TRAINING CENTRE

Target area:
Interior walls

Existing

Basic
Function

: Divide spaces

Brick wall with cement plaster and paint


Description of current approach. Include types, sizes, and locations

Initial Cost :
Life Cycle Cost:

VE Proposal

Use soundproofing materials for the walls


Description of alternative approach. Include types, sizes, and locations

Initial Cost :
Life Cycle Cost:

Target area

Basic
Function

Existing
Identify the advantages and disadvantages of the current way or approach.

ADVANTAGES

DISADVANTAGES

VE Proposal
Identify the advantages and disadvantages of the alternative approach.

ADVANTAGES

DISADVANTAGES

Justification for Change


Explain why change from the current way or approach

Target
Area

Basic
Function

Estimate: Existing Approach

Quantity

Unit

1000

Unit Cost

3455

Total

3455000

Subtotal
Engr. & Const Supportr Cost
Prorates

Estimated Initial Cost

Estimate: VE Proposal Approach

Quantity

Unit

Subtotal
Engr. & Const Supportr Cost
Prorates

Estimated Initial Cost

Summarize
Initial Cost Savings

Unit Cost

Total