You are on page 1of 1
Required Paper-works and Certificates for OUTLANDER project Prepared by Engineering Department, RAIL ; Status (Vendor/ Rate) g Rewiren S1| Nameofthe certificate | Issuingauthority RMBL REL Industrial property’ factory development [Land ownership( company 1 Jowned land rental lease) [LOC Land office 1 2, [No objection certificate (NOC) |Local Government. Ex {for factory building Union parishad, city 3 [Approval of proposed Bulding|Local autority’ city plan, corporation/ RAIUK 4 [Holding number Local government 5 [electricity toad approval [REB: 2 «6 [cas connection Local Gas distribution |compan 7_ |Water Connection Local water supph 8 [Road development Local government Factory operation 9 [Environmental certificate [Dol 10 [Fire certificate Local fire service office 3 11 [Lobour certificate Dol lice of Chief Inspector 12 [industria safety certificate [OPEC OT Cet 13 [iSO certificate 14 [insurance [Business Operation 15 [Trade License [Gty corporation 16 |VAT redistration NBR. 17 [TIN certificate NBR, 4 18 |import Redistration Cert (IRQ) |Office of COE 19 [limited company RISC 20 [Bank VC Bank Asia 21 |BO recistration El 22 [License for handling explosive Department of explosive control For Vehicle 5 23 [BST certificate BST 24 | Chassis number] VIN BRTA 25 |Emission certificate BRTA

You might also like