Professional Documents
Culture Documents
Lahore 2 16
Lahore 2 16
(MRS)
BI-ANNUAL PERIOD
S.No.
01.
02.
03.
04.
05.
06.
07.
08.
09.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
TABLE OF CONTENTS
Chapter
Carriage
Loading, Unloading & Stacking
Earthwork (Excavation & Embankment)
Dismantling (Demolition)
Mortar.
Concrete
Brickwork
Stone Masonry
Roofing
Flooring.
Surface Rendering
Wood Work
Painting & Varnishing.
Lining of Canals
Sheet Piling
Protection & Diversion Work
Outlets
Road & Road Structure
Plumbing, Sanitary Installation & Gas Fittings
Surface Drainage.
Sewerage
Sinking of Wells
Tubewell & Water Supply
Electric Installation
Iron Work
Miscellaneous
Page Nos
3 to 23
24 to 26
27 to 33
34 to 38
39 to 40
41 to 50
51 to 56
57 to 59
60 to 65
66 to 70
71 to 74
75 to 84
85 to 90
91 to 92
93 to 94
95 to 104
105 to 106
107 to 111
112 to 117
118 to 119
120 to 124
125 to 127
128 to 139
140 to 152
153 to 158
159 to 162
1. CARRIAGE
Note:
Note:
2 For hilly areas 25% above the rates in the plain areas shall be allowed for total mileage (Km) covered.
Note:
3 In case of articles longer than 15 ft. (4.6 m) carried in trucks, the following rates shall be allowed:i) Above 15 ft. to 25 ft. (4.6 to 7.6 m) :- Total rates to be paid for 15 ft. to 25 ft. (4.6 to 7.6 m) length will be 1.5 times of the
rate given in the Composite Schedule of Rates.
ii) Above 25 ft. (7.6 m) :- The total rate to be paid for above 25 ft. (7.6 m) length will be 2 times of the rate given in the
Composite Schedule of Rates.
The length measured shall not be the actual length, but the length of the form of consignment as actually
received.
Note:
4 The term 'mile' (Km) whenever used is to mean statute mile (Km).
Note:
5 The rates include loading and unloading of material from the conveyance and stacking as directed.
Note:
6 The rates for carriage by boat or steamer shall be the same as by any other mechanical means on land.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
1
Description
Labour
Composite
Chain
"
"
1000 ft.
157.70
29.05
18.05
177.25
1st Km
2nd Km
3rd Km
4th Km
5th Km
6th Km
7th Km
8th Km
9th Km
10th Km
11th Kms to 200Kms
201 Kms to 250 Kms
251 Kms & susequent Kms
Chap-1 (Carriage)
30M
30M
30M
300 M
157.70
29.05
18.05
177.25
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
176.45
81.10
59.80
39.85
36.50
35.75
32.75
32.35
29.90
27.35
19.60
3.25
2.00
Spec.
No.
Remarks
16.1
Page 3
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
2
Description
Labour
Composite
Spec.
No.
16.1
Chain
"
"
1000 Ft.
157.70
29.05
18.05
177.25
Mile
283.95
"
63.75
Mile
56.95
51.25
46.75
42.90
25.80
30M
30M
30M
300M
Km
Km
Km
Km
157.70
29.05
18.05
177.25
176.45
81.10
59.80
39.85
Km
36.50
Km
35.75
Km
32.75
Km
32.35
Km
29.90
Km
27.35
Km
Km
Km
19.60
3.25
2.00
Remarks
16.1
Chain
"
"
1000 ft
157.70
29.05
18.05
177.25
Mile
283.95
"
63.75
"
56.95
"
51.25
"
46.75
"
42.90
Chap-1 (Carriage)
30 M
30 M
30 M
300 M
Km
Km
Km
Km
157.70
29.05
18.05
177.25
176.45
81.10
59.80
39.85
Km
36.50
Km
35.75
Km
32.75
Km
32.35
Km
29.90
Page 4
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
10th Km
7th mile and subsequent miles
11th & subsequent Kms
Carriage of 1000 Nos. bricks 10"x5"x3" (250x125x75 mm)
or 1000 Nos. tiles 12"x6"x2" (300x150x50 mm) by truck or
any other means owned by the contractor :1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile
7th Km
4th mile
8th Km
5th mile
9th Km
6th mile
10th Km
7th mile and subsequent miles
11th & subsequent Kms
Carriage of 100 cft. (2.83 cu.m) of all material like stone,
aggregate, spawl, kankar lime(unslaked), surkhi, etc. or
150 cft. (4.25 cu.m) of timber, by means of material trolly.
1st chain (1st 30 m)
2nd chain to 10th chain (2nd 30 m to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th
Km
1st mile
5th
2ndKm
mile
6th
3rd Km
mile
7th Km
8th Km
9th
6th Km
mile
10th
Km and subsequent miles
7th mile
11th Kms to 200Kms
201 Kms to 250 Kms
251 Kms & susequent Kms
"
Labour
157.70
29.05
18.05
177.25
Mile
283.95
"
63.75
"
56.95
"
51.25
"
46.75
"
42.90
"
25.80
Mile
Km
27.35
Km
19.60
Spec.
No.
Remarks
25.80
Chain
"
"
1000 Ft
Chain
"
1000 Ft.
Composite
157.70
29.05
177.25
30 M
30 M
30 M
300 M
Km
Km
Km
Km
157.70
29.05
18.05
177.25
176.45
81.10
59.80
39.85
Km
36.50
Km
35.75
Km
32.75
Km
32.35
Km
29.90
Km
27.35
Km
19.60
232.90
30 M
30 M
300 M
Km
Km
Km
Km
157.70
29.05
177.25
144.70
107.35
54.00
40.85
76.50
Km
35.40
64.30
Km
33.95
42.90
Km
Km
Km
28.30
27.90
25.80
25.80
Km
23.60
Km
Km
Km
18.55
3.25
2.00
Chap-1 (Carriage)
ditto
16.1
Page 5
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
6
Description
Chain
"
0/00 Ft.
Chain
"
1000 Ft
Mile
Labour
Composite
157.70
29.05
177.25
64.3
30 M
30 M
300 M
Km
Km
Km
Km
Km
Km
157.70
29.05
177.25
144.70
107.35
54.00
40.85
35.40
33.95
51.25
Km
28.30
Km
Km
Km
Km
Km
Km
27.90
25.80
23.60
18.55
3.25
2.00
157.70
29.05
177.25
30 M
30 M
300 M
Km
Km
Km
Km
157.70
29.05
177.25
144.70
107.35
54.00
40.85
Km
35.40
Km
33.95
Km
28.30
Km
27.90
Km
25.80
Km
23.60
Km
18.55
Spec.
No.
Remarks
16.1
ditto
ditto
232.90
"
76.50
"
64.30
51.25
46.75
42.90
25.80
Chain
"
0/00 Ft.
157.70
29.05
177.25
Chap-1 (Carriage)
30 M
30 M
300 M
157.70
29.05
177.25
Page 6
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile subsequent miles
7th Km
4th mile
8th.
5th mile
9th Km
6th mile
10th Km
7th mile and subsequent miles
11th & subsequent Kms
9 Carriage of 1000 No. bricks, 9"x4"x3"
(225x113x75 mm) or 8"x4"x4" (200x100x100
mm) (nominal)
1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile
7th Km
4th mile
8th Km
5th mile
9th Km
6th mile
10th Km
7th mile and subsequent miles
11th & subsequent Kms
10 Carriage of 1000 No. tiles 9"x4"x1"
(225x113x38 mm).
1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
Labour
Mile
232.90
"
76.50
"
64.30
Composite
144.70
107.35
54.00
40.85
Km
35.40
Km
33.95
Km
28.30
Km
27.90
Km
25.80
Km
23.60
Km
18.55
Spec.
No.
Remarks
16.1
51.25
46.75
42.90
25.80
ditto
Chain
"
"
0/00 Ft.
129.21
27.60
14.81
145.12
Mile
232.75
"
52.25
"
48.20
"
42.00
"
38.30
"
35.15
"
21.15
30 M
30 M
30 M
300 M
Km
Km
Km
Km
129.21
27.60
14.81
145.12
144.65
66.30
48.95
32.90
Km
30.80
Km
30.00
Km
26.85
Km
26.50
Km
24.50
Km
22.40
Km
15.95
16.1
Chain
"
"
77.98
14.35
8.85
Chap-1 (Carriage)
30 M
30 M
30 M
77.98
14.35
8.85
16.1
Page 7
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
0/00 Ft.
87.67
Mile
140.50
"
31.55
"
27.95
"
25.35
"
23.10
"
21.25
"
12.75
Composite
87.67
87.30
40.15
29.60
19.70
Km
17.90
Km
17.60
Km
16.20
Km
16.00
Km
14.80
Km
13.60
Km
9.65
Chain
"
"
2.97
0.36
0.17
30 M
30 M
30 M
2.97
0.36
0.17
0/00 Ft.
1.75
300 M
1.75
Km
2.20
Mile
3.50
Km
1.45
"
1.00
Km
0.60
"
0.50
Km
0.35
Remarks
ditto
1st Km
1st mile
2nd Km
2nd mile
3rd Km
3rd mile subsequent miles
4th Km and subsequent kilometers.
