Q1. Given in the table is the list of activities for the manufacture of a washing machine. Which of the
following flow of tasks is not correct for the given data?

o
o
o
o
o

ACDEFGJ
BCDEIJ
ACFGJ
BCFGJ
BCDEHJ

Q2. Which of the following control charts is/are used to study discrete variables?
1. P chart
2. R chart
3. X-bar chart
o
o
o
o
o

Only 1
Only 2
Only 3
Both 1 and 2
Both 1 and 3

Aspiring Minds Assessment Pvt. Ltd.

Q3. Minaj Co. sells tins of guava juice at a retail superstore. deliveryman stops by and checks the
inventory level after every 12 days. He then places an order, which is delivered 4 days later. Average
demand is 200 tins and the standard deviation of demand is 25 tins. The retail store wants enough
inventories on hand to meet
demand 90 percent of the time. (Z-value = 1.28). Calculate the restocking level.
o
o
o
o

205 tins
209 tins
225 tins
232 tins

Q4. While purchasing a new car, Vishal is keen in knowing if there ha been any grievances from the
existing customers with respect to defective parts being used in the making of the car. Which aspect of
quality is Vishal concerned with?
o
o
o
o

Durability
Reliability
Aesthetics
Conformance

Q5. A manufacturing company uses two types of machines to produce final finished goods. Depending
upon the demand for the goods, the type of the machine to be used for production is decided In summers,
the demand is low and machine A is used while machine B is used in winters when the demand is high.
The average demand in summers is 400 and in winters is 1200. Assuming that the probability of the
demand being low or high is equal, what is the expected cost of using Machine B?
o
o
o
o

Rs. 42 000
Rs. 21 000
Rs. 41 000
Rs. 20 500