Required Paper-works and Certificates for OUTLANDER project
Prepared by Engineering Department, RAIL
; Status (Vendor/ Rate)
g Rewiren S1| Nameofthe certificate | Issuingauthority
RMBL REL
Industrial property’ factory development
[Land ownership( company
1 Jowned land rental lease) [LOC Land office
1 2, [No objection certificate (NOC) |Local Government. Ex
{for factory building Union parishad, city
3 [Approval of proposed Bulding|Local autority’ city
plan, corporation/ RAIUK
4 [Holding number Local government
5 [electricity toad approval [REB:
2 «6 [cas connection Local Gas distribution
|compan
7_ |Water Connection Local water supph
8 [Road development Local government
Factory operation
9 [Environmental certificate [Dol
10 [Fire certificate Local fire service office
3 11 [Lobour certificate Dol
lice of Chief Inspector
12 [industria safety certificate [OPEC OT Cet
13 [iSO certificate
14 [insurance
[Business Operation
15 [Trade License [Gty corporation
16 |VAT redistration NBR.
17 [TIN certificate NBR,
4 18 |import Redistration Cert (IRQ) |Office of COE
19 [limited company RISC
20 [Bank VC Bank Asia
21 |BO recistration El
22 [License for handling explosive Department of explosive control
For Vehicle
5 23 [BST certificate BST
24 | Chassis number] VIN BRTA
25 |Emission certificate BRTA