12 Carriage of 100 Nos. empty cement bags including
bundling.
Spec.
No.
16.1
0/00 Ft.
"
43.48
5.41
Mile
8.55
Mile
1.95
"
3.15
300 M
300 M
43.48
5.41
Km
5.30
Km
4.60
Km
2.15
Km
1.75
ditto
Chap-1 (Carriage)
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Spec.
No.
Remarks
lead of carriage.
1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
Chain
"
"
64.52
29.05
8.85
30 M
30 M
30 M
64.52
29.05
8.85
0/00 Ft.
72.82
300 M
72.82
Km
81.30
Mile
124.95
Km
40.15
"
89.15
Km
29.60
"
74.00
Km
19.70
"
53.85
Km
17.90
"
44.35
Km
17.60
Km
16.20
Km
Km
Km
Km
16.00
14.80
13.60
9.65
Tonne
300 M
"
526.86
127.65
Km
173.60
Km
79.40
Km
52.10
Km
32.30
Km
30.15
Km
28.90
Km
24.75
Km
Km
24.35
23.55
1st Km
1st mile
2nd Km
2nd mile
3rd Km
3rd mile
4th Km
4th mile
5th Km
5th mile
6th Km
6th mile
7th Km
7th mile and subsequent miles
8th Km
9th Km
10th Km
11th Km & subsequent
14 Carriage of light machinery weighing upto 3 tonne
upto 1000 ft. (300 metre)
Exceeding 1000 to 5000 ft (300 to 1500metre)
1st Km
1st mile
2nd Km
2nd mile
3rd Km
3rd mile
4th Km
4th mile
5th Km
5th mile
6th Km
6th mile
7th Km
7th mile and subsequent miles
8th Km
9th Km
35.15
21.15
Ton
0/00 ft.
1000 ft.
526.86
127.65
Mile
279.35
"
50.40
"
47.30
"
37.70
"
38.05
"
29.15
"
20.20
Chap-1 (Carriage)
ditto
Page 9
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
10th Km
11th Km & susequent
ii)
Consignment/Mile
"
42.79
29.34
Consignment/
300 M
43.75
Consignment/ Km
42.79
29.34
27.20
16.60
7.80
"
"
5.20
a) Upto 5 Km
b) Above 5 to 13 Km
Each
Consignment
"
53.85
110.05
Each
Consignmen
"
53.85
110.05
Each
Consignment
"
"
"
"
"
10.85
16.45
20.80
26.00
45.95
82.25
Each
Consignmen
"
"
"
"
"
10.85
16.45
20.80
26.00
45.95
82.25
Each
Consignment
"
"
89.85
163.55
Each
Consignment
"
"
89.85
163.55
"
"
66.45
100.75
"
"
66.45
100.75
iv)
16.1
Consigment/
1000 ft.
1000 ft.
Remarks
18.35
14.75
Spec.
No.
Per
day
3000.00
Chap-1 (Carriage)
Per
day
3000.00
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
ii)
Labour
Composite
"
4352.00
"
1000.00
"
4352.00
"
800.00
Remarks
Per
Ton
"
"
46.60
Per
Tonne
"
28.95
"
7.35
30 M
30 M
30 M
300 M
Km
Km
Km
6.20
1.15
0.70
7.00
6.95
3.15
2.30
Km
1.55
Km
1.40
Km
1.35
Km
1.25
Km
1.20
Km
1.15
Km
1.05
Km
1.00
30 M
30 M
30 M
8.15
1.50
0.95
19.30
7.45
11.80
Chain
"
"
0/00 Ft.
6.20
1.15
0.70
7.00
Mile
11.20
"
2.50
"
2.25
"
2.00
"
1.85
"
1.70
"
1.00
Spec.
No.
Chain
"
"
8.15
1.50
0.95
Chap-1 (Carriage)
Page 11
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
0/00 Ft.
9.15
Mile
14.70
"
3.30
"
2.95
"
2.65
"
2.40
"
2.20
"
1.35
Composite
9.15
Km
9.15
Km
4.15
Km
3.05
Km
2.05
Km
1.85
Km
1.75
Km
1.65
Km
Km
Km
Km
1.60
1.50
1.35
1.30
30 M
30 M
30 M
300 M
Km
Km
Km
12.25
2.25
1.40
13.75
13.70
6.30
4.60
Km
3.05
Km
2.80
Km
2.75
Km
2.55
Km
2.40
Km
2.30
Km
Km
2.10
1.75
30 M
30 M
20.70
3.80
Spec.
No.
Remarks
iv)
Chain
"
"
0/00 Ft.
12.25
2.25
1.40
13.75
Mile
22.05
"
4.95
"
4.40
"
4.00
"
3.65
"
3.35
"
2.00
Chain
"
20.70
3.80
Chap-1 (Carriage)
Page 12
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
vi)
Labour
"
0/00 Ft.
2.35
23.25
Mile
37.25
"
8.35
"
7.50
"
6.70
"
6.15
"
5.65
"
3.40
Chain
"
"
0/00 Ft.
27.8
5.10
3.20
31.25
Mile
50.10
"
11.25
"
10.05
Mile
9.05
"
8.25
"
7.55
"
4.55
Chain
"
"
0/00 Ft.
Composite
36.15
6.65
4.15
40.65
Chap-1 (Carriage)
2.35
23.25
23.15
10.90
7.95
Km
5.25
Km
4.85
Km
4.75
Km
4.30
Km
4.15
Km
3.75
Km
Km
2.45
1.70
30 M
30 M
30 M
300 M
Km
Km
Km
27.8
5.10
3.20
31.25
31.15
14.20
10.45
Km
6.90
Km
6.30
Km
6.20
Km
5.90
Km
5.85
Km
5.40
Km
Km
4.95
3.50
30 M
30 M
30 M
300 M
36.15
6.65
4.15
40.65
Spec.
No.
Remarks
Page 13
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile
7th Km
4th mile
8th Km
5th mile
9th Km
6th mile
10th Km
7th mile and subsequent miles
11th Km & subsequent Kms
vii) 16" (400 mm) i/d pipes:1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
viii) 18" (450 mm) i/d pipes:1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
Labour
Mile
65.15
"
14.60
"
13.05
"
11.75
"
10.70
"
9.85
"
5.90
Chain
"
"
0/00 Ft.
59.30
10.90
6.80
66.65
Mile
106.75
"
23.95
"
21.40
"
19.25
"
17.55
"
16.15
"
9.70
Chain
"
"
0/00 Ft.
Composite
76.20
14.05
8.70
85.65
Chap-1 (Carriage)
40.50
19.45
13.95
9.00
Km
8.20
Km
8.05
Km
7.35
Km
7.25
Km
6.70
Km
6.15
Km
4.45
30 M
30 M
30 M
300 M
Km
Km
Km
59.30
10.90
6.80
66.65
66.35
30.70
22.45
Km
14.95
Km
13.70
Km
13.40
Km
12.30
Km
12.10
Km
11.20
Km
Km
10.25
7.40
30 M
30 M
30 M
300 M
76.20
14.05
8.70
85.65
Spec.
No.
Remarks
Page 14
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
Labour
Mile
137.15
"
30.80
"
27.50
"
24.75
"
22.60
"
20.75
"
12.45
ix)
80.85
14.90
9.25
90.90
Mile
145.60
"
32.70
"
29.20
"
26.25
"
23.95
"
22.00
"
13.20
x)
Chain
"
"
0/00 Ft.
Composite
89.60
16.50
10.25
100.70
Chap-1 (Carriage)
85.25
39.15
28.90
Km
19.25
Km
17.65
Km
17.25
Km
15.85
Km
15.60
Km
14.45
Km
Km
13.25
9.40
30 M
30 M
30 M
300 M
Km
Km
Km
80.85
14.90
9.25
90.90
90.50
41.55
30.65
Km
20.45
Km
18.70
Km
18.30
Km
16.75
Km
16.55
Km
15.30
Km
Km
14.00
10.15
30 M
30 M
30 M
300 M
Km
89.60
16.50
10.25
100.70
100.25
Spec.
No.
Remarks
Page 15
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
20 Carriage of PVC pipes B.S.S. Class 'B' including loading,
unloading and stacking (Rate per 1000 ft.) (300 metre) :i)
ii)
Labour
Mile
161.35
"
36.20
"
32.35
Mile
29.10
"
26.55
"
24.40
"
14.65
Chain
"
"
0/00 Ft.
12.20
2.25
1.40
13.70
Mile
22.00
"
4.95
"
4.40
"
3.95
Mile
3.60
"
3.30
"
2.00
Chain
"
Composite
18.80
3.45
Chap-1 (Carriage)
46.05
33.90
Km
23.10
Km
20.70
Km
20.25
Km
18.55
Km
18.30
Km
16.95
Km
Km
15.50
11.05
30 M
30 M
30 M
300 M
Km
Km
Km
12.20
2.25
1.40
13.70
13.65
6.30
4.65
Km
3.10
Km
2.80
Km.
2.75
Km
2.50
Km
2.45
Km
2.25
Km
Km
2.05
1.65
30 M
30 M
18.80
3.45
Spec.
No.
