GUIDE POUR LES ACCESSOIRES
DES CABLES A FIBRES OPTIQUES
SUR LES LIGNES
DE TRANSPORT AERTENNES
PARTIE 2A — METHODES D’ESSAI
Accessoires pour cables de garde a fibres optiques
et accessoires pour conducteurs a fibres optiques
Groupe d'Action 03 du Groupe de Travail 22.11
TABLE DES MATIERES
1. OBJECTIF 6.1. Montage général pour le
CONDITIONS GéNéRaLes | Cle atténuation optique
feaiees 62. Essais et séquence de
charge recommandés
3, ABREVIATIONS ET DEFINITIONS 63. Accessoires pour cables de
garde a fibres optiques (CGFO)
4, DURABILITE, E
: 64, Accessoires pour conduc-
5, TYPES DE CABLES teurs a fibres optiques (CFO)
6, METHODE D'ESSAI 7. REFERENCES (voit anglais)
Président :. Smart
‘Socrétaire :§.0, Mikkelson
Membres : H. Argasinsxa, U. Cosma, K. Halsan, D. Havard, D. Heamshaw, R. Kleveborn,
M. Mito, F. Morentin, M. Nuggiasca, J. Schmidt, M. Shaw, M, Si-Louis,D. Suna, R. Sut-
hall et W. Troppauer.
‘Membres correspendants : A. Bartlet G. Diana, J. Evans, A. Manent et A. Ross.
aoporteurs sodciaux :T. Aldarton et. Erik
FRévision pour le Comité d'Etudes 22: K. Papalou at F. Tavano.
La 1! partie de ce guide fournissait
1. OBJECTIF des recommandations pour le choix et
Nutlisation des accessoires pour les
cables optiques sur les lignes de trans-
port aériennes.
Le présent document a pour objectif | La Partie 28 de ce guide donnait des
de fournir un guide de référence pour | recommandations pour les méthodes
les méthodes d'essais de types des | d'essais de types des accessoires
accessoires en contact direct aves les | pour les cébles autoportants tout
Abies optiques sur las lignes de trans- | diélectriques (ADSS) et les cables
port aériennes. ‘optiques supportés (OPAC)
42
2. CONDITIONS
GENERALES REQUISES
Le cable optique et les accessoires
constituent un ensemble et i est indis-
pensable que le cable et les accos-
soires soient testés ensemble. Chaque
type do cable est abords séparément
avec les conditions de performances
requises par ses accessoires. Dans
les paragraphes correspondants, le
crittre de réiérence d'acceptation est
la charge que Taccessoire doit tre &
méme de supporter sans provoquer de
détérioration du céble, ni au niveau
‘optique ni au niveau mécanique, et
sans nuire aux performances du cable
en matitre de résistance & la fatigue
pendant la durée de vie prévue.
Lorsque cela est prévu, les essais doi-
vent 8tre menés a bien avec un signal
optique dans le cable, et les citeres
d'essai_impliquent que atténuation
optique n’augmente pas du fait de
Vaccessoire
Dans la mesure du possible, les
accessoires doivent respecter les
conditions requises par la norme
61284 inttulée « Conditions requises
et essais pour les accessoires des
lignes aériennes » (référence 1),
3, ABREVIATION
ET DEFINITIONS
Les abréviations suivantes sont utii-
‘sées dans le présent document ; leur
signification est indiquée ci-apres
ADSS Cable optique autoportant tout
diélectique
SLECTRA N° 188 FEVRIER 2000SRB}
GUIDE TO FITTINGS
FOR OPTICAL CABLES
ON TRANSMISSION LINES
PART 2A — TESTING PROCEDURES
Optical Ground Wire Fittings
and Optical Phase Conductor Fittings
Task Force 03 of Working Group 22.11
‘TABLE OF CONTENTS
1. OBJECTIVE
2, GENERAL REQUIREMENTS
3. ABBREVIATIONS AND DEFINI
TIONS
4, DURABILITY
5. CABLE TYPES
6, TESTING PROCEDURE
Chainnan:T. Smart
‘Secretary: SD. Mikkelson
6.1. Genetic setup for optical
attenuation monitoring
6.2. Recommended tests and
loading sequence
6.3, Optical Ground Wire [OPGW]
fittings
6.4, Optical Phase Conductor
[OPPC) fittings
7. REFERENCES
‘Members: H. Argasinska, U. Cosmal, K. Halsan, . Havard, D. Heamnshaw, R. Kleveborn,
M. Mio, F. Morertin, —M. Muggiasea, J. Schmit, AlShaw, -MStLouis, D. Sunke,
i. Surehall, W.Troppauer.
Corresponding members: A. Banat, G. Diana, J. Evans, A. Manenti, A. Ross
‘Spocial contabutors:.Alderton and Mi Erik
Reviewed or Stuey Commitios 22"K. Papaiiow and F, Tavano
The objective of this document is to
provide a reference guide for the type
testing procedures of fitings that are in
direct contact with optical cables on
overhead transmission lines,
ELECTRA No. 188 FEBRUARY 2000
Part 1 of this guide provided recom:
mendations for the selection and use
of fittings for optical cables on over.
head transmission lines.
Part 28 of this guide provided recom-
mendations for the type testing proce-
dures of fitings for All Dielectric Solt
Supporting [ADSS} cable and Optical
‘Attached Cable [OPAC],
43
The optical cable and fitings area
system and itis essential thatthe fit-
tings and the cable are tested
together. Each type of cable and the
performance requirements ofits fitings
fare discussed separately. In these
discussions the acceptance criteria
refers to the load the fiting should be
able to withstand without causing dam-
age to the cable, both optically and
mechanically, or impair the fatigue per-
formance of the cable during its design
life,
Where specified the tests should be
performed with an optical signal in the
cable and the test criteria Is no
increase in the optical attenuation due
to the fitting
Where applicable the fitings should
conform to the requirements. of IEC
Standard 61284 ‘Requirements and
tests for overhead line fitings” (reter-
cence 1].
‘The following abbreviations and dofini-
tions are used in this document:
ADSS All Dielectric Self Supporting
Optical Cable.
OPAC Optical Attached Cable.
