PROJECT PROFILE GEOTHERMAL & ENERGY Dieng - 1 Geothermal Power Plant Project Dieng-1 Re-commissioning Geothermal Power Plant Project the capacity of 60 MW, located in Central Jawa. This Project was the first EPC Geothermal project of REKIND in 2002. The project owner is Himpurna California Energy Ltd. The Kamojang - 4 Geothermal Power Plant Project This project is the first geothermal power plant project in Indonesia financed by local bank which was a historical breakthrough. With the project REKIND provides another solution to overcome the energy crisis in Indonesia. PT Pertamina (Persero) as the ower of this project and it’s located at the border between Bandung and Garut Regencies, West Java. Lahendong - 2 & 3 Geothermal Power Plant Project This project has successfully completed reliability test run and in mid of June 2007 and has been handed over to PT Perusahaan Listrik Negara (Persero) as the owner of this project (1 day earlier from the determined schedule). REKIND executed Lahendong -3 Geothermal Power Plant Project which has the same capacity as Lahendong-2 Project, 1 X 20 MW. These projects are located at Tomohon, North Sulawesi. Wayang Windu - 2 Geothermal Power Plant Project As an expansion project of existing Wayang Windu Unit | (1X110 MW) and in order to fill electricity demand, Wayang Windu Unit 2 Geothermal Power Plant Project was built with capacity of 110 MW. This project is owned by PT Star Energy and Finished one month earlier from determined schedule, Lahendong - 4 Geothermal Power Plant Project ‘As continuing development of Lahendong-2 & 3 project, Lahendong 4 Geothermal Power Plant Project has extended with capacity of 20 MW in North Sulawesi. All projects has been completed on 2012. 1. Gunung Salak Geothermal Power UNOCAL Geothermal of indonesia Ltd. 1993 c Plant Project Jakarta - Indonesia 2. Geothermal Power Plant PT. PLN. (Persero) 1994 c Gurung Salak Unit / I Project Jakarta - Indonesia 3. Sanulla Unocal Project PERTAMINA (UNOCAL Geother 1994 - 1995 c North Sumatera Mal of indonesia) Jakarta - Indonesia 4. _Lahendong Geothermal Pipe BUD Engineering Pte. Ltd. 1998 - 1999 E Line Project Lok Yang Way - Singapore 85 in, Km, Dia. 10", 18", 22” & 2a", 5. Wayang Windu Geothermal PT. Mandala Nusantara Ltd. and 1997 - 2000 BC Pipeline Project Sumitomo Corporation 790 in. Km, Dia. 18°, 24", 30", Jakarta - Indonesia 36", & 42" 6. _Dieng 1 Geothermal Power Himpurna California Energy Ltd, 2002 EPC. Plant Project 1 x 60 MW. Patuha Power Ltd Jakarta - Indonesia 7. Lahendong i! Geothermal 1 x 20 MW PT PLN (Persero) 2005 - 2007 EPC Jakarta indonesia 8. Total Project Kamojang - 4, 1 X 60 MW PT PERTAMINA DIT HULU 2006 - 2008 ePce Geothermal Power Plant 9. —_Lahendong i! Gothermal Plant Project PT PLN (Persero) 2007 - 2009 1X 20 MW, Tomohon, Sulewesi Utara Jakarta Indonesia Epc 10. Wayang Windu Phase 2 Geothermal Power PT Star Energy Holding Limited 2007 - 2008 EPC For Plant Project , 1 X 110 MW, Pengalengan, sacs West Java 11, PLTU Sumatera Barat 2 x 112 MW Project PT PLN (Persero) 2008 - 2011 EPC Coil Jakarta, Indonesia 12 __Lahendong IV Geothermal Power Plant PT PLN (Persero) Jakarta, indonesia 2009 - 2011 EPC Project, 1X 20 MW 13 Unibelu Power Plant 2 x 55 MW PT PLN (Persero) Jakarta, Indonesia 2009 - 2012 EPC 14 PLTU Riau Project PT PLN (Persero) 2010 - 2013 EPcc 1S SPG Merbau Project PT Pertamina (Persero) EP 2011-2012 BPC

You might also like