Remarks
Page 16
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
"
0/00 Ft.
2.15
21.15
Mile
33.85
"
7.60
"
6.80
"
6.10
"
5.55
"
5.10
"
3.05
Chain
"
"
0/00 Ft.
25.65
4.75
2.95
28.85
Mile
46.20
"
10.35
"
9.25
Mile
8.35
"
7.60
"
7.00
"
4.20
iv)
Composite
2.15
21.15
21.05
9.85
7.15
Km
4.65
Km
4.30
Km
4.20
Km
3.80
Km
3.75
Km
3.45
Km
Km
3.15
2.70
30 M
"
"
300 M
Km
"
"
25.65
4.75
2.95
28.85
28.70
13.35
9.85
"
6.60
Km.
5.85
"
5.75
"
5.25
Spec.
No.
Remarks
5.20
4.80
4.40
3.20
Chain
"
35.35
6.50
Chap-1 (Carriage)
30 M
30 M
35.35
6.50
Page 17
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
vi)
Labour
"
0/00 Ft.
4.05
39.75
Mile
63.65
"
14.30
"
12.80
"
11.50
"
10.50
"
9.60
"
5.80
Chain
"
"
0/00 Ft.
62.00
11.40
7.10
69.70
Mile
111.65
"
25.05
Mile
22.40
"
20.15
"
18.40
"
16.85
"
10.15
Chain
"
Composite
96.15
17.70
Chap-1 (Carriage)
4.05
39.75
39.55
18.20
13.40
Km.
8.95
Km.
8.20
Km.
8.05
Km.
7.35
Km.
7.25
Km.
6.70
Km.
Km.
6.15
4.40
30 M
30 M
30 M
300 M
Km
Km
Km
62.00
11.40
7.10
69.70
69.40
31.90
23.50
Km
15.70
Km
14.35
Km
14.05
Km
12.90
Km
12.70
Km
11.75
Km
Km
10.75
7.65
30 M
30 M
96.15
17.70
Spec.
No.
Remarks
Page 18
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
"
0/00 Ft.
11.00
108.10
Mile
173.15
"
38.85
"
34.75
"
31.25
"
28.50
"
26.15
"
15.70
Composite
11.00
108.10
107.60
49.45
36.45
Km
24.30
Km
22.25
Km
21.80
Km
19.95
Km
19.70
Km
18.20
Km
Km
16.65
12.00
30 M
30 M
30 M
300 M
Km
Km
Km
135.35
24.95
15.50
152.15
151.45
69.60
51.30
Km
34.20
Km
31.35
Km
30.70
Km
28.15
Km
27.75
Km
25.65
Km
Km
23.45
16.85
30 M
30 M
176.20
32.45
Spec.
No.
Remarks
Chain
"
"
0/00 Ft.
135.35
24.95
15.50
152.15
Mile
243.75
Mile
54.70
"
48.90
"
44.00
"
40.10
"
36.85
"
22.15
Chain
"
176.20
32.45
Chap-1 (Carriage)
Page 19
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
"
0/00 Ft.
20.15
198.05
Mile
317.25
"
71.25
"
63.65
Mile
57.25
"
52.20
"
47.95
"
28.80
Composite
20.15
198.05
197.15
90.60
66.80
Km
44.55
Km
40.75
Km
39.95
Km
36.60
Km
36.10
Km
33.35
Km
Km
30.60
22.00
30 M
30 M
30 M
300 M
Km
Km
Km
8.90
1.65
1.00
10.05
9.95
4.60
3.40
Km
2.25
Km
2.05
Km
2.00
Km
1.85
Km
1.80
Km
1.70
Km
Km
1.55
1.15
Spec.
No.
Remarks
ii)
Chain
"
"
0/00 Ft.
8.90
1.65
1.00
10.05
Mile
16.05
"
3.60
"
3.20
"
2.90
"
2.65
"
2.45
"
1.45
Page 20
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Chain
"
"
0/00 Ft.
13.90
2.55
1.60
15.60
Mile
25.00
"
5.60
"
5.00
"
4.50
"
4.10
"
3.80
"
2.25
Composite
13.90
2.55
1.60
15.60
15.55
7.15
5.30
Km
3.55
Km
3.25
Km
3.20
Km
2.90
Km
2.70
Km
2.55
Km
Km
2.35
1.75
30 M
30 M
30 M
300 M
Km
Km
Km
19.25
3.55
2.20
21.60
21.55
9.90
7.35
Km
4.90
Km
4.45
Km
4.40
Km
4.00
Km
3.95
Km
3.55
Km
Km
3.25
2.45
30 M
31.85
Spec.
No.
Remarks
Chain
"
"
0/00 Ft.
19.25
3.55
2.20
21.60
Mile
34.65
"
7.80
"
6.95
"
6.25
Mile
5.70
"
5.25
"
3.15
Chain
31.85
Chap-1 (Carriage)
Page 21
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
5.85
3.65
35.80
Mile
57.35
"
12.85
"
11.50
"
10.35
"
9.45
"
8.65
"
5.20
Composite
30 M
30 M
300 M
Km
Km
Km
5.85
3.65
35.80
35.65
16.35
12.05
Km
8.05
Km
7.35
Km
7.20
Km
6.70
Km
6.50
Km
6.00
Km
Km
5.45
4.05
30 M
30 M
30 M
300 M
Km
Km
Km
47.60
8.75
5.45
53.50
53.25
24.50
18.05
Km
12.05
Km
11.00
Km
10.80
Km
9.90
Km
9.75
Km
9.00
Km
Km
8.15
6.00
30 M
68.55
Spec.
No.
Remarks
vi)
Labour
"
"
0/00 Ft.
Chain
"
"
0/00 Ft.
47.60
8.75
5.45
53.50
Mile
85.70
"
19.25
"
17.20
"
15.45
"
14.10
12.95
7.80
Chain
68.55
Chap-1 (Carriage)
Page 22
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
"
"
0/00 Ft.
12.65
7.85
77.05
Mile
4th
2ndKm
mile
5th
Km
3rd mile
Composite
123.45
30 M
30 M
300 M
Km
Km
Km
12.65
7.85
77.05
76.70
35.25
25.95
27.70
Km
17.30
24.75
Km
15.85
6th
4th Km
mile
7th
5th Km
mile
22.30
Km
15.55
20.30
Km
14.25
8th mile
Km
6th
9th
7th Km
mile and subsequent miles
18.65
Km
14.05
11.20
Km
12.95
Km
Km
11.85
8.60
Each
No
"
"
Each
No/Km
162.15
293.50
396.25
471.50
Each
No.
"
"
Each
No/Km
94.05
155.80
205.45
246.65
10th Km
11th Km & subsequent Kms
22 Hand shunting loaded Railway wagons or
trucks:a)
b)
c)
d)
e)
upto mile / Km
upto mile / Km
upto mile / Km
upto 1 (1.6 Km) mile
2nd mile and subsequent miles/
2nd and subsequent kilometres
Each
No
"
"
Each
No/Mile
259.40
469.60
634.00
754.40
Each
No.
"
"
Each
No/Mile
150.45
249.30
328.75
394.65
425.85
Spec.
No.
Remarks
266.15
upto mile / Km
upto mile / Km
upto mile / Km
upto 1 mile / 1 Km
2nd mile and subsequent miles/
2nd and subsequent kilometres
209.10
Chap-1 (Carriage)
130.70
Page 23
The rate for loading into and unloading from mobile trucks, trollies and boats, etc. will be the same as for Railway wagons.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
100 Cft.
533.30
cu.m
188.35
1000 Nos.
666.60
1000 Nos.
666.60
ditto
533.30
ditto
533.30
Spec.
No.
Remarks
Composite
b)
100 Bags
666.60
100 Bags
666.60
100 Nos.
64.00
100 Nos.
64.00
100 Mds.
399.95
100 Kg
10.70
Per
Tonne
319.95
Per
Tonne
314.90
Each
40.00
Each
40.00
Each
20.00
Each
20.00
a)
b)
100 Nos.
1333.20
100 Nos.
1333.20
ditto
666.60
ditto
666.60
Chap-2 (Loading/Unloading)
Page 24
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Per
Ton
166.65
Per
Tonne
164
100 Mds.
1599.85
100 Kg
42.85
Per
Ton
266.65
Per
Tonne
262.45
100 Cft.
197.30
cu.m
69.70
100 Cft.
255.95
cu.m
90.40
Spec.
No.
Remarks
Composite
1000
Gallon
666.60
100
litres
14.65
b)
1000
Gallon
666.60
100
litres
14.65
c)
100 Cft.
85.35
cu.m
30.15
d)
Per
Ton
237.00
Per
Tonne
233.25
e)
100 Nos.
335.95
100 Nos.
335.95
100 Nos.
666.60
100 Nos.
666.60
100 Cft.
266.65
cu.m
94.20
f)
Kerosene oil (4 gallon tin)
16 Removing and stacking within one chain
(30 m) lead:
a)
b)
Bricks.
