You are on page 1of 2

REKAPITULASI VOLUME

BACK UP DATA -APRIL (MC-01)


PROGRAM
KEGIATAN
PEKERJAAN
KONTRAKTOR
KONSULTAN
NO
MATA
PEMBAYARAN
1.1

2.1.(1)
2.2.(1)

3.1.7

5.1.1
5.1.2

6.1 (1)(a)
6.1 (2)(a)
6.3 (5a)
6.3 (6a)

10.1.(2)
10.1.(3)

: REHABILITASI/PEMELIHARAAN JALAN DAN JEMBATAN


: REHABILITASI/PEMELIHARAAN JALAN
: REHABILITASI/PEMELIHARAAN JALAN DI KABUPATEN MALINAU
: PT. BELAWA MAHA KARYA
: CV. JASINDO CONSULT
URAIAN PEKERJAAN

DIVISI 1. UMUM
Mobilisasi
Sub. Total
BAB II- PEKERJAAN DRAINASE
Galian Untuk Drainase dan Saluran Air
Pasangan Batu Dengan Mortar
Sub Total
DIVISI 3. PEKERASAN TANAH
Galian Perkerasan Beraspal tanpa Cold Milling Machine
Sub. Total
BAB V- PEK PERKERASAN BERBUTIR
Lapis Pondasi Aggregat Klas A
Lapis Pondasi Aggregat Klas B
Sub Total
DIVISI 6. PERKERASAN ASPAL
Lapis Resap Pengikat - Aspal Cair
Lapis Perekat - Aspal Cair
Laston Lapis Aus (AC - WC )
Laston Lapis Antara ( AC - BC )
Sub Total
BAB X - PEMELIHARAAN RUTIN
Pemeliharaan Rutin Bahu Jalan
Pemeliharaan Rutin Selokan, Sal. Air, Gal & Timb
Sub Total
JUMLAH TOTAL TANPA PPN

SAT

VOLUME
KONTRAK
AWAL

VOLUME
KONTRAK
Add- 01

HARGA
SATUAN
(Rp)

JUMLAH
HARGA
(Rp)

Bobot
(%)

Volume
Back-Up
MC - 02

Bobot
(%)

Volume
Yg ditagihkan
MC - 02

Ls

1.00

134,500,000.00

134,500,000.00
134,500,000.00

5.96
5.96

0.00

0.00
0.00

0.00

M
M

187.00
98.12

104,380.43
1,704,615.87

19,519,140.41
167,256,909.16
186,776,049.57

0.86
7.41
8.28

0.00
0.00

0.00
0.00
0.00

0.00
0.00

720.00

209,458.12

150,809,846.40
150,809,846.40

6.68
6.68

0.00

0.00
0.00

0.00

M
M

270.00
360.00

872,580.91
691,926.19

235,596,845.70
249,093,428.40
484,690,274.10

10.44
11.04
21.48

0.00
0.00

0.00
0.00
0.00

0.00
0.00

1,530.00
1,080.00
167.04
250.56

18,535.96
18,464.74
2,459,980.84
2,271,567.94

28,360,017.10
19,941,918.12
410,915,199.51
569,164,063.05
1,028,381,197.78

1.26
0.88
18.21
25.22
45.57

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

1.00
1.00

234,000,000.00
37,741,590.04

234,000,000.00
37,741,590.04
271,741,590.04
2,256,898,957.89

10.37
1.67
12.04

0.00
0.00

0.00
0.00
0.00

0.00
0.00

Liter
Liter
Ton
Ton

Ls
Ls

Disetujui Oleh :
Pejabat Pelaksana Teknis Kegiatan
Dinas Pekerjaan Umum

Diperiksa Oleh,
Konsultan Pengawas
CV. JASINDO CONSULT

SUJARWO, SE.
NIP. 19730424 199703 1 004

Ir. DUDY ISMAIL


Supervision engineer

100.00

0.00

Dibuat Ole
Kontraktor Pela
PT. BELAWA MAH

RUSTA
Direktur Uta

PITULASI VOLUME

UP DATA -APRIL (MC-01)

Bobot
(%)

Sisa Volume
Back-Up
MC - 02

Bobot
(%)

0.00
0.00

0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00

Dibuat Oleh :
Kontraktor Pelaksana
PT. BELAWA MAHA KARYA

RUSTAN
Direktur Utama