PGW Optical Ground Wire,
OPPC Optical Phase Conductor.
Also known as OPCON‘opac
caro
Cable optique supports
Cable de garde 8 fibres opti:
ques (Vabréviation anglaise
est OPGW)
Conductour & fibres optiquos
(les abréviations anglaises
sont OPPC ou OPCON)
Charge de rupture mécant
que, eesta-dre charge app
quée sur le cable et suscep-
tole dentrainor_sa_ rupture
mécanique (Cabréviation an-
dglaise ost MFL)
Résistance nominale en trac:
tion, cest-a-dire charge de
traction meximale théorique
que le edible peut supporer
(abréviation anglaise est
RTS).
Tension de service maximale
spéciide, cestadire charge
se tension maximale pouvant
etre appliquée au cable en
service sans ltération des
performances optiques cu
cable ('abréviation anglaise
est TNMS). Cette veleur est
également connue sous le
sigle TMA (AT en anglais,
Cesti-dre la tension max:
male admissible) ov CNMC
(MRCL en anglais, lest-a-cite
la charge nominala maximale
sure cable)
DURABILITE
FO
cA
NT
SMS
les CFO (cables a fibros optiques) sont
abordés dans la présente partie du
guide. Les détails sur les méthodes
essai concernant les ADSS (cables
autoportants tout dilectriques) et les
OPAC (cables supportés) sont traités
dans la partie 2B de ca guide.
(On pourra trouver une description
detallée do ces types de cables a la
partie 1 de ce guide (référence 2)
Pour de plus amples renseignements,
voir également la brochure technique
de la CIGRE récigée par le GTO4 du
(CE9S et inttulée « Optical Fibre Plan-
ning Guide for Power Utiities » (r8té-
rence 3) ainsi que la « Norme P1122
de IEEE pour les ADSS (cables auto-
portants tout didlectriques a fibres
optiques) utlisés sur les lignes de
transport des compagnies lec
triques » (référence 4) et le document
1138-1994 de IEEE sur le « Cablage
normalise des cablos de garde & fibres
optiques (CGFO) utilisés sur les lignes
de transport des compagnies dfélect-
cite » (r6f6rence 5}.
(On trouvera par ailleurs des rensei-
gnemenis sur les experiences réali-
‘3608 ot los types daccessoires utlisés
avec les divers cables fibres
optiques dans le rapport de la CIGRE
sur les « Résultats de analyse du
{questionnaire sur les accessoires des
cables a fibres optiques pour les lignes
aériennas » (référence 6)
Tous les accessoires doivent étro
ccongus pour une durée de vie en ser-
Vice au moins équivalente a la durée
do vie du cable sous toutes les condi
tions do service connues,
Les matériaux et les finitions doivent
{tro appropriées pour une plage de
températures de service allant de
= 40 °C & + 70 °C. Pour certaines
applications spécifiques, la limite in
Fieure de température peut étre ame
1ée par le client &~ 60 °C.
5. TYPES DE CABLES
Les accessoires pour les CGFO
(cles de garde a fibres optiques) et
6. METHODE D’ESSAI
6-1, MONTAGE GENERAL POUR LE
CONTROLE D'ATTENUATION OPTI
ue
Les performances optiques doivent
eye verifiées par Tune des deux
méthodes ci-aprés ou, do préférence,
par les deux. Il appartiant au client et
‘au fournisseur de so mettre accord
surla méthode de mesure & utiliser.
6.1.1. Contréle optique
Le signal optique doit étre control a la
onguaur donde 1550 nm en connec-
tant un minimum de 1 fibro par tube
ppour former une boucle d'essal conti-
rue, comme indiqué a la figure 1. 11
convient dutiiser un matériel de
mesure approprié,
44
Lacoroissement de Fatténuation
optique pendant essai, lorsque la
charge appliqude va jusqu'a la TSMS
Jncluse, ne doit dépasser
(0,05 dBvarn,
pas
6.1.2. Intégrité mécar
Les dimensions du tubo métallique
contenant les fibres optiques testées
doivent étre mesurées apres l'essai
La déformation ne doit pas dépasser la
limite dovalisation spécitiée par le
fabricant du céble. Le tube métallique
contenant les fibres optiques dolt éga-
lement étre inspecté pour verifier
Fabsence dun quelconque signe de
détérioration ou de fissures,
62. ESSAIS ET SEQUENCE DE
CHARGE RECOMMANDES
Les essais et la séquance de charge
recommandés pour chaquo type
daccessoire utilisé avec les CGFO et
les CFO sont décrts dans cotte parte
ddu Guide, Le client peut toutetois spé-
cifier une autre sequence cessais st
le soubaite
63, ACCESSOIRES POUR CABLES
DE GARDE A FIBRES OPTIQUES
(ccFo)
Ce chapitre aborde les conditions
requises pour les essais sur les acces-
soies ci-apres
1. Accessoire d'anctage
2. Accessoire de suspension
3. Amortisseur de vibrations éoliennes:
4, Accessoire anti-galop
5, Accessoire de signalisation
8. Raccord de mise a la terre et de
cavalier
7. Pince de descente
8. Bottier 'épissures
6.3.1. Accessoire d'ancrage
Les quatre essais ci-aprés s'avérent
1. Charge de rupture
2, Fatigue due aux vibrations éoliennes
8. Fatigue due au galop
4, Fute ala terre
6.3.1.1. Charge de rupture
Un accessoire dancrage doit ere
plac @ chaque extrémité dune lon
‘queur minimale de 8 metres de CGFO,
le fil devant depasser des accessoires
ELECTRA N° 188 FEVRIER 2000MFL_— Mechanical Failure Load. The
load on the cable that causes
it to break mechanically
RTS Rated Tensile Strength. The
theoretical maximum tensile
load that the cable should
withstand,
SMWT Spocified Maximum Working
Tension. The maximum ten-
sile load that may be applied
to the cable in service without
detriment to the optical perfor
mance of the cable. This
value is also known as MAT
[Maximum Allowable Tension]
or MRCL [Maximum Rated
Cable Load}
All fitings. should be designed for a
service feat least equivalent to that of
the cable under all known service con-
ditions.
