You are on page 1of 6
Electrical Industry Bulletin No I~ Connections to the ETSA Utilities Network ADDITIONAL INFORMATION id Senter fe Work Proce REFN. SWE: 124 ewes Peer Spon ts 2 9 APPENDIX? Connection Check List - LV Installations ex vate spent If the following items do not comply: i ee © New installation - notify Builders & Contractors Group of non-compli not connect, ‘© Existing installation - refer to clause 7.6. \ SS ‘SIR Reference {Sea aaon ei coweatontat as dvs von coma TO" "| aspects should not be connected uni tis made safe aa a erin fea (20 ee yong pl caren tb ulcer onsite. (See Appen 1) 2. 3 | Service protection exuipnen must be accesses 1422 7. | Commie Mains Cable penned pe The Consumers Marie a cael havea * | emerging per Figure 2 0f 7.1 aa 5 | Consumer’ maine poarky a phasing wo be earectyen 73a 773 {6} Consumers mains lito cea iam 3A — toe» Meg Om TWP 1272S 7 J tsiataton of mui phase serie tobe oad bn 335 9 | SESS itng psoas oS Tan aT TET NSTI Pos a9 paw “Ace Feige To mtaing STENTS Su ° | wherereguired. _ wht Metering enelosare be oF asia fy (Clery Manufactured) wd insiled Wa sae waa 101 ocatin. ¥ 885 A13 Ty | Metering sochnurs vo be lg o nas arene end aly eoesiba 88.1 ;89 12 | Meter enclonre seco os pte Finged np mt have he ings mount oe VOT ws art 2 sting pe wcessdodhimaalnove horzonlly. - Ty] iet pel msl sie (Rasbeaos oF inbor panels) hes; aaa 14] Panel spiced to be nf ormanent comet height om Connect te) m4 re ats ;surs: sifices use damage 7 | | Vbei6 By expninulon ane where accostary test ha all axpect of The elsirieal astalion are mu ‘ft lee verve purposes. 17 | S:2uB Mele Position may be av» run and Te dooce of woos and coco ucs Rowing Hee mn quipnent shall be Inbeled "Elotriity Meters” and nbsled in accordance with 45. TSWP T2716 1g] Main site(s) prove complete soaton ofthe clerics installation fom the sources of spy and | ASINZS sre readily accesile 000.2007 234 Page 3 of 8 Electrical Industry Bulletin No 1 ~ Connections to the ETSA Utilities Network etd Serves Job Safe Work Procedure RefNo. IS APPENDIX 2 CONT. ‘TEM SIR Reference Ta ETE TR TS ORT TST RATE istlaon ang conety abcd Whee he ottlecat reer piles mule cons (6 “Mian Sicksand Marto) 4 ate bed eam cote mons: Forsisy | 45:25 ‘crs nance) MAIN SCT mat bee pedo sng hha Nae Insos nals tha othe ee led ler dined ad ted by Ente niteion eanet Ths ming shoul be chelates assegue! in las 3 ‘Verify there is adequate protection against electric shock - e.g. Where provision has been provided for |], °) b 20) mate ocspin mitigates thane tein seem and edo SAVED 2007 ~ | agains ive parts being exposed! atthe end of unused cables. ~ ‘orion aaron tte soy on caste’ lao ndings oss Iering quiet lokableolsors, e okes an ecksurssal beade endy o se] ) Nera Ui sears - Seating acangment sl ney onal ofl been ands, _ J ‘Metal onciosutescoraining ETSA Utilities sevice protction equipment down sigeden from the pt salt ated va on, aving sos eon ara ene a2 29 |conbaed pace catueaal (PEN) conducts nce srt mansJHbeathcoMastr shal | ASIN petomctel to (te PEN cack ora 30002007 {iy the main earthing terminal, connection link orb, in which ase thé MEN Tak Sal bot ess 5.53.5 hn the oss sol as of ie PEN cna he conan as Earing - main earthing conductor i installed and continous Froth earth electrode to the erting 23|teminaltrottnathcmnswitiboudand vate MEN sagas woe PEN natine | 6.13 runic. 2] Comeson faa eating conto o art cto gated nt coven ASS OAT <5 Tati NSB owing rou oT undead coun sade ston oT Rea [RSIS 3002007 oketeewde itis. sea 26] Saal ar sans Paso andin apatin pon (ONT AU), #57362 53.65 Overhead Sie ; eqns £ ppopia advan iioaee Tr ” > te iB A perme heh Bt Tasca Sen on | Coma at EGR Ha aa har EH sa me Tier proaian es mason OT a Sabie pow score sud eel] 7631 29 | bonded and of sufficient length, a8 Conds Bebe nen UV. tid) FAG3.1 roferonee 30 | Consumerammains ected aun mechani dare ‘where passing fom the ground into the building to ASINZS. 8th profetion adequately secured 30002007 (1.5.14) Non-Compliance. Single phase switched oad mast be no, > 0A in| phase WOOBSOV wes or 25A wa pase 31 | 4000330Varea; oni ithe sched load is observed wile perfonning the connection work oris writen] 6.5.7 on the FCC fom, Typ | Ateativesuppiy ses wo be lary and parmaneniy beled athe eonsames emma miler | gg 9, 2 | postion and where necessary, the ain switchboard and abe in accordance with 45 | 6826842 yy | Public Liging columns tobe labeled wih the responsible organization name and cone phone wimtbt) 7g 5 g and installed in accordance with clause 4.5 * Installation can be connected with advice that appliance is not to be used, and report to Builders & Contractors Group for re-test. SISA Unter Re Paged of 8 Electrical Industry Bulletin No | ~ Connections to the ETSA Utilities Network Fed Series Joh Safe Work Procedure Ret No. JSWP: 128, lsu Date uly 209 Page 19 of 22 sot sets TENA rap TSA Utilities Sonate 34 8d Spe ot 8 ya [APPENDIX 3 Soo oem a Connection Check List — 11 Os Deep Lint LV Multiple Installations ee aan If the following items do not comply: es. Cy) © New installation - notify Builders & Contractors Group of non-cor iu do not connect. fr + Existing installation - refer to clause 7.6. 