1000 Nos.
711.05
1000 Nos.
711.05
c)
100 Nos.
426.6
100 Nos.
426.6
d)
100 Nos.
253.95
100 Nos.
253.95
e)
Per
Ton
118.50
Per
Tonne
116.65
Chap-2 (Loading/Unloading)
Page 25
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
f)
Labour
Composite
Unit
Labour
100 No.
1422.10
100 No.
1422.10
Per
Ton
266.65
Per
Tonne
262.45
Per
Ton
152.35
Per
Tonne
149.95
100 Nos.
1066.55
100 Nos.
1066.55
100 Nos.
507.90
100 Nos.
507.90
100 Nos.
533.30
100 Nos.
533.30
100 Nos.
280.65
100 Nos.
280.65
100 Nos.
2133.10
100 Nos.
2133.10
100 Nos.
1066.55
100 Nos.
1066.55
Per
Ton
160.00
Per
Tonne
157.45
Chap-2 (Loading/Unloading)
Spec.
No.
Remarks
Composite
Page 26
Special allowances for the hardness, wetness and slush:The grant of allowances for hard, very hard, wet and slush will be subject to Superinteding Engineer's approval. Specific instructions regarding grant of such
allowances may be issued by the various Administrative Departments and Statutory Bodies. The earth requiring repeated blows of Kassi to break it and of
which dry bulk density is not less than 1.5, will be treated as hard.
Deduction for shrinkage from bank measurements:The following allowances should be provided for material which is not rammed, or equally consolidated:a) Deduction for shrinkage from the bank measurements when the earthwork is done by manual labour.......... 10%
b) Deduction for settlement from the bank measurement when the earthwork is done by machines................... 3 to 6%
Before the work is let out to be done by tractors, scrapers, etc. deduction ranging between 3% to 6% should be agreed to with the contractors.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
1000 Cft.
1000 Cft.
1,999.80
2,399.75
---
cu.m
cu.m
70.65
84.75
---
1000 Cft.
2,933.05
--
cu.m
103.60
--
1000 Cft.
1000 Cft.
3,732.95
4,037.90
---
cu.m
cu.m
131.85
142.60
---
1000 Cft.
1000 Cft.
3,732.95
4,586.20
---
cu.m
cu.m
131.85
162.00
---
6
7
Remarks
171 to 17.5
Spec.
No.
ditto
ditto
* 411-1 to
411-13 and
301-1 &
202-3
1000
1000
1000
1000
Cft.
Cft.
Cft.
Cft.
4,074.15
4,074.15
4,074.15
2,749.20
4,651.40
4,562.80
4,474.20
--
cu.m
cu.m
cu.m
cu.m
143.90
143.90
143.90
97.10
164.30
161.15
158.05
--
* 411-2
17.1 to
17.5
Chap-3 (Earthwork)
Page 27
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
1000
1000
1000
1000
Cft.
Cft.
Cft.
Cft.
Labour
4,674.40
5,527.65
6,434.20
10,828.20
Composite
4,751.65
5,604.90
6,511.50
10,905.50
cu.m
cu.m
cu.m
cu.m
165.10
195.25
227.25
382.45
12 a)
ditto
1000
1000
1000
1000
Cft.
Cft.
Cft.
Cft.
5,087.30
5,940.55
6,847.10
11,774.40
5,241.00
6,094.25
7,000.80
11,928.10
cu.m
cu.m
cu.m
cu.m
179.70
209.80
241.85
415.85
185.10
215.25
247.25
421.30
17.1 to 17.5
1000 Cft.
1000 Cft.
1000 Cft.
10,132.30
11,732.15
14,931.85
----
cu.m
cu.m
cu.m
357.85
414.40
527.40
----
ditto
1000
1000
1000
1000
Cft.
Cft.
Cft.
Cft.
4,287.35
5,140.60
6,047.20
10,707.85
-----
cu.m
cu.m
cu.m
cu.m
151.45
181.55
213.60
378.20
1000 Cft.
10,237.90
1000 Cft.
16,188.60
-16,779.00
cu.m
361.60
cu.m
571.80
-592.65
Remarks
167.85
197.95
230.00
385.20
Spec.
No.
1000
1000
1000
1000
Cft.
Cft.
Cft.
Cft.
9,876.25
10,583.75
12,654.85
14,054.05
10,466.65
11,567.75
13,835.65
15,431.65
Chap-3 (Earthwork)
cu.m
cu.m
cu.m
cu.m
348.85
373.80
446.95
496.40
369.70
408.55
488.70
545.05
Page 28
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
v) Grade V
vi) Grade VI
b)
1000 Cft.
1000 Cft.
Labour
15,557.50
16,690.10
Composite
17,131.90
18,461.30
549.50
589.50
Remarks
605.10
652.05
Spec.
No.
1000
1000
1000
1000
1000
1000
Cft.
Cft.
Cft.
Cft.
Cft.
Cft.
19,752.50
21,167.50
25,309.70
28,108.10
31,115.05
33,380.15
1000 Cft.
1000 Cft.
1,333.20
1,866.50
1000 Cft.
5,332.80
20,933.30
23,135.50
27,671.30
30,863.30
34,263.85
36,922.55
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
697.65
747.65
893.95
992.80
1099.00
1179.00
739.35
817.15
977.35
1090.10
1210.20
1304.10
---
cu.m
cu.m
47.10
65.95
---
ditto
--
cu.m
188.35
--
17.1 to 17.5
13 Rehandling of earthwork:
a)
b)
ditto
1000 Cft.
1000 Cft.
1000 Cft.
1000 Cft.
2,698.10
5,250.35
50.15
59.20
---
---
cu.m
cu.m
cu.m
cu.m
95.30
185.45
1.75
2.10
---
1000 Cft.
2,443.50
--
cu.m
86.30
--
1000 Cft.
33.00
--
cu.m
1.15
--
1000 Cft.
159.40
--
cu.m
5.65
--
1000 Cft.
141.35
--
cu.m
5.00
--
17.10 to 17.5
1000 Cft.
1000 Cft.
1000 Cft.
174.85
341.20
821.05
----
Chap-3 (Earthwork)
cu.m
cu.m
cu.m
6.20
12.05
29.00
---Page 29
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Spec.
No.
Remarks
19 Dowel dressing.
Per
Chain
159.95
--
Metre
5.25
--
ditto
20 a)
100Sft.
71.45
--
sq.m
7.70
--
ditto
100Sft.
126.65
--
sq.m
13.65
--
b)
17.1 to 17.5
Cft.
Cft.
Cft.
Cft.
4,820.65
5,631.10
6,303.00
40,323.35
---44,353.10
cu.m
cu.m
cu.m
cu.m
170.25
198.90
222.60
1424.20
1000 Cft.
683.75
942.50
cu.m
24.15
1000 Cft.
646.10
--
cu.m
22.80
--
1000 Cft.
799.90
--
cu.m
28.25
--
1000 Cft.
933.25
--
cu.m
32.95
--
1000 Cft.
1,066.55
--
cu.m
37.65
--
1000 Cft.
1,199.90
--
cu.m
42.40
--
c)
1000 Cft.
799.90
--
cu.m
28.25
--
d)
1000 Cft.
1,066.55
--
cu.m
37.65
--
1000
1000
1000
1000
b)
17.1 (a)
* 411-5 and The rate also includes hire charges of
Chap-3 (Earthwork)
Page 30
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Spec.
No.
202-3
i)
1000 Cft.
--
577.25
cu.m
20.40
ii)
1000 Cft.
--
488.65
cu.m
17.25
1000 Cft.
--
400.05
cu.m
14.15
Remarks
1000 Cft.
1,866.50
--
cu.m
65.95
1000 Cft.
4,266.25
--
cu.m
150.70
1000 Cft.
3,364.70
--
cu.m
118.85
ditto
506.60
--
Metre
16.60
ditto
1000 Cft.
4,799.50
--
cu.m
169.50
--
17.1 to 17.5
Per mile
2,049.05
--
Per
Km
1273.50
--
ditto
100Sft.
888.80
--
sq.m
95.65
--
ditto
100 Rft.
17.1 to 17.5
33 Berm cutting:a)
b)
1000 Cft.
2,399.75
--
cu.m
84.75
--
1000 Cft.
4,287.35
--
cu.m
151.45
--
17.1 to 17.5
Per Mile
Per Mile
Per Mile
6,256.80
8,783.70
13,689.70
----
Per Km.
Per Km.
Per Km.
3910.50
5489.80
8556.05
----
ditto
Per Acre
Per Acre
1,333.20
2,666.40
---
Per Hect.
Per Hect.
3294.40
6588.80
--ditto
in unploughed land:
Chap-3 (Earthwork)
Page 31
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Per Chain
Per Chain
675.40
906.40
---
Metre
Metre
22.15
29.75
---
Per Chain
Per Chain
696.65
927.65
---
Metre
Metre
22.85
30.45
---
Spec.
No.
Remarks
in ploughed land:
a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide.
b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide.
3,999.60
1,021.10
107.90
----
cu.m
cu.m
cu.m
141.25
36.05
3.80
----
1000 Cft.
1,866.50
--
cu.m
65.95
--
1000 Cft.
1,599.85
--
cu.m
56.50
--
17.1 to 17.5
1000 Cft.
3,732.95
--
cu.m
131.85
--
17.1 to 17.5
1000 Cft.
2,999.70
--
cu.m
105.95
--
ditto
cu.m
188.30
100Cft.