Materials and finishes should be suit-
able for an operating temperature
range of minus 40°C to 70°C. For
specific applications the lower tamper-
ature limit may be changed, by the
customer, to minus 60 °C.
Fittings for Optical Ground Wire
{OPGW and Optical Phase Conductor
{OPPC] are covered by this part ofthe
Guide. Details of testing procedures
for fitings for All Dielectric Seif Sup-
porting [ADSS] optical cablo and Opt-
cal Allached Cable [OPAC] are cov-
ered by Part 28 ofthis guido,
For a detailed description of these
cable types please refer to Part 1 of
this guide [reference 2}. For more
etailed information also see CIGRE
technical brochure ‘Optical Fibre Plan-
ning Guide for Power Utities’ by
SC35-WG04 [reference 3] and IEEE
P1222 ‘Standard for All Dielectric Self
‘Supporting [ADS] Optical Cable for
use on Overhead Utiity Lines' (rofer-
ence 4] and IEEE 1198-1894 ‘Sian-
dard Construction of Composite Fibre
ELECTRA No, [88 FEBRUARY 2000
Optic Overhead Ground Wire [OPGW}
for use on Electric Utility Power Lines’
[roforence 5}.
Information on the experience and type
of fitings used with the various optical
fibre cables can be obtained from the
CIGRE report ‘Results of tho Question-
naire: Fitings for Fibre Optic Cables on
(Overhead Lines’ reference 6}
6.1 GENERIC SETUP FOR OPTICAL
ATTENUATION MONITORING
The optical performance should be
verified by either or preferably both of
the following 2 methods. The measur.
ing method to be used should be
agreed between the customer and the
supplier.
6.1.1 Optical monitoring
The optical signal should be monitored
at the 1550 nm wavelength by con-
necting a minimum of 1 fibre per tube
In one continuous test loop, as shown
in Figure 1. Suitable measuring equip-
‘ment should be used,
Any increase in optical attenuation dur-
ing the test, when loaded upto and
including SMWT should not exceed
(0.05 dBi/km,
6.1.2 Mechanical integrity
‘The dimensions of the metallic tube
containing the optical fibres under the
test fitting should be moasured after
the test, The deformation should not
exceed the ovaliy imit specified by the
‘cable manufacturer. The metallic tube
‘containing the optical fibres should
also be inspected for signs of daterio-
ration and cracking
6.2 RECOMMENDED TESTS AND
LOADING SEQUENCE
The recommended tests and the load:
ing sequence of each type of fitting for
use with OPGW and OPPC are
described in this Part of the Guide
The customer may however specity
another testing sequence, if required,
63 OPTICAL
[oPGw] FITTINGS
GROUND WIRE
This section covers the requirements
{or testing the following fitings:
1. Tension fting
‘Suspension iting
Aeolian vibration damper
Anti-galloping device
Warning device
Grounding and jumper connector
Download clamp
Splice enclosure
6.3.1 Tension fitting
‘The following four tests are required:
4. Tensile load
2. Aeolian vibration fatigue
3. Galloping fatigue
4, Fault current
6.3.1.1 Tensile load
AA tension fiting should be installed at
each end of an 8 metre minimum
length of OPGW, which should extend
Tension
buaciaal ‘esrermies
Figure 1. Schéma dun circuit optique
Figure 1. Schematic of optical circuit
oe
anes seuceD
Ncownmuous
tor
TREES
45danerage, de fagon & contréler le
signal optique.
Léchantilon test8 doit étre chargé en
respeciant la séquence suivante
1. Charger & une RNT do 2,5 % ot
enregistrer Vatténuation optique &
tito de référence.
2. Charger & une RNT de 50 % et
maintonir pendant 60 minutes.
8, Enregistrer le signal optique au
debut et a la fin de la période de 60
minutes ci-dessus,
4, Ramener a une RNT de 2,5 %.
5. Augmenter la charge jusqu’au pour-
centage de la RINT décidé et mai
tenir pendant 1 minute.
6. Enregistrer le signal optique pen-
dant Taugmentation de charge ci-
dessus el 2 la fin de la période de
maintien indiquee.
7. Ramener léchantilon & une ANT
do 2,5 % et enregistrer 'atténuation
optique.
6.3.1.2. Fatigue due aux vibrations
éolionnes
Une longueur de CGFO doit étre termi
née & chaque extrémité par V'acces-
solre danerage, comme indiqué a la
figure 2, de fagon & avoir un minimum
de 5 boucles de vibrations entre le
vibrateur et Vaccessoire testé sur la
portée active. Sauf indication contrare,
la tension dans le CGFO doit étre
maintenue pondant essai a une ANT
constante de 20 %. La portée doit étre
factivée par un vibrateur se trouvant
dans les deux premiéres boucles en
partant du raccord de la portée active.
Dieutres dispositifs diessai peuvent
etre acceptés si le client en est
accord.
Des vibrations doivent étre appliquées
‘au CGFO pendant 100 000 000 cycles
a une fréquence de résonance située
dans une plage de 20 a 70 Hz. Confor-
mément @ la recommandation de la
CIGRE (référence 9), amplitude de la
vitesse dans le ventre oscillation de
la portée active doit rester constante &
500 mmiseconde pendant toute la
durée de essai
Les mesures optiques doivent stre
effectuées au début et @ la fin de
essai, puis chaque jour pendant la
durée de Tessai. La section de CGFO
située sous faccessoire d'ancrage doit
ire inspectée visuelement une fois,
essai de vibrations réalisé. Cet essai
peut étre associé a Fessai de fatigue
due aux vibrations éoliennes réalisé
vse
reson mae
mrne SHAKER
sy eee eine
Ky Sti | — ene
Figure 2. Montage pour les ossais de vibration/de galop
Figuro 2, Vibrationgaloping arangoment
sur Vaccessoire de suspension (voir le
paragraphe 6.3.2.2).
6.3.1.3. Fatigue due au galop
Dans les régions oUt on ne constate
pas de galop des lignes agriennes, ces
essais sont inutles. Deux types
dessais sont décrits; il convient do
décider du type & ulliser en accord
avec le cient.
