You are on page 1of 68

ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAM

No.
A

Pekerjaan

Satuan

Harga Satuan

Pekerjaan Persiapan
1 Pengukuran dan pemasangan bouwplank

m2

39,163.00

2 Pembersihan lokasi

m2

9,075.00

3 Bongkaran Beton Bertulang

m3

390,495.00

4 Bongkaran dinding tembok batu bata

m3

390,495.00

1 Menbikin Kepala dan meruncing tiang

bh

25,658.00

2 Menbikin Pen dan lubanga

bh

47,520.00

3 Menumbuk tiang di tanah lembek (dipergunakan masuk kedalam tanah )

176,886.00

4 Pancang ulun 10/10-400

Titik

153,835.00

5 Pancang ulun 10/10-200

Titik

93,335.00

6 Psang Pondasi sumuran dia 100cm

Titik

1,237,225.00

1 Pasang dinding bataco Tebal 20Cm

m2

191,065.00

2 Pasang dinding bataco Tebal 15Cm

m2

163,821.00

3 Pasang dinding bataco Tebal 10Cm

m2

132,138.00

Pekerjaan Pobdasi

Pekerjaan Dinding

No.
D

Pekerjaan

Satuan

Harga Satuan

Pekerjaan Beton
1 Beton Tumbuk 1 Pc: 3 Psr: 5 Kr

m3

1,012,473.00

2 Beton Tumbuk 1 Pc: 3 Psr: 6 Kr

m3

993,014.00

3 Beton Tumbuk 1 Pc: 4 Psr: 6 Kr

m3

979,583.00

4 Lantai kerja Beton Tumbuk 1 Pc: 3 Psr: 5 Kr

m3

109,162.00

5 Beton Bertulang 1 Pc: 2 Psr: 3 Kr

m3

990,924.00

6 Beton Bertulang 1 Pc: 2 Psr: 4 Kr

m3

1,070,300.00

7 Beton Bertulang 1 Pc: 2 Psr: 2.5 Kr

m3

1,125,476.00

8 Beton Bertulang 1 Pc: 1.5 Psr: 3 Kr

m3

996,314.00

9 Beton Bertulang 1 Pc: 1.5 Psr: 2.5 Kr

m3

1,160,500.00

10 Beton Bertulang 1 Pc: 1 Psr: 2 Kr

m3

1,212,662.00

11 Beton Bertulang K 175

m3

1,218,553.00

12 Beton Bertulang K 225

m3

1,336,975.00

13 Beton Bertulang K 300

m3

1,383,311.00

14 Beton Bertulang K350

m3

1,383,674.00

15 Pembesian Dengan Besi Polos

kg

20,967.00

16 Pembesian Dengan Besi Ulir

kg

27,320.00

17 Pasang Bekisting Untuk Pondasi

m2

98,984.00

18 Pasang Bekisting Untuk Sloof

m2

105,584.00

19 Pasang Bekisting Untuk Kolom

m2

241,442.00

20 Pasang Bekisting Untuk Balok

m2

246,502.00

21 Pasang Bekisting Untuk Lantai

m2

375,356.00

22 Pasang Bekisting Untuk Tangga

m2

227,076.00

23 Pondasi Beton Bertulang ( 150 kg + Bekisting )

m3

4,570,907.00

24 Pondasi Beton Bertulang ( 200 kg + Bekisting )

m3

5,751,031.00

25 Kolom Beton Bertulang ( 300 kg + Bekisting )

m3

9,545,641.00

26 Balok Beton Bertulang ( 200 kg + Bekisting )

m3

7,101,336.00

27 Balok Beton Bertulang ( 150 kg + Bekisting )

m3

6,623,529.00

28 Dinding Beton Bertulang ( 150 kg + Bekisting )

m3

6,277,161.00

29 Tangga Beton Bertulang ( 200 kg + Bekisting )

m3

6,790,526.00

30 Kolom Penguat Beton Bertulang ( 11 x 11 )cm

m3

7,449,818.00

31 Ring Balk Beton Bertulang ( 10 x 15 )cm

m3

6,958,013.00

1 Pasang Kawat Harmonika

m2

53,661.00

2 Pasang Kawat Nyamuk

m2

46,577.00

3 Pasang Rangka Atap baja Ringan

m2

274,588.00

1 Membersihkan bidang permukan tembok lama yang pernah di cat

m2

9,254.00

2 Pengecetan bidang kayu lama

m2

29,647.00

3 Pengecetan bidang kayu baru (1 Lapis plamir)

m2

33,910.00

4 Pelaburan bidang kayu dengan residu / ter

m2

10,511.00

1 Memasang Bak Kontrol Pasangan Batu Bata kuran 30x30cm tinggi 35 cm

bh

496,768.00

2 Memasang Bak Cuci piring Stailis still

bh

410,517.00

Pekerjaan Besi dan Alluminium

Pekerjaan Pengecetan

Pekerjaan Sanitasi

Total Rekapitulasi
PROGRAM

: PENDIDIKAN MENENGAH

KEGIATAN

: PEMBANGUNAN GEDUNG SEKOLAH

PEKERJAAN

: PEMBANGUNAN GAPURA SMAN 1 LONG IKIS

LOKASI

: KECAMATAN LONG IKIS - KABUPATEN PASER

NO

URAIAN PEKERJAAN

JUMLAH HARGA

Pekerjaan Pendahuluan

Rp

2,427,000.00

II

Pekerjaan Pondasi

Rp

15,284,133.66

III

Pekerjaan Struktur

Rp

57,118,337.58

IV

Pekerjaan Dinding

Rp

81,264,845.54

Pekerjaan Lantai

Rp

1,135,369.98

VI

Pekerjaan Kusen Pintu Jendela dan Penggantung

Rp

3,307,383.60

VII

Pekerjaan Elektrikal

Rp

4,354,900.00

VIII

Pekerjaan Cat - catan

Rp

4,026,974.02

IX

Pekerjaan Lain - Lain

Rp

12,900,000.00

JUMLAH

Rp

181,818,944.39

PPN = 10 %

Rp

18,181,894.44

JUMLAH TOTAL

Rp

200,000,838.83

DIBULATKAN

Rp

200,000,000.00

Terbilang

// Dua ratus juta rupiah "

Tanah Grogot,2013
Dibuat Oleh :
CV. DFIZDTOR WIDYA REKAYASA

M. IRWANSYAH, ST
Direktur

Rencana Anggaran Biaya ( R A B )


PROGRAM

: PENDIDIKAN MENENGAH

KEGIATAN

: PEMBANGUNAN GEDUNG SEKOLAH

PEKERJAAN

: PEMBANGUNAN GAPURA SMAN 1 LONG IKIS

LOKASI

: KECAMATAN LONG IKIS - KABUPATEN PASER

NO

URAIAN PEKERJAAN

SATUAN VOLUME

HARGA SATUAN

JUMLAH HARGA

( Rp )

( Rp )

Pekerjaan Pendahuluan
1 Pekerjaan pembersihan lokasi pekerjaan

ls

1.00

427,000.00

427,000.00

2 Pekerjaan pengukuran kembali

ls

1.00

1,500,000.00

1,500,000.00

3 Pasang papan nama proyek

ls

1.00

500,000.00

500,000.00

JUMLAH I
II
A

2,427,000.00

Pekerjaan Pondasi
Pekerjaan Pondasi Type P1
1 Galian tanah pondasi

m3

2.30

51,250.00

118,080.00

2 Pengadaan pancang kayu ulin 10/10 cm P - 2m

m3

0.40

5,500,000.00

2,200,000.00

3 Upah memancang kayu ulin 10/10 cm P - 2m

m'

40.00

20,275.00

811,000.00

4 Urugan pasir dibawah pondasi tebal 7 cm

0.18

153,520.00

27,510.78

5 Cor lantai kerja camp. 1pc : 3ps : 5krl

0.13

790,528.50

101,187.65

6 Pasang begesting

2.56

51,206.33

131,088.21

7 Cor pondasi K-225

m3

0.51

1,213,866.46

621,499.63

8 Pembesian 12 mm

kg

94.48

10,372.65

980,041.16

9 Pembesian D. 16 mm

kg

167.90

13,176.40

2,212,307.02

JUMLAH A
B

7,202,714.45

Pekerjaan Pondasi Type P2


1 Galian tanah pondasi batu gunung

m3

1.25

51,250.00

64,124.00

2 Urugan pasir dibawah pondasi batu gunung

m3

0.07

153,520.00

11,299.07

3 Pasang aanstamping batu gunung

m3

0.29

462,007.20

136,014.92

4 Pasangan pondasi batu gunung camp. 1 : 4

0.55

841,057.50

464,263.74

5 Urugan tanah kembali

0.31

17,083.33

5,343.67

6 Pasang angkur untuk sloof

ls

1.00

150,000.00

150,000.00

JUMLAH B
C

1 Galian tanah pondasi

m3

1.76

51,250.00

90,405.00

2 Pengadaan pancang kayu ulin 10/10 cm P - 2m

0.18

5,500,000.00

990,000.00

3 Upah memancang kayu ulin 10/10 cm P - 2m

m'

18.00

20,275.00

364,950.00

4 Urugan pasir dibawah pondasi tebal 7 cm

0.14

153,520.00

21,062.94

5 Cor lantai kerja camp. 1pc : 3ps : 5krl

m3

0.10

790,528.50

77,471.79

6 Pasang begesting

m2

1.12

51,206.33

57,351.09

7 Cor pondasi K-225

0.39

1,213,866.46

475,835.65

8 Pembesian 12 mm

kg

62.52

10,372.65

648,448.29

9 Pembesian D. 16 mm

kg

111.09

13,176.40

1,463,782.09

JUMLAH C
D

831,045.40

Pekerjaan Pondasi Type P3

Pekerjaan Pondasi Type P4

4,189,306.86

1 Galian tanah pondasi batu gunung

m3

5.44

51,250.00

278,800.00

2 Urugan pasir dibawah pondasi batu gunung

0.32

153,520.00

49,126.40

3 Pasang aanstamping batu gunung

1.28

462,007.20

591,369.22

4 Pasangan pondasi batu gunung camp. 1 : 4

m3

2.40

841,057.50

2,018,538.00

5 Urugan tanah kembali

m3

1.36

17,083.33

23,233.33

6 Pasang angkur untuk sloof

ls

1.00

100,000.00

100,000.00

NO
III

URAIAN PEKERJAAN

JUMLAH D

3,061,066.95

JUMLAH II

15,284,133.66

SATUAN VOLUME

HARGA SATUAN

JUMLAH HARGA

( Rp )

( Rp )

Pekerjaan Struktur
1 Pekerjaan sloof 20/30 cm
- Pekerjaan begesting

m2

10.88

54,839.67

596,655.57

- Cor K-225

0.82

1,213,866.46

990,515.03

- Pembesian 12 mm

kg

96.61

10,372.65

1,002,147.36

- Pembesian 10 mm

kg

50.35

10,372.65

JUMLAH 1

522,233.88
3,111,551.84

2 Pekerjaan sloof 15/20 cm


- Pekerjaan begesting

m2

0.74

54,839.67

40,361.99

- Cor K-225

0.06

1,213,866.46

67,005.43

- Pembesian 12 mm

kg

9.80

10,372.65

101,688.48

- Pembesian 10 mm

kg

4.54

10,372.65

47,103.45

JUMLAH 2

256,159.35

3 Pekerjaan kolom 30/30 cm


- Pekerjaan begesting

m2

53.04

99,561.42

5,280,737.54

- Cor K-225

3.98

1,213,866.46

4,828,760.77

- Pembesian 12 mm

kg

314.00

10,372.65

3,256,978.91

- Pembesian 10 mm

kg

218.17

10,372.65

2,263,013.50

JUMLAH 3

15,629,490.71

4 Pekerjaan kolom 20/20 cm


- Pekerjaan begesting

m2

7.44

99,561.42

740,736.94

- Cor K-225

0.37

1,213,866.46

451,558.32

- Pembesian 12 mm

kg

66.07

10,372.65

685,291.94

- Pembesian 10 mm

kg

26.78

10,372.65

277,756.75

JUMLAH 4

2,155,343.95

5 Pekerjaan kolom 15/15 cm


- Pekerjaan begesting

m2

10.08

99,561.42

1,003,579.08

- Cor K-225

0.38

1,213,866.46

458,841.52

- Pembesian 12 mm

kg

59.67

10,372.65

618,973.37

- Pembesian 10 mm

kg

34.55

10,372.65

358,395.80

JUMLAH 5

2,439,789.77

6 Pekerjaan kolom 12/12 cm


- Pekerjaan begesting

m2

1.44

99,561.42

143,368.44

- Cor K-175

m3

0.09

1,137,336.61

98,265.88

- Pembesian 12 mm

kg

21.31

10,372.65

221,061.92

- Pembesian 10 mm

kg

6.00

10,372.65

JUMLAH 6

62,277.39
524,973.63

7 Pekerjaan balok 20/30 cm


- Pekerjaan begesting

m2

4.08

101,761.42

415,186.58

- Cor K-225

0.31

1,213,866.46

371,443.14

- Pembesian 12 mm

kg

36.23

10,372.65

375,805.26

- Pembesian 10 mm

kg

18.88

10,372.65

195,837.71

JUMLAH 7

1,358,272.68

8 Pekerjaan balok 20/25 cm


- Pekerjaan begesting

m2

8.40

101,761.42

854,795.90

- Cor K-225

0.60

1,213,866.46

728,319.87

- Pembesian 12 mm

kg

85.25

10,372.65

884,247.67

- Pembesian 10 mm

kg

39.49

10,372.65

409,595.20

JUMLAH 8

NO

URAIAN PEKERJAAN

SATUAN VOLUME

2,876,958.64

HARGA SATUAN

JUMLAH HARGA

( Rp )

( Rp )

9 Pekerjaan balok 15/30 cm


- Pekerjaan begesting

m2

3.15

101,761.42

320,548.46

- Cor K-225

m3

0.19

1,213,866.46

229,420.76

- Pembesian 12 mm

kg

22.38

10,372.65

232,115.01

- Pembesian 10 mm

kg

13.82

10,372.65

143,358.32

JUMLAH 9

925,442.56

10 Pekerjaan balok 12/20 cm


- Pekerjaan begesting

m2

9.96

101,761.42

1,013,340.19

- Cor K-175

m3

0.46

1,137,336.61

522,719.91

- Pembesian 12 mm

kg

68.02

10,372.65

705,555.95

- Pembesian 10 mm

kg

42.54

10,372.65

441,210.83

JUMLAH 10

2,682,826.88

11 Pekerjaan balok 12/15 cm


- Pekerjaan begesting

m2

5.23

101,761.42

532,110.45

- Cor K-175

m3

0.30

1,137,336.61

339,836.18

- Pembesian 12 mm

kg

44.22

10,372.65

458,703.48

- Pembesian 10 mm

kg

22.53

10,372.65

233,725.26

JUMLAH 11

1,564,375.37

12 Pekerjaan plat dag


- Pekerjaan begesting

m2

6.96

122,661.42

853,723.46

- Cor K-225

0.70

1,213,866.46

844,851.05

- Pembesian 12 mm

kg

208.21

10,372.65

2,159,725.80

- Plesteran dag

ls

1.00

750,000.00

750,000.00

- Pekerjaan list profil

m'

17.60

500,000.00

JUMLAH 12

8,800,000.00
13,408,300.32

13 Pekerjaan plat gapura

IV

- Pekerjaan begesting

m2

12.27

122,661.42

1,504,442.28

- Cor K-225

0.86

1,213,866.46

1,042,165.05

- Pembesian 12 mm

kg

198.91

10,372.65

2,063,244.56

- Pekerjaan list profil

m'

11.15

500,000.00

5,575,000.00

JUMLAH 13

10,184,851.88

JUMLAH III

57,118,337.58

Pekerjaan Dinding
1 Pekerjaan dinding pos jaga
- Pasang dinding bata campuran 1pc : 4ps

m2

13.43

115,730.25

1,554,257.26

- Plesteran dinding bata campuran 1pc : 4ps

26.86

39,673.28

1,065,624.30

- Pekerjaan acian untuk plesteran dinding bata

26.86

24,980.63

670,979.59

- Pekerjaan profil list dinding

m'

14.30

475,000.00

6,792,500.00

- Pekerjaan profil motif garis pada dinding

m2

9.36

750,000.00

7,020,000.00

2 Pekerjaan dinding kolom gapura

- Pasang dinding bata campuran 1pc : 4ps

42.76

115,730.25

4,948,625.49

- Plesteran dinding bata campuran 1pc : 4ps

85.52

39,673.28

3,392,858.91

- Pekerjaan profil list dinding

m'

50.00

475,000.00

23,750,000.00

- Pekerjaan profil motif garis pada dinding

m2

42.76

750,000.00

32,070,000.00

JUMLAH IV
V

81,264,845.54

Pekerjaan Lantai
1 Urugan tanah pilihan peninggian feil lantai

m3

1.44

84,950.00

2 Urugan pasir dibawah lantai tebal 5 cm

0.20

153,520.00

30,704.00

3 Cor beton lantai kerja camp. 1:3:5 tebal 7 cm (bawah keramik)

m3

0.28

790,528.50

221,347.98

4 Pasang keramik lantai 40 x 40 cm polos

m2

4.00

190,247.50

760,990.00

JUMLAH V

NO
VI

URAIAN PEKERJAAN

SATUAN VOLUME

122,328.00

1,135,369.98

HARGA SATUAN

JUMLAH HARGA

( Rp )

