10 February 2014 Project No. 2508118
Task No.: T1123450/EG
‘Tyco Fire Protection Products
1467 Elmwood Ave
Cransion, RI02910
‘Attention: Mr. Robert Heintzelman
Subject: Type Approval Product Design Assessment - Revalidation
Grooved Fi
‘Model: 200 & 300,
Grooved Couplin
‘Model: 705, 707, 716, 722, 71
‘Threaded Fitings
‘Model: 811, $13, 813, 814, 815, 816, 817, 818, $20, 825, 27, 830
Ret. PDA Cert O4-H18455700 B thn D
Drawings and Documentation as per the Attached List
Models and Sizes as per the Attached
Gentlemen:
‘We have your Application for ABS Type Approval Revalidation dated 11 November 2013
{ogether with the enclosures listed above and are pleased (o advise that we have completed the
design assessment phase ofthe type approval process.
‘The plans have been eviewed fr compliance wih the applicable requirements of the 2014 ABS
Rules for Buldingand Cassng See! Vessln
Enclosed is your original copy ofthe Certificate of Design Assessment. Please read the pages
attached tothe cenificee to be sure that you understand the scope and conditions of the validity
of the cerifcate. We recommend that you monitor the ABS Rules and olher specifications used
inthe approval. ‘These Rules and specifications often change on an annual basis, and you must
comply with the new Rules and specifications in order for the product to be used onan ABS
classed vessel oF facility contracted under the new Rules or specifications.
Since the original certificate is multi-colored, we have no objections to unlimited black and
wie phrocpis of the cence Beng dsiibued. "AS you already know, your det
published on our web site and ean also be downloaded there.
One (1) copy of the drawings appropriately stamped to indicate our review is being returned.
‘An invoice to cover the cost ofthe type approval revalidation process will follow separately.
Page | of 4
suereas ovsion “=
Fe ataes "Ta arrsoh a eStonigeon Wenn10 February 2015 Projecto, 2508118
‘Tyco Fire Protection Products “Task No.: T11234S0/EG
Ifyou should have any comment relat
product, oi we can be of
ive to the scope and conditions of the assessment of your
further ass
assistance, please do not hesitate f0 contact us. We do
Appreciate your continued confidence inthe services that ABS provides.
ccc: ABS Brie wiv.
Page 2 of10 February 2014
Project No. 2508118
‘Tyco Fie Suppression and Building Products Task No. TH123450/EG
Drawing List
Engineering Ome: ‘meres Enpnerng Admin
‘Seber “TYCO FIRE SUPPRESSION AND BUILDING PRODUCTS
Drawing No Rey. No Drawing Tie
ABS Tet eae Oct 2013 TEST RESULTS
‘correspondence = EMAIL DATED 4 aPRIL 2011
CConesponcence