A. Galop
Une longueur de CGFO doit étre termi-
née chaque extrémité par Tacces-
sire dlancrage et, sauf_ indication
contraira, la tension du CGFO doit per
mettre avoir amplitude verticale
Fequise dans le ventre descilation
pendant essai. La portée doit etre
activee par un vibrateur. Dautres dis-
postils dlessai peuvent étre utlisés si
le client en est daccord,
Des vibrations doivent étre appliquées
‘au CGFO pendant 100 000 cycles &
lune fréquence de résonance simple
ouce. Le rapport entre amplitude
verticale du ventre oscillation de
créte @ créte et la longueur de la
boucle dans la portée active doit atre
maintenu constant & 1/25 pendant la
durée de Tessa, conformément
aux recommandations de EEE (rete
rence 5).
Les mesures optiques doivent tre
effectuées au début ot a la fin de
Tessai, puis chaque jour pendant la
durée de llessai. La section do CGFO
située sous laccessoire d'ancrage doit
tre inspectée visuelloment une fois,
Tessai de galop réalisé. Cet essai peut
tro associé & essai de fatigue due au
galop qui est réalisé sur accessoire
do suspension (voir le paragraphe
6323),
4
B. Charge eyciique
Cet essai simule les forces de tension
‘agissant sur accessoire pendant le
galop.
Un accessoire diancrage doit tro
placé & chaque extrémité dune lon-
quour de CGFO de 5 métres minimum,
le fl devant dépasser des accessoires
lancrage, do fagon & contiOler Io
signal optique.
Léchantillon testé doit tre chargé en
respactant la séquonco suivante, a
tne fréquence <2 Hz
1. Charger & une ANT de 2,6 % et
enregistrer Taiténuation optique &
titre de référence,
2, Charger Méchantillon & une ANT de
20%.
3. Charger Péchantilon & une AINT de
28%,
4, Ramener & une PINT de 20 %.
5. Répéter les séquences 3 et 4 ci-
dessus pendant 45 000 cycles,
6. Ramener léchantilon @ une RNT
de 2.5 % et enregistrer Vatténuation
optique.
Les mesures optiques doivent tre
effectuges au début et a la fin de
Vessai, puis chaque jour pendant la
durée de essai. Chaque mesure jour-
nalre doit inclure au moins 5 cycles
diessai consécutiis. La section de
CGFO située sous accessoire
dlancrage doit étre inspectée vieuelle
ment @ la fin de essai de charge
oyclique,
6.3.1.4. Fuite & la terre
Le dispositit d'ancrage du CGFO doit
inclure un raccord de mise @ la terre,
afin dléviter toute détérioration méca-
nique de Vaccessoire Pancrage et du
CGFO pour un courant de Tuite maxi
mal du systeme @ la terre,
ELECTRA N° 188 FEVRIER 2000TF 22.11.03
past the tension fitings so the optical
signal can be monitored.
‘The test sample should be loaded in
the following sequence:
1. Load to 2.5% RTS and record opti-
cal attenuation as reference.
2. Load to 50% RTS and hold for 60
minutes,
8, Record optical signal at the begin-
ning and the end of above holding
period.
4. Unload to 2.5% ATS.
5. Increase load to agreed percentage
(of RTS and maintain for 1 minute.
6. Record optical signal during the
above load increase and at the end
Of the above holding prio,
7. Unload sample to 2.5% RTS and
record optical attenuation.
6.3.1.2. Aeolian vibration fatigue
‘A longth of OPGW should be termi
nated at each end with the tension fit
ting, as shown in Figure 2, such as to
give a minimum of 5 vibration loops
between the shaker and the test fiting
in the active span. The tension in the
OPGW should be maintained at a con-
stant 20.% RTS during the test, unless
otherwise specified. The span should
be driven by a shaker located within
the first two loops from the end termi-
nation in the active span. Other test
arrangements are acceptable if agreed
with the customer.
‘The OPGW should be viorated for
100,000,000 cycles at a resonant fre-
quency in the range from 20 Hz to
70 Hz. The antinod velocity amplitude
in the active span should be kept con-
stant at 500mmisecond during the test
in accordance with the CIGRE recom:
mondation [reference 9},
Optical measurements should be
taken at the start and end of the tost
and daily during the duration of the
test. The section of OPGW beneath
the tension fiting should be visually
inspected at the completion of the
vibration test. This test may be com-
bined with the aeolian vibration test on
the suspension fitting, see clause
63.22
6.3.1.3 Galloping fatigue
In areas where galloping of overhead
linos has not occurred these tests are
rot applicable. Two types of tast are
‘desorbed. The type of test should be
agreed with the customer.
ELECTRA No, 188 FEBRUARY 2000
A. Galloping
A length of OPGW should be termi-
nated at each end with the tension fit.
ting and the tension in the OPGW
should be such as to permit the
required. vertical antinode amplitude
ring the test, unless otherwise speci-
fied. The span should be driven by &
shaker. Other test arrangements are
acceptable if agreed with the cus-
tomer,
The OPGW should be vibrated for
100,000 cycles at a single loop reso-
nant frequency. The peak to peak ver
tical antinode amplituderloop length
ratio in the active span should be kept
constant at 1/25 during the test in
accordance with the IEEE recommen-
dation {reference 5}
Optical measurements should be
taken at the start and end of the test
land daily during the duration of the
test. The section of OPGW beneath
the tension fiting should be visually
ingpectod at the completion of the gal-
loping test. This test may be com-
bined with the galloping test on the
suspension fiting, see clause 6.3.2.3,
B. Cyclic load
‘This test simulates the tensile forces
‘acting on the fiting during galloping,
A tension fing should be installed at
each end of § metre minimum length
of OPGW, which should extend past
the tension fittings so the optical signal
‘can be monitored,
‘The test sample should be loaded in
the following sequence at a frequency
of <2 Ha:
1. Load to 2.5% FITS and record opti=
cal attonuation as reference.
Load sample to 20% RTS,
Load sampie to 26% RTS.
Unload sample to 20% RTS.
Repeat load/unioading sequence 3
and 4 for 45,000 cycies.
Unload sample to 2.5% ATS and
record optical attonuation.