( Rp )

Pekerjaan Kusen Pintu Jendela dan Penggantung


1 Pasang angkur untuk kusen

ls

1.00

176,000.00

176,000.00

2 Pasang kusen pintu kayu bengkirai 5/12 cm

m'

3 Pasang daun pintu panil kayu bengkirai

bh

17.80

75,075.00

1,336,335.00

1.00

680,000.00

680,000.00

4 Pasang daun jendela panil + kaca (kecil)

bh

1.00

288,750.00

288,750.00

5 Pasang engsel pintu 4 " 3 buah / daun

bh

3.00

29,650.00

88,950.00

6 Pasang gerendel pintu

bh

2.00

24,150.00

48,300.00

7 Pasang kunci pintu 2 slaag

bh

1.00

238,300.00

238,300.00

8 Pasang engsel jendela 3 " 2 buah / daun

bh

2.00

44,225.00

88,450.00

9 Pasang hak angin jendela 2 buah / daun

bh

2.00

31,575.00

63,150.00

10 Pasang gerendel jendela 2 buah / daun

bh

2.00

21,750.00

43,500.00

11 Pasang handel jendela 1 buah / daun

bh

1.00

31,575.00

31,575.00

12 Pasang kaca mati 5 cm

2.04

109,840.00

224,073.60

JUMLAH VI
VII

3,307,383.60

Pekerjaan Elektrikal
1 Pasang lampu EL 18 Watt

bh

1.00

32,000.00

32,000.00

2 Lampu Spot Light

bh

2.00

500,000.00

1,000,000.00

3 Pasang stop kontak

bh

2.00

14,300.00

28,600.00

4 Pasang instalasi titik lampu

ttk

4.00

195,000.00

780,000.00

5 Pasang saklar tunggal

bh

1.00

14,300.00

14,300.00

6 Penyambungan kemeteran induk

ls

1.00

2,500,000.00

2,500,000.00

JUMLAH VII
VIII

4,354,900.00

Pekerjaan Cat - catan


1 Cat dinding luar dalam

m2

124.65

29,289.80

3,650,827.12

2 Cat plafond

4.00

53,136.00

212,544.00

3 Cat kilap (kusen, pintu, jendela)

8.67

18,870.00

163,602.90

JUMLAH VIII
IX

4,026,974.02

Pekerjaan Lain - Lain


1 Pembuatan meja beton

bh

1.00

1,500,000.00

1,500,000.00

2 Pembuatan tempat duduk lapis keramik

bh

1.00

1,400,000.00

1,400,000.00

3 Pembuatan bak bunga (lengkap)

bh

1.00

5,000,000.00

5,000,000.00

4 Pembuatan profil mainan pada kolom (diatas pos jaga)

bh

1.00

2,500,000.00

2,500,000.00

5 Pembuatan tulisan

ls

1.00

2,500,000.00

JUMLAH IX

2,500,000.00
12,900,000.00

BACKUP DATA VOLUME PEKERJAAN


NO

URAIAN PEKERJAAN

Pekerjaan Pendahuluan

Pasang buwplank
3.000

panjang Samping kanan

m'

3.000

panjang Samping kiri

m'

3.000

panjang depan

m'

3.000

m'

12.000

Jumlah pondasi fot plat

ttk

4.000

Jumlah
#

Pondasi type P1 (foot plat)

Galian pondasi
Lebar

m'

0.800

Tinggi

m'

0.900

Panjang

m'

0.800

m3

2.304

Jumlah pondasi fot plat

ttk

4.000

Jumlah pancang /ttk

ttk

5.000

Lebar

m'

0.100

Tinggi

m'

0.100

Panjang/ttk

m'

2.000

m3

0.400

Jumlah pondasi fot plat

ttk

4.000

Jumlah pancang /ttk

ttk

5.000

Panjang/ttk

m'

2.000

m'

40.000

Jumlah pondasi fot plat

ttk

4.000

Lebar

m'

0.800

Tinggi

m'

0.070

Jumlah
Pengadaan pancang ulin 10/10 cm

Jumlah
Upah memancang pancang

Jumlah
5

Urugan pasir

Panjang

m'

0.800

m3

0.179

Jumlah pondasi fot plat

ttk

4.000

Lebar

m'

0.800

Tinggi

m'

0.050

Panjang

m'

0.800

m3

0.128

m'

0.200

Jumlah
6

Cor lantai kerja

Jumlah
7

KETERANGAN

m'

Pekerjaan Pondasi

VOLUME

panjang belakang

II

SATUAN

Begesting fot plat


Tinggi
Panjang (0,8 x 4)
Jumlah
Luas/ttk
Jumlah pondasi fot plat
Jumlah

m'

3.200

m2

0.640

m2

0.640

bh

4.000

m2

2.560

NO
8

URAIAN PEKERJAAN

VOLUME

KETERANGAN

Cor pondasi
Jumlah pondasi fot plat

ttk

4.000

Lebar

m'

0.800

Tinggi

m'

0.200

Panjang

m'

0.800

m3

0.512

Jumlah pondasi fot plat

ttk

4.000

Besi dia 12 mm ( bbt/m' )

kg

0.888

Jumlah tulangan/ttk (7 x 2)

bh

14.000

Jumlah
9

Pembesian

Pembesian pondasi bagian luar

Panjang tulangan/btg = (0,75 x 2) + (0,15 x 2) + (0,05 x 2)

m'

1.900

kg

94.483

Jumlah pondasi fot plat

ttk

4.000

Besi dia 16 mm ( bbt/m' )

kg

1.578

Jumlah tulangan/ttk (7 x 2)

bh

14.000

Panjang tulangan/btg = (0,75 x 2) + (0,15 x 2) + (0,05 x 2)

m'

1.900

kg

167.899

m'

1.840

Jumlah
b

SATUAN

Pembesian pondasi bagian dalam

Jumlah
#

Pondasi type P2 (batu gunung)

Galian Pondasi batu gunung


Panjang
arah horizontal
arah vertikal

m'
Jumlah

1.840

Panjang

m'

1.840

Lebar

m'

0.800

Tinggi

m'

0.850

m3

1.251

Panjang

m'

1.840

Lebar

m'

0.800

Tinggi

m'

0.050

m3

0.074

Panjang

m'

1.840

Lebar

m'

0.800

Jumlah
2

Pasir urug dibawah Pondasi batu gunung

Jumlah
3

m'

Pas. Aanstamping batu gunung

Tinggi

m'

0.200

m3

0.294

Lebar atas

m'

0.300

Lebar bawah

m'

0.700

Jumlah
4

Vol pondasi batu gunung

m'

0.500

Lebar

Jumlah rata - rata

m'

0.500

Panjang

m'

1.840

Tinggi

m'

0.600

m3

0.552

m3

1.251

m3

0.313

Jumlah
5

Urugan tanah kembali


Volume galian
Koefisien ( 25 % )

0.250
Jumlah

NO

URAIAN PEKERJAAN

Pondasi type P3 (foot plat)

Galian pondasi
ttk

1.000

m'

1.400

Tinggi

m'

0.900

m'

1.400

m3

1.764

Jumlah pondasi fot plat

ttk

1.000

Jumlah pancang /ttk

ttk

9.000

Lebar

m'

0.100

Tinggi

m'

0.100

Pengadaan pancang ulin 10/10 cm

Panjang/ttk

m'

2.000

m3

0.180

Jumlah pondasi fot plat

ttk

1.000

Jumlah pancang /ttk

ttk

9.000

Jumlah
Upah memancang pancang

Panjang/ttk

m'

2.000

m'

18.000

Jumlah pondasi fot plat

ttk

1.000

Lebar

m'

1.400

Tinggi

m'

0.070

Panjang

m'

1.400

m3

0.137

Jumlah
5

Urugan pasir

Jumlah
6

KETERANGAN

Lebar

Jumlah

VOLUME

Jumlah pondasi fot plat

Panjang
2

SATUAN

Cor lantai kerja

Jumlah pondasi fot plat

ttk

1.000

Lebar

m'

1.400

Tinggi

m'

0.050

Panjang

m'

1.400

m3

0.098

m'

0.200

Jumlah
7

Begesting fot plat


Tinggi
Panjang (1,4 x 4)
Jumlah
Luas/ttk
Jumlah pondasi fot plat

m2

1.120

bh

1.000
1.120

Jumlah pondasi fot plat

ttk

1.000

Lebar

m'

1.400

Tinggi

m'

0.200

Panjang

m'

1.400

m3

0.392

Jumlah pondasi fot plat

ttk

1.000

Besi dia 12 mm ( bbt/m' )

kg

0.888

Jumlah tulangan/ttk (11 x 2)

bh

22.000

Panjang tulangan/btg = (1,4 x 2) + (0,15 x 2) + (0,05 x 2)

m'

3.200

kg

62.515

Cor pondasi

Jumlah
9

Pembesian

Pembesian pondasi bagian luar

Jumlah

NO
b

5.600
1.120

m2

Jumlah
8

m'
m2

URAIAN PEKERJAAN

SATUAN

VOLUME

KETERANGAN

Pembesian pondasi bagian dalam


Jumlah pondasi fot plat

ttk

1.000

Besi dia 16 mm ( bbt/m' )

kg

1.578

Jumlah tulangan/ttk (11 x 2)

bh

22.000

Panjang tulangan/btg = (1,4 x 2) + (0,15 x 2) + (0,05 x 2)

m'

3.200

kg

111.091

arah horizontal

m'

4.000

arah vertikal

m'

4.000

Jumlah
#

Pondasi type P4 (batu gunung)

Galian Pondasi batu gunung


Panjang

m'

8.000

Panjang

Jumlah

m'

8.000

Lebar

m'

0.800

Tinggi

m'

0.850

Jumlah
2

m3

5.440

Panjang

m'

8.000

Lebar

m'

0.800

Tinggi

m'

0.050

m3

0.320

Panjang

m'

8.000

Lebar

m'

0.800

Tinggi

m'

0.200

m3

1.280

Lebar atas

m'

0.300

Lebar bawah

m'

0.700

m'

0.500

Lebar

m'

0.500

Panjang

m'

8.000

Pasir urug dibawah Pondasi batu gunung

Jumlah
3

Pas. Aanstamping batu gunung

Jumlah
4

Vol pondasi batu gunung

Jumlah rata - rata

Tinggi
Jumlah
5

m'

0.600

m3

2.400

m3

5.440

Urugan tanah kembali


Volume galian
Koefisien ( 25 % )

0.250
Jumlah

III

Pekerjaan Struktur

Sloof 20/30 cm

Panjang
Panjang (1,4 x 4)
Panjang (2 x 4)

m3

1.360

m'

5.600

m'

8.000

m'

13.600

Panjang

m'

13.600

Lebar (0,3 x 2) + 0,2

m'

0.800

m2

10.880

Panjang

m'

13.600

Lebar

m'

0.200

Tinggi

m'

0.300

m3

0.816

Jumlah
Pasang begesting

Jumlah
Pengecoran

Jumlah

NO
#

URAIAN PEKERJAAN

SATUAN

VOLUME

KETERANGAN

Pembesian dia 12 mm
Panjang

m'

13.600

Jumlah Tulangan

bh

8.000

Besi dia 12 mm ( bbt/m' )

kg

0.888

Jumlah
#

kg

96.614

Panjang

m'

13.600

Jarak beugel

m'

0.150

Jumlah beugel

bh

90.667

Panjang 1 bh beugel (0,25 x 2) + (0,15 x 2) + (0,05 X 2)

m'

0.900

Besi dia 10 mm (bbt/m')

kg

0.617

Jumlah

kg

50.347

m'

1.840

Jumlah

m'

1.840

Panjang

m'

1.840

Lebar (0,2 x 2)

m'

0.400

m2

0.736

Panjang

m'

1.840

Lebar

m'

0.150

Tinggi

m'

0.200

m3

0.055

Panjang

m'

1.840

Jumlah Tulangan

bh

6.000

Besi dia 12 mm ( bbt/m' )

kg

0.888

kg

9.804

Panjang

m'

1.840

Jarak beugel

m'

0.150

Jumlah beugel

bh

12.267

Panjang 1 bh beugel (0,15 x 2) + (0,10 x 2) + (0,05 X 2)

m'

0.600

Besi dia 10 mm (bbt/m')

kg

0.617

kg

4.541

Panjang (7,5 x 4)

m'

30.000

Panjang (3,55 x 4)

m'

14.200

m'

44.200

Panjang

m'

44.200

Lebar (0,3 x 4)

m'

1.200

m2

53.040

Panjang

m'

44.200

Lebar

m'

0.300

Tinggi

m'

0.300

m3

3.978

Panjang

m'

44.200

Jumlah Tulangan

bh

8.000

Besi dia 12 mm ( bbt/m' )

kg

0.888

Pembesian dia 10 mm

Sloof 15/20 cm

Panjang
Panjang (1,84 x 1)
Pasang begesting

Jumlah
Pengecoran

Jumlah
#

Pembesian dia 12 mm

Jumlah
#

Pembesian dia 10 mm

Jumlah
#

Kolom 30/30 cm

Panjang kolom

Jumlah
#

Begesting

Jumlah
#

Vol beton

Jumlah

Pembesian dia 12 mm

Jumlah

NO
#

URAIAN PEKERJAAN

44.200

Jarak beugel

m'

0.150

Jumlah beugel

bh

294.667

Panjang 1 bh beugel (0,25 x 4) + (0,05 X 2)

m'

1.200

Kolom 20/20 cm

Panjang kolom
Panjang (2,5 x 2)
Panjang (4,3 x 1)

m'

5.000
4.300
9.300

Panjang

m'

9.300

Lebar (0,2 x 4)

m'

0.800

m2

7.440

Panjang

m'

9.300

Lebar

m'

0.200

Tinggi

m'

0.200

m3

0.372

Panjang

m'

9.300

Jumlah Tulangan

bh

8.000

Besi dia 12 mm ( bbt/m' )

kg

0.888

kg

66.067

m'

9.300

Begesting

Vol beton

Jumlah

Pembesian dia 12 mm

Jumlah
Pembesian dia 10 mm
Panjang
Jarak beugel

m'

0.150

Jumlah beugel

bh

62.000

Panjang 1 bh beugel (0,15 x 4) + (0,05 X 2)

m'

0.700

Besi dia 10 mm ( bbt/m' )

kg

0.617

kg

26.778

Panjang (4,2 x 4)

m'

16.800

Lebar (0,15 x 4)

m'

0.600

m2

10.080

Panjang

m'

16.800

Lebar

m'

0.150

Tinggi

m'

0.150

m3

0.378

Jumlah
#

Kolom 15/15 cm

Begesting

Jumlah
Vol beton

Jumlah

0.617
218.171

m'

Jumlah

kg
kg

m'

Jumlah

KETERANGAN

m'

VOLUME

Panjang

Jumlah

SATUAN

313.997

Pembesian dia 10 mm

Besi dia 10 mm ( bbt/m' )

kg

Pembesian dia 12 mm

Panjang

m'

16.800

Jumlah Tulangan

bh

4.000

Besi dia 12 mm ( bbt/m' )

kg

0.888

kg

59.674

Panjang

m'

16.800

Jarak beugel

m'

0.150

Jumlah beugel

bh

112.000

Panjang 1 bh beugel (0,10 x 4) + (0,05 X 2)

m'

0.500

Besi dia 10 mm ( bbt/m' )

kg

0.617

kg

34.552

Jumlah
#

Pembesian dia 10 mm

Jumlah

NO

URAIAN PEKERJAAN

Kolom 12/12 cm

Begesting
6.000

Lebar (0,12 x 2)

m'

0.240

m2

1.440

Panjang

m'

6.000

Lebar

m'

0.120

Tinggi

m'

0.120

m3

0.086

Panjang

m'

6.000

Jumlah Tulangan

bh

4.000

Besi dia 12 mm ( bbt/m' )

kg

0.888

kg

21.312

m'

6.000

Vol beton

Pembesian dia 12 mm

Jumlah
#

KETERANGAN

m'

Jumlah

VOLUME

Panjang (6 x 1)

Jumlah
#

SATUAN

Pembesian dia 8 mm
Panjang
Jarak beugel

m'

0.150

Jumlah beugel

bh

40.000

Panjang 1 bh beugel (0,07 x 4) + (0,05 X 2)

m'

0.380

Besi dia 8 mm ( bbt/m' )

kg

0.395

kg

6.004

Panjang (1,1 x 1)

m'

1.100

Panjang (1 x 4)

m'

4.000

m'

5.100

m'

5.100

Jumlah
#

Balok 20/30 cm

Panjang

Jumlah
Pasang begesting
Panjang
Lebar (0,3 x 2) + 0,2
Jumlah

m'

0.800

m2

4.080

m'

5.100

Pengecoran
Panjang

Lebar

m'

0.200

Tinggi

m'

0.300

m3

0.306

Panjang

m'

5.100

Jumlah Tulangan

bh

8.000

Besi dia 12 mm ( bbt/m' )

kg

0.888

kg

36.230

m'

5.100

Jumlah
#

Pembesian dia 12 mm

Jumlah
#

Pembesian dia 10 mm
Panjang
Jarak beugel

m'

