Professional Documents
Culture Documents
TECH (PE)/SEM-2/PEM-204/09
QUALITY ASSESSMENT & CONTROL ( SEMESTER - 2 )
/q
p:/
htt
1.
Signature of Invigilator
2.
Reg. No.
CS/M.TECH (PE)/SEM-2/PEM-204/09
Time : 3 Hours ]
pap
1.
2.
3.
4.
5.
6.
9.
in
a c.
ut .
7.
8.
wb
er.
Head-Examiner/Co-Ordinator/Scrutineer
44013 (06/07)
Total
Marks
Examiner's
Signature
CS/M.TECH (PE)/SEM-2/PEM-204/09
wb
er.
pap
/q
p:/
htt
in
a c.
ut .
44013 (06/07)
CS/M.TECH (PE)/SEM-2/PEM-204/09
CS/M.TECH (PE)/SEM-2/PEM-204/09
QUALITY ASSESSMENT & CONTROL
SEMESTER 2
/q
p:/
htt
Time : 3 Hours ]
[ Full Marks : 70
Candidates are required to give their answers in their own words as far as practicable.
Answer any five questions taking at least two from each group.
a)
pap
1.
GROUP - A
What is internal customer concept ? Explain the utility of this concept in making
an organization people-driven.
What are the basic steps required to implement total quality management within
wb
er.
b)
2+3
the framework of an existing functional structure ? Briefly explain, with the help
of a neat sketch, how a cross-functional structure is super imposed on a
functional structure to implement TQM.
2.
a)
4+5
them.
b)
in
a c.
ut .
discrepancy among the employees bring about the energy for change in
3.
a)
3+3
What is Kaizen philosophy ? Explain how innovation and kaizen can improve the
performance of an organization over time.
b)
3+5
3+3
What is a cause and effect diagram ? Write down probable applications of this
diagram.
44013 (06/07)
3+2
CS/M.TECH (PE)/SEM-2/PEM-204/09
4.
c)
a)
5.
/q
p:/
htt
b)
a)
What is quality function deployment ( QFD ) ? List down the basic steps required
in QFD.
2+3
c)
What are the objectives of a quality circle ? List the elements that constitute the
pap
b)
3+3
6.
a)
i)
ii)
What are Attribute control chart in the context of SPC and how can they
determined ?
2+6
Based on two months daily data, the attribute control chart for the part X123
in
a c.
ut .
b)
wb
er.
GROUP - B
had been determined as average fraction defective as 0125 with UCl as 0200
and LCL as 0050.
Recently for six days 12 units were sampled each day and the no. of defective
found to be 2, 1, 2, 0, 3 and 3 respectively.
i)
Construct the control chart with proper levelling ( need not be on scale ).
ii)
iii)
What is the extra significance of the data obtained on the 4th day. 2 + 2 + 2
44013 (06/07)
CS/M.TECH (PE)/SEM-2/PEM-204/09
7.
a)
/q
p:/
htt
Establish the control limits for x , so that = 010 when sample size
i)
( x ) = 4.
!
Also establish the 3 control limits for R for the process.
ii)
Given :
pap
i)
ii)
R
= 2059
"
d2 =
ii)
!
b)
8.
wb
er.
i)
x = 16 and = 2
Determine :
!
i)
The value of C p .
ii)
iii)
iv)
in
a c.
ut .
4+4
44013 (06/07)
CS/M.TECH (PE)/SEM-2/PEM-204/09
9.
a)
b)
A tool on the lathe machine lasts on an average of 200 hours. Assume that it
/q
p:/
htt
ii)
What is the chance that the tool will last for at least 300 hours ?
iii)
What is the chance that the tool would fail within 100 hours ?
iv)
After already lasting for 150 hours, what is the chance that the tool would
10.
52
pap
27
b)
Quality Spiral
c)
d)
wb
er.
a)
44013 (06/07)
in
a c.
ut .