Optical measurements should be
taken at the beginning and the end of
the test and dally during the duration of
the test. Each daily measurement
should include at least 5 consecutive
tost cycies,
‘The section of OPGW beneath the ton-
sion fiting should be visually inspected
at the completion of the cyclic load
test,
47
6.3.1.4 Fault current
The OPGW tension arrangement
should include a grounding connection
to ensure that no mechanical degrada-
tion of the tension fiting and OPGW
occurs at the maximum fault current
rating of the system,
‘The supplier should demonstrate the
adequacy of the proposed grounding
arrangement to the satisfaction of the
‘customer by reference to test data,
field experience or calculation.
6.3.2. Supension fitting
‘The following five tests are required:
4. Vertical loadturning angle
2. Aeolian vibration fatigue
8. Galloping fatigue
4, Fault current
5. Unbalanced load
6.3.2.1 Vertical loadfurning angle
AA suspension fiting should be installed
Centrally on a suitable length of OPGW
and displaced to achieve the angle f,
which is the maximum recommended
by the fiting manufacturer, as shown
in Figure 3. The minimum bend racius
‘of tho OPGW should be taken into
consideration in the design of the test
arrangement.
‘The test sample should be loaded in
the following sequence:
1. Load to 2.5% RTS and record opti=
cal attenuation as reference.
2, Increase load to SMIWT at angle fb
and hold for 60 minutes,
8, Record optical signal during the
above load increase and at the
beginning and the end of the hold
ing parios.
4, Unload sample to 2.5% RTS and
record optical attenuation
‘The iting and the section of OPGW
beneath tho suspension fitting should
be visually inspected,
6.3.2.2. Aeolian vibration fatigue
A length of OPGW should be termi-
nated at each end with a tension fit-
ting. A suspension fiting should be
Installed at 0.5 — 0.66 x span length
from the termination in the span con-
taining the shaker, called the active
‘span, such as to achieve the inciina-
tion angle a of 1.5 degiee + 05
degree and a minimum of 5 vibration
loops between the shaker and the test
fiting. Seo Figure 2. The suspensionSur la base de données dlessais, de
experience sur le terrain ou de cal-
culs, le fournisseur doit démontrer que
le dispositit Ge mise a la terre proposé
est approprié et donnera entiére satis-
faction au client.
6.3.2. Aecessoire de suspension
Les cing essals ciaprés s'avérent
nécessaires
Virago toumanticharge verticale
Fatigue due aux vibrations éoliennes:
Fatigue due au galop
Fuke a la terre
Charge dissymétrique
6.3.2.1. Virage tournanticharge verti-
cale
Un accessoire de suspension doit étre
placé au centre sur une longueur
approprige de CGFO, et il doit éire
‘deplacé pour obtenir langle fi corres-
pondant au virage maximal recom-
mandé par le fabricant de l'accessoire
comme indiqué & la figure 3. Le rayon
de courture minimal du CGFO doit
‘tte pris en considération dans la
conception du disposit essai
Léchantillon testé doit atre chargé en
respectant la séquence suivante
4, Charger a une ANT de 2,6 % et
‘enregistrer Vatiénuation optique &
titre de ratérence.
2, Augmenter la charge jusqu’& la
TNMS & T'angle f et maintenir pen
dant 60 minutos.
3, Enregistrer le signal optique pen
dant Taugmentation de charge ci:
dessus el au début et & la fin de la
période do maintion,
4, Ramener Méchantion & une RNT
do 2,5 % et enregistrer Fattanuation
optique.
Ltaccessoire et la saction de CGFO
sous l'accessoire de suspension doi-
vent étre Inspectés visuelloment.
6.3.2.2. Fatigue due aux vibrations
éoliennes
Une longuour de CGFO dott etre termi-
née a chaque extrémité par un acces-
soire dlancrage. Un accessoire de sus-
pension doit éive installé & 0,5 ~ 0,08 x
Jongueur de la portée & panir du rac
cord de la portée contenant le vibra
tour, appelée la portée active, de facon
@ obtenir un angle dinclinaison « do
15° 4 0,5" ot un minimum de 5
boucles de vibrations entre le vibratour
ft accessolre testé. Voir la figure 2
RESULTANT
Figure 8, Essa do charge veticale/de vege tournant
Figure 9, Vertical oadurning angle test.
La pince de suspension doit étre soit
raccordée de fagon rigide pour éviter
les oscillations pendant ressai, soit
raccordée comme dans les conditions
do service. Les vibrations dans la por-
tée arridre ne doivent pas étre supé-
rioures & celles de la portée active; it
est dailleurs possible d'y installer un
amoriisseur de vibrations en cas de
besoin,
‘Sauf indications contraires, la tension
doit tre maintenue & une RINT nomi=
nnale constante de 20 % pendant
Tessai, La portée doit étre activée par
tun vibrateur situé dans les deux pre-
migres boucles @ partir du raccord
dextrémité de la portée active. Cet
essai pout étro associé & Vessai de
fatigue due aux vibrations éoliennes
réalisé sur los accossoires o'ancrage
(oir le paragraphe 6.3.1.2.)
Dautres dispositifs d'essai peuvent
ira acceptés si le client en est
accord,
Das vibrations doivent étre appliquées
‘au CGFO pendant 100000000 de
cycles & une fréquence de résonance
située dans une plage de 20 & 70 He.
Conformément aux tecommandations
de la CIGRE (référence 9), amplitude
do la vitesse dans le ventre d'oscilla-
tion de la poriée libro doit étre mainte-
nue constanie & 500 mm/seconde
ondant essai
Les mesures optiques doivent tre
effectuées au début ot @ la fin de
Trssai, pu's chaque jour pendant toute
la durée de essai. La section de
CGFO se trouvant sous Paccesscire
de suspension doit tre inspoctée
visuellement une fots 'essal de vibra
tion réalisé, Cet essai peut étre asso-
cié & Tessai de fatigue due aux vibra
tions dolionnes réalisé sur laccesscire
anerage (voir le paragraphe 6.3.1.2).