533.10
556.10
196.40
1000 Cft.
1000 Cft.
1000 Cft.
4,349.40
7,375.65
9,508.75
4,732.55
7,944.10
10,077.25
cu.m
cu.m
cu.m
153.60
260.50
335.85
167.15
280.60
355.95
ditto
13.5
1000 Cft.
1000 Cft.
1000 Cft.
6,000.70
7,501.85
11,252.80
8,484.90
10,554.10
14,474.35
Chap-3 (Earthwork)
cu.m
cu.m
cu.m
211.95
264.95
397.45
separately.
299.70
372.75
511.25
Page 32
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
1000 Cft.
4,010.15
--
cu.m
141.65
--
Each
Each
779.45
1,521.30
---
Each
Each
779.45
1521.30
Each
999.90
--
Each
999.90
1000 Sft.
1000 Sft.
133.30
266.65
---
sq.m
sq.m
1.45
2.85
---
100Sft.
64.00
--
sq.m
6.90
--
Per
Acre
541.60
--
Per Hect.
1338.35
--
100Sft.
266.65
--
sq.m
28.70
--
100Sft.
231.00
--
sq.m
24.85
--
cu.m
--
Spec.
No.
Remarks
46 Uprooting stump and removing within 100 ft. (30 m) from 2 ft.
to 6 ft. (600 to 1800 mm) girth.
47 Jungle clearance and removing within 100 ft. (30 m).
a)
b)
light
thick
1000 Cft.
--
1519.00
53.65
Specification number correspond to Book of "Specification for Road & Bridge Construction, 1971".
Specification number correspond to Book of "Building & Roads Department Specification Vol. II, 1966 (Public Health Works).
Chap-3 (Earthwork)
Page 33
4. DISMANTLING (DEMOLITION)
1
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
The rates for dismantling roofs or upper storey floor, include the dismantling of all materials, except roof
supports such as beams and trusses.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Labour
Spec.
No.
Remarks
Composite
Stone Work
1
100Cft.
453.30
cu.m
160.10
18.1
100Cft.
666.60
cu.m
235.45
ditto
100Cft.
1,599.85
cu.m
565.05
ditto
a)
100Cft.
799.90
cu.m
282.55
ditto
b)
100Cft.
1,013.25
cu.m
357.90
ditto
100Cft.
1,333.20
cu.m
470.90
ditto
100Cft.
2,133.10
cu.m
753.40
ditto
1,066.55
cu.m
376.70
ditto
1,333.20
ditto
470.90
746.60
cu.m
263.70
a)
wooden crates
b)
wire crates
100Cft.
ditto
Brick Work
9 Dismantling mud/pise walling.
100Cft.
266.65
cu.m
94.2
18.1
100Cft.
666.6
cu.m
235.45
ditto
100Cft.
453.3
cu.m
160.1
ditto
100Cft.
933.25
cu.m
329.6
100Cft.
2266.45
cu.m
800.5
100Cft.
1,999.80
Chap-4 (Dismantling)
cu.m
706.35
ditto
Page 34
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Labour
Spec.
No.
Remarks
Composite
100Cft.
533.30
cu.m
188.35
ditto
100Cft.
1,066.55
cu.m
376.70
ditto
100Cft.
1,466.50
cu.m
517.95
100Cft.
5,599.45
cu.m
1977.75
19 a)
100Cft.
2,933.05
cu.m
1035.95
ditto
4,799.50
ditto
1695.20
ditto
5,866.10
ditto
2071.90
ditto
1,599.85
ditto
565.05
ditto
799.90
ditto
282.55
100Cft.
9,599.05
cu.m
3390.40
ditto
100Sft.
319.95
sq.m
34.45
18.1
22 a)
100Sft.
799.90
sq.m
86.05
100Sft.
666.60
sq.m
71.75
ditto
100Sft.
417.10
sq.m
44.90
18.1
24 a)
100Sft.
sq.m
35.9
ditto
b)
100Sft.
sq.m
142.15
ditto
Concrete
b)
c)
d)
e)
Roofing
b)
333.7
1,321.05
Chap-4 (Dismantling)
Page 35
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Labour
Spec.
No.
Composite
100Sft.
1,066.55
sq.m
114.75
ditto
100Sft.
1,333.20
sq.m
143.45
ditto
27 a)
100Sft.
666.60
sq.m
71.75
b)
ditto
605.50
ditto
65.15
c)
ditto
735.25
ditto
79.10
100Sft.
1,066.55
sq.m
114.75
18.1
100Sft.
453.30
sq.m
48.80
18.1
100Sft.
666.60
sq.m
71.75
ditto
Remarks
Flooring
16.70
27.35
31.95
45.60
Metre
Metre
ditto
ditto
54.80
89.70
104.80
149.55
Per
No.
ditto
212.85
212.85
164.45
Per
No.
ditto
164.45
Per No.
86.00
Per No.
86.00
ditto
34 a)
Per No.
166.65
Per No.
166.65
ditto
32 a)
b)
WOOD WORK
Removing door with chowkat.
Removing windows and sky lights with chowkat.
Chap-4 (Dismantling)
18.1
Page 36
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
b)
Labour
Composite
Labour
Spec.
No.
Composite
ditto
266.65
ditto
266.65
100Sft.
297.95
sq.m
32.05
100Kg
936.50
%Kg
936.50
Per Lft.
23.65
Metre
77.55
ditto
100Kg
902.90
%Kg
902.90
18.1
100Kg
437.60
%Kg
437.60
ditto
Per Unit/
2 Seats
967.55
Per Unit/
2 Seats
967.55
ditto
Each per
inch bore
19.70
Each per
cm bore
7.90
ditto
35 a)
b)
Remarks
ditto
I ron work
41 a)
Each
6,461.40
Each
6461.40
ditto
Each
4,273.50
Each
4273.50
ditto
100Lft.
453.30
Metre
14.85
18.1
100Sft.
213.30
sq.m
22.95
18.1
100Sft.
399.95
sq.m
43.05
ditto
100Cft.
1,066.55
cu.m
376.70
ditto
100Cft.
1,423.85
cu.m
502.90
ditto
100Sft.
111.10
sq.m
11.95
ditto
100Sft.
222.20
sq.m
23.90
ditto
b)
M iscellaneous
Chap-4 (Dismantling)
Page 37
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
49 Scraping:-
18.1
a)
b)
100Sft.
133.30
sq.m
14.35
ditto
399.95
ditto
43.05
100Sft.
1,135.20
sq.m
122.15
18.1
51 Scraping boulders.
100Cft.
1,866.50
cu.m
659.25
18.1
100Cft.
933.25
cu.m
329.60
18.1
Per
point
36.20
36.65
Per
point
36.20
36.65
Per
point
31.00
31.45
Per
point
31.00
31.45
Per foot
Per foot
6.60
14.40
6.70
14.55
P.Mtr
P.Mtr
21.65
47.25
22.00
47.70
Electric Wiring
on surface
recessed in wall
Chap-4 (Dismantling)
Page 38
5. MORTAR
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Dry Material Required for
100 Cft. Wet (Ready) Mortar
S. No.
Ratio of Mortar
1
1
Lime
Putty
Cft.
4
Sand
Cft.
5
Cement
(50 Kg.)
Bag.
6
82
85
90
90
100
100
100
11.83
8.16
6.49
5.19
4.81
4.12
3.61
15.0
13.1
11.5
10.44
9.4
22.5
20.0
18.8
15.66
23.0
20.1
17.7
7.0
90
92
92
94
94
90
90
94
94
92
94
94
85
4.33
3.78
3.32
3.00
2.71
3.25
2.88
2.71
2.26
2.21
1.93
1.70
8.16
43
31
86
93
Lime
Putty
Cum
7
Sand
Cum.
8
Cement : Sand
1
1
1
1
1
1
1
Cement
(50 Kg)
Bag
3
:
:
:
:
:
:
:
2
3
4
5
6
7
8
33.48
23.11
18.37
14.70
13.61
11.68
10.21
12.25
10.70
9.39
8.52
7.67
9.19
8.16
7.67
6.39
6.26
5.47
4.82
23.11
0.82
0.85
0.90
0.90
1.00
1.00
1.00
0.15
0.13
0.12
0.10
0.09
0.23
0.20
0.19
0.16
0.23
0.20
0.18
0.07
0.90
0.92
0.92
0.94
0.94
0.90
0.90
0.94
0.94
0.92
0.94
0.94
0.85
0.43
0.31
0.86
0.93
Lime : Sand
1 : 2
1 : 3
Chap-5 (Mortar)
Page 39
5. MORTAR
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
S.
No.
Ratio of Mortar
Clay
Cft.
