Rekapitulasi Volume: Back Up Data - April (Mc-01)
Rekapitulasi Volume: Back Up Data - April (Mc-01)
2.1.(1)
2.2.(1)
3.1.7
5.1.1
5.1.2
6.1 (1)(a)
6.1 (2)(a)
6.3 (5a)
6.3 (6a)
10.1.(2)
10.1.(3)
DIVISI 1. UMUM
Mobilisasi
Sub. Total
BAB II- PEKERJAAN DRAINASE
Galian Untuk Drainase dan Saluran Air
Pasangan Batu Dengan Mortar
Sub Total
DIVISI 3. PEKERASAN TANAH
Galian Perkerasan Beraspal tanpa Cold Milling Machine
Sub. Total
BAB V- PEK PERKERASAN BERBUTIR
Lapis Pondasi Aggregat Klas A
Lapis Pondasi Aggregat Klas B
Sub Total
DIVISI 6. PERKERASAN ASPAL
Lapis Resap Pengikat - Aspal Cair
Lapis Perekat - Aspal Cair
Laston Lapis Aus (AC - WC )
Laston Lapis Antara ( AC - BC )
Sub Total
BAB X - PEMELIHARAAN RUTIN
Pemeliharaan Rutin Bahu Jalan
Pemeliharaan Rutin Selokan, Sal. Air, Gal & Timb
Sub Total
JUMLAH TOTAL TANPA PPN
SAT
VOLUME
KONTRAK
AWAL
VOLUME
KONTRAK
Add- 01
HARGA
SATUAN
(Rp)
JUMLAH
HARGA
(Rp)
Bobot
(%)
Volume
Back-Up
MC - 02
Bobot
(%)
Volume
Yg ditagihkan
MC - 02
Ls
1.00
134,500,000.00
134,500,000.00
134,500,000.00
5.96
5.96
0.00
0.00
0.00
0.00
M
M
187.00
98.12
104,380.43
1,704,615.87
19,519,140.41
167,256,909.16
186,776,049.57
0.86
7.41
8.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
720.00
209,458.12
150,809,846.40
150,809,846.40
6.68
6.68
0.00
0.00
0.00
0.00
M
M
270.00
360.00
872,580.91
691,926.19
235,596,845.70
249,093,428.40
484,690,274.10
10.44
11.04
21.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,530.00
1,080.00
167.04
250.56
18,535.96
18,464.74
2,459,980.84
2,271,567.94
28,360,017.10
19,941,918.12
410,915,199.51
569,164,063.05
1,028,381,197.78
1.26
0.88
18.21
25.22
45.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
234,000,000.00
37,741,590.04
234,000,000.00
37,741,590.04
271,741,590.04
2,256,898,957.89
10.37
1.67
12.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liter
Liter
Ton
Ton
Ls
Ls
Disetujui Oleh :
Pejabat Pelaksana Teknis Kegiatan
Dinas Pekerjaan Umum
Diperiksa Oleh,
Konsultan Pengawas
CV. JASINDO CONSULT
SUJARWO, SE.
NIP. 19730424 199703 1 004
100.00
0.00
Dibuat Ole
Kontraktor Pela
PT. BELAWA MAH
RUSTA
Direktur Uta
PITULASI VOLUME
Bobot
(%)
Sisa Volume
Back-Up
MC - 02
Bobot
(%)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Dibuat Oleh :
Kontraktor Pelaksana
PT. BELAWA MAHA KARYA
RUSTAN
Direktur Utama
0.00
KET.