48
6.3:
Fatigue due au galop
Dans les régions ou fon ne constate
pas de galop des lignes aériennes, ces
fessais s'averont inutilos. Deux types
dessais sont décrits; il convient de
decider du type a utllser en accord
avec le client
A, Galop
Une longueur de CGFO doit étre term:
née @ chaque extrémité par Tacces-
sore dancrage, et un accessoire de
suspension doit étre installé & 0,5 —
0,66 x longueur de portée & partir du
accord de la porlée contenant le
vibratour, appelée portée active, de
fagon a obtenir un angle dinclinaison
do 1,5° = 05° et un minimum de 5
bboucles de vibrations entre le vibrateur
‘et Faccessoire testé, Volr la figure 2.
La pince de suspension doit pouvoir
oseiller pendant essai pour permettre
la transmission du galop la portéo
ariére. Saut indication contraire, la
tension du GGFO doit pormotire
avoir amplitude veriicale requise
dans le vontre doscilation pendant
essai, La portée doit tre activée par
un vibrateur se trouvant dans la portée
active, D’autres dispositi's dessai pou-
vent étre utlisés en accord avec le
client
Des vibrations doivent étre appliquées
‘au CGFO pendant 100 000 cyclos a
lune fréquence de résonance simple
oucle, Le rapport entre l'amplitude
verticale du ventre dioscillation de
oréte @ créte ot la longueur de la
boucle dans la portée active doit étre
‘maintenu constant & 1/25 pendant
lessai, conformément aux recomman-
dations de TIEEE (référence 5),
Lamplitude de la portée arribre doit
tre au moins égale & 50 % de celle de
la portée active.
[ELECTRA N° 188 FEVRIER 2000Laan)
clamp should be either rigidly con
ected to prevent oscillation during the
test or connected as in service. The
vibration in the back span should not
exceed that of the active span and the
installation of a vibration damper to the
back span is acceptable, i required,
‘The OPGW tension should be main-
tained at a constant 20 % nominal
TS during the test unless otherwise
spociiod. Tho span should be driven
by a shaker located within the first two
loops trom the end termination in the
active span. This test may be com
bined with the aeolian vibration test on
the tension fiting, see clause 6.3.1.2.
Other test arrangements are accept
able if agreed withthe customer.
The OPGW should be vibrated for
100,000,000 cycies at a resonant fre-
Queney in the range from 20 Hz to
70 Hz. The antinode velocity amplitude
inthe free span should be kept con-
stant at 500 mm/second curing the test
in accordance with the CIGRE recom
‘mendation [reference 9}
Optical measurements should be
taken at the beginning and the end of
the test and daly during the duration of
the test. The section of OPGW
beneath the suspension clamp should
be visually inspected atthe completion
ofthe wibraton test. Ths test may be
combined with the aeolian vibration
test on the tonsion fing, s90 clause
63.12
6.3.2.3 Galloping fatigue
In areas where galloping of overhead
lines has not occurred these tests are
not applicable. Two types of test are
described. The type of test should be
‘agreed with the customer.
A. Galloping
A length of OPGW should be termi-
rated at each ond with the tension fit-
ting and a suspension fiting should be
installed at 0.5 - 0.68 x span length
from the termination in the span con-
taining the shaker, called the active
‘span, such as to achieve the inclina-
tion angle @ of 1.5 degree +05
ogres. See Figure 2. Tho suspon-
sion clamp should be free to oscillate
during the test to provide feed:-through
galloping to the back span, The ten-
sion in the OPGW should be such as
to permit the required vertical antinode
amplitude during the test, unlass other-
‘wise specified. The span should be
ELECTRA No, 188 FEBRUARY 2000
driven by a shaker located within the
active span. Other test arrangements
are acceptable if agreed with the cus-
tomer.
The OPGW should be vibrated for
100,000 cycles at a single loop reso-
nant frequency. The peak to peak ver-
ical antinode amplitude/loop length
ratio in the active span should be kept
constant at 1/25 during the test in
accordance with the IEEE recommen
dation [reference 5]. The amplitude in
tho back span should be at least 50%
of that in the active span,
Optical moasuroments shall be taken
at the start and end of the test and
daily during the duration of the test
The section of OPGW beneath the
suspension iting should be visually
inspected at the completion of the gal-
loping test. This test may be com-
bined with the galloping test on the
tension fiting, see clause 6.3.1.3,
8. Calc load
This test simulates the tonsilo forces
acting on the fiting during galloping
{A tension fiting and suspension fit-
ting should be installed at each end of
1.5 metre minimum length of OPGW,
which should extend past the tension
land suspension fitings so the optical
signal can be monitored.
‘The test sample should be loaded in
the following sequence at a frequency
of <2Hz:
1. Load to 2.5% RTS and record opti-
cal attenuation as reference,
2. Load sample to 10% ATS or to
SMWT, whichever is the lesser.
3, Load sample to 130% of load in
sequence 2.
4, Unioad sample to load in sequence
2,
5. Repeat load/unloading sequence 3
and 4 for 45,000 cycles.
6. Unload sample to 2.5% RTS and
record optical attenuation as refor-
Optical measurements should be
taken at the beginning and the end of
the test and daily during the duration of
the test. Each daily measurement
should include at least 5 consecutive
test cycles,
‘The section of OPGW beneath the
suspension fitting should be visually
inspected at the completion of the
‘yclc load tost,
6.3.24, Fault current
‘The OPGW suspension arrangement
should include grounding connection
to ensure that no mechanical degrada-
tion of the suspension fiting or OPGW
occurs at maximum fault current rating
ofthe system,
‘The supplier should demonstrate the
adequacy of the proposed grounding
arrangement to the satisfaction of the
customer by reference to test data,
field experience or calculation,
6.3.2. Unbalanced load
This test, it required, should be per-
formed in accordance with IEC 61284
[reference 1], Optical monitoring is not
required for thi test.
6.3.3. Aeolian vibration damper
‘An application test should be per
formed on this fiting. Bolted clamps
should be installed at 1.1 x manufac
turers’ recommended installation tor-
quo. Tho dampor should be installod
on a length of OPGW tensioned to
20% RTS and the optical performance
should be measured before and after
inetallation. The section of OPGW
beneath the aeolian vibration damper
fiting should be visually inspected,
TENSION SUSPENSION
FITTING cave
Force.
