Daily Check List for Shop Floor Activities

Inspector

Job No

Project

Date

No

Item

Are the Fabrication ITP/WPS/Welders Register displayed and the


Drawings are available at Shop Floor are in current revision?

Are the WPS/WQR Stamped properly on the Shop floor?

Are the Electrode Quivers registered and in Good Condition?

If yes, are the Quivers closed and connected properly?

Do the welders and welding foreman aware of pre-heat requirements?

6
7
8
9
10
11
12
13
14
15

Complied

Not
Complied

PROFAB

Remarks

If yes, do they have required Pre-Heat temperature sticks as per


applied WPS requirements?
Are the Project Information boards up to date and located near the job
location?
Are the fabrication methods are complying the applicable standards?
Are the welders having their ID cards and perform their welding works
accordingly?
Are the welders and welding foreman able to read and understand the
WPS requirements?
Are the welding boxes filled with correct information such as joint
number, WPS number, Welders stamps and dates?
Are RFIs completed accurately?
For piping are the correct tapes are used to identify stages of
inspections?
Are the welders on the project qualified as per applied Welders
Register?
Are weld repairs properly communicated with the welders and
supervisors and have they been resolved?

16

Do the Weld Parameters meet the applied WPS requirements?

17

Other Concerns:

Signature