You are on page 1of 4

TRACON INDONESIA

KICK OF MEETING
PROCUREMENT AND CONSTRUCTION OF XXXXX
June 06, 2014 at Le- Grandeur Hotel, XXXX
TIME

DURATION
(minutes)

PROGRAM
Opening, Agenda & Ground Rules,
Safety Tips
Message from Client Management
Project (Scope of work, organization chart, project
schedule)
Contractual Matter
HSE Requirement (HSE Regulation)
Project Strategy
ADK Organization Chart, Vision & Mision
HSE
- Inductions
- PPE
- 8SSP
- HSE Training
- Safety Meeting
- Emergency response & plan
- TRA &WPS
- dll
Human Recources
- Manpower planning & loading
- Recruitment & termination (MCU, ID Badge, Qualification,
PPE, etc)
- Development (Training & certification, reward &
punishment)
- Manpower job description and qualification
Equipment
- Equipment utilization schedules
- Inspection equipment schedules
- Maintenance schedules
Material Monitoring & Control
- Material handling & storage procedure
Construction / Instalation
- Construction schedules
- Marked up as built drawing
Quality Control (Prosedure & Sertification)
- Mechanical & piping
- Civil & Structural

TRACON INDONESIA
KICK OF MEETING
PROCUREMENT AND CONSTRUCTION OF XXXXX
June 06, 2014 at Le- Grandeur Hotel, XXXX
- Electrical & instrument
- Painting & Coating
- QA/QC Documentation
Project Control
- Correspondence procedure & Contractual matter
- Completion
- Invoice
- Reporting
KOM Summary
Closing Remarks

SIA
G
CTION OF XXXXX
ur Hotel, XXXX
BY
INL/TRACON
INL/TRACON
INL/TRACON

INL/TRACON
INL/TRACON
Wika Management

WIKA

Wika Management

WIKA

Wika Management

WIKA

Wika Management

WIKA

Wika Management

WIKA

Wika Management

SIA
G
CTION OF XXXXX
ur Hotel, XXXX

WIKA

Wika Management

You might also like