B 5 TENSION
FITTING
Figure 4. Essai do charge aissymetrique,
Figure 4, Unbatancad load test
49Les mesures optiques doivent etre
effectuées au début et @ la fin de
essai, puis chaque jour pendant toute
la durée de Tessai. La section de
CGFO se trouvant sous Faccessoire
de suspension doit étreinspectée
visuellement une fois Tessai de galop
réalisé. Cot essai peut étre associé a
essai de fatigue due au galop qui est
réalisé sur l'accessoire d'ancrage (voir
le paragraphe 6.3.1.3).
B. Charge cyctique
Cot essal simule les forces de tension
agissant sur Taccessoire pendent le
galop.
Un accessoire dancrage et un acces
soire de suspension doivent étre pla-
ce6s & chaque oxtrémité d'une lonquour
de CGFO de § metres minimurn, le fil
devant dépasser des accessoires
dancrage, de fagon @ contréler le
signal optique.
L’schantilon testé doit étre chargé en
respectant la séquence suivante, 4
tune fréquence <2 Hz
41, Charger A une ANT de 2,5 % et
enregistrer Fatténuation optique &
tive de référence,
2. Charger "échantilon & une RINT de
10 % ou a la TNMS, la plus grande
des doux valeurs étant & prendre en.
considération,
8. Charger échantillon & 130 % de la
charge de la sequence 2
4.Ramener & la charge de la
sequence 2.
5. Répéter les séquences 3 at 4 ci-
dessus pendent 45 000 cycles,
6. Ramener 'échantilon & une ANT
de 2.5 % et enregistrer 'atténuation
optique.
Les mesures optiques doivent etre
effectuées au début et a la fin de
essai, puis chaque jour pendant foute
la durée de essai, Chacune des
mesures quotidiennes doit inclure au
moins § cycles c'essai consécutis,
La section de CGFO se trouvant sous
Taccessoire de suspension doit tre
inspectée visuellement & la fin de
Tessa de charge cycique.
6.3.2.4 Pulte a la terre
Le disposi de suspension du CGFO
doit inclure un raccord de mise & la
terre, afin déviter toute détérioration
mécanique de 'accessoire de suspen-
sion ou du CGFO pour un courant de
fuite maximal du systéme a la torre,
GA 22.11.03
Sur la base de données dessais, de
Texpérience sur le terrain ou de cal>
culs, le fournisseur doit démontrer que
le dispositf de mise a la terre proposé
fest approprié et donnera entiare satis:
faction au dliont
6.3.2.5. Charge dissymétrique
Si nécessaire, cet essai doit etre réa-
lisé conformément aux recommanda-
tions de la CEI 61284 (référence 1),
Un contrdle optique n'est pas néces:
saite pour cet essai
6.3.3. Amortissement des vibrations
éoliennes
Un essai application dot re mené &
bien sur cet accessoire. Des pinces &
Gtrior doivent étve instaliées @ 1,1 x
couple installation conseilé. par te
fabricant. Lamorisseur doit étre
monte sur une longuour de CGFO
tondu & 20 % de la INT, et les perfor-
mancos optiques doivent étre mesu-
160s avant et aprés instalation. La
section du CGFO située sous famor-
tisseur de vibrations éoliennes doit
étro inspectée visuelement
Commentaire spéciique rela aux
performances des amorisseurs do
vibrations éoliennes : famortissour doit
réduire les vibrations dans le CGFO
sans provoquer do fatigue du CGFO
au riveau de emplacement du vibra-
tour ou a Fintérour. I rvexiste actucllo-
ment pas de méthode de laboratoire
aeceptée au niveau international pour
apprécer les performances en matiore
aamortssement et de fatigue pour la
gamme
lar fitings to OPGW with the addition
of a special type of insulator for the
separation of the optical circuit from
the metallic components of the con-
ductor and the transition from phase 10
earth potential at down lead positions,
Therefore the test requirements. for
OPPC fitings are as described above
for OPGW fitings with the addition of
the following:
6.4.1, Corona and RIV
The following fitings should be tested
for corona and RIV:
Tension fiting
‘Suspension fitting
Aeolian vibration damper
Anti-galloping device
Warning device
Jumper connector
The iting to be tested should be
installed on a length of OPPC, or an
‘equivalent sized metallic tube, as in
service and located in a high voltage
test laboratory. The corona and RLV.
performance should be measured in
‘accordance with the requirements of
IEC Standard 61284, clause 14 [refer-
‘ence 1)
Optical monitoring is not required for
this test
6.4.2. Phase to Earth Insulator
‘There Is no current standard for these
insulators but the folowing is recom-
mended as a guide. The insulator
should be sultable for the pollution
conditions in the area of the OPPC
overhead line, in accordance with IEC
Standard 60815 [reference 11], IEC
Standard 60437 [reference 12) andLorsquil est appliqué au obté moins
tondu du CGFO (c6t8 du cavalier), le
raccord du cavalier et de mise a la
torre doit étre installé sur une longueur
de CGFO non tendue, et les pertor-
‘mancas optiques doivent étre mesu-
rées avant et aprés installation. La
section du CGFO située sous le rao-
cord de cavalier et de mise @ la terre
doit tre inspectée visuellement,
6.3.7. Pince de descente
Un essai d'application doit aire mené &
bien sur cet accessoire. Des pinces &
trier doivent etre installées @ 1,1 <
couple dinstallation conseillé par le
fabricant. La pince de descente doit
tre instellée sur une longuour de
CGFO non tendue, et les perfor
manoes optiques doivent tro mosur
rées avant el apres installation. La
section du CGFO située sous la pince
de descente doit dire inspectée visuel-
lement.
6.38, Boltier d'épissures
Les essais névessaires pour le bottior
Tépissures dépendent de la concep-
tion du CGFO ainsi que des matériaux
‘et de la méthode dinstallation utilisés,
Los conditions requises pour les
essais doivent done faire robjet dun
accord entre acheteur et le fabricant
sur une base cas par cas,
Pari les conditions dessai_ clas-
siques, solon application, nous cite-
rons.
|. La résistance a eau
>. La résistance aux balles
La résistance aux vibrations
Le cycle thermique
Letaneheite a Yair
Cos essais doivent tre réalisés
Cconformément aux conditions requises
par la norme américaine Bellcore
(référence 7) ou le rapport japonais sur
Jes CGFO (référence 8), selon les spé-
coffcations du client.
