

10.0%

Please fill out all areas that are highlighted in "Blue".

20.0%

30.0%

40.0%

50.0%

60.0%

70.0%

80.0%

90.0%

100.0%

337230980.xlsx

OEE: Overall Equipment Effectiveness


Ideal
OEE:

11/16/2016

85.0%
0.0%

10.0%

Please fill out all areas that are highlighted in "Blue".

20.0%

30.0%

40.0%

50.0%

60.0%

70.0%

80.0%

90.0%

100.0%

337230980.xlsx

Costs of OEE

11/16/2016

Name:

Program Name:

0
0
0
0
0

1
2
3
4
5

Equipment/Cell Description:

Availability:

Todays Date:
OEE Study Range: 30-Dec-99
1
Program Part Numbers:
2
3
4
5

Cost
Assumptions Made:

$0.0
Total Minutes Out

Equipment/Cell Number:

Shifts/Day:

to

30-Dec-99
30-Dec-99

Work Days/Week:
Number
Required

0
Weeks:

Average
Rate / Hour

Avg Overtime
Rate / Hour

Total

Operators

$14.00

$19.50

$0.00

Maintenance

$24.00

$34.50

$0.00

Cell Technician

$19.00

$27.00

$0.00
Cost of Availability

Minutes Out/shift

Total Number of Overtime Minutes:

45

Performance:
Cost

Operator Cost
Ideal

Program Name:
0
0
0
0
0

$0.00

Weighted calculation based


on run time.

3
5

Quality:

Program Name:

Cost

$0.00

3
4

Please fill in Resin


Cost Below.

Operator Cost
Actual

$0.00
$0.00
$0.00
$0.00
$0.00

$0.00
$0.00
$0.00
$0.00
$0.00

$0.00

$0.00

Part Weight

Total Cost
Good Parts

Total Cost
Scrap Parts

$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

0
0
0
0
0

$0.00

Resin Cost per lb:

Total
Cost:

$0.00

$0.00

$0.10

$0.20

Please fill out all areas that are highlighted in "Blue".

$0.30

$0.40

$0.50

$0.60

$0.70

$0.80

$0.90

$1.00

337230980.xlsx

Costs of OEE
Ideal
Cost:

11/16/2016

$0.00
$0.00

$0.10

$0.20

Please fill out all areas that are highlighted in "Blue".

$0.30

$0.40

$0.50

$0.60

$0.70

$0.80

$0.90

$1.00

337230980.xlsx

You might also like