Project Financials Milk Chilling, Ice Blocks Making & Packaged Drinking Water Combined Industry
Project Financials Milk Chilling, Ice Blocks Making & Packaged Drinking Water Combined Industry
Description
Water plant
Amou
nt
1
2
Land -3 acres
3 x Rs.2.00 lakhs
Land development
Leveling expenses
Compound wall
Internal roads
Drainage
arrangement
Gates,Gardening
etc.
TOTAL
Bore wells & water
tank
Bore wells with
submersible pumps
-2
Atmospheric
Condenser Water
Tank (15mtr X
10mtr X 1.5 mtr
Deep.)
Chilling plant
Amou
nt
ICE blocks
plant
TOTAL
AMOUNT
(Rs.in Lakhs)
Amou
nt
6.00
1.00
4.50
0.50
0.50
1.50
8.00
3.00
0.50
8.00
4.
Buildings
Total factory
Building area
55 X 30 Mtrs.:1650
sqm
Rate per sq. meter
Total
Office 1000 sft
x750.00
TOTAL
Plant & machinery
Main Plant &
machinery
VAT
Packing ,Insurance
& transportation
Total
7
8
9
10
11
12
0.25
0.25
4.00
Electrical
Equipment
Transformer
Generator 250kva
Total
Vehicles
ALFA-LOAD
TRUMP-40 HIDECH
Total
Office furniture &
equipment
Lab.equipment
ISI certificates &
other licenses
Electrical fittings
Electrical Deposit
200 HP X rs.300000
Other fixed assets
20 Liter jars 1000
Nos
10 litre size water
Dispensors -250 No
Water pouches
packing machine
Other Equipment
Other equipment
TOTAL
4.00
1650
5000
82.50
7.50
90.00
5.90
12.5%
3%
0.74
0.18
6.82
Chillin
g
plant
12.5%
22.60
50TPD
ICE
Plant
95.60
2.83
0.68
12.5%
11.95
2.87
26.11
110.4
2
90.00
143.3
5
5.00
13.15
18.15
1.52
4.50
6.02
18.15
6.02
1.00
5.00
1.50
0.50
1.00
5.00
3.00
0.50
0.50
1.00
2.00
6.00
12500
1.25
10000
0.25
1.00
5.00
2.50
5.00
5.00
5.00
12.50
13
14
1
2
3
4
4.
5
6
7
8
9
10
11
12
13
14
Preliminary
expense s
Preoperative
expenses
2.00
8.13
6.00
8.00
4.00
90.00
143.3
5
18.15
6.02
1.00
5.00
3.00
2.00
6.00
12.50
2.00
7.98
315.0
0
0.03
0.48
0.01
0.04
0.02
0.15
0.30
0.65
1.21
10HP x0.746
x20Hx 25
45HPX0.746 x 8 H
x25
165HPX40%
X0.746 X 16H x25
days
Diesel:
ALFA-LOAD
200KM/day
200/12Km x25
days: 417 liters
TRUMP-40 HIDECH
200/8 Km x25
days: 625 liters
TOTAL
Wages & salaries
3730 x
5
Production In
charge
Skilled workers
Unskilled workers
Drivers
Clerks
1No
Lab technician
Technician
Watch men
TOTAL
1 No
Add: contingencies
20%
TOTAL
4
Repairs
2% on
275.07Lakhs PA/12
months:5.50/12
Insurance on
Building & major
machinery
251.50 Lakhs x
Rs.4.00 per Thound
:25250
x4=101000/12
Other
Admn.expenses
Total working
capital
0.19
6714x
5
46.00
Nos
2
3
1
1
No
no
No
No
1 No
10 Nos
0.34
19695
0.99
46.00
0.29
0.19
0.38
Amou
Nos
nt
0.06 1 No
0.34
Amou
Nos
nt
0.08 1.No
1.28
Amuo
nt
0.12
0.10 2 No
0.12 3 No
0.05
0.05 1 No
0.10 2 No
0.12 3 No
1 No
I No
0.05
0.10
0.12
0.06
2.00
0.05
0.06
0.04 1 No
8Nos
0.48
1 No
0.04 1 No
0.39 10 Nos
0.10
0.04
0.59
0.12
0.10
0.08
0.58
0.47
0.71 28
Nos
1.76
0.46
0.09
0.10
0.02
0.15
0.27
5.79
WORKING CAPITAL
CALCULATION
Raw materials
1 Month
1.21
1 Month
2.00
1 Month
1 Day
1 Month
(390/12)
1.76
0.17
32.50
TOTAL
Less: Bills payable
Working capital required
say
TOTAL PROJECT
INVESTMENT
Capital
Expenditure
Working capital
TOTAL
Project Cost
Capital
Expenditure
Working capital
margin
Total
37.64
NIL
37.65
38.00
315.00
38.00
353.00
315.00
33%
13.00
328.00
MEANS OF
FINANCE
Promoter capital
129.2
0
Term Loan
Asset
1
2
3
4
4.
5
6
7
8
9
10
11
12
13
Land -3 acres
Land
development
Bore wells &
water tank
Buildings
Plant &
machinery
Electrical
Equipment
Vehicles
Office furniture
& equipment
Lab.equipment
ISI certificates &
other licenses
Electrical fittings
Electrical
Deposit
200 HP X
rs.3000-00
Other fixed
assets
Preliminary
Term
loan
4.02
5.36
Equity
6.00
8.00
Bank
%
67
67
4.00
67
2.68
1.32
90.00
143.3
5
18.15
67
67
60.3
96.05
29.7
47.30
67
12.16
5.99
6.02
1.00
67
67
4.03
0.67
1.99
0.33
5.00
3.00
67
3.35
1.65
3.00
2.00
67
1.34
0.66
6.00
12.50
2.00
1.98
2.64
6.00
67
8.38
4.12
2.00
14
expense s
Preoperative
expenses
TOTAL
Working capital
Loan
33 % of Rs.38.00
Total
7.98
315.0
0
198.3
4
116.6
6
198.3
4
38.00
25.46
223.8
0
12.54
129.2
0
25.46
353.0
0
1
2
7.98
30.00
60.00
300.00
30.00
60.00
Annual Expenditure
Working Expenses
Depreciation
Land
development
Bore wells &
water tank
Buildings
Plant &
machinery
Electrical
Equipment
Vehicles
Office furniture
& equipment
Lab.equipment
ISI certificates &
other licenses
Electrical fittings
Other fixed
assets
TOTAL
Interest
Term loan
Working capital
loan
TOTAL
300.0
0
390.0
0
5.79
x12
69.48
8.00
%
15
1.20
4.00
15
0.60
90.00
143.3
5
18.15
15
15
13.50
21.50
15
2.72
6.02
1.00
15
15
0.90
0.15
5.00
3.00
100%
100%
5.00
3.00
2.00
12.50
15%
15%
0.30
1.88
198.3
4
25.46
50.75
50.75
13.75 27.27
%
13.75 3.50
%
30.77
30.77
4.
5
Preliminary expense s
write off
Preoperative expenses
write off
TOTAL
Profit:
Annual Sales
Annual Expenses
Profit before taxes
2.00
7.98
160.9
6
390.00
160.96
229.04