0.150

Jumlah beugel

bh

34.000

Panjang 1 bh beugel (0,25 x 2) + (0,15 x 2) + (0,05 X 2)

m'

0.900

Besi dia 10 mm (bbt/m')

kg

0.617

kg

18.880

Panjang horizontal (2 x 3)

m'

6.000

Panjang vertikal (2 x 3)

m'

6.000

m'

12.000

m'

12.000

Jumlah
#

Balok 20/25 cm

Panjang

Jumlah
Pasang begesting
Panjang
Lebar (0,25 x 2) + 0,2
Jumlah

NO

URAIAN PEKERJAAN

m'

0.700

m2

8.400

SATUAN

VOLUME

KETERANGAN

Pengecoran
Panjang

m'

12.000

Lebar

m'

0.200

Tinggi

m'

0.250

m3

0.600

Panjang

m'

12.000

Jumlah Tulangan

bh

8.000

Jumlah
#

Pembesian dia 12 mm

Besi dia 12 mm ( bbt/m' )

kg

0.888

kg

85.248

Panjang

m'

12.000

Jarak beugel

m'

0.150

Jumlah beugel

bh

80.000

Panjang 1 bh beugel (0,20 x 2) + (0,15 x 2) + (0,05 X 2)

m'

0.800

Besi dia 10 mm (bbt/m')

kg

0.617

kg

39.488

m'

4.200

m'

4.200

Jumlah
#

Pembesian dia 10 mm

Jumlah
#

Balok 15/30 cm

Panjang
Panjang (1,4 x 3)
Jumlah
Pasang begesting

Panjang

m'

4.200

Lebar (0,3 x 2) + 0,15

m'

0.750

m2

3.150

Panjang

m'

4.200

Lebar

m'

0.150

Tinggi

m'

0.300

m3

0.189

Panjang

m'

4.200

Jumlah Tulangan

bh

6.000

Besi dia 12 mm ( bbt/m' )

kg

0.888

kg

22.378

m'

4.200

Jumlah
Pengecoran

Jumlah
#

Pembesian dia 12 mm

Jumlah
#

Pembesian dia 10 mm
Panjang
Jarak beugel

m'

0.150

Jumlah beugel

bh

28.000

Panjang 1 bh beugel (0,10 x 2) + (0,25 x 2) + (0,05 X 2)

m'

0.800

Besi dia 10 mm (bbt/m')

kg

0.617

Jumlah

kg

13.821

m'

19.150

Jumlah

m'

19.150

Panjang

m'

19.150

Lebar (0,2 x 2) + 0,12

m'

0.520

m2

9.958

Panjang

m'

19.150

Lebar

m'

0.120

Tinggi

m'

0.200

m3

0.460

Balok 12/20 cm

Panjang
Panjang (1 x 8) + 11,15
Pasang begesting

Jumlah
Pengecoran

Jumlah

NO
#

URAIAN PEKERJAAN

VOLUME

KETERANGAN

Pembesian dia 12 mm
Panjang

m'

19.150

Jumlah Tulangan

bh

4.000

Besi dia 12 mm ( bbt/m' )

kg

0.888

kg

68.021

m'

19.150

Jumlah
#

SATUAN

Pembesian dia 10 mm
Panjang
Jarak beugel

m'

0.150

Jumlah beugel

bh

127.667

Panjang 1 bh beugel (0,15 x 2) + (0,07 x 2) + (0,05 X 2)

m'

0.540

Besi dia 10 mm (bbt/m')

kg

0.617

Jumlah
#

Balok 12/15 cm

Panjang
Panjang (11,15 x 1) + 1,4
Jumlah

kg

42.536

m'

12.450

m'

12.450

m'

12.450

Pasang begesting
Panjang
Lebar (0,15 x 2) + 0,12

m'

0.420

m2

5.229

Panjang

m'

12.450

Lebar

m'

0.120

Jumlah
Pengecoran

Tinggi

m'

0.200

m3

0.299

Panjang

m'

12.450

Jumlah Tulangan

bh

4.000

Jumlah
#

Pembesian dia 12 mm

Besi dia 12 mm ( bbt/m' )

kg

0.888

kg

44.222

Panjang

m'

12.450

Jarak beugel

m'

0.150

Jumlah beugel

bh

83.000

Panjang 1 bh beugel (0,10 x 2) + (0,07 x 2) + (0,05 X 2)

m'

0.440

Besi dia 10 mm (bbt/m')

kg

0.617

kg

22.533

(2 x 2)

m2

4.000

(1 x 1)

m2

1.000

Jumlah
#

Pembesian dia 10 mm

Jumlah
#

Pat dag

Luas plat

(1,4 x 1,4)
Jumlah
#

1.960
6.960

m2

6.960

m2

6.960

m2

6.960

Pasang begesting
Luas plat lantai lantai
Jumlah

m2
m2

Beton
Luas
Tebal

m'

0.100

m3

0.696

Tulangan bagi ( 3 : 3 ) = 1 : 0,15 = 6,6 x 4 = 26,4 x 3 m'

m'

79.200

Tulangan pokok atas / kuda ( 3 : 0,5 ) = 1,5 : 0,15 = 11 x 2 = 22 x 3

m'

66.000

Tulangan pokok bawah ( 3 : 0,15 ) = 21 x 2 = 42 x 3

m'

126.000

Jumlah
Pembesian
Penghitungan ( 3 x 3 ) dengan jarak 15 cm
Luas / 9 m2

Tulangan ekstra ( 3 : 0,5 ) = 1,5 : 0,15 = 10 x 4 = 40 x 0,8


Jumlah

NO

URAIAN PEKERJAAN

m'

32.000

m'

303.200

SATUAN

VOLUME

KETERANGAN

Luas / 1 m2
Panjang tulangan 9 m2

m'

Peanjang / m2
Jumlah

303.200

m2

9.000

m'

33.689

Pembesian los
Luas plat

m2

6.960

kebutuan besi / m2

m'

33.689

Besi dia 12 mm ( bbt/m' )

kg

0.888

kg

208.214

m'

17.600

Jumlah

m'

17.600

m2

12.265

Jumlah

m2

12.265

m2

12.265

m2

12.265

m2

12.265

Jumlah
#

List profil
Panjang
(2 x 4) + (1 x 4) + (1,4 x 4)

Plat dinding gapura

Luas plat
(11,15 x 1,1)

Pasang begesting
Luas plat lantai lantai
Jumlah

Beton
Luas
Tebal
Jumlah

m'

0.070

m3

0.859

Pembesian
Arah horizintal (11,2 x 8)

m'

89.600

Arah vertikal (1,2 x 112)

m'

134.400

m'

224.000

kebutuan besi

Jumlah

m'

224.000

Besi dia 12 mm ( bbt/m' )

kg

0.888

kg

198.912

m'

11.150

m'

11.150

Panjang (2 x 4)

m'

8.000

Tinggi pasangan

m'

2.250

m2

18.000

Pintu (0,9 x 2,1)

m2

1.890

Jendela 1 (1 x 1,6)

m2

1.600

Jendela 2 (0,68 x 1)

m2

0.680

Jumlah
#

List profil
Panjang
Jumlah

IV

Pekerjaan Dinding

Pekerjaan dinding pos jaga


Luas dinding bata pos jaga

Jumlah
#

Luas pengurangan

Jendela 3 (0,4 x 1)

m2

0.400

m2

4.570

Luas dinding bata pos jaga

m2

18.000

Luas pengurangan

m2

4.570

m2

13.430

Jumlah
#

Luas bersih

Jumlah

Pasangan dinding 1:4


Luas keseluruhan

NO
2

URAIAN PEKERJAAN

Luar dalam
Jumlah

Luar dalam

KETERANGAN

13.430

kl

2.000

m2

26.860

m2

13.430

m2

2.000
26.860

Plesteran ban dinding


Vertikal (1,15 x 2)

m'

2.300

Horizontal (2 x 6)

m'

12.000

m'

14.300

m2

10.400

Jumlah
Plesteran profil dinding
Luas kotor (2 x 4) x 1,3
Luas pengurangan (0,8 x 1,3)

m2

1.040

m2

9.360

Kolom (0,5 x 4) x 6,9

m2

13.800

Kolom {(1,4 x 4) x 4,25

m2

23.800

Kolom (1,2 x 4,3)

m2

5.160

m2

42.760

m2

42.760

m2

42.760

m2

42.760

kl

2.000

Jumlah
#

VOLUME

m2

kl
Jumlah

SATUAN

Vol acian untuk plesteran


Vol plesteran 1:4

13.430
13.430

Vol plesteran 1:4


Luas Pasangan

m2
m2

Pekerjaan dinding kolom


Luas dinding kolom

Jumlah
1

Pasangan dinding 1:4


Luas keseluruhan

Vol plesteran 1:4


Luas Pasangan
Luar dalam
Jumlah

85.520

m'

24.000

Plesteran ban dinding


(1 x 4) x 6 ttk
{(1,4 x 2) + (1,2 x 2)} x 5 ttk

m2

m'

26.000

Jumlah

m'

50.000

m2

42.760

Jumlah

m2

42.760

Panjang

m'

2.000

Lebar

m'

2.000

Plesteran profil dinding


Luas dinding bata

Pekerjaan lantai

Urugan tanah dibawah lantai

Tinggi

m'

0.360

m3

1.440

Luas urugan

m2

4.000

Tinggi

m'

0.050

m3

0.200

Luas

m2

4.000

Tinggi

m'

0.070

m3

0.280

m'

2.000

Jumlah
2

Urugan pasir dibawah lantai

Jumlah
3

Cor camp. 1 : 3 : 5 dibawah lantai

Jumlah
5

Pasangan keramik ruangan


Panjang
Lebar
Jumlah

NO

URAIAN PEKERJAAN

VI

Pekerjaan kusen, pintu dan penggatung

Panjang kusen dan pintu kayu bengkirai


m'

6.400

J2 = 1 bh (1 x 2) + (0,6 x 2) + (0,05 x 4)

m'

3.400
2.800
17.800

bh

1.000

bh

1.000

bh

1.000

bh

1.000

bh

1.000

Pasang daun jendela kecil


Jumlah
Pasang engsel pintu
Jumlah daun
Pasangan/daun

bh

3.000

bh

3.000

Jumlah daun

bh

1.000

Pasangan/daun

bh

2.000

bh

2.000

bh

1.000

Jumlah
Pasang grendel pintu

Jumlah
Pasang kunci 2 slagg biasa
Jumlah daun
Pasangan/daun

bh

1.000

bh

1.000

Jumlah daun

bh

1.000

Pasangan/daun

bh

2.000

bh

2.000

Jumlah
7

m'
m'

Pasang daun pintu bengkirai

J2 = 1 bh x 1

KETERANGAN

J1 = 1 bh (1 x 3) + (1,6 x 2) + (0,05 x 4)

Jumlah

VOLUME

5.200

P1

SATUAN

m'

Jumlah

2.000
4.000

P = 1 bh (2,1 x 2) + (0,9 x 1) + (0,05 x 2)

J3 = 1 bh (1 x 2) + (0,3 x 2) + (0,05 x 4)
2

m'
m2

Pasang engsel jendela

Jumlah

Pasang hak angin jendela


Jumlah daun

bh

Pasangan/daun

bh

2.000

bh

2.000

Jumlah daun

bh

1.000

Pasangan/daun

bh

2.000

bh

2.000

bh

1.000

Jumlah
9

Pasang grendel jendela

Jumlah
10

Pasang handle jendela


Jumlah daun
Pasangan/daun

bh

1.000

bh

1.000

(0,68 x 1)

m2

0.680

Jumlah

bh

3.000

m2

2.040

Pasang lampu EL 18 Watt

bh

1.000

Pasang stop kontak

bh

2.000

Lampu Spot Light

bh

1.000

Pasang instalasi titik lampu

ttk

4.000

Pasang saklar tunggal

bh

1.000

Luas dinding bata bangunan pos = luas volume acian

m2

26.860

Luas dinding bata kolom gapura = luas volume acian

m2

85.520

Luas plat gapura

m2

12.265

m2

124.645

Jumlah
11

Pasang kaca mati 5 mm

Jumlah
VII

VIII

1.000

Pekerjaan Elektrikal

Pekerjaan Cat - catan


1 Cat dinding

Jumlah

NO

URAIAN PEKERJAAN
2 Cat plafong = volume dag pos

SATUAN

VOLUME

KETERANGAN

m2

4.000

m'

17.800

3 Cat kilap
kusen kayu
Panjang kusen
Lebar

m'

0.250

m2

4.450

Luas daun pintu = ( 2,1 x 0,85 x 2 )

m2

3.570

Jumlah daun pintu

bh

1.000

m2

3.570

Jumlah daun

bh

1.000

luas 1 bingkai = {( 0,7 x 2 ) + ( 0,6 x 2 )} x {( 0,1 x 2 ) + 0,05 )}

m2

0.650

m2

0.650

kusen kayu

m2

4.450

Daun pintu

m2

3.570

Bingkai Daun jendela

m2

0.650

Jumlah
Daun pintu

Jumlah
Bingkai Daun jendela

Jumlah
Luas cat kilap keseluruhan

Jumlah

m2

8.670

Daftar Harga Satuan Upah


No.

Uraian Pekerjaan

Satuan

Total

Harga Upah ratarata/jam

Keterangan

1 Pekerja

hari

Rp

65,000.00

Rp

9,285.71

2 Tukang kayu

hari

Rp

80,000.00

Rp

11,428.57

3 Tukang Batu

hari

Rp

80,000.00

Rp

11,428.57

4 Tukang Besi

hari

Rp

80,000.00

Rp

11,428.57

5 Tukang cat

hari

Rp

80,000.00

Rp

6 Kepala tukang

hari

Rp

80,000.00

Rp

11,428.57 1 Hari =
7 Jam Kerja
11,428.57

7 Mandor

hari

Rp

100,000.00

Rp

14,285.71

8 Operator Trampil

hari

Rp

90,000.00

Rp

12,857.14

9 Pembantu Operator

hari

Rp

60,000.00

Rp

8,571.43

hari

Rp

100,000.00

Rp

14,285.71

10 Sopir

Page 25 of 68

Daftar Harga Satuan Bahan


No.

Nama Bahan

Satuan

Harga Bahan

1 Tanah Urug

m3

42,875.00

2 Pasir urug

m3

110,850.00

3 Pasir pasang

m3

145,500.00

4 Sirtu

m3

190,150.00

5 Pasir beton

m3

151,275.00

6 Koral beton/ kerikil

m3

224,800.00

7 Batu gunung

m3

271,000.00

8 Batu pecah

m3

395,000.00

9 Batu bata

bh

1,195.00

10 Paving block natural

bh

2,400.00

11 Paving Blok Warna

bh

2,800.00

12 Kansteen K.225 15/20x30x50

bh

28,000.00

13 Semen pc 50 Kg

zak

86,625.00

14 Semen putih

zak

75,075.00

15 Semen warna

kg

4,850.00

16 Kayu Galam 10 - 12 cm

btg

17,325.00

17 Kayu balok ulin

m3

5,500,000.00

18 Kayu balok meranti

m3

2,640,000.00

19 Kayu balok bengkirai

m3

3,520,000.00

20 Kayu balok resak

m3

4,500,000.00

21 kayu balok kelas 2

m3

2,200,000.00

22 Papan Kayu meranti

m3

2,750,000.00

23 Papan Kayu bengkirai

m3

3,850,000.00

24 Papan Kayu Ulin

m3

6,600,000.00

25 Papan Kayu kelas 2

m3

2,200,000.00

26 Papan Ruiter

m3

2,656,000.00

27 Baja Truss C Zingkalum

m2

175,000.00

28 Skrup

Kg

75,000.00

29 Kalsiboard 3.5 mm

lbr

63,525.00

30 Kalsiboard 4.5 mm

lbr

66,990.00

31 Triplek 3 mm

lbr

57,750.00

32 Triplek 3,6 mm

lbr

75,075.00

33 Triplek 6 mm

lbr

109,725.00

34 Triplek 9 mm

lbr

167,475.00

35 Triplek 12 mm

lbr

213,675.00

36 Gipsum Standar

m2

27,900.00

m'

11,550.00

37 Jalusi Kayu
Page 26 of 68

No.

Nama Bahan

Satuan

Harga Bahan

38 Jalusi Dinding layar

bh

39,600.00

39 Paku Tripleks

kg

27,500.00

40 Paku Kayu

kg

17,500.00

41 Paku Seng

kg

27,500.00

42 Paku Asbes + Karet

kg

27,500.00

43 Paku Genteng Metal

kg

39,700.00

kotak

10,000.00

kg

22,000.00

kotak

16,500.00

kg

27,500.00

44 Paku sekrup
45 Paku Ulin
46 Paku beton
47 Paku gypsum

Page 27 of 68

No.