4 ITEM — SIR Reference 1, | Labeling of sub mains cables and lbeled in accordance with 45. 862 2, | Labeling oF meter pane inclang sect addres, tenancy numbers and rlaiga 782.7; 862; isolators, meters and sub mains protection labeled in accordance with 4.5, > 45 3, | Metering enclosure loeated in common area and asesible vn commor liga) 8a3 4, | Motoring tobe located and grouped at the origin ofthe sub min. y= #83 2 oad Ting onl devs mat be neal wih ining ea hn onind sven 6. | capacity. Where the authorized service capacity igspeciied by BU'Gn the notifeation the rating ofthe | 6.72.1 Joad limiting contol device must be checked * - Note: Requirements of Appendix 1 & 2 ai catego Appendix 3. HINA Urine Re Page 5 of Electrical Industry Bulletin No 1 ~ Connections to the ETSA Utilities Network ob Safe Work Preedre RefNo, SWE: 128 Sattar fy it “Ron sotie3 Sook ee ya Spat arate 3) fy APPENDIX 4 eae a Connection Check List - CT Installations a aan wos S) If the following items do not comply: ‘© New installation - notify Builders & Contractors Group of non >: and do not connect, ey + Existing installation - refer to clause 7.6. SIR Reference CF Tasailation 1, | Main switchboard must be < $0 metres from an EU te 7452 2. | Merri cen ring ppt nmr gute asi 67,75 58124 Tastalatons supplied by mauliple supplies Atthe MSD a ited Torte Tocaton of he 3. | point of supply, changeover arrangements, kenerator. metered points and layout 64 ‘of unmetored wiring “Any protective device or Bolator supplying exe] servic’ must indicate the porionls oF he 4 | cet nalation controls nde sled in aes th 45. 2822 5, | Location of CT metering ae 8.1222;88 6. | Separate CT chamber. ¥ 8125.1 7, | CFs hal be mounted withthe label “Ths ide FTneoming Supply” or PL orice witha red dot 7 || fcinetieinsoming spy. 2s? —_ | +, | Clas of CTs a4 81232 +9. wate pele 812245417 0. conned 1272 Cie ST CORE RST Si WE Cao Tas | Cts sats am 6.0mm SDI cable arrange to minimize the likelihood oF eshortcireut. | 8.12.2. i alto ntact a busbar or conductor ofthe opposite hase or exposed met SNS [2 | es ei ong hig ett ee oe, “|aaebanor to 3 812.51 mp Note: Requirements of Appendix 1,2 & 3 are in addition to Appendix 4. * tems 8, 9 and 10 are mandatory where ETSA Utilities is the meter provider, in all other eases ‘where non-compliance with these clauses is observed the connection may proceed with defects reported to the Builders & Contractors Group. Dens vais Re Page 6 of8 Electrical Industry Bulletin No 1 ~ Connections to the ETSA Utilities Network _ Field Serves ob Safe Work Procedure RefNo SW 128 ty 302 Pagel of 22 ETSA Utiliti TSA Ui ABN 032300799 Sma unran e3y Sot nt tit APPENDIX S cock acme ta Connection Check List — HV Installations a Utes ope If the following items do not comply: | »/ ‘© New installation - notify Builders & Contractors Group of non-col tot — not connect. ms + Existing installation - refer to clause 7.6. € ra - SETS HY Installations _ - || equipment and CB tripping, unless the test is performed by ETSA Utilities Bersonne),. 7” ou The CCO MUST obtain a valid ECC Form (Appendix 1) which states Werk performell from the OMe Contactor ace ee 423 >| installation ofthe equipment on site MUST be provided tothe CCO' prior tthe cormection. 8 eos Where C's and VT"s for revenue metering dix" [by the customers, NATA approved test 5: | results are to be provided. 2 | © asingle line diagram ofthe HV elgftrical system which MUST identify having single main ‘control for each incomirig supply. 9.15.1 7-1 6 Ifthe Combiiéyfarthing System is used, the minimum resistance shall be { ohm or less than 1 | 95911 1 ety Warts -ocrernasnce be changed to ETSA Utilities locking system). ‘OTSA Uaiver Re Page 7 of 8 Electrical Industry Bulletin No 1 ~ Connections to the ETSA Utilities Network Fe Service Job Safe Work Procedure Ret No. SSWP: 128. se Dates Sly 2009 age 2 af 22 APPENDIX 5 CONT. TTEM SIR Reference HY Installations Fea aca, CO a a a TTT Sa . sykse Ae | Si ons 13,| The CCO to perform a phase sequence test atthe metering test block. ‘SETS Uatiee Re Page 8 of &

You might also like