Professional Documents
Culture Documents
Final Exam:: CIS 139 Yang S Spring 2016
Final Exam:: CIS 139 Yang S Spring 2016
Yang S
Spring 2016
Final Exam:
Due: 5:30pm, 5/5/2016
3. Configure SRVxx-ISP as a LAN router. Do NOT configure any static routes on SRVxx-ISP.
Configure SRVxx-ISP as a DNS and Web server for INTERNET.com.
4. Configure routing on each company router. Enable NAT and VPN on SRVxx-R3-LA and SRVxxR-NY.
5. Configure a site-to-site VPN (L2TP) between SRVxx-R3-LA and SRVxx-R-NY.
6. Configure static routing on each company router; use route summarization. Test the connectivity
among branch offices. Test the connectivity to SRVxx-ISP.
7. Configure Active Directory (DOMAINxx.COM) on SRVxx-HQ-DC01. Configure user accounts.
Configure Active Directory Sites. Set the inter-site replication to be 15 min.
-
AD Sites:
HQ-Users
Subnets (networks containing SRVxx-HQ-DC01 & Win7-xx-HQ-01)
HQ-Exchange Subnets (network containing SRVxx-HQ-EX-DC01 & SRVxx-HQ-EX01)
SD
Subnets (networks containing servers and clients)
Site Links
HQ-Users-to-HQ-Exchange
HQ-Users-to-SD
Final Exam
Page 1 of 3
CIS 139
Yang S
Spring 2016
Final Exam
Page 2 of 3
CIS 139
Yang S
Spring 2016
Lab Setup:
Final Exam
Page 3 of 3