Nama Bahan

Satuan

Harga Bahan

48 Baut 12 mm

bh

6,930.00

49 Kawat harmonika

m2

22,500.00

50 Kawat Whire mask

Roll

3,245,000.00

51 Kawat Duri

Roll

86,625.00

52 Kawat Nyamuk Lebar 90cm

m'

28,875.00

53 Kawat Las 3.2mm

dos

167,475.00

54 Kawat beton

kg

24,000.00

55 Besi beton polos U 22

kg

8,893.00

56 Besi beton ulir U 32

kg

11,148.00

57 Besi strip

kg

58 Baja Profil WF 150

kg

22,000.00

59 Pintu Besi

m2

990,000.00

60 Rolling door

m2

1,237,500.00

61 Buis beton diameter 80 tanpa tulangan - 0,5 m

bh

165,000.00

62 Buis beton bertulang diameter 60

m'

313,000.00

63 Buis beton bertulang diameter 80

m'

330,000.00

64 Buis beton bertulang diameter 100

m'

420,000.00

65 Plat begel

bh

10,450.00

66 Begel besi - U

bh

10,450.00

67 Keramik 10 x 20

m2

67,000.00

68 Keramik 20 x 20 anti slip

m2

59,900.00

69 Keramik 20 x 25

m2

59,900.00

70 Keramik 30x30 warna

m2

58,850.00

71 Keramik 40 x 40 polos

m2

85,000.00

72 Keramik 40 x 40 anti slip

m2

90,000.00

73 Roster beton 30 x 30

bh

8,000.00

74 Roster kayu 20 x 20 cm

bh

82,500.00

75 List Profile Sudut 3/5 kayu meranti

m'

12,500.00

76 List Profile Sudut 3/5 kayu bengkirai

m'

13,000.00

77 Kusen kayu ulin

m'

86,625.00

78 Kusen kayu bengkirai

m'

75,075.00

79 Pintu Panil Kayu Ulin ukuran besar (fabrikasi) lebar 80 cm

bh

866,250.00

80 Pintu Panil Kayu Ulin ukuran kecil (fabrikasi) lebar 70 cm

bh

770,000.00

81 Pintu Panil Kayu Bengkirai ukuran besar (fabrikasi) L=80 cm

bh

693,000.00

82 Pintu Panil Kayu Bengkirai ukuran kecil (fabrikasi) L= 70 cm

bh

680,000.00

83 Pintu Panil Kayu Bengkirai Double (fabrikasi)

pasang

1,375,000.00

84 Daun jendela ulin ukuran besar (fabrikasi) + kaca 5 mm

bh

346,500.00

85 Daun jendela ulin ukuran kecil (fabrikasi) + kaca 5 mm

bh

323,400.00

86 Daun jendela bengkirai ukuran besar (fabrikasi) + kaca 5 mm

bh

317,625.00

Page 28 of 68

No.

Nama Bahan

Satuan

Harga Bahan

87 Daun jendela bengkirai ukuran kecil (fabrikasi) + kaca 5 mm

bh

288,750.00

88 Hak angin

bh

17,325.00

89 Kaca bening uk. 5 mm

m2

86,900.00

90 Kaca Ryben 5 mm

m2

97,900.00

91 Engsel Jendela Kuningan 3''

bh

28,875.00

92 Engsel Pintu Kuningan 4 ''

bh

15,400.00

93 Grendel Pintu Kuningan 3''

psg

9,900.00

94 Grendel Jendela Kuningan 2''

psg

7,500.00

95 Handle Pintu

bh

17,600.00

96 Handle Jendela

bh

17,325.00

Page 29 of 68

No.

Nama Bahan

Satuan

Harga Bahan

97 Kunci Pintu standar 2 slaag (besar)

bh

196,350.00

98 Kunci Pintu 1 slag (besar)

bh

173,250.00

99 Seng gelombang BJLS 20

lbr

46,200.00

100 Seng plat BJLS 20 Lebar 50cm

m'

32,340.00

101 Asbes gelombang

lbr

34,650.00

102 Atap Genteng Metal tebal 0.30 mm

lbr

34,650.00

103 Nok Model C

28,875.00

104 Nok Model U

36,960.00

105 Nok samping metal L

m'

31,500.00

106 Dempul

kg

28,875.00

107 Lem Vinyl

Kg

50,000.00

108 Lem Kaca

Tube

45,000.00

109 Ampelas

lbr

3,850.00

110 Plitur kayu

liter

57,750.00

111 Minyak cat

liter

11,000.00

112 Minyak bekisting

liter

10,890.00

113 Residu

kg

28,875.00

114 Cat Meni kayu

kg

28,875.00

115 Cat Tembok Mutu A

kg

200,200.00

116 Cat Kayu

kg

49,500.00

117 Cat Besi

kg

38,500.00

118 Cat Dasar

kg

13,750.00

119 Plamir

kg

27,830.00

120 Instalasi titik lampu

ttk

195,000.00

121 Lampu pijar 5 watt

bh

4,500.00

122 Lampu pijar 10 watt

bh

6,500.00

123 Lampu pijar 15 watt

bh

7,500.00

124 Lampu pijar 25 watt

bh

9,500.00

125 Lampu pijar 40 watt

bh

9,500.00

126 Lampu pijar 60 watt

bh

12,500.00

127 Lampu pijar 100 watt

bh

15,000.00

128 Lampu EL 8 watt standard mutu klas - A

bh

28,000.00

129 Lampu EL 18 watt standard mutu klas - A

bh

32,000.00

130 Lampu EL 20 watt standard mutu klas - A

bh

40,000.00

131 Lampu TL (trafo) 20 watt

bh

85,000.00

132 Lampu TL (trafo) 40 watt

bh

120,000.00

133 Lampu TL (trafo) 2 x 20 watt

bh

150,000.00

134 Lampu TL (trafo) 2 x 40 watt

bh

235,000.00

bh

15,420.00

135 Kap lampu biasa


Page 30 of 68

No.

Nama Bahan

Satuan

Harga Bahan

136 Kap lampu Down lights RD 100 E27

bh

137 Sistem Penangkal Petir + instalasi lengkap

ttk

2,500,000.00

138 Box MCB 4 Group

bh

34,650.00

139 Box MCB 8 Group

bh

75,075.00

140 Saklar Tunggal standard mutu klas - A

bh

14,300.00

141 Saklar Ganda standard mutu klas - A

bh

17,600.00

142 Stop Kontak standard mutu klas - A

bh

14,300.00

143 Piting lampu tanam (besar)

bh

85,000.00

144 Piting lampu tanam (kecil)

bh

57,750.00

145 Breaker / MCB 2 amp

bh

23,100.00

Page 31 of 68

No.

Nama Bahan

Satuan

Harga Bahan

146 Breaker / MCB 4 amp

bh

23,100.00

147 Kabel NGA 2,5 / ETERNA

rol

463,000.00

148 Klosed jongkok keramik

bh

144,375.00

149 Klosed Duduk keramik

bh

2,310,000.00

150 Urinoir

Set

880,000.00

151 Bak cuci piring aluminium lobang 1

bh

288,750.00

152 Bak cuci piring aluminium lobang 2

bh

519,750.00

153 Bak air Uk. 80x 60 x 60 (fiber)

bh

375,375.00

154 Pipa PVC AW 1/2"

m'

5,053.25

155 Pipa PVC AW 3/4"

m'

7,940.75

156 Pipa PVC 2"

m'

10,025.00

157 Pipa PVC 3"

m'

20,025.00

158 Pipa PVC 4"

m'

27,625.00

159 Pipa Galvanis 2"

m'

82,293.75

160 Pipa Galvanis 3"

m'

180,468.75

161 Pipa Galvanis 4"

m'

209,343.75

162 Tee pvc aw 1/2"

bh

4,500.00

163 Tee pvc aw 3/4"

bh

5,250.00

164 Tee pvc aw 1"

bh

11,250.00

165 Tee pvc aw 2"

bh

34,600.00

166 Tee pvc aw 4"

bh

113,400.00

167 Elbow pvc aw 1/2"

bh

3,500.00

168 Elbow pvc aw 3/4"

bh

4,800.00

169 Elbow pvc aw 1"

bh

5,500.00

170 Elbow pvc aw 2"

bh

16,750.00

171 Elbow pvc aw 4"

bh

91,400.00

172 Sokced drat pvc aw 1/2"

bh

3,000.00

173 Socked drat pvc aw 3/4"

bh

3,900.00

174 Socked drat pvc aw 1"

bh

4,800.00

175 Socked drat pvc aw 2"

bh

15,300.00

176 Socked drat pvc aw 4"

bh

61,200.00

177 Lem PVC

bh

11,550.00

Liter

15,000.00

179 Seal Tape

bh

4,950.00

180 Kran Air 3/4" stainless

bh

45,540.00

181 Kran Air 3/4" galvanis

bh

30,360.00

182 Kran Air 1/2" galvanis

bh

25,300.00

183 Floor Drain

bh

23,100.00

bh

98,175.00

178 Lem Kayu (Fox)

184 Talang PVC


Page 32 of 68

No.

Nama Bahan

Satuan

Harga Bahan

185 Corong Talang

bh

23,100.00

186 Sambungan Talang

bh

17,325.00

187 Concrete Mixer

jam

70,600.00

188 Tandon air/ Viberglass 3.000 lt

bh

4,360,125.00

189 Tandon air/ Viberglass 2.000 lt

bh

3,080,000.00

190 Tandon air/ Viberglass 1.200 lt

bh

1,501,500.00

191 Tandon air/ Viberglass 1.000 lt

bh

1,270,500.00

192 Tandon air/ Viberglass 450 lt

bh

981,750.00

193 Minyak bekisting

liter

9,900.00

194 Air bersih (PDAM)

liter

6.30

Page 33 of 68

ANALISA HARGA SATUAN PEKERJAAN


No.
A
A.1

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

Bahan
(Rp.)

Keterangan

Pekerjaan Persiapan
1 m' Pengukuran dan Pasangan bouwplank
0.0070 m3

Papan kayu meranti

2,750,000.00

19,250.00

0.0120 m3

Balok 5/7

2,640,000.00

31,680.00

0.0200 kg

Paku kayu

17,500.00

0.1000 oh

Tukang kayu

80,000.00

8,000.00

0.1000 oh

Pekerja

65,000.00

6,500.00

0.0100 oh

Kepala tukang

80,000.00

800.00

0.0050 oh

Mandor

100,000.00

350.00

500.00
15,800.00

A.2

Jumlah Harga
(Rp.)

51,280.00

67,080.00

SNI

3,793.00

Analisa kab.

4,900.00

Analisa kab.

14,500.00

Analisa kab.

1,055.00

Analisa kab.

51,250.00

SNI

63,000.00

SNI

74,950.00

SNI

68,200.00

SNI

103,500.00

SNI

82,500.00

SNI

1 m2 bongkar &menurunkan atap sirap/genteng/seng


yang tidak dipakai
0.0542 oh

Pekerja

65,000.00

0.0027 oh

Mandor

100,000.00

3,523.00
270.00
3,793.00

A.3

1 m2 menurunkan rangka atap dari kayu


(kayu bongkaran tidak dipakai lagi )
0.0700 oh

Pekerja

65,000.00

0.0035 oh

Mandor

100,000.00

4,550.00
350.00
4,900.00

A.4

1 m2 bongkar dinding, lantai dari kayu


(kayu bongkaran tidak dipakai lagi )
0.2000 oh

Pekerja

65,000.00

0.0150 oh

Mandor

100,000.00

13,000.00
1,500.00
14,500.00

A.5

1 m2 Pembersihan Lokasi dan perataan


0.0150 oh

Pekerja

65,000.00

0.0008 oh

Mandor

100,000.00

975.00
80.00
1,055.00

B
B.1

Pekerjaan Tanah
1 m3 Galian Tanah Biasa sedalam 1 meter
0.7500 oh

Pekerja

65,000.00

0.0250 oh

Mandor

100,000.00

48,750.00
2,500.00
51,250.00

B.2

1 m3 Galian Tanah Biasa sedalam 2 meter


0.9000 oh

Pekerja

65,000.00

0.0450 oh

Mandor

100,000.00

58,500.00
4,500.00
63,000.00

B.3

1 m3 Galian Tanah Biasa sedalam 3 meter


1.0500 oh

Pekerja

65,000.00

0.0670 oh

Mandor

100,000.00

68,250.00
6,700.00
74,950.00

B.4

1 m3 Galian Tanah Keras sedalam 1 meter


1.0000 oh

Pekerja

65,000.00

0.0320 oh

Mandor

100,000.00

65,000.00
3,200.00
68,200.00

B.5

1 m3 Galian Tanah Cadas sedalam 1 meter


1.5000 oh

Pekerja

65,000.00

0.0600 oh

Mandor

100,000.00

97,500.00
6,000.00
103,500.00

B.6

1 m3 Galian Tanah Lumpur sedalam 1 meter


1.2000 oh

Pekerja

65,000.00

0.0450 oh

Mandor

100,000.00

78,000.00
4,500.00
82,500.00

B.7

1 m3 Urugan tanah kembali

No.

Nama Pekerjaan

Harga Satuan
(Rp.)

0.3333 m3 Dari indeks pekerjaan galian

Upah
(Rp.)

Jumlah Harga
(Rp.)

Keterangan

17,083.33
17,083.33

B.8

Bahan
(Rp.)
-

17,083.33

1 m3 Urugan Tanah dipadatkan


1.2000 m3

Tanah urug

42,875.00

0.5000 oh

Pekerja

65,000.00

0.0100 oh

Mandor

100,000.00

51,450.00
32,500.00
1,000.00
33,500.00

51,450.00

84,950.00

SNI

No.
B.9

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

1.2000 m3

Pasir urug

0.3000 oh

Pekerja

65,000.00

0.0100 oh

Mandor

100,000.00

110,850.00

133,020.00
1,000.00

C.1

1.2000 m3

Sirtu

0.2500 oh

Pekerja

65,000.00

0.0250 oh

Mandor

100,000.00

190,150.00

D.1

246,930.00

SNI

71,250.00

SNI

462,007.20

SNI

903,648.90

SNI

841,057.50

SNI

2,500.00
228,180.00

1 m2 pasang lapisan ijuk tebal 10 cm , untuk bidang resapan.


6.0000 kg

Ijuk

10,000.00

0.1500 oh

Pekerja

65,000.00

0.0150 oh

Mandor

100,000.00

60,000.00
9,750.00
1,500.00
60,000.00

Pekerjaan Pondasi
1 m3 Pas. batu kosong / Aanstamping
1.2000 m3

Batu Gunung/ batu belah 15/20 cm

271,000.00

0.4320 m3

Pasir urug

110,850.00

0.7800 oh

Pekerja

65,000.00

0.0390 oh

Mandor

100,000.00

3,900.00

0.3900 oh

Tukang Batu

80,000.00

31,200.00

0.0390 oh

Kepala Tukang

80,000.00

325,200.00
47,887.20
50,700.00

3,120.00
373,087.20

1 m3 Pasangan batu gunung 1 : 3


1.2000 m3

Batu Gunung/ batu belah 15/20 cm

271,000.00

0.4858 m3

Pasir pasang

145,500.00

70,683.90

202.00 kg

Semen portland 50 kg

1,732.50

349,965.00

1.5000 oh

Pekerja

65,000.00

0.0750 oh

Mandor

100,000.00

7,500.00

0.6000 oh

Tukang batu

80,000.00

48,000.00

0.0600 oh

Kepala tukang

80,000.00

325,200.00

97,500.00

4,800.00
745,848.90

1 m3 Pasangan batu gunung 1 : 4


1.2000 m3

Batu Gunung/ batu belah 15/20 cm

271,000.00

0.5200 m3

Pasir pasang

145,500.00

75,660.00

163.00 kg

Semen portland 50 kg

1,732.50

282,397.50

1.5000 oh

Pekerja

65,000.00

0.0750 oh

Mandor

100,000.00

7,500.00

0.6000 oh

Tukang batu

80,000.00

48,000.00

0.0600 oh

Kepala tukang

80,000.00

325,200.00

97,500.00

4,800.00
157,800.00

SNI

228,180.00

157,800.00
C.3

153,520.00

16,250.00

88,920.00
C.2

133,020.00

1 m3 Urugan sirtu

11,250.00
C

683,257.50

Pekerjaan Tiang Pancang


Pekerjaan tiang per m' - 20/20, tanah biasa
(dihitung bagian yang masuk tanah)
0.4000 Tukang kayu

80,000.00

32,000.00

0.3000 Pekerja

65,000.00

19,500.00

0.0460 Mandor

100,000.00

4,600.00

25,000.00

25,000.00

1.0000 Ls sewa alat pancang

81,100.00
D.2

81,100.00

20,275.00

121,650.00

81,100.00

162,200.00

1 m1 Tanah keras - 20/20


1.5000 Upah (C.4.1)

81,100.00

121,650.00
121,650.00

1 m1 Tanah keras - 10/10


1.0000 Upah (C.4.1)

81,100.00

81,100.00
81,100.00

D.5

81,100.00

20,275.00
20,275.00

D.4

1 m1 Tanah biasa - 10/10


0.2500 Upah (C.4.1)

D.3

Keterangan

19,500.00

18,750.00
B.11

Jumlah Harga
(Rp.)

1 m3 Urugan Pasir

20,500.00
B.10

Bahan
(Rp.)

1 m1 Tanah pasir - 20/20


2.0000 Upah (C.4.1)

81,100.00

162,200.00
162,200.00

No.
D.6

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

Bahan
(Rp.)

Jumlah Harga
(Rp.)

1 m1 Tanah pasir - 10/10


2.6667 Upah (C.4.1)

81,100.00

216,269.37
216,269.37

216,269.37

Keterangan

No.
D.7

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

Bahan
(Rp.)

Jumlah Harga
(Rp.)