3
1
4
Mud
Lime : Surkhi
M3
3
49.00
40.75
30.30
73.5
81.5
91.0
0.49
0.41
0.30
0.74
0.82
0.91
40.50
40.5
40.5
0.41
0.41
0.41
0.57
57.0
57.0
M3
7
35.00
25.00
25.00
25.00
Cft
Cft
Cft
Cft
0.35
0.25
0.25
0.25
M3
M3
M3
M3
Stone M asonry :
a) Random rubble, uncoursed
i) Foundation and Plinth
ii) Superstructure
iii) Coursed
45.00 Cft
40.00 Cft
35.00 Cft
0.45
0.40
0.35
M3
M3
M3
30.00 Cft
20.00 Cft
0.30
0.20
M3
M3
(1) Cement
(2) Unslaked lime
(3) Slaked lime
1 Cft.
1.7 Cft.
2.5 Cft.
40 Kg
0.57
Brick M asonry :
a) Mud Mortar
b) Cement, Sand
c) Cement, Lime (Putty) Sand
d) Lime (Putty) Sand
b)
c)
Notes :
Cft.
7
Cinder
1.35
Clay
Lime : Cinder
1 : 1
Cinder
135
2 : 3
1 : 2
1 : 3
6
= 40.8233 Kg
= 37.3242 Kg
= 37.3242 Kg
Will yield 2.6 Cft. lime putty.
Chap-5 (Mortar)
Page 40
6. CONCRETE
1. Rates for all finished works include the removal of surplus debris, unused material and by products.
2. If concrete mixer or high frequency vibrator, etc. is supplied by the Government, all charges including depreciation will be recovered from the contractor.
3. Subsequent carriage of crushed stone aggregate / bajri will be paid according to the following:
a) The carriage for the whole distance to the site of work shall be calculated on the basis of the rates of the actual means of transport used in carriage, i.e. road and / or rail, as the case may be.
b) It shall be payable from the nearest approved quarry.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
100Cft
Labour
2937.45
Composite
4956.45
Unit
cu.m
Labour
1037.50
Spec.
No.
Remarks
Composite
1750.60
100Cft
1999.80
3913.80
cu.m
706.35
1382.35
mm) gauge.
20.1
-do-
(a) Ratio 1: 3: 6
100Cft
3867.60
14472.00
cu.m
1366.05
(b) Ratio 1: 4: 8
ditto
3867.60
12363.60
"
1366.05
5111.50
4366.80
ditto
3867.60
11244.60
"
1366.05
3971.60
ditto
3867.60
10402.20
"
1366.05
3674.05
(e) Ratio 1: 6: 18
ditto
3867.60
9522.60
"
1366.05
3363.40
ditto
3867.60
9117.90
"
1366.05
3220.45
(a) in bed
100Cft
1187.35
cu.m
419.35
(b) on slope
5
ditto
1754.95
"
619.85
Chap-6 (Concrete)
Page 41
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Cft
5167.80
29066.40
cu.m
1825.25
10266.25
(b) Ratio 1: 1: 1
ditto
5167.80
28537.80
"
1825.25
10079.55
(c) Ratio 1: 1: 3
ditto
5167.80
23502.60
"
1825.25
8301.10
(d) Ratio 1: 2: 3
ditto
5167.80
22426.20
"
1825.25
7920.95
(e) Ratio 1: 3: 3
ditto
5167.80
19938.60
"
1825.25
7042.30
7242.80
(f) Ratio 1: 2: 4
100Cft
5167.80
20506.20
cu.m
1825.25
(g) Ratio 1: 2: 6
ditto
5167.80
18390.60
"
1825.25
6495.55
(h) Ratio 1: 3: 6
ditto
5167.80
17704.20
"
1825.25
6253.10
(i) Ratio 1: 4: 8
ditto
5167.80
15679.80
"
1825.25
5538.10
20.4
extra.
Per Cft
120.35
414.10
cu.m
4250.75
14626.00
ditto
120.35
359.20
"
4250.75
12686.95
ditto
120.35
329.7
"
4250.75
11645.00
Per Cft
69.60
331.05
cu.m
2458.25
11692.70
ditto
69.60
271.25
"
2458.25
9580.55
ditto
69.60
241.70
"
2458.25
8536.85
Chap-6 (Concrete)
Page 42
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Cft
90.35
371.75
cu.m
3191.15
13130.20
ditto
90.35
316.45
"
3191.15
11177.00
ditto
90.35
287.35
"
3191.15
10149.20
Per Cft
40.85
49.80
cu.m
1442.80
1758.95
Per Cft
20.00
cu.m
706.40
--
* 851-1
to
cement in dry mix, and course sand, including all labour and
851-10
* 851-5
Per Rft
757.40
1079.65
Metre
2484.25
3541.25
Per Rft
878.65
1276.30
Metre
2881.95
4186.25
Per Rft
1067.65
1533.9
Metre
3501.9
5031.2
Per Rft
1306.80
1879.65
Metre
4286.30
6165.3
Per Cwt.
1376.10
4840.00
100 kg
2708.85
9527.55
ditto
1376.10
5771.35
"
2708.85
11360.95
* 851.5
Chap-6 (Concrete)
Page 43
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Cwt.
354.75
3997.45
100 kg
698.35
7869.00
ditto
354.75
5003.95
ditto
698.35
9850.30
ditto
354.75
5234.95
ditto
698.35
10305.05
Per Cft
45.75
194.30
cu.m
1615.90
6862.70
20.2
Per Cft
101.35
198.95
cu.m
3579.70
7026.90
20.2
Per Sft
28.40
53.50
sq.m
305.60
575.65
20.1 to
20.4
100Cft
2133.10
cu.m
753.40
100Cft
1333.20
cu.m
470.90
100Cft
533.30
cu.m
188.35
Each
354.75
Each
354.75
507.30
20.4
Per hole
851.40
Each
851.40
20.1
100Cft
3168.00
cu.m
1118.95
20.1
100Sft
300.95
sq.m
32.40
ditto
99.30
"
10.70
14 Extra labour for work of weirs, rail or road bridges, syphons, and
concreting in superstructure
15 Making reinforced cement concrete spout, including fixing in
507.30
Chap-6 (Concrete)
Page 44
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Sft
301.85
sq.m
32.50
ditto
434.30
"
46.75
ditto
141.90
"
15.25
100 Kg.
4391.50
4391.50
30550.10
* 811-1
to
drawing the H.T. wire through metal spacer plate, inserting in helix
811-11
100kg
2626.45
27641.05
%kg
2626.45
27641.05
providing M.S. shear bars, spacers and lift hooks, male and
female anchorage, tie down, struts, stressing cables, maintaining
basis of payment.
* 811-1
to
811-11
complete
i)
100Cft
1667.80
cu.m
589.05
ii)
100Cft
2375.30
cu.m
838.95
100Cft
3184.10
cu.m
1124.60
iv)
100Cft
4126.60
cu.m
1457.50
v)
100Cft
5087.30
cu.m
1796.85
Chap-6 (Concrete)
Page 45
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Sft.
27.95
66.20
sq.m.
300.75
712.30
Per Rft.
13.75
90.65
Metre
45.10
297.35
Per Rft.
14.05
74.25
Metre
46.10
243.55
Per Rft.
12.55
89.45
Metre
41.15
293.40
ditto
12.55
93.05
"
41.15
305.20
Per Sft.
14.25
102.00
Sq.m
153.35
1097.50
Per Rft.
4.65
60.85
Metre
15.25
199.60
Per Rft.
18.80
66.80
Metre
61.65
219.05
11.00
48.85
25 Providing and fixing 1/8" (3 mm) thick 3" (75 mm) wide aluminium
strip on horizontal and vertical expansion joints in walls, columns,
ceilings and floors etc., including cost of clips/screws etc.,
complete in all respects:a) On interior surface (without mastic strip)
b) On exterior surface (with mastic strip)
26 Providing and fixing 1/16" (1.5 mm) thick copper flashing on
expansion joints complete in all respects.
27 Providing and fixing 6 in (150 mm). wideG.I. sheet 18SWG.
stopper to expansion joint.
28 Providing embeding 10" (250 mm) wide " (6 mm) thick
rubber water stopper in expansion joints of R.C.C. roof
slab complete in all respects.
29 Filling expansion joints with bitumen. sand & saw dust in
ratio 1:2:2.
Per Rft
per inch
P.Metre/
3.35
14.90 Per 25 mm
width
30 Filling expansion joints with bitumen.
Per Rft.
Width
48.90
Chap-6 (Concrete)
Metre
160.40
Page 46
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Metre
153.00
Spec.
No.
Remarks
Composite
Per Rft.
46.65
Per Sft.
