Update on construction The Bell Building @ Goldberg, Craig @ Atlanta Peachtree 1D Repiyall |v Thuy 347 PH Monica Henson, Penelope Pugh Austin Abbey © | vote ream + our contractor, Mark Fitzpatrick is scheduled for completion on Novemiver 30,2016. Carpet will be installed ‘between Nov. 23-29. + allwalls tobe removed have been removed, plus all of the existing carpet ‘+ Mark Fitzpatrick is now working on ceiling ties, electrical outlets, molding, pairting, and typical finish work, thus the schedule is being adhered to. ‘+ Imaddition, anne is having keys made fr Suite 110 plus the south main entrance doot. Looks lke a December 1 ‘occupancy is go. The construction did not need to be permitted. As@ result, there Is noneed for the C/O. Pease call me vith any questions.