Keterangan

1 bh Membuat cincin kepala tiang pancang &


dilancipkan balok kayu ulin 20/20 cm
0.2250 Tukang kayu

80,000.00

18,000.00

0.0750 Pekerja

65,000.00

4,875.00

0.0038 Mandor

100,000.00

380.00
23,255.00

D.8

23,255.00

11,627.50

11,627.50

1 bh Membuat cincin kepala tiang pancang &


dilancipkan balok kayu ulin 10/10 cm
0.5000 Upah (C.4.7)

23,255.00

11,627.50
11,627.50

D.9

1 bh Membuat cincin kepala tiang pancang &


dilancipkan balok kayu galam n 12 - 20 cm
0.5000 Upah (C.4.7)

23,255.00

11,627.50
11,627.50

D.10

Membuat kalang pada pancangan kayu 5/7 - 50 cm


0.0019 Kayu Ulin
0.0600 Tukang kayu

5,500,000.00

10,450.00

80,000.00

4,800.00

0.0600 Pekerja

65,000.00

3,900.00

0.0030 Mandor

100,000.00

300.00
9,000.00

D.11

10,450.00

19,450.00

Membuat pen dan lubang pada


tiap kepala kayu ( Tiap -tiap pasang)
0.2000 Tukang kayu
0.0200 Mandor

80,000.00
100,000.00

16,000.00
2,000.00
18,000.00

Pekerjaan Struktur Beton

Dimana Bobot isi pasir=1.400 kg/m3, Bobot isi Kerikil =

18,000.00

1.350 kg/m3, Bukling faktor pasir = 20%


E.1

1m3 Beton Mutu K 100


247.00 kg

Semen portland 50 kg

869.00 kg

Pasir beton

108.05

93,898.55

999.00 kg

Batu pecah 2/3

292.59

292,300.00

215.00 Ltr

Air

1.6500 oh

Pekerja

65,000.00

107,250.00

0.2750 oh

Tukang batu

80,000.00

22,000.00

0.0280 oh

Kepala tukang

80,000.00

2,240.00

0.0830 oh

Mandor

100,000.00

8,300.00

0.6827 Jam Cocrete Mixer

1,732.50

427,927.50

6.30

1,354.50

70,600.00

48,198.62
139,790.00

E.2

276.00 kg

Semen portland 50 kg

828.00 kg

Pasir beton

108.05

89,468.36

Batu pecah 2/3

292.59

296,103.70

1,732.50

SNI

1,053,085.18

SNI

1,091,262.09

SNI

478,170.00

215.00 Ltr

Air

1.6500 oh

Pekerja

65,000.00

107,250.00

0.2750 oh

Tukang batu

80,000.00

22,000.00

0.0280 oh

Kepala tukang

80,000.00

2,240.00

0.0830 oh

Mandor

100,000.00

8,300.00

0.6827 Jam Cocrete Mixer

6.30

1,354.50

70,600.00

48,198.62
139,790.00

913,295.18

1m3 Beton Mutu K 150


299.00 kg

Semen portland 50 kg

799.00 kg

Pasir beton

108.05

86,334.80

Batu pecah 2/3

292.59

297,566.67

1,017.00 kg

1,732.50

518,017.50

215.00 Ltr

Air

1.6500 oh

Pekerja

65,000.00

107,250.00

0.2750 oh

Tukang batu

80,000.00

22,000.00

0.0280 oh

Kepala tukang

80,000.00

2,240.00

0.0830 oh

Mandor

100,000.00

8,300.00

0.6827 Jam Cocrete Mixer

6.30

1,354.50

70,600.00

48,198.62
139,790.00

E.4

1,003,469.17

1m3 Beton Mutu K 125

1,012.00 kg

E.3

863,679.17

1m3 Beton Lantai kerja Mutu K 100

951,472.09

No.

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

Bahan
(Rp.)

230.00 kg

Semen portland 50 kg

893.00 kg

Pasir beton

108.05

96,491.84

Batu pecah 2/3

292.59

300,492.59

1,027.00 kg

1,732.50

Keterangan

398,475.00

200.00 Ltr

Air

1.2000 oh

Pekerja

65,000.00

78,000.00

0.2000 oh

Tukang batu

80,000.00

16,000.00

0.0200 oh

Kepala tukang

80,000.00

1,600.00

0.0600 oh

Mandor

100,000.00

6,000.00

0.6827 Jam Cocrete Mixer

Jumlah Harga
(Rp.)

6.30

1,260.00

70,600.00

48,198.62
101,600.00

844,918.05

946,518.05

SNI

No.
E.5

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

326.00 kg

Semen portland 50 kg

760.00 kg

Pasir beton

108.05

82,120.71

Batu pecah 2/3

292.59

301,077.78

1,732.50

Air

1.6500 oh

Pekerja

65,000.00

107,250.00

0.2750 oh

Tukang batu

80,000.00

22,000.00

0.0280 oh

Kepala tukang

80,000.00

2,240.00

0.0830 oh

Mandor

100,000.00

8,300.00

6.30

1,354.50

70,600.00

48,198.62
139,790.00

326.00 kg

Semen portland 50 kg

760.00 kg

Pasir beton

108.05

82,120.71

Batu pecah 2/3

292.59

301,077.78

1,732.50

Air

1.6500 oh

Pekerja

65,000.00

107,250.00

0.2750 oh

Tukang batu

80,000.00

22,000.00

0.0280 oh

Kepala tukang

80,000.00

2,240.00

0.0830 oh

Mandor

100,000.00

8,300.00

6.30

SNI

1,137,336.61

SNI

1,213,866.46

SNI

1,233,399.90

SNI

1,266,846.76

SNI

1,354.50

70,600.00

48,198.62
139,790.00

997,546.61

1m3 Beton Mutu K 225


371.00 kg

Semen portland 50 kg

698.00 kg

Pasir beton

108.05

75,421.39

Batu pecah 2/3

292.59

306,344.44

1,047.00 kg

1,732.50

642,757.50

215.00 Ltr

Air

1.6500 oh

Pekerja

65,000.00

107,250.00

0.2750 oh

Tukang batu

80,000.00

22,000.00

0.0280 oh

Kepala tukang

80,000.00

2,240.00

0.0830 oh

Mandor

100,000.00

8,300.00

0.6827 Jam Cocrete Mixer

6.30

1,354.50

70,600.00

48,198.62
139,790.00

1,074,076.46

1m3 Beton Mutu K 250


384.00 kg

Semen portland 50 kg

692.00 kg

Pasir beton

108.05

74,773.07

Batu pecah 2/3

292.59

304,003.70

1,039.00 kg

1,732.50

665,280.00

215.00 Ltr

Air

1.6500 oh

Pekerja

65,000.00

107,250.00

0.2750 oh

Tukang batu

80,000.00

22,000.00

0.0280 oh

Kepala tukang

80,000.00

2,240.00

0.0830 oh

Mandor

100,000.00

8,300.00

0.6827 Jam Cocrete Mixer

6.30

1,354.50

70,600.00

48,198.62
139,790.00

1,093,609.90

1m3 Beton Mutu K 275


406.00 kg

Semen portland 50 kg

684.00 kg

Pasir beton

108.05

73,908.64

Batu pecah 2/3

292.59

300,200.00

1,026.00 kg

1,732.50

703,395.00

215.00 Ltr

Air

1.6500 oh

Pekerja

65,000.00

107,250.00

0.2750 oh

Tukang batu

80,000.00

22,000.00

0.0280 oh

Kepala tukang

80,000.00

2,240.00

0.0830 oh

Mandor

100,000.00

8,300.00

0.6827 Jam Cocrete Mixer

6.30

1,354.50

70,600.00

48,198.62
139,790.00

E.10

1,137,336.61

564,795.00

215.00 Ltr

0.6827 Jam Cocrete Mixer

E.9

997,546.61

1m3 Beton Mutu K 200

1,029.00 kg

E.8

Keterangan

564,795.00

215.00 Ltr

0.6827 Jam Cocrete Mixer

E.7

Jumlah Harga
(Rp.)

1m3 Beton Mutu K 175

1,029.00 kg

E.6

Bahan
(Rp.)

1,127,056.76

1m3 Beton Mutu K 300


413.00 kg

Semen portland 50 kg

681.00 kg

Pasir beton

108.05

73,584.48

Batu pecah 2/3

292.59

298,737.04

1,021.00 kg

1,732.50

715,522.50

215.00 Ltr

Air

1.6500 oh

Pekerja

65,000.00

107,250.00

0.2750 oh

Tukang batu

80,000.00

22,000.00

6.30

1,354.50

No.

Nama Pekerjaan
0.0280 oh

Kepala tukang

0.0830 oh

Mandor

0.6827 Jam Cocrete Mixer

Harga Satuan
(Rp.)

Upah
(Rp.)

80,000.00

2,240.00

100,000.00

8,300.00

70,600.00

Jumlah Harga
(Rp.)

Keterangan

48,198.62
139,790.00

E.11

Bahan
(Rp.)

1,137,397.14

1,277,187.14

SNI

1,359,053.55

SNI

1m3 Beton Mutu K 325


439.00 kg

Semen portland 50 kg

670.00 kg

Pasir beton

108.05

72,395.89

Batu pecah 2/3

292.59

298,737.04

1,021.00 kg

1,732.50

760,567.50

215.00 Ltr

Air

2.1000 oh

Pekerja

65,000.00

136,500.00

0.3500 oh

Tukang batu

80,000.00

28,000.00

0.0350 oh

Kepala tukang

80,000.00

2,800.00

0.1050 oh

Mandor

100,000.00

10,500.00

0.6827 Jam Cocrete Mixer

6.30

1,354.50

70,600.00

48,198.62
177,800.00

1,181,253.55

No.
E.12

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

Bahan
(Rp.)

Semen portland 50 kg

1,732.50

693,000.00

0.48 m3 Pasir beton

108.05

51.87

0.80 m3 Batu pecah 2/3

292.59

234.07

1.20 kg

Strorox - 100

2.1000 oh

Pekerja

65,000.00

136,500.00

0.3500 oh

Tukang batu

80,000.00

28,000.00

0.0350 oh

Kepala tukang

80,000.00

2,800.00

0.1050 oh

Mandor

100,000.00

10,500.00
177,800.00

0.8700 m3 Koral beton

224,800.00

0.5200 m3 Pasir beton

151,275.00

78,663.00

1,732.50

377,685.00

Semen portland

215.00 Ltr

Air

0.2500 oh

Tukang batu

80,000.00

20,000.00

1.6500 oh

Pekerja

65,000.00

107,250.00

0.0250 oh

Kepala tukang

80,000.00

2,000.00

0.0800 oh

Mandor

6.30

100,000.00

1,354.50

8,000.00

224,800.00

0.4700 m3 Pasir beton

151,275.00

71,099.25

1,732.50

341,302.50

Semen portland
Air

0.2500 oh

Tukang batu

80,000.00

20,000.00

1.6500 oh

Pekerja

65,000.00

107,250.00

0.0250 oh

Kepala tukang

80,000.00

2,000.00

0.0800 oh

Mandor

6.30

100,000.00

1,354.50

8,000.00
625,068.25

762,318.25

1 m3 Membuat beton bertulang 1:2:3


0.8100 m3 Koral beton

224,800.00

0.5400 m3 Pasir beton

151,275.00

81,688.50

1,732.50

582,120.00

Semen portland

182,088.00

215.00 Ltr

Air

0.3500 oh

Tukang batu

80,000.00

28,000.00

2.0000 oh

Pekerja

65,000.00

130,000.00

0.0350 oh

Kepala tukang

80,000.00

2,800.00

1.0000 oh

Mandor

100,000.00

100,000.00

6.30

1,354.50

260,800.00

847,251.00

1,108,051.00

Pekerjaan Struktur Pembesian


1 kg Pekerjaan Pembesian (besi polos)
1.0500 kg

Besi beton polos

0.0100 kg

Kawat beton

24,000.00

0.0050 oh

Tukang besi

80,000.00

400.00

0.0050 oh

Pekerja

65,000.00

325.00

0.0005 oh

Kepala tukang

80,000.00

40.00

0.0003 oh

Mandor

8,893.00

100,000.00

9,337.65
240.00

30.00
795.00

9,577.65

10,372.65

SNI

13,176.40

SNI

1 kg Pekerjaan Pembesian (besi ulir)


1.0500 kg

Besi beton ulir

11,148.00

0.0150 kg

Kawat beton

24,000.00

0.0070 oh

Tukang besi

80,000.00

560.00

0.0070 oh

Pekerja

65,000.00

455.00

0.0007 oh

Kepala tukang

80,000.00

56.00

0.0004 oh

Mandor

100,000.00

11,705.40
360.00

40.00
1,111.00

F.3

790,528.50

211,312.00

215.00 Ltr

336.0000 kg

F.2

653,278.50

0.9400 m3 Koral beton

137,250.00

F.1

SNI

1 m3 Membuat beton tumbuk 1:3:6

197.0000 kg

871,085.94

195,576.00

137,250.00

E.15

693,285.94

1 m3 Membuat beton tumbuk 1:3:5

218.0000 kg

E.14

Keterangan

1m3 Beton kedap air dengan strorox-100


400.00 kg

E.13

Jumlah Harga
(Rp.)

12,065.40

1 kg Pekerjaan Jaring Kawat baja /Wire mesh


1.0200 kg

Besi beton ulir

11,148.00

0.0050 kg

Kawat beton

24,000.00

0.0025 oh

Tukang besi

80,000.00

200.00

0.0025 oh

Pekerja

65,000.00

162.50

11,370.96
120.00

No.

Nama Pekerjaan
0.0025 oh

Kepala tukang

0.0001 oh

Mandor

Harga Satuan
(Rp.)
80,000.00
100,000.00

Upah
(Rp.)

Bahan
(Rp.)

Jumlah Harga
(Rp.)

Keterangan

200.00
10.00
572.50

11,490.96

12,063.46

SNI

No.
G
G.1

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

Bahan
(Rp.)

1 m2 Membuat bekisting untuk Pondasi


2,200,000.00

88,000.00

0.3000 kg

Paku kayu

17,500.00

5,250.00

0.1000 Ltr

Minyak Bekisting

10,890.00

0.2600 oh

Tukang kayu

80,000.00

20,800.00

0.5200 oh

Pekerja

65,000.00

33,800.00

0.0260 oh

Kepala tukang kayu

80,000.00

2,080.00

0.0260 oh

Mandor

100,000.00

1,089.00

2,600.00
59,280.00

94,339.00

3 x pakai
2,200,000.00

99,000.00

Paku kayu

17,500.00

5,250.00

0.1000 Ltr

Minyak Bekisting

10,890.00

0.2600 oh

Tukang kayu

80,000.00

20,800.00

0.5200 oh

Pekerja

65,000.00

33,800.00

0.0260 oh

Kepala tukang kayu

80,000.00

2,080.00

0.0250 oh

Mandor

100,000.00

1,089.00

2,500.00
105,339.00

3 x pakai

SNI

54,839.67

0.0400 m3

kayuKelas III

2,200,000.00

88,000.00

0.0150 m3

Balok kayu Kelas II

2,200,000.00

33,000.00

0.4000 kg

Paku kayu

17,500.00

7,000.00

0.2000 Ltr

Minyak Bekisting

10,890.00

2,178.00

0.3500 Lbr

Plywood Tebal 9mm

167,475.00

58,616.25

2.0000 Btg

Dolken kayu galam Dia.8-10cm P=4m

17,325.00

0.3300 oh

Tukang kayu

80,000.00

26,400.00

0.6600 oh

Pekerja

65,000.00

42,900.00

0.0330 oh

Kepala tukang kayu

80,000.00

2,640.00

0.0330 oh

Mandor

100,000.00

34,650.00

3,300.00
223,444.25

3 x pakai

298,684.25

SNI

99,561.42

1 m2 Membuat bekisting untuk balok


0.0400 m3

kayuKelas III

2,200,000.00

88,000.00

0.0180 m3

Balok kayu Kelas II

2,200,000.00

39,600.00

0.4000 kg

Paku kayu

17,500.00

7,000.00

0.2000 Ltr

Minyak Bekisting

10,890.00

2,178.00

0.3500 Lbr

Plywood Tebal 9mm

167,475.00

58,616.25

2.0000 Btg

Dolken kayu galam Dia.8-10cm P=4m

17,325.00

0.3300 oh

Tukang kayu

80,000.00

26,400.00

0.6600 oh

Pekerja

65,000.00

42,900.00

0.0330 oh

Kepala tukang kayu

80,000.00

2,640.00

0.0330 oh

Mandor

100,000.00

34,650.00

3,300.00
75,240.00

230,044.25

3 x pakai

305,284.25

SNI

101,761.42

1 m2 Membuat bekisting untuk Lantai


0.0400 m3

kayuKelas III

2,200,000.00

88,000.00

0.0150 m3

Balok kayu Kelas II

2,200,000.00

33,000.00

0.4000 kg

Paku kayu

17,500.00

7,000.00

0.2000 Ltr

Minyak Bekisting

10,890.00

2,178.00

0.3500 Lbr

Plywood Tebal 9mm

167,475.00

58,616.25

6.0000 Btg

Dolken kayu galam Dia.8-10cm P=4m

17,325.00

0.3300 oh

Tukang kayu

80,000.00

26,400.00

0.6600 oh

Pekerja

65,000.00

42,900.00

0.0330 oh

Kepala tukang kayu

80,000.00

2,640.00

0.0330 oh

Mandor

100,000.00

103,950.00

3,300.00
75,240.00

292,744.25

3 x pakai
G.6

164,519.00

1 m2 Membuat bekisting untuk kolom

75,240.00

G.5

SNI

51,206.33

0.3000 kg

59,180.00

G.4

153,619.00

1 m2 Membuat bekisting untuk sloof


0.0450 m3 kayu kelas III

G.3

Keterangan

Pekerjaan Struktur Begesting


0.0400 m3 kayu bekisting papan kelas III

G.2

Jumlah Harga
(Rp.)