5.70
11.20
Sq.m
61.35
120.50
ditto
5.70
15.05
"
61.35
161.95
b)
100Sft
1330.35
4248.35
sq.m
143.15
457.10
100Sft
1330.35
4808.10
sq.m
143.15
517.35
100Sft
1380.50
6083.55
sq.m
148.55
654.60
100Sft
1330.35
4473.55
sq.m
143.15
481.35
100Sft
1330.35
5032.80
sq.m
143.15
541.55
100Sft
1380.50
6308.20
sq.m
148.55
678.75
100Sft
1255.10
2689.60
sq.m
135.05
289.40
100Sft
1255.10
2978.95
sq.m
135.05
320.55
Chap-6 (Concrete)
Page 47
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Sft
1255.10
2784.00
sq.m
135.05
299.55
100Sft
1255.10
3090.55
sq.m
135.05
332.55
100Sft
1255.10
2939.65
sq.m
135.05
316.30
100Sft
1255.10
3373.80
sq.m
135.05
363.00
100Sft
1255.10
2797.90
sq.m
135.05
301.05
100Sft
1255.10
3087.40
sq.m
135.05
332.20
100Sft
1255.10
2893.25
sq.m
135.05
311.30
100Sft
1255.10
3199.80
sq.m
135.05
344.30
100Sft
1255.10
3128.00
sq.m
135.05
336.55
100Sft
1255.10
3587.35
sq.m
135.05
386.00
100Sft
1255.10
2610.10
sq.m
135.05
280.85
100Sft
1255.10
2899.85
sq.m
135.05
312.00
100Sft
1255.10
2704.90
sq.m
135.05
291.05
100Sft
1255.10
3011.45
sq.m
135.05
324.05
Chap-6 (Concrete)
Page 48
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Sft
1255.10
2939.65
sq.m
135.05
316.30
100Sft
1255.10
3399.00
sq.m
135.05
365.75
100Sft
1255.10
2797.75
sq.m
135.05
301.05
100Sft
1255.10
3087.40
sq.m
135.05
332.20
100Sft
1255.10
2892.45
sq.m
135.05
311.25
100Sft
1255.10
3199.00
sq.m
135.05
344.20
100Sft
1255.10
3127.30
sq.m
135.05
336.50
100Sft
1255.10
3586.50
sq.m
135.05
385.90
100Cft
5907.00
cu.m.
2086.35
100Sft
165.55
sq.m
17.80
100Cft
2166.45
cu.m
765.20
per No.
65.20
per No.
65.20
100Cft.
1666.50
cu.m
588.60
ditto
1866.50
"
659.25
ditto
2166.45
"
765.20
ditto
2499.75
"
882.90
metre
168.75
Per Rft
51.45
95.95
314.70
Chap-6 (Concrete)
Page 49
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
100Cft
Labour
1666.50
Composite
Unit
cu.m.
Labour
588.60
Spec.
No.
Remarks
Composite
-
43 Breaking stone ballast screened and stacked:(a) 2" ring (50 mm)
100Cft.
1866.50
cu.m.
659.25
ditto
2166.45
"
765.20
ditto
2499.75
"
882.90
ditto
3333.00
"
1177.20
ditto
5666.10
"
2001.25
100Cft.
533.30
cu.m.
188.35
100Cft.
533.30
cu.m.
188.35
Each
288.55
Each
288.55
Specification numbers correspond to book of standard specification of Road and Bridge Construction, "1971"
Chap-6 (Concrete)
Page 50
7. BRICK WORK
1
2
Rates for all finsihed works include the removal of surplus debris, unused material and byproducts.
The rates apply to all sizes of bricks, including the modular bricks of size 8"x4"x4" (200x100x100 mm) nominal.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
100Cft.
ditto
2581.75
3416.00
16061.05
16895.30
cu.m
ditto
911.85
1206.55
Remarks
5672.75
5967.40
21.1
to
21.4
100Cft.
ditto
ditto
ditto
683.75
1518.00
2352.25
3754.10
-----
cu.m
ditto
ditto
ditto
241.50
536.15
830.80
1325.95
first floor
second floor
third floor
fourth & subsequent floors
100Cft.
ditto
3519.90
683.75
16999.20
--
cu.m
ditto
1243.25
241.50
ditto
21.1
ii)
6004.10
-
21.1 to
21.4
1:2
1:3
1:4
1:5
1:6
1:7
1:8
100Cft.
ditto
ditto
ditto
ditto
ditto
ditto
3395.45
3395.45
3395.45
3395.45
3395.45
3395.45
3395.45
22115.45
20850.95
20092.25
19586.45
19206.50
18957.35
18739.20
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
1199.20
1199.20
1199.20
1199.20
1199.20
1199.20
1199.20
7811.20
7364.55
7096.60
6917.95
6783.75
6695.75
6618.70
1:1:6
1:1:7
1:1:8
1:1:9
1:1:10
100Cft.
ditto
ditto
ditto
ditto
3395.45
3395.45
3395.45
3395.45
3395.45
19485.45
19220.10
19004.90
18824.70
18689.65
cu.m
ditto
ditto
ditto
ditto
1199.20
1199.20
1199.20
1199.20
1199.20
6882.25
6788.55
6712.55
6648.90
6601.20
100Cft.
3395.45
18228.4
cu.m
1199.2
6438.25
chapter-7(Brickwork)
ditto
ditto
Page 51
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Unit
Labour
ii)
1:2
1:3
1:4
1:5
1:6
1:7
1:8
100Cft.
ditto
ditto
ditto
ditto
ditto
ditto
4496.35
4496.35
4496.35
4496.35
4496.35
4496.35
4496.35
23216.35
21951.85
21193.15
20687.35
20307.35
20058.25
19838.80
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
1588.10
1588.10
1588.10
1588.10
1588.10
1588.10
1588.10
Remarks
Composite
ditto
Ratio
Ratio
Ratio
Ratio
Ratio
Ratio
Ratio
8200.00
7753.40
7485.40
7306.75
7172.55
7084.55
7007.05
1:1:6
1:1:7
1:1:8
1:1:9
1:1:10
100Cft.
ditto
ditto
ditto
ditto
4496.35
4496.35
4496.35
4496.35
4496.35
20586.35
20323.65
20105.80
19925.60
19790.95
cu.m
ditto
ditto
ditto
ditto
1588.10
1588.10
1588.10
1588.10
1588.10
7271.10
7178.30
7101.35
7037.70
6990.15
100Cft.
4496.35
19329.25
cu.m
1588.10
6827.10
100Cft.
ditto
ditto
ditto
683.75
1518.00
2352.25
3754.10
-----
cu.m
ditto
ditto
ditto
241.50
536.15
830.80
1325.95
Composite
Spec.
No.
Labour
first floor
second floor
third floor
fourth & subsequent floors
ii)
21.1
to
21.5
1:2
1:3
1:4
1:5
1:6
1:7
1:8
100Cft.
ditto
ditto
ditto
ditto
ditto
ditto
3915.10
3915.10
3915.10
3915.10
3915.10
3915.10
3915.10
22635.10
21370.60
20611.90
20106.10
19726.15
19477.00
19258.85
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
1382.80
1382.80
1382.80
1382.80
1382.80
1382.80
1382.80
7994.70
7548.10
7280.10
7101.50
6967.30
6879.30
6802.25
1:1:6
1:1:7
1:1:8
1:1:9
100Cft.
ditto
ditto
ditto
3915.10
3915.10
3915.10
3915.10
20005.10
19739.75
19524.60
19344.30
chapter-7(Brickwork)
cu.m
ditto
ditto
ditto
1382.80
1382.80
1382.80
1382.80
7065.80
6972.10
6896.10
6832.40
Page 52
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Ratio 1:1:10
Labour
Composite
Unit
Labour
Spec.
No.
Composite
ditto
3915.10
19209.30
ditto
1382.80
6784.75
100Cft.
3915.10
18748.05
cu.m
1382.80
6621.80
100Cft.
683.75
--
cu.m
241.50
100Cft.
1169.50
--
cu.m
413.05
100Cft.
752.40
cu.m
265.75
100Cft.
258.85
--
cu.m
91.45
100Cft.
100Cft.
338.85
683.75
---
cu.m
cu.m
119.70
241.50
1559.30
Remarks
ditto
21.5
550.75
21.1
to
21.4
13 Extra for face work (half brick thick) using special bricks
instead of first class bricks.
100Cft.
Per Cft.
111.75
100 Nos.
ditto
1987.10
993.55
2269.15
cu.m
801.45
288.55
cu.m
3946.70
10191.60
% Nos.
ditto
1987.10
993.55
mud mortar
ii)
1:2
1:3
1:4
1:5
1:6
1:7
21.1
to
21.4
100 Sft.
1705.35
5080.10
Sqm.
183.50
546.60
100 Sft.
ditto
ditto
ditto
ditto
ditto
2253.60
2253.60
2253.60
2253.60
2253.60
2253.60
6938.55
6622.10
6432.75
6306.30
6217.45
6148.45
sq.m.
ditto
ditto
ditto
ditto
ditto
242.50
242.50
242.50
242.50
242.50
242.50
746.60
712.55
692.15
678.55
669.00
661.55
chapter-7(Brickwork)
Page 53
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Ratio 1:8
ditto
Labour
2253.60
Composite
6097.75
Unit
ditto
Labour
Spec.
No.
Composite
242.50
656.10
iv)
Remarks
1:1:6
1:1:7
1:1:8
1:1:9
1:1:10
100Sft.
100Sft.
100Sft.
100Sft.
100Sft.
2253.60
2253.60
2253.60
2253.60
2253.60
6281.05
6213.60
6163.60
6115.15
6086.45
sq.m
sq.m
sq.m
sq.m
sq.m
242.50
242.50
242.50
242.50
242.50
675.85
668.60
663.20
658.00
654.90
100Sft.
2253.60
5964.25
sq.m
242.50
641.75
100Sft.
ditto
ditto
ditto
344.90
756.00
1179.15
1804.70
sq.m
ditto
ditto
ditto
37.10
81.35
126.90
194.20
ditto
17 Add extra labour on item No. 16 for pacca brick work in:i)
ii)
iii)
iv)
first floor
second floor
third floor
fourth & subsequent floors
mud mortar
ii)
21.1
to
21.4
100Sft.
