CEO - Trattic & Roads Avency A 11 MAR 2008 Bie GOVERNMENT OF DUNAL CIRCULAR TO ALL CONSULTANTS AND ZONE SAFETY ENGINEERS No. (21) SUBJECT: Safety campaigns on Lifting Operations. In order to make sure all lifting activities safe, Traffic & Roads Agency (TRA) QHSE department is starting a campaign which will have the following points: 1) Safety Surveys: It's 2 very detailed examination of all safety devices on machinery in particular, lifting equipments. 2) One-off Equipment inspection: inspect particular Lifting machineries, Equipments and Gears in certain conditions, Lifting equipments on site condition to ensure safe system of work and the frequency of inspection as Routine Inspection, Maintenance Inspection, Functionality testing, Manufactures Instructions’ testing etc 3) Third Party Certification: Approved Competent third party must conduct the certfication and the verification process in specific site conditions for the lifting equipments & gears. 4) No Objection Certificate (NOC): TRA (Right of Way) ROW and Traffic Department NOC's must be obtained prior to start the work and the consultant must verify that these permits are in place. No objection certificates must be obtained from all relevant authorities, 6) Lifting Plan: all critical lifting activities must have a plan which details how the activity will be carried out safely. The plan includes: = A) Method statement B) Responsible Engineer ©) Lifting Supervisor D) Equipments & Accessories to be used E) Risk Assessment F) Competency of the Crew G) Competency of the crane operators H) Load Detalls/ Load Chart/ Angle of Lifting 1) Details of Material/ Gantries/ Structural elements etc. TRAFFIC & ROADS AGENCY Developing 2 best in class QMSE Department = Safe systom of work and safe work place ‘DecumertN Revision | Date Seton te Seaton No Rao TRAIGHSE/SR © arc 2003 | Circular (2) to all Consutansaety Engineers 1? 2 ‘Safety Campaigns on litng operations Shy BSS cuneate mnie 9 ROADS a TRANSPORT AUTHORITY GOVERNMENT OF DUBAY 6) Lifting Permit ( Permit To Work — PTW): it's a formal written system and is recommended in lifting operations where a reasonably foreseeable risk of serious injury! Damage or Dangerous Occurrence. Once the plan is approved by the consultant the contractor has to apply forthe lifting permit. NOC from Right of Way and Traffic Department are integral parts in obtaining the permit. A permit must contain: (Please find the sample/ form: with the ciroul \d_emergenc: lures: Lifting operations back up and emergency preparedness to deal with any emergency situation on site in line with the site HSE Plan and RTA Emergency team: (Please see the attached chart of TRA emeruency team) All zone safety engineers are requested to prepare @ presentation in consultation with the resident engineers and the HSE team on “Safe Lifting Operations” and should be present to QHSE Department Traffic & Roads Agency, RTA. The selected presentation methodology will be then circulated to all for presenting in their projects. The campaign will start from 15" of March 2009, We should get the information of prepared presentation on or before 9° March 2009. 8) Objectives: A) All the critical lifting activities are controlled with a safe system of work. B) Develop a prequalification process for the sub contractors engaged in such activities. C) Ensure the third party certification bodies are approved by RTA. D) Effectiveness of response procedure in case of emergency. We expect a prompt and positive response from you. Regards, oy Chief Executive Officer Traffic & Roads Agency, RTA. Co: HE. Chairman of the Board and Executive Director Roads Depertmert-Traffc & Roads Agency Safety Reguiation and Planning Department QHSE Depariment-Traffic & Roads Agency Traffic Department-Traffic & Roads Agency Right of Way Department-Traffc & Roads Roads & Facities Maintenance Depertment-Traffic & Roads Agency File ‘Atachmens: iting Permit Format, TRA Emergency team fow char, TRAFFIC & ROADS AGENCY Developing a best in less QHSE Department ‘Safe system of work and safe work place a DecunetNe Revcon [Oat Seaton we ‘Section No RAO TRATGHSEDSR 0 ‘Warsi 2008 | Cireuar (1) toll Gonsutamvaaten Engineors 2" 2 ‘Safety Campaigns on iting operations LIFTING PERMIT- Sample a Section —1 DETAILS OF THE PERMIT RECIVER Project / Name & No Location(s) Permit Receiver (contracior) Contact Number Engineer Responsible (Contact Number Uting Supervisor Contact Number Safety in charge Contact Number ‘Section =I PERMIT VALIDATIONS Date issued T Vaid TH | Time lved t Vala Ta ‘Brief description ofthe tasic Section - PREREQUISITE (Work May be stopped ifone oF the following is not complied with) ¥ for YES and X for No Yes_NA '¥ for YES and X for No Yes NA ‘A Approved Method Statement OC O]K Loadetabiity oa B Approved Risk Assessment D Dt teed within swe goa © RTANOC—ROW + Tratfe Dept DD] m Sete angle oftiting oa D_ Ground Concition/ Stabilty C O]N RadistBoom extensionwitinimts O Approved Third perty Certification (DM) DD] 0 toad chart known ay ee F Certified iting equipment DO | P Task rietng a © Certified iting accessories C1] Tap tines’ spreader beams og H_ Competent Operator DO] R Adequate ilumination og 1 Competent Rigger OD D8 Operators visitity og J Traffic Management O_O |T _ Appropriate PPE Provided oe a Daciaration by the Permit Receiver Name and address of subcontractor (engaged) n representing herby | Company Name: declare that | have checked the conditions ofthe permit and the | Nature of Job ling supervisor has ben breed aboutne emergency procedure | oo aay rags ‘nda toolbox tak given to ALL involved inthe activity. Fax No. . Emirate Name: se SINR DAIE.sssussee | Contact Number (Ste Safety Rep). ‘Section IV PERMIT APPROVAL Work shall be caried out ONLY after complying withthe precautions given in Section =U ofthis Permit. ‘The permit is valid up to completing the task specified. It has to be ensured thatthe ling supervisor executing the Job has a ‘copy of the permit at alltmes during work. Task to be briefed to all engaged Approved by: Resident Engineer: Signature - Date... Veriid by: Safty Engineer. Sionature ah Section V CLOSING OUT {het confirm hat the litng sehity hes been completed. [iting Super n SIQMAU,.naae Responsible Engineer sa. Sgnate PERMIT COPY DISTRIBUTION (tick appropriate boxes): akan (1 Responsible Engineer] upc ] Sateyinchage Fe O Section II! must be supported by documentary evidences wherever applicable and attached to the permit. The closed permit ‘must be returned back to the Permit Issuer. Safe system of work and safe work place [ereson [oneteem | mad (csvaess050) ‘(ezzez05080) Jen, PaLILUEYoYY IQ pewiweyow peysnon Syueynstio; | (zeezz690s0) ‘s1or2eNUIOD 0} perEjou ‘S013 JEJEEY peoH jeuoHesedo, PeOH SHO. (Grr0s9030) yoose Jeu :BuOY (cerpesvoso) EUS Jy peoH uopoedsuy 8081607 / suoneiodg S159 (Aoueby speoy 99 OWyes) Wee) JUEWwoBeuey) AoueBiowy Aouebhy

You might also like