Client Liaison Diary


MEETINGS WITH CLIENT AND MIELLES ADAMSJACKSON

Contact Log
PROJECT NAME: THE GRID

Name of
contact

Date and
time

Reason for
contact

Result of contact

LGS

6/9/15

1st meeting - To
discuss initial ideas

Client was OK with my


suggestions gave me
some practical ideas

LGS

28/1/16

Client Requirements

Both Flash and Director


need to be set at 832 x 624

LGS

13/10/16

Logo and dope sheet

Discussing logo and dope


sheet

LGS

18/10/16

Progress meeting

Discussed progress with


client

PAGE 1

Client Liaison Reports


1 Comments from meeting with Client
I showed an outline sketch to my client for the logo. Client liked the black and blue
colour scheme and liked the circuit board idea. I then showed my client my finished
version and was impressed we discussed dope sheet but the client liked the start and
the end but need to explain the middle part so I am going to create another dope sheet
to show the clips I will be using. On my other dope sheet I have shown exactly how the
ident is going to look and work and I have shown the client the ideas I have come up
with and they are happy with them and they have given me the go ahead to create the
product and they will be checking in on the progress I make throughout the making of
it to make sure they are happy with how it is coming along.

2 Comments from meeting with Client


I have shown the ident to my client and they are happy with the progress I have made
I have also shown them the problems I encountered during the making of it and I have
shown them what I did to get past them and they are happy with the work. The agree
that the product that I have produced for them hits the brief I was given and that I
have created a product that hits the correct target audience. Thanks to the client
meetings I have managed to create a product that is to the standard of the client and
because I kept in contact with the client they told me any changes they would like to
make early on in to the project meaning they were easy to change resulting in a better
over all out come.

3 Comments from meeting with Client

PAGE 2

I have shown my client the final finished ident and they are very happy with it and I
have also shown them my diary to show everything I did during the making of the TV
ident as well as told them all the problems I have had whilst making the ident and
reasons for how the ident has been exported and saved and Director wouldnt publish it
properly. I have also showed my client the questionnaire and the feedback I received
and they are very happy with all the comments we got back and they have no other
changes they would like to make. They are also happy that I met my deadline and
completed the project to the standard they were looking for meaning I have met all
the requirements so I have kept the client happy and given them a product they are
very happy with.