Professional Documents
Culture Documents
ESP Design 1 PDF
ESP Design 1 PDF
1.
2.
3.
4.
5.
:
,
.
=++
bpd
= 70 1000
=
70
7500 = 525
1000
= 525 0.433
= 525 0.433 1.013 = 230
= 6657 ft
# = 6657/22 ft per stage = 302 stages
22
EX: Given
Well Total Depth (Hw)
7500 ft
1.05
7000 ft
0.876
Perforation Depth(Hperfs)
7250 ft
0.7
5 17.0 lb/ft
2500 psi
Viscosity of Oil
10 cp
900 BPD
Available Voltage
7200 V
1900 psi
60 Hertz
2500 psi
120 psi
150 scf/bbl
Water cut
65 %
180 F
2000 stb/d
2.083(
34.3
4.8655
At Q=2000 bpd
Pwf=789 psi
Pump:7000
Perf:7250
At Q=2000 bpd
Pwf=789 psi
PIP=681 psi
THP=120 psi
100
At Q=2000 bpd
F=35.7 ft/1000 ft
Tbg=7000
=(35.7/1000)*7000=250 ft
THP=120 psi
= 120 + 2998 + 107 =3225 psi