122,661.42

1 m2 Membuat bekisting untuk Dinding


0.0300 m3

kayuKelas III

2,200,000.00

367,984.25

66,000.00

SNI

No.

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

Bahan
(Rp.)

0.0200 m3

Balok kayu Kelas II

2,200,000.00

44,000.00

0.4000 kg

Paku kayu

17,500.00

7,000.00

0.2000 Ltr

Minyak Bekisting

10,890.00

2,178.00

0.3500 Lbr

Plywood Tebal 9mm

167,475.00

58,616.25

3.0000 Btg

Dolken kayu galam Dia.8-10cm P=4m

17,325.00

0.3300 oh

Tukang kayu

80,000.00

26,400.00

0.6600 oh

Pekerja

65,000.00

42,900.00

0.0330 oh

Kepala tukang kayu

80,000.00

2,640.00

0.0330 oh

Mandor

100,000.00

Jumlah Harga
(Rp.)

Keterangan

51,975.00

3,300.00
75,240.00
3 x pakai

229,769.25

305,009.25
101,669.75

SNI

No.
G.7

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

Bahan
(Rp.)

0.0300 m3

kayuKelas III

2,200,000.00

66,000.00

0.0150 m3

Balok kayu Kelas II

2,200,000.00

33,000.00

0.4000 kg

Paku kayu

17,500.00

7,000.00

0.1500 Ltr

Minyak Bekisting

10,890.00

1,633.50

0.3500 Lbr

Plywood Tebal 9mm

167,475.00

58,616.25

2.0000 Btg

Dolken kayu galam Dia.8-10cm P=4m

17,325.00

34,650.00

0.3300 oh

Tukang kayu

80,000.00

26,400.00

0.6600 oh

Pekerja

65,000.00

42,900.00

0.0330 oh

Kepala tukang kayu

80,000.00

2,640.00

0.0330 oh

Mandor

100,000.00

3,300.00
166,249.75

3 x pakai
H

18.9500 kg

Batu Bata
Semen portland 50 kg

1,195.00

59,750.00

145,500.00

5,529.00

1,732.50

32,830.88

0.3000 oh

Pekerja

65,000.00

19,500.00

0.0150 oh

Mandor

100,000.00

1,500.00

0.1000 oh

Tukang batu

80,000.00

8,000.00

0.0100 oh

Kepala tukang

80,000.00

800.00
29,800.00

Batu Bata

0.043 m3 Pasir Pasang


11.5000 kg

Semen portland 50 kg

1,195.00

6,256.50

1,732.50

19,923.75

0.3000 oh

Pekerja

65,000.00

19,500.00

0.0150 oh

Mandor

100,000.00

1,500.00

0.1000 oh

Tukang batu

80,000.00

8,000.00

0.0100 oh

Kepala tukang

80,000.00

SNI

115,730.25

SNI

111,093.90

SNI

141,950.00

SNI

47,816.15

SNI

800.00
85,930.25

1 m2 Pasangan batu bata 1/2 bata, 1 Pc : 6 Ps


50.0000 bh

Batu Bata

0.049 m3 Pasir Pasang

1,195.00

59,750.00

145,500.00

7,129.50

1,732.50

14,414.40

8.3200 kg

Semen portland 50 kg

0.3000 oh

Pekerja

65,000.00

19,500.00

0.0150 oh

Mandor

100,000.00

1,500.00

0.1000 oh

Tukang batu

80,000.00

8,000.00

0.0100 oh

Kepala tukang

80,000.00

800.00
29,800.00

81,293.90

1 m2 Pasang Dinding terawang (Roster ), 1 Pc : 4 Ps


11.0000 bh

Roster 30x30 cm

0.035 m3 Pasir Pasang


11.0000 kg

Semen portland 50 kg

8,000.00

88,000.00

145,500.00

5,092.50

1,732.50

19,057.50

0.3000 oh

Pekerja

65,000.00

19,500.00

0.0150 oh

Mandor

100,000.00

1,500.00

0.1000 oh

Tukang batu

80,000.00

8,000.00

0.0100 oh

Kepala tukang

80,000.00

800.00
29,800.00

112,150.00

1 m2 Plesteran 1 : 2 , tebal 15 mm
0.0200 m3 Pasir Pasang
10.2200 kg

Semen portland 50 kg

145,500.00

2,910.00

1,732.50

17,706.15

0.2000 oh

Pekerja

65,000.00

0.0100 oh

Mandor

100,000.00

1,000.00

0.1500 oh

Tukang batu

80,000.00

12,000.00

0.0150 oh

Kepala tukang

80,000.00

13,000.00

1,200.00
27,200.00

H.6

127,909.88

59,750.00

145,500.00

29,800.00

H.5

98,109.88

1 m2 Pasangan batu bata 1/2 bata, 1 Pc : 4 Ps


50.0000 bh

H.4

SNI

80,496.58

1 m2 Pasangan batu bata tebal 1/2 bata. 1 Pc : 2 Ps


0.038 m3 Pasir Pasang

H.3

241,489.75

Pekerjaan Dinding
50.0000 bh

H.2

Keterangan

1 m2 Membuat bekisting untuk Tangga

75,240.00

H.1

Jumlah Harga
(Rp.)

20,616.15

1 m2 Plesteran 1 : 4 , tebal 15 mm
0.0240 m3 Pasir Pasang
5.1840 kg

Semen portland 50 kg

0.2000 oh

Pekerja

145,500.00

3,492.00

1,732.50
65,000.00

8,981.28
13,000.00

No.

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

0.0100 oh

Mandor

100,000.00

1,000.00

0.1500 oh

Tukang batu

80,000.00

12,000.00

0.0150 oh

Kepala tukang

80,000.00

Bahan
(Rp.)

Jumlah Harga
(Rp.)

Keterangan

1,200.00
27,200.00

12,473.28

39,673.28

SNI

No.
H.7

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

145,500.00

Semen portland 50 kg

0.2000 oh

Pekerja

65,000.00

0.0100 oh

Mandor

100,000.00

1,000.00

0.1500 oh

Tukang batu

80,000.00

12,000.00

0.0150 oh

Kepala tukang

80,000.00

1,732.50

7,650.72
13,000.00

1,200.00

145,500.00

873.00

1,732.50

7,484.40

4.3200 kg

Semen portland 50 kg

0.2500 oh

Pekerja

65,000.00

16,250.00

0.0130 oh

Mandor

100,000.00

1,300.00

0.1000 oh

Tukang batu

80,000.00

8,000.00

0.0100 oh

Kepala tukang

80,000.00

3.2500 kg

Semen Pc 50 kg

0.1000 oh

Tukang batu

0.1500 oh
0.0080 oh
0.0100 oh

Kepala tukang

9.3000 kg

1,732.50
8,000.00

Pekerja

65,000.00

9,750.00

Mandor

100,000.00

800.00

80,000.00

SNI

24,980.63

SNI

172,635.25

SNI

881,589.50

SNI

230,600.00

SNI

104,395.00

SNI

800.00
5,630.63

Keramik 20x25

2,995.00

62,895.00

Semen portland 50 kg

1,732.50

16,112.25

145,500.00

2,619.00

1.9400 kg

Semen warna

0.4500 or

Tukang batu

80,000.00

36,000.00

0.6000 or

Pekerja

65,000.00

39,000.00

0.0450 or

Kepala tukang

80,000.00

3,600.00

0.0300 or

Mandor

4,850.00

100,000.00

9,409.00

3,000.00
81,600.00

91,035.25

1 m2 Dinding pemisah plywood rangkap


0.8600 lbr

Plywood tebal 4mm 120x240cm

0.2800 m3

Kayu meranti

0.1500 kg
0.5600 Kg
0.2000 oh

75,075.00

64,564.50

2,640,000.00

739,200.00

Paku kayu

17,500.00

2,625.00

Lem Kayu

15,000.00

Pekerja

65,000.00

0.0100 oh

Mandor

100,000.00

1,000.00

0.6000 oh

Tukang kayu

80,000.00

48,000.00

0.0600 oh

Kepala tukang

80,000.00

8,400.00
13,000.00

4,800.00
66,800.00

814,789.50

1 m2 Dinding lambriziring dari papan


0.0070 m3

Papan kayu

3,850,000.00

26,950.00

0.1000 kg

Paku kayu

17,500.00

1,750.00

0.1500 Kg

Paku Skrup

10,000.00

0.6000 oh

Pekerja

65,000.00

0.0300 oh

Mandor

100,000.00

3,000.00

1.8000 oh

Tukang kayu

80,000.00

144,000.00

0.1800 oh

Kepala tukang

80,000.00

1,500.00
39,000.00

14,400.00
200,400.00

30,200.00

1 m2 Rangka dinding pemisah (60x120)


0.0280 m3

Balok Kayu

0.1500 kg

Paku kayu

17,500.00

0.1500 oh

Pekerja

65,000.00

0.0050 oh

Mandor

100,000.00

500.00

0.2000 oh

Tukang kayu

80,000.00

16,000.00

0.0200 oh

Kepala tukang

80,000.00

2,640,000.00

73,920.00
2,625.00
9,750.00

1,600.00
27,850.00

I.1

34,707.40

5,630.63

80,000.00

0.0180 m3 Pasir Pasang

8,357.40

1 m2 Pasang dinding keramik 20x25


21.0000 bh

H.13

SNI

1 m2 Acian

19,350.00

H.12

38,779.22

800.00
26,350.00

H.11

11,579.22

1 m2 Plesteran Ciprat 1:2


0.0060 m3 Pasir Pasang

H.10

Keterangan

3,928.50

4.4160 kg

27,200.00

H.9

Jumlah Harga
(Rp.)

1 m2 Plesteran 1 : 6 , tebal 15 mm
0.0270 m3 Pasir Pasang

H.8

Bahan
(Rp.)

Pekerjaan Kayu. Rangka Atap


1 m3 Mengerjakan rangka bawah dari kayu ulin

76,545.00

No.

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

Bahan
(Rp.)

Jumlah Harga
(Rp.)

(tongkat,Sunduk)
1.1000 m3

Kayu ulin

5,500,000.00

6,050,000.00

9.0000 oh

Tukang kayu

80,000.00

720,000.00

9.0000 oh

Pekerja

65,000.00

585,000.00

0.9000 oh

Kepala tukang

80,000.00

72,000.00

0.4500 oh

Mandor

100,000.00

45,000.00

1.0000 ls

Alat bantu(Bor listrik,dll)

25,000.00
1,422,000.00

6,050,000.00

7,472,000.00

Keterangan

No.
I.2

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

1.1000 m3

Kayu ulin

5,500,000.00

5.2238 kg

Paku ulin

22,000.00

Tukang kayu

80,000.00

800,000.00

6.0000 oh

Pekerja

65,000.00

390,000.00

1.0000 oh

Kepala tukang

80,000.00

80,000.00

0.3000 oh

Mandor

100,000.00

30,000.00

1.0000 ls

Alat bantu (Bor Listrik dll)

25,000.00

114,923.60

25,000.00

0.0234 m3

Papan kayu ulin

0.1609 kg

Paku ulin

22,000.00

0.6000 oh

Tukang kayu

80,000.00

48,000.00

0.3000 oh

Pekerja

65,000.00

19,500.00

0.0600 oh

Kepala tukang

80,000.00

4,800.00

0.0150 oh

Mandor

1.0000 ls

Ls alat bantu (ketam listrik)

6,600,000.00

154,440.00
3,539.80

100,000.00

1,500.00

25,000.00

25,000.00

1.1000 m3

Kayu Meranti

2.6493 kg

Paku ulin

22,000.00

Tukang kayu

80,000.00

960,000.00

5.7143 oh

Pekerja

65,000.00

371,429.50

2.5000 oh

Kepala tukang

80,000.00

200,000.00

0.4688 oh

Mandor

100,000.00

46,880.00

1.0000 ls

Ls alat bantu (ketam listrik)

2,640,000.00

256,779.80

25,000.00

58,284.60

25,000.00
2,962,284.60

4,565,594.10

1 m3 Mengerjakan Rangka Rumah Kayu Ulin


1.1000 m3

Kayu ulin

5,500,000.00

2.6493 kg

Paku ulin

22,000.00

Tukang kayu

80,000.00

2,000,000.00

9.3750 oh

Pekerja

65,000.00

609,375.00

2.5000 oh

Kepala tukang

80,000.00

200,000.00

0.4688 oh

Mandor

100,000.00

46,880.00

1.0000 ls

Ls alat bantu (ketam listrik)

25.0000 oh

25,000.00

6,050,000.00
58,284.60

25,000.00
2,881,255.00

6,108,284.60

8,989,539.60

1 m3 Membuat dan memasang kusen pintu dan jendela


1.1000 m3 Kayu ulin

5,500,000.00

6,050,000.00

1.2500 Kg

Paku Ulin

22,000.00

27,500.00

1.0000 Kg

Lem kayu

15,000.00

6.0000 oh

Pekerja

65,000.00

0.3000 oh

Mandor

20.0000 oh
2.0000 oh

15,000.00
390,000.00

100,000.00

30,000.00

Tukang kayu

80,000.00

1,600,000.00

Kepala tukang

80,000.00

160,000.00
2,180,000.00

6,092,500.00

8,272,500.00

SNI

6,088,875.00

SNI

1 m3 Membuat dan memasang kusen pintu dan jendela


1.1000 m3 Kayu Bengkirai

3,520,000.00

3,872,000.00

1.2500 kg

Paku Kayu

17,500.00

21,875.00

1.0000 kg

Lem kayu

15,000.00

6.0000 oh

Pekerja

65,000.00

0.3000 oh

Mandor

20.0000 oh
2.0000 oh

15,000.00
390,000.00

100,000.00

30,000.00

Tukang kayu

80,000.00

1,600,000.00

Kepala tukang

80,000.00

160,000.00
2,180,000.00

I.8

157,979.80
2,904,000.00

1,603,309.50

I.7

7,489,923.60

1 m3 Mengerjakan Kolom Praktis Kayu Meranti

12.0000 oh

I.6

6,164,923.60

1 m2 Lantai papan ulin diketam tanpa celah

98,800.00

I.5

Keterangan

6,050,000.00

1,325,000.00

I.4

Jumlah Harga
(Rp.)

1 m3 Mengerjakan sloof dan lenger

10.0000 oh

I.3

Bahan
(Rp.)

3,908,875.00

1 m3 Membuat dan memasang kusen pintu dan jendela


1.2000 m3 Kayu Kelas II dan III

3,520,000.00

4,224,000.00

1.2500 kg

Paku Kayu

17,500.00

21,875.00

1.0000 kg

Lem kayu

15,000.00

6.0000 oh

Pekerja

65,000.00

0.3000 oh

Mandor

18.0000 oh
2.0000 oh

15,000.00
390,000.00

100,000.00

30,000.00

Tukang kayu

80,000.00

1,440,000.00

Kepala tukang

80,000.00

160,000.00

No.

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)
2,020,000.00

I.9

Bahan
(Rp.)
4,260,875.00

Jumlah Harga
(Rp.)