6.4. ACCESSOIRES POUR CONDUC-
TEURS A FIBRES OPTIQUES (CFO)
Ce type de cable permet de transpor-
ter des données optiques en plus de
‘énergie électrique. Les accessoires
doivent done aire mémes de suppor-
ter les conditions optiques. méca-
niques et électriques du systame, Le
CFO ullse des accessoires sem-
lables a ceux ullisés avec les CGFO
avec, en oulte, un type spécifique
dlisolateur pour la séparation entre le
circuit optique et les composants
métalliques du conducteur et pour la
transition du potentiel de phase au
potentiel de terre au niveau des pinces
de descont.
Les conditions d'essal requises pour
les accessoires de CFO sont donc les
mémes que celles décrites ci-dessus
pour les accessoires de CGFO; on y
ajoutera celles citées ci-dessous.
6.4.1. Effet couronne et interféren-
ces radio
Letfet couronne et les intertérences
radio doivent élre testés sur les acces-
soires suivants
1. Accessoire dlancrage
2. Accessoire de suspension
3. Amortiseeur do vibrations éolionnos
4, Accessoire ant-galop
5, Accessoire de signalisation
6, Raccord de cavalier
Ltacoesssire a tester doit étro installé
sur une longueur de CGFO, ou sur un
tube métalique de dimensions équiva-
lente, comme dans les conditions de
sorvice, ot il doit tre conserve dans
un laboratoire dessais haute tension,
Les performances lides & leffet de
couronne et aux performances radio
oivant etre mesurées conformément
‘aux conditions requises dans la norme
61284, clause 14, de la CEI (16f6-
rence 1}.
52
Un contréle optique n'est pas nécos-
saire pour cet essa
6.4.2, Isolateur entre phase et terre
I ny a pas de norme de courant pour
ces isolatours, mals les points suivants
sont recommandés comme quide.
Lisolateur doit étre approprié pour les
conditions de pollution de la région
dans laquelle se trouve la. ligne
aérianne utilisant des cables & fibres
optiques, conformément la norme
60815 do la CEI (ference 11), & la
nnorme 60497 de la CEI (référence 12)
et 4 la norme 61109 de la CEI (r8ié-
rence 19). Il est conseillé de sceller
hermétiquement lisolateur pour éviter
un amorgage darc interne,
Les trois essais ci-aprés sont néces-
salres
1. Tenue en atmosphere sche & la
fréquence industrielle et aux chocs
ce foudre, et décharge électrique
2, Tenue a la fréquence industrielle en
‘atmosphere humide
3, Performances en matiare de fré-
‘quence industriollo en cas de pollu-
tion artiticiele,
La tension dlessai doit étre équivalente
la tension maximale de service da la
ligne, et les performances optiques
doivent atre contrélées au début et la
fin de chacun des essais ci-dessus.
Lisolatour entre phase et terre ne
subit pas de contraintes. mécaniques
(nn servica, ot dos essais de charge ne
sont done pas nécessaires,
1. REFERENCES
{voit anglais)
ELECTRA N° 188 FEVRIER 2000bir a ahd
IEC Standard 61109 [reference 13]. It
is recommended that the insulator Is
hormetically sealed to prevent intemal
flashover.
‘The following 3 tasts are required:
1. Power frequency and lightning
impulse cry withstand and tlash-
over.
2, Power frequency wet withstand,
3, Power frequency performance
under artificial pollution
‘The test voltage should be equivalent
{0 the maximum operating line voltage
and the optical performance should be
monitored at the beginning and the
‘end of each of the above tests.
‘The phase to earth insulator is not
stressed mechanically in service and
therefore load tests are not required.
ELECTRA No, 188 FEBRUARY 2000
[1] IEC Standard 61284 ‘Overhead Lines
= Requirements and tests for fitings’
[2] CIGRE report ‘Guide to Fitings for
Opiical Cables on Transmission Lines,
Part 1 — Selection and Use / Guide
‘pour les accessoires des cables @
‘bres optiques sur les lgnes adriennes
= Parte 1 sélection et utilsation
ELECTRA no. 176, Fobruary 1998.
[9] CIGRE technical. brochure “Optical
Fore Planning Guide for Power Ut-
ties, ELECTRA number 157, Dacom-
ber 1994,
(4) IEEE P1222 ‘Standard for Al Delactle
Solt Supporting {ADSS] Opte Caaie tor
Use on Overhead Unity Lines
(6) IEEE 1138-1994 ‘Standard construe-
tion of Composite Fibre Optic Over-
head Ground Wire [PGW] used on
Electric Utity Power Lines
[6] CIGRE report Results of tho Quostion-
nair-Fitings for Fare Optic Cablos on
‘Ovethoad Lines / Résutats du ques-
tionnaire = accessoires pour cables a
53
‘bres optiques sur tes ones
aérionnes, ELECTRA number 165,
Apt 1996
[7] Botcore Standard ‘Generic require:
ments for Fibro Optic Spice Closuros'
GAL771-CORE, Issue 1, July 1994,
[8] Electric Technology Research in Japan
repor ‘Opiical Ground Wires [OPGWT,
Volume 48, Number 1, May 1990.
[9] CIGRE report “Guide for endurance
testing of conductor inside clamp 1
Guide pour les assais d'endurance ces
Conducteurs & Viméneur des pinces
ELECTRA number 100, page 77-86.
[10] IEC Standard. 61897 Requirements
‘and tosts for stookbridge type aeolian
vibration dampers’
[11] IEC Standard 60815 ‘Guide for he
selection of insulator in respect of pol>
luted conditions.
[12] I€C Standard 60437 “Radio interter-
{ence test on high vallage insulators
[19} 1EC Standard 61109 ‘Composite insu-
laters for AC. overhead lines with a
‘nominal voltage above 1,000 volt —
definitions, test methods and accep-
tance ertri