You are on page 1of 1

There are values for cost element 701006 that are not assigned to any line ID

Message no. KJ161

Diagnosis
Not all values for the cost element are assigned to a line ID.

Procedure
Assign the cost element to a line ID. If you don't want to include the cost elem
ent in results analysis, assign it to a line ID of category N.

You can access a detailed list of unassigned cost elements as follows: Start res
ults analysis in the individual processing mode (transaction KKA1, KKA2, or KKA3
). Select the field Full log. Execute the function. On the next screen, choose L
ogs -> Parameter List in the menu. A list is generated. The unassigned values ar
e shown at the end of the list.

If cost element "++++++++++" was shown in the message, this is because in the as
signment of costs and revenues to line IDs, you have not used a cost element oth
er than the full masking "++++++++++". In this case a presummarization eliminate
s the information on the cost element.
(15:27:54) minni: step calculate wip ORD 1030018999

You might also like