Keterangan

6,280,875.00

SNI

651,675.00

SNI

1 m2 Memasang jalusi kusen, kayu ulin


0.0600 m3 Papan kayu ulin

6,600,000.00

396,000.00

0.1500 kg

Paku 1 s/d 2.5 cm

17,500.00

0.6700 or

Pekerja

65,000.00

0.3350 or

Mandor

100,000.00

33,500.00

2.0000 or

Tukang kayu

80,000.00

160,000.00

0.2000 or

Kepala tukang

80,000.00

2,625.00
43,550.00

16,000.00
253,050.00

398,625.00

No.
I.10

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

2,640,000.00

2,904,000.00

15.0000 kg

Besi strip

10,450.00

156,750.00

5.6000 kg

Paku kayu

17,500.00

4.0000 oh

Pekerja

65,000.00

0.2000 oh

Mandor

12.0000 oh
1.2000 oh

98,000.00

100,000.00

20,000.00

Tukang kayu

80,000.00

960,000.00

Kepala tukang

80,000.00

96,000.00

3,520,000.00

4,224,000.00

15.0000 kg

Besi strip

10,450.00

156,750.00

5.6000 kg

Paku kayu

17,500.00

6.0000 oh

Pekerja

65,000.00

0.3000 oh

Mandor

20.0000 oh
2.0000 oh

100,000.00

30,000.00

Tukang kayu

80,000.00

1,600,000.00

Kepala tukang

80,000.00

4,478,750.00

SNI

207,615.00

SNI

458,060.00

SNI

3,914,850.00

SNI

98,480.00

SNI

56,450.00

SNI

1 m2 Rangka atap genteng, Kayu kelas II


0.0140 m3

Kasau

2,640,000.00

36,960.00

0.0570 m3

Reng

2,640,000.00

150,480.00

0.2500 kg

Paku kayu

17,500.00

0.1000 oh

Tukang kayu

80,000.00

8,000.00

0.1000 oh

Pekerja

65,000.00

6,500.00

0.0100 oh

Kepala tukang

80,000.00

800.00

0.0050 oh

Mandor

100,000.00

4,375.00

500.00
191,815.00

1 m2 Rangka atap sirap, Kayu kelas II


0.1650 m3

Kayu kelas II

0.2000 kg

Paku kayu

17,500.00

0.1200 oh

Tukang kayu

80,000.00

9,600.00

0.1200 oh

Pekerja

65,000.00

7,800.00

0.0120 oh

Kepala tukang

80,000.00

960.00

0.0060 oh

Mandor

2,640,000.00

100,000.00

435,600.00
3,500.00

600.00
439,100.00

1 m3 Gording
1.1000 m3

2,640,000.00

2,904,000.00

Besi Srip

10,450.00

156,750.00

3.0000 kg

Paku kayu

17,500.00

7.2000 oh

Tukang kayu

80,000.00

576,000.00

2.4000 oh

Pekerja

65,000.00

156,000.00

0.7200 oh

Kepala tukang

80,000.00

57,600.00

0.1200 oh

Mandor

15.0000 kg

Kayu meranti

100,000.00

52,500.00

12,000.00
801,600.00

3,113,250.00

1 m' Pasang listplank 2x 2/20 kayu ulin


0.0108 m3

Papan kayu ulin

0.1000 kg

Paku ulin

22,000.00

0.2000 oh

Tukang kayu

80,000.00

16,000.00

0.1000 oh

Pekerja

65,000.00

6,500.00

0.0250 oh

Kepala tukang

80,000.00

2,000.00

0.0050 oh

Mandor

6,600,000.00

100,000.00

71,280.00
2,200.00

500.00
25,000.00

73,480.00

1 m' Pasang listplank 2x 2/20 kayu meranti


0.0108 m3

Papan kayu meranti

0.1000 kg

Paku kayu

17,500.00

0.2000 oh

Tukang kayu

80,000.00

16,000.00

0.1000 oh

Pekerja

65,000.00

6,500.00

0.0250 oh

Kepala tukang

80,000.00

2,000.00

0.0050 oh

Mandor

2,750,000.00

100,000.00

29,700.00
1,750.00

500.00
25,000.00

I.17

6,658,750.00

160,000.00

18,960.00

I.16

SNI

98,000.00

15,800.00

I.15

4,494,750.00

390,000.00

2,180,000.00

I.14

3,158,750.00

1 m3 Pasang konstruksi kuda-kuda Expose, kayu kelas I


1.2000 m3 Balok Kayu

I.13

Keterangan

260,000.00

1,336,000.00

I.12

Jumlah Harga
(Rp.)

1 m3 Pasang konstruksi kuda-kuda kayu Bentang 6m


1.1000 m3 Kayu Kelas I, II dan III

I.11

Bahan
(Rp.)

31,450.00

1 m2 Rangka atap baja ringan


1.1000 m2

Baja Ringan (truus + reng) +Peralatan

175,000.00

192,500.00

No.

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

0.1500 kg

Screw

75,000.00

0.1200 oh

Tukang baja ringan

80,000.00

9,600.00

0.1200 oh

Pekerja

65,000.00

7,800.00

0.0120 oh

Kepala tukang

80,000.00

960.00

0.0060 oh

Mandor

100,000.00

Bahan
(Rp.)

Jumlah Harga
(Rp.)

Keterangan

11,250.00

600.00
18,960.00

203,750.00

222,710.00

Analisa Kab.

No.
J
J.1

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

1 m2 Pasang atap genteng metal tebal 0.3 mm (2 susun)


1.7858 lbr

Genteng metal tebal 0.3 mm (2 susun)

34,650.00

0.0267 kg

paku genteng

39,700.00

0.0417 oh

Tukang kayu

80,000.00

3,336.00

0.0250 oh

Pekerja

65,000.00

1,625.00

0.0042 oh

Kepala tukang

80,000.00

336.00

0.0013 oh

Mandor

100,000.00

61,877.97
1,059.99

130.00

1.1000 bh

Genteng metal U 110 cm

36,960.00

0.2000 kg

paku genteng

39,700.00

0.1500 oh

Tukang kayu

80,000.00

12,000.00

0.2500 oh

Pekerja

65,000.00

16,250.00

0.0150 oh

Kepala tukang

80,000.00

1,200.00

0.0130 oh

Mandor

100,000.00

7,940.00

1,300.00

3.0000 bh

Genteng metal model C 40 cm

28,875.00

0.0750 kg

paku genteng

39,700.00

0.0375 oh

Tukang kayu

80,000.00

3,000.00

0.0375 oh

Pekerja

65,000.00

2,437.50

0.0038 oh

Kepala tukang

80,000.00

304.00

0.0019 oh

Mandor

100,000.00

2,977.50

190.00

1.1000 bh

Nok samping genteng metal

31,500.00

0.0750 kg

Paku genteng

39,700.00

95,534.00

0.0375 oh

Tukang kayu

80,000.00

3,000.00

0.0375 oh

Pekerja

65,000.00

2,437.50

0.0038 oh

Kepala tukang

80,000.00

304.00

0.0019 oh

Mandor

100,000.00

34,650.00
2,977.50

190.00
37,627.50

43,559.00

1 m2 Penutup Atap Seng Gelombang BJLS 20


0.8929 Lbr

Seng BJLS 20

42,900.00

0.0482 kg

kg Paku seng

27,500.00

0.0750 oh

Tukang kayu

80,000.00

6,000.00

0.0375 oh

Pekerja

65,000.00

2,437.50

0.0075 oh

Kepala tukang

80,000.00

600.00

0.0018 oh

Mandor

100,000.00

38,305.41
1,325.50

180.00
39,630.91

48,848.41

1 m2 penutup atap seng gelombang BJLS 20 Banyak Jurai


1.1688 Lbr

Seng BJLS 20

42,900.00

0.0540 kg

Paku seng

27,500.00

0.0975 oh

Tukang kayu

80,000.00

7,800.00

0.0488 oh

Pekerja

65,000.00

3,172.00

0.0098 oh

Kepala tukang

80,000.00

784.00

0.0023 oh

Mandor

100,000.00

50,141.52
1,485.00

230.00
51,626.52

63,612.52

1 m' Bubungan seng datar / Jurai dalam


1.0000 m'

Seng plat BJLS 20

22,000.00

0.0500 kg

Paku seng

27,500.00

1,375.00

0.0088 m3

Papan meranti

2,750,000.00

24,200.00

0.0750 oh

Tukang kayu

80,000.00

6,000.00

0.0750 oh

Pekerja

65,000.00

4,875.00

0.0075 oh

Kepala tukang

80,000.00

600.00

0.0038 oh

Mandor

100,000.00

22,000.00

380.00
11,855.00

J.8

89,602.50

1 m' Nok samping genteng metal 110 cm

11,986.00
J.7

79,346.00

86,625.00

9,217.50
J.6

48,596.00

1 m' Pasang nok genteng metal model C 40 cm

5,931.50
J.5

68,364.96

40,656.00

5,931.50
J.4

62,937.96

1 m' Pasang nok genteng metal U 110 cm

30,750.00
J.3

Jumlah Harga
(Rp.)

Pekerjaan Penutup Atap

5,427.00
J.2

Bahan
(Rp.)

47,575.00

1 m2 Atap genteng
25.0000 bh

Genteng

0.1000 oh

Tukang Batu

80,000.00

8,000.00

0.2000 oh

Pekerja

65,000.00

13,000.00

59,430.00

Keterangan

No.

Nama Pekerjaan
0.0100 oh

Kepala tukang

0.0100 oh

Mandor

Harga Satuan
(Rp.)

Upah
(Rp.)

80,000.00

800.00

100,000.00

1,000.00
22,800.00

Bahan
(Rp.)

Jumlah Harga
(Rp.)

22,800.00

Keterangan

No.
J.9

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

5.0000 bh

Bubungan genteng beton

0.2160 zak

Semen Pc 50 kg

K.1

15,444.00

0.0300 m3

Pasir Pasang

100,600.00

0.1500 oh

Tukang kayu

80,000.00

12,000.00

0.3000 oh

Pekerja

65,000.00

19,500.00

0.0150 oh

Kepala tukang

80,000.00

1,200.00

0.0150 oh

Mandor

100,000.00

3,018.00

1,500.00

1.2000 Ikt

ikat sirap ulin isi 100 bh

0.2000 kg

kg Paku sirap

27,500.00

0.1500 oh

Tukang kayu

80,000.00

12,000.00

0.3000 oh

Pekerja

65,000.00

19,500.00

0.0150 oh

Kepala tukang

80,000.00

1,200.00

0.0150 oh

Mandor

100,000.00

1,500.00

2,640,000.00

43,032.00

0.2500 kg

Paku Kayu

17,500.00

0.3000 oh

Tukang kayu

80,000.00

24,000.00

0.2000 oh

Pekerja

65,000.00

13,000.00

0.0300 oh

Kepala tukang

80,000.00

2,400.00

0.0100 oh

Mandor

100,000.00

1,000.00
43,032.00

83,432.00

SNI

268,000.00

SNI

38,771.88

SNI

167,850.00

SNI

41,748.13

SNI

1 M2 Memasang langit - langit besi profil + kawat


150,000.00

150,000.00

0.1500 kg Kawat diameter 4 mm

40,000.00

6,000.00

1.0500 bh Ramset

25,000.00

26,250.00

0.0500 oh Pekerja

65,000.00

3,250.00

0.5000 oh Tukang kayu

80,000.00

40,000.00

80,000.00

40,000.00

0.0250 oh Mandor

100,000.00

2,500.00
85,750.00

182,250.00

1 m2 Plafond Calsiboard 120x240 tebal 3.5 mm'


0.3750 Lbr Kalsiboard 3.5 mm

63,525.00

0.0300 kg

Paku Tripleks

40,000.00

0.1000 oh

Tukang kayu

80,000.00

8,000.00

0.0700 oh

Pekerja

65,000.00

4,550.00

0.0100 oh

Kepala tukang

80,000.00

800.00

0.0040 oh

Mandor

100,000.00

23,821.88
1,200.00

400.00
13,750.00

25,021.88

1 m2 Plafond lambriziring kayu tebal 9mm


0.0150 m3 Papan Kayu

3,850,000.00

57,750.00

0.0100 kg

Paku Tripleks

40,000.00

0.8000 oh

Tukang kayu

80,000.00

64,000.00

0.6000 oh

Pekerja

65,000.00

39,000.00

0.0800 oh

Kepala tukang

80,000.00

6,400.00

0.0030 oh

Mandor

100,000.00

400.00

300.00
109,700.00

58,150.00

1 m2 Plafond Gypsum (120x240x9)


0.3640 Lbr Gypsum board

80,352.00

0.1100 kg

Paku Skrup

10,000.00

0.0500 oh

Tukang kayu

80,000.00

4,000.00

0.1000 oh

Pekerja

65,000.00

6,500.00

0.0050 oh

Kepala tukang

80,000.00

400.00

0.0050 oh

Mandor

100,000.00

29,248.13
1,100.00

500.00
11,400.00

K.6

39,700.00

1 m2 rangka langit-langit (60x60 )

0.5000 oh Kepala tukang

K.5

5,500.00

Pekerjaan Langit-langit

1.0000 m2 Besi Profil "I"

K.4

52,662.00

5,500.00

40,400.00

K.3

18,462.00

1 m2 penutup atap sirap

0.0163 m3 Kayu meranti

K.2

Keterangan

71,500.00

34,200.00
K

Jumlah Harga
(Rp.)

1 m' Nok Genteng

34,200.00
J.10

Bahan
(Rp.)

30,348.13

1 m2 Plafond Akustik 60x120 + Rangka Aluminium


3.6000 m'

Profil Aluminium

0.1500 kg

Kawat Dia 4mm

No.

Nama Pekerjaan
1.0500 bh

Harga Satuan
(Rp.)

Upah
(Rp.)

Ramset

Bahan
(Rp.)

Jumlah Harga
(Rp.)

Keterangan

1.5000 Lbr Akustik 60x120

0.5000 oh

Tukang kayu

80,000.00

40,000.00

0.1500 oh

Pekerja

65,000.00

9,750.00

0.0500 oh

Kepala tukang

80,000.00

4,000.00

0.0080 oh

Mandor

100,000.00

800.00
54,550.00

54,550.00

SNI

No.
K.7

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

L.1

1.0500 m'

list kayu profil

12,500.00

0.0100 kg

paku kayu

17,500.00

0.0500 oh

Tukang kayu

80,000.00

4,000.00

0.0500 oh

Pekerja

65,000.00

3,250.00

0.0050 oh

Kepala tukang

80,000.00

400.00

0.0030 oh

Mandor

100,000.00

13,125.00
175.00

300.00

11.8700 bh

Keramik30x30 warna

5,350.00

63,504.50

10.0000 kg

Semen portland

1,732.50

17,325.00

145,500.00

6,547.50

1.5000 kg

Semen warna

0.3500 or

Tukang batu

80,000.00

28,000.00

0.6200 or

Pekerja

65,000.00

40,300.00

0.0350 or

Kepala tukang

80,000.00

2,800.00

0.0300 or

Mandor

6.2500 bh

Keramik 40x40 polos


Semen portland

0.0450 m3 Pasir Pasang

4,850.00

100,000.00

94,652.00

13,600.00

85,000.00

1,732.50

17,325.00

145,500.00

6,547.50

Semen warna

0.3500 or

Tukang batu

80,000.00

28,000.00

0.6200 or

Pekerja

65,000.00

40,300.00

0.0350 or

Kepala tukang

80,000.00

2,800.00

0.0300 or

Mandor

SNI

4,850.00

100,000.00

190,247.50

SNI

195,247.50

SNI

168,741.50

SNI

7,275.00

3,000.00
116,147.50

1 m2 Pasang Lantai Keramik 40x40 anti slip


6.2500 bh

Keramik 40x40 anti slip


Semen portland

0.0450 m3 Pasir Pasang

14,400.00

90,000.00

1,732.50

17,325.00

145,500.00

6,547.50

1.5000 kg

Semen warna

0.3500 or

Tukang batu

80,000.00

28,000.00

0.6200 or

Pekerja

65,000.00

40,300.00

0.0350 or

Kepala tukang

80,000.00

2,800.00

0.0300 or

Mandor

4,850.00

100,000.00

7,275.00

3,000.00
74,100.00

121,147.50

1 m2 Pasang Lantai Keramik 20x20 anti slip


26.5000 bh

Keramik 20x20 anti slip

2,396.00

63,494.00

10.0000 kg

Semen portland

1,732.50

17,325.00

145,500.00

6,547.50

0.0450 m3 Pasir Pasang


1.5000 kg

Semen warna

0.3500 or

Tukang batu

80,000.00

28,000.00

0.6200 or

Pekerja

65,000.00

40,300.00

0.0350 or

Kepala tukang

80,000.00

2,800.00

0.0300 or

Mandor

4,850.00

100,000.00

7,275.00

3,000.00
74,100.00

94,641.50

1 m2 Pasang lantai double Plywood 12 mm


0.8600 lbr

Plywood 12 mm

0.2500 or

Tukang batu

80,000.00

20,000.00

0.1250 or

Pekerja

65,000.00

8,125.00

0.0250 or

Kepala tukang

80,000.00

2,000.00

0.0063 or

Mandor

213,675.00

100,000.00

183,760.50

630.00
30,755.00

M.1

168,752.00

3,000.00

1.5000 kg

10.0000 kg

SNI

7,275.00

74,100.00

L.5

21,250.00

1 m2 Pasang Lantai Keramik 40x40 polos


10.0000 kg

L.4

13,300.00

1 m2 Pasang Lantai Keramik 30x30

74,100.00

L.3

Keterangan

Pekerjaan Lantai

0.0450 m3 Pasir Pasang

L.2

Jumlah Harga
(Rp.)

1 m' list plafond kayu profil

7,950.00
L

Bahan
(Rp.)

183,760.50

Pekerjaan pipa dan sanitasi


1 bh Memasang klosed duduk/monohok keramik
1.0000 bh

Klosed duduk/monohok

2,310,000.00

2,310,000.00

214,515.50

No.

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

Bahan
(Rp.)

0.0600 ls

Perlengkapan 6% harga klosed

1.1000 or

Tukang batu

80,000.00

88,000.00

3.3000 or

Pekerja

65,000.00

214,500.00

0.0010 or

Kepala tukang

80,000.00

80.00

0.1600 or

Mandor

100,000.00

16,000.00

138,600.00

Jumlah Harga
(Rp.)

