Professional Documents
Culture Documents
Reference to Agreement:
This is to certify that the above work is inspected and Quality Control checks have
been performed at random in association with construction staff in respect to LS Bill
No......................................& Part/Final bill for the above said work is found satisfactory.
Asst.Executive Engineer
Q.C & I.Sub-Divn.No.2
Gadwal
Executive Engineer
Q.C & I.Division No.3
Mahabubnagar
GOVERNMENT OF TELENGANA
IRRIGATION & CAD DEPARTMENT
Reference to Agreement:
This is to certify that the above work is inspected and pre-levels/work done levels
have been checked at random in respect of LS No.....................................& Part/Final bill.
The Quality of work is found satisfactory.
Assistant Engineer
Q.C & I.Sub-Divn.No.2
Gadwal
Executive Engineer
Q.C & I.Division No.3
Mahabubnagar