Keterangan

8,316.00

318,580.00

2,318,316.00

2,636,896.00

SNI

No.
M.2

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

1.0000 bh

Klosed jongkok keramik

6.0000 kg

Semen PC

144,375.00

144,375.00

1,732.50

10,395.00

145,500.00

Tukang batu

80,000.00

120,000.00

1.0000 or

Pekerja

65,000.00

65,000.00

0.3000 or

Kepala tukang

80,000.00

24,000.00

0.1600 or

Mandor

100,000.00

16,000.00

1.2000 m'

Pipa PVC 1/2'

5,053.25

0.3500 ls

Perlengkapan

1,010.65

0.0600 or

Tukang batu

80,000.00

4,800.00

0.0360 or

Pekerja

65,000.00

2,340.00

0.0060 or

Kepala tukang

80,000.00

480.00

0.0018 or

Mandor

100,000.00

1.2000 m'

Pipa PVC 3/4'

7,940.75

0.3500 ls

Perlengkapan

1,588.15

SNI

0.0600 or

Tukang batu

80,000.00

4,800.00

0.0360 or

Pekerja

65,000.00

2,340.00

0.0060 or

Kepala tukang

80,000.00

480.00

0.0018 or

Mandor

100,000.00

17,884.75

SNI

20,531.75

SNI

52,638.75

SNI

35,373.75

SNI

9,528.90
555.85

180.00
10,084.75

1 m' Memasang pipa PVC Aw dia. 2'


1.2000 m'

Pipa PVC 2'

0.3500 ls

Perlengkapan

0.0600 or

Tukang batu

80,000.00

4,800.00

0.0360 or

Pekerja

65,000.00

2,340.00

0.0060 or

Kepala tukang

80,000.00

480.00

0.0018 or

Mandor

10,025.00

12,030.00

2,005.00

100,000.00

701.75

180.00
12,731.75

1 m' Memasang pipa PVC Aw dia. 4''


1.2000 m'

Pipa PVC 4'

0.3500 ls

Perlengkapan

0.1350 or

Tukang batu

80,000.00

10,800.00

0.0810 or

Pekerja

65,000.00

5,265.00

0.0135 or

Kepala tukang

80,000.00

1,080.00

0.0041 or

Mandor

27,625.00

33,150.00

5,525.00

100,000.00

1,933.75

410.00
35,083.75

1 bh Memasang kran dia. 3/4'' atau 1/2''


1.0000 bh

Kran air

0.0250 bh

Seal tape

0.1000 or

Tukang batu

80,000.00

8,000.00

0.0100 or

Pekerja

65,000.00

650.00

0.0100 or

Kepala tukang

80,000.00

800.00

0.0050 or

Mandor

25,300.00

25,300.00

4,950.00

100,000.00

123.75

500.00
25,423.75

1 bh memasang floor drain


1.0000 bh

Floor drain

23,100.00

0.1000 or

Tukang batu

80,000.00

8,000.00

0.0100 or

Pekerja

65,000.00

650.00

0.0100 or

Kepala tukang

80,000.00

800.00

0.0050 or

Mandor

100,000.00

23,100.00

500.00
9,950.00

N.1

6,417.63

1 m' Memasang pipa PVC Aw dia. 3/4'

9,950.00

14,217.63

180.00

17,555.00

M.8

SNI

353.73

7,800.00

M.7

381,225.00

6,063.90

7,800.00

M.6

156,225.00

1 m' Memasang pipa PVC Aw dia. 1/2'

7,800.00

M.5

Keterangan

1,455.00

1.5000 or

225,000.00

M.4

Jumlah Harga
(Rp.)

1 bh Memasang klosed jongkok porselin

0.0100 m3 Pasir pasang

M.3

Bahan
(Rp.)

23,100.00

Pekerjaan Kunci dan Kaca


1 bh Pasang Kunci Tanam Biasa
1.0000 bh

Kunci tanam biasa

196,350.00

196,350.00

33,050.00

No.

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

0.5000 or

Tukang kayu

80,000.00

40,000.00

0.0100 or

Pekerja

65,000.00

650.00

0.0100 or

Kepala tukang

80,000.00

800.00

0.0050 or

Mandor

100,000.00

Bahan
(Rp.)

Jumlah Harga
(Rp.)

Keterangan

500.00
41,950.00

196,350.00

238,300.00

SNI

No.
N.2

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

Bahan
(Rp.)

1.0000 bh

Kunci tanam kamar mandi

0.5000 or

Tukang kayu

80,000.00

40,000.00

0.0050 or

Pekerja

65,000.00

325.00

0.0050 or

Kepala tukang

80,000.00

400.00

0.0025 or

Mandor

173,250.00

100,000.00

173,250.00

250.00

1.0000 bh

Engsel pintu kuningan 4 "

15,400.00

0.1500 or

Tukang kayu

80,000.00

0.0150 or

Pekerja

65,000.00

975.00

0.0150 or

Kepala tukang

80,000.00

1,200.00

Mandor

100,000.00

Engsel jendela 3'

28,875.00

0.1000 or

Tukang kayu

80,000.00

8,000.00

0.1000 or

Pekerja

65,000.00

6,500.00

0.0100 or

Kepala tukang

80,000.00

800.00

Mandor

100,000.00

44,225.00

SNI

31,575.00

SNI

31,850.00

SNI

31,575.00

SNI

24,150.00

SNI

21,750.00

SNI

50.00
28,875.00

1 bh Pasang Kait Angin


1.0000 bh

Kait angin

17,325.00

0.1500 or

Tukang kayu

80,000.00

0.0150 or

Pekerja

65,000.00

975.00

0.0150 or

Kepala tukang

80,000.00

1,200.00

Mandor

100,000.00

17,325.00
12,000.00

75.00
17,325.00

1 bh Pasang handle Pintu


1.0000 bh

Handle

17,600.00

0.1500 or

Tukang kayu

80,000.00

0.0150 or

Pekerja

65,000.00

975.00

0.0150 or

Kepala tukang

80,000.00

1,200.00

0.00075 or

Mandor

100,000.00

17,600.00
12,000.00

75.00
14,250.00

17,600.00

1 bh Pasang handle Jendela


1.0000 bh

Handle

17,325.00

0.1500 or

Tukang kayu

80,000.00

0.0150 or

Pekerja

65,000.00

975.00

0.0150 or

Kepala tukang

80,000.00

1,200.00

0.00075 or

Mandor

100,000.00

17,325.00
12,000.00

75.00
14,250.00

17,325.00

1 bh Pasang grandel Pintu


1.0000 bh

Grandel

0.1500 or

Tukang kayu

80,000.00

0.0150 or

Pekerja

65,000.00

975.00

0.0150 or

Kepala tukang

80,000.00

1,200.00

0.00075 or

Mandor

9,900.00

100,000.00

9,900.00
12,000.00

75.00
14,250.00

9,900.00

1 bh Pasang grandel Jendela


1.0000 bh

Grandel

0.1500 or

Tukang kayu

80,000.00

0.0150 or

Pekerja

65,000.00

975.00

0.0150 or

Kepala tukang

80,000.00

1,200.00

0.00075 or

Mandor

7,500.00

100,000.00

7,500.00
12,000.00

75.00
14,250.00

N.10

15,400.00
28,875.00

14,250.00

N.9

SNI

75.00

1.0000 bh

0.00075 or

N.8

29,650.00

15,400.00

15,350.00

N.7

SNI

1 bh Pasang Engsel Jendela kupu-kupu

0.00050 or

N.6

214,225.00

12,000.00

14,250.00

N.5

173,250.00

1 bh Pasang Engsel pintu

0.00075 or
N.4

Keterangan

1 bh Pasang Kunci Tanam Kamar Mandi

40,975.00
N.3

Jumlah Harga
(Rp.)

7,500.00

1 bh Pasang grandel Pintu Tanam [esoagnolet]


1.0000 bh

Grandel tanam

0.1500 or

Tukang kayu

80,000.00

0.0150 or

Pekerja

65,000.00

975.00

0.0150 or

Kepala tukang

80,000.00

1,200.00

100,000.00

75.00

0.00075 or

Mandor

108,900.00

108,900.00
12,000.00

No.

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

Bahan
(Rp.)

14,250.00
N.11

108,900.00

Jumlah Harga
(Rp.)

Keterangan

123,150.00

SNI

109,840.00

SNI

1 m2 Pasang Kaca, tebal 5 mm


1.1000 m2 Kaca 5 mm

86,900.00

0.1500 or

Tukang kayu

80,000.00

0.0150 or

Pekerja

65,000.00

975.00

0.0150 or

Kepala tukang

80,000.00

1,200.00

0.00075 or

Mandor

100,000.00

95,590.00
12,000.00

75.00
14,250.00

95,590.00

No.
N.12

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

Bahan
(Rp.)
-

0.1500 or

Tukang kayu

80,000.00

0.0150 or

Pekerja

65,000.00

975.00

0.0150 or

Kepala tukang

80,000.00

1,200.00

0.00075 or

Mandor

100,000.00

12,000.00

75.00
14,250.00

O.1

0.2000 kg

Cat meni

0.1500 kg

Plamir

0.1700 kg

Cat dasar

0.2600 kg

Cat Penutup 2 kali

49,500.00

0.0090 or

Tukang Cat

80,000.00

720.00

0.0700 or

Pekerja

65,000.00

4,550.00

0.0060 or

Kepala tukang

80,000.00

480.00

0.0025 or

Mandor

100,000.00

0.1000 kg

Plamir

0.1000 kg

Cat dasar

13,750.00

0.2600 kg

Cat Penutup 2 kali

80,080.00

0.0630 or

Tukang Cat

80,000.00

5,040.00

0.0200 or

Pekerja

65,000.00

1,300.00

0.0063 or

Kepala tukang

80,000.00

504.00

0.0025 or

Mandor

100,000.00

29,289.80

SNI

1,375.00
20,820.80

250.00

0.1800 Kg

Cat tembok

200,200.00

0.0750 or

Tukang cat

80,000.00

6,000.00

22,195.80

0.1500 or

Pekerja

65,000.00

9,750.00

0.0075 or

Kepala tukang

80,000.00

600.00

0.0075 or

Mandor

100,000.00

36,036.00

750.00
36,036.00

53,136.00 Standar Kab.

1 m2 Pekerjaan Cat Semprot


0.1500 Kg

Cat kayu

49,500.00

0.0500 Ltr

Tiner A

16,500.00

0.1200 or

Tukang Cat

80,000.00

9,600.00

0.0600 or

Pekerja

65,000.00

3,900.00

0.0120 or

Kepala tukang

80,000.00

960.00

0.0030 or

Mandor

100,000.00

7,425.00
825.00

300.00
8,250.00

23,010.00

1 m2 Plituran
0.0200 Kg

Sirlak

0.3300 Ltr

Spritus
Tukang cat

51,700.00

1,034.00
-

3,850.00

7,700.00

80,000.00

15,992.00
23,692.00

7,700.00
8,734.00

32,426.00

1 m2 Mengecat dasar / meni


0.0840 Kg

Cat dasar/meni

25,850.00

0.0440 Ltr

Minyak cat

16,500.00

0.0600 or

Tukang cat

80,000.00

4,800.00

0.0300 or

Pekerja

65,000.00

1,950.00

0.0060 or

Kepala tukang

80,000.00

480.00

0.0015 or

Mandor

100,000.00

2,171.40
726.00

150.00
7,380.00

P.1

12,870.00

1 m2 Mengecat dinding/plapond

0.1999 or

SNI

250.00

1 m2 pengecatan tembok baru

2.0000 Lbr Ampelas

O.6

18,870.00

14,760.00
O.5

SNI

12,870.00

17,100.00
O.4

14,250.00

1 m2 pengecatan bidang kayu lama

7,094.00
O.3

Pekerjaan Cat-catan

6,000.00
O.2

Keterangan

1 m2 Pasang Kaca Patri, tebal 5 mm


1.1000 m2 Kaca patri 5 mm

Jumlah Harga
(Rp.)

2,897.40

Pekerjaan Besi Dan Aluminium


1 Kg Pemasangan Besi Frofil
1.1500 kg

Besi Profil

22,000.00

0.0600 or

Pekerja

65,000.00

3,900.00

0.0600 or

Tukang Las

80,000.00

4,800.00

0.0060 or

Kepala tukang

80,000.00

480.00

25,300.00

10,277.40

No.

Nama Pekerjaan
0.0030 or

Mandor

Harga Satuan
(Rp.)
100,000.00

Upah
(Rp.)

Bahan
(Rp.)

Jumlah Harga
(Rp.)

Keterangan

300.00
9,480.00

25,300.00

34,780.00

SNI

No.
P.2

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

Bahan
(Rp.)

Keterangan

1 Kg Pemasangan Rangka Kuda-kuda baja IWF


1.1500 kg

Besi baja IWF

22,000.00

0.0600 or

Pekerja

65,000.00

3,900.00

0.0600 or

Tukang Las

80,000.00

4,800.00

0.0060 or

Kepala tukang

80,000.00

480.00

0.0030 or

Mandor

100,000.00

25,300.00

300.00
9,480.00

P.3

Jumlah Harga
(Rp.)

25,300.00

34,780.00

SNI

15,080.00

SNI

165,850.00

SNI

456.00

SNI

69,520.00

SNI

76,000.00

SNI

158,000.00

SNI

100 Kg Pekerjaan perakitan


1.0000 ltr

Solar

0.1000 ltr

Minyak pelumas

0.1000 or

Pekerja

65,000.00

6,500.00

0.1000 or

Tukang Besi

80,000.00

8,000.00

0.0010 or

Kepala tukang

80,000.00

80.00

0.0050 or

Mandor

100,000.00

500.00

0.0080 jam Sewa alat


15,080.00
P.4

15.0000 kg

Besi Siku 30.30.3

32.8000 kg

Besi Plat Baja

0.0500 kg

Kawat las

1.0500 or

Pekerja

65,000.00

68,250.00

1.0500 or

Tukang Besi

80,000.00

84,000.00

0.1050 or

Kepala tukang

80,000.00

8,400.00

0.0520 or

Mandor

100,000.00

5,200.00
165,850.00

P.5

1m2 Pintu besi Plat baja Tebal 2mm rangkap,rangka baja siku

1 Cm Pengelasan dengan las listrik


0.0400 kg

Kawat las listrik

0.0300 ltr

Solar

0.0040 ltr

Minyak pelumas

0.0040 or

Pekerja

65,000.00

260.00

0.0020 or

Tukang Besi

80,000.00

160.00

0.0002 or

Kepala tukang

80,000.00

16.00

0.0002 or

Mandor

100,000.00

20.00

0.0170 jam Sewa alat


456.00
P.6

1.0000 m2 Pintu lipat

0.4400 or

Pekerja

65,000.00

28,600.00

0.4400 or

Tukang Besi

80,000.00

35,200.00

0.0440 or

Kepala tukang

80,000.00

3,520.00

0.0220 or

Mandor

100,000.00

2,200.00
69,520.00

P.7

0.0800 or

Pekerja

65,000.00

5,200.00

0.8000 or

Tukang Besi

80,000.00

64,000.00

0.0800 or

Kepala tukang

80,000.00

6,400.00

0.0040 or

Mandor

100,000.00

400.00
76,000.00

1 m2 Memasang Rolling door Alluminium


1.0000 m2 Rolling door alluminium

1.0000 or

Pekerja

65,000.00

65,000.00

1.0000 or

Tukang Besi

80,000.00

80,000.00

0.1000 or

Kepala tukang

80,000.00

8,000.00

0.0500 or

Mandor

100,000.00

5,000.00
158,000.00

P.9

1 m2 Memasangsunscreen Alluminium
1.0000 m2 Sunscreen alluminium

P.8

1 m2 Memasang pintu lipat ( Folding door)

1 m' Kosen pintu Alluminium


1.1000 m'

Profil alluminium

2.0000 bh

Skrup Fikxer

No.

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

0.0600 tube Sealant

45,000.00

0.0430 or

Pekerja

65,000.00

2,795.00

0.0430 or

Tukang Besi Konstruksi

80,000.00

3,440.00

0.0043 or

Kepala tukang

80,000.00

344.00

0.0021 or

Mandor

100,000.00

Bahan
(Rp.)

Jumlah Harga
(Rp.)

Keterangan

210.00
6,789.00

6,789.00

SNI

No.
P.10

Nama Pekerjaan

Harga Satuan
(Rp.)

Upah
(Rp.)

4.4000 m'

Pintu alluminium

4.5000 m'

Profil kaca

Keterangan

0.2700 tube Sealant

45,000.00

0.0850 or

Pekerja

65,000.00

5,525.00

0.0850 or

Tukang Besi

80,000.00

6,800.00

0.0080 or

Kepala tukang

80,000.00

640.00

0.0040 or

Mandor

100,000.00

12,150.00

400.00
12,150.00

25,515.00

SNI

47,562.50

SNI

134,469.50

SNI

1 m2 Kawat nyamuk
1.1000 m2 Kawat nyamuk
11.1100 cm Pengelasan

28,875.00

31,762.50

1.7160 kg

Baja Strip

0.1000 or

Pekerja

65,000.00

6,500.00

0.1000 or

Tukang Besi

80,000.00

8,000.00

0.0100 or

Kepala tukang

80,000.00

800.00

0.0050 or

Mandor

100,000.00

500.00
15,800.00

P.12

Jumlah Harga
(Rp.)

1 m2 Pintu kaca rangka Alluminium

13,365.00
P.11

Bahan
(Rp.)

31,762.50

1 m' Talang datar/jurai seng


1.0500 m'

Seng Plat

32,340.00

0.0150 kg

Paku Kayu

17,500.00

262.50

2,750,000.00

52,250.00

0.0190 m3 Papan Kayu kelas II atau III

33,957.00

0.2000 or

Pekerja

65,000.00

13,000.00

0.4000 or

Tukang Besi

80,000.00

32,000.00

0.0250 or

Kepala tukang

80,000.00

2,000.00

0.0100 or

Mandor

100,000.00

1,000.00
48,000.00

86,469.50