2412.95
9152.60
sq.m
259.65
984.80
1:2
1:3
1:4
1:5
1:6
1:7
1:8
100 Sft.
ditto
ditto
ditto
ditto
ditto
ditto
3384.35
3384.35
3384.35
3384.35
3384.35
3384.35
3384.35
12744.35
12112.10
11732.75
11479.85
11302.20
11163.80
11056.30
sq.m
ditto
ditto
ditto
ditto
ditto
ditto
364.15
364.15
364.15
364.15
364.15
364.15
364.15
1371.30
1303.25
1262.45
1235.25
1216.10
1201.25
1189.65
1:1:6
1:1:7
1:1:8
1:1:9
1:1:10
100Sft.
ditto
ditto
ditto
ditto
3384.35
3384.35
3384.35
3384.35
3384.35
11429.35
11293.45
11189.15
11099.00
11032.85
sq.m
ditto
ditto
ditto
ditto
364.15
364.15
364.15
364.15
364.15
1229.80
1215.20
1203.95
1194.25
1187.15
100Sft.
3384.35
10799.60
sq.m
364.15
1162.05
100Sft.
ditto
ditto
ditto
512.80
1138.50
1764.20
2815.60
-----
sq.m
ditto
ditto
ditto
181.15
402.10
623.10
994.45
Ratio
Ratio
Ratio
Ratio
Ratio
Ratio
Ratio
iii) lime, cement, sand mortar:Ratio
Ratio
Ratio
Ratio
Ratio
iv)
ditto
first floor
second floor
third floor
fourth & subsequent floors
chapter-7(Brickwork)
Page 54
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Cft.
42.15
ii)
100Cft.
683.75
636.45
--
cu.m
1489.10
ditto
241.50
22478.50
4" (113 mm) thick walling with hoop iron, bonding 6"
(150 mm) apart.
ii) 4" (113 mm) thick walling with hoop iron, bonding
12" (300 mm) apart.
iii) 3" (75 mm) thick walling with hoop iron, bonding 6"
(150 mm) apart.
iv) 3" (75 mm) thick walling with hoop iron, bonding 12"
(300 mm) apart.
21.1
to
21.2
21.19
100Sft.
1871.75
9612.55
sq.m
201.40
1034.30
100Sft.
1667.50
8954.95
sq.m
179.40
963.55
ditto
1482.35
7080.85
ditto
159.50
761.90
ditto
1185.90
6280.90
ditto
127.60
675.85
100Cft.
3438.20
10943.75
cu.m
1214.35
3865.35
21.18
100Cft.
2085.60
15369.60
cu.m
736.65
5428.55
21.1
100Cft.
2907.95
4439.75
cu.m
1027.10
1568.10
21.16
100Cft.
1679.05
cu.m
593.05
21.17
--
21.1 to 21.2
Rft.
ditto
ditto
21.25
24.10
16.70
53.10
109.75
129.45
Metre
ditto
ditto
69.70
79.05
54.80
174.15
360.00
424.60
1 brick
2 bricks
3 bricks
4 bricks
21.1 to 21.2
Rft.
ditto
ditto
ditto
24.10
35.45
47.30
59.55
1,000
Nos
933.25
1,000
Nos
1759.80
100Cft.
222.20
Remarks
41.10
87.35
133.25
186.05
Metre
ditto
ditto
ditto
79.05
116.30
155.15
195.30
--
1,000
Nos
933.25
--
1,000
Nos
1759.80
cu.m
78.50
1482.20
chapter-7(Brickwork)
134.80
286.50
437.05
610.25
523.50
Page 55
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
31 Providing and laying 2" (50 mm) thick and 15" (375 mm)
projected tile band, laid in 1:2 cement sand mortar, with
hoop iron 1" (25 mm) wide 18 gauge flat iron sheet 9"
apart.
Rft.
Labour
Composite
88.70
147.75
Unit
Metre
Labour
Spec.
No.
Composite
290.95
484.60
1:3
1:4
100Sft.
ditto
1667.50
1667.50
Per Sft.
47.30
Each No.
36.20
Each No.
236.50
Per Lft.
18.80
37 Maroo corners
Each
Corner
120.40
38 Providing and laying Fair Face Gutka, clading laid with 1:3 cement / red
% Sft
20502.90
Remarks
9564.05
9260.60
sq.m
ditto
179.40
179.40
1029.10
996.45
sq.m
508.95
44.45
Each
36.20
44.45
316.35
Each
236.50
316.35
--
Metre
61.65
--
Each
Corner
120.40
23389.60
P.Sqm
2206.10
--
chapter-7(Brickwork)
2516.70
Page 56
8. STONE MASONRY
1
The composite rates do not include the carriage of stone or spawl which will be paid separately by road and/or rail whichever means of
transport is adopted. The supply and carriage to site of work of all other materials is included in the composite rates.
The payment of carriage of stone or spawl will be made on the basis of the actual stack measurement (without any reduction factor) of the
stone or spawl carried.
Where the stone or spawl is issued from stock and the contractor is paid for its carriage and/or labour only; or where the stone or spawl is
supplied, carried or handled by the contractor in which no laying is required, the actual stack measurement (without any reduction factor)
shall form the basis of the payment of supply or carriage of stone or spawl. The quantity of finished and completed item of work shall form
the basis of laying.
Rates for all finished work include the removal of surplus debris, unused material and byproducts.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
i)
ii)
iii)
iv)
Unit
Labour
dry masonry
in mud mortar
in lime, sand mortar 1:2
in cement, sand mortar
ratio 1:3
ratio 1:4
ratio 1:6
ratio 1:8
i)
ii)
iii)
iv)
dry masonry
in mud mortar
in lime, sand mortar 1:2
in cement, sand mortar:
ratio 1:3
ratio 1:4
ratio 1:6
ratio 1:8
22.10,
22.11
100 Cft.
100 Cft.
100 Cft.
3504.60
4387.35
6689.10
4308.60
5442.45
9483.90
cu.m
cu.m
cu.m
1237.85
1549.60
2362.60
1521.80
1922.25
3349.70
100 Cft.
100 Cft.
100 Cft.
100 Cft.
6689.10
6689.10
6689.10
6689.10
13750.35
12612.30
11309.80
10589.10
cu.m
cu.m
cu.m
cu.m
2362.60
2362.60
2362.60
2362.60
4856.60
4454.65
3994.60
3740.05
22.8
100 Cft.
100 Cft.
100 Cft.
4257.00
6022.50
7426.65
5061.00
7077.60
9999.50
cu.m
cu.m
cu.m
1503.55
2127.15
2623.10
1787.55
2499.80
3531.80
100 Cft.
100 Cft.
100 Cft.
100 Cft.
7426.65
7426.65
7426.65
7426.65
14080.65
13069.05
11910.95
11274.10
cu.m
cu.m
cu.m
cu.m
2623.10
2623.10
2623.10
2623.10
4973.30
4616.00
4206.95
3982.00
dry masonry
in mud mortar
Remarks
Composite
Composite
Spec.
No.
Labour
22.10
100 Cft.
100 Cft.
3880.80
5270.10
4684.80
6325.20
chapter-8(Stone masonary)
cu.m
cu.m
1370.70
1861.40
1654.65
2234.05
Page 57
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
c)
d)
i)
ii)
iii)
iv)
4
i)
ii)
iii)
iv)
dry masonry
in mud mortar
in lime, sand mortar 1:2
in cement, sand mortar:
ratio 1:3
ratio 1:4
ratio 1:6
ratio 1:8
Remarks
Composite
100 Cft.
7238.55
10033.35
cu.m
2556.65
3543.80
100 Cft.
100 Cft.
100 Cft.
100 Cft.
7238.55
7238.55
7238.55
7238.55
14299.80
13161.75
11859.25
11138.55
cu.m
cu.m
cu.m
cu.m
2556.65
2556.65
2556.65
2556.65
5050.70
4648.75
4188.70
3934.15
22.8
100 Cft.
100 Cft.
100 Cft.
4966.50
7441.50
8324.25
5770.50
8485.45
10897.10
cu.m
cu.m
cu.m
1754.15
2628.35
2940.15
2038.15
2997.05
3848.85
100 Cft.
100 Cft.
100 Cft.
100 Cft.
8324.25
8324.25
8324.25
8324.25
14978.25
13966.65
12808.55
12171.70
cu.m
cu.m
cu.m
cu.m
2940.15
2940.15
2940.15
2940.15
5290.30
4933.00
4524.00
4299.05
22.5
&
22.6
100 Cft.
21576.70
24055.00
cu.m
7620.90
8496.25
100 Cft.
100 Cft.
100 Cft.
21576.70
21576.70
21576.70
26899.55
26140.85
25281.00
cu.m
cu.m
cu.m
7620.90
7620.90
7620.90
9500.90
9232.95
8929.25
100 Cft.
38262.20
40520.90
cu.m
13514.20
14312.00
100 Cft.
100 Cft.
100 Cft.
38262.20
38262.20
38262.20
41943.15
41563.35
41141.75
cu.m
cu.m
cu.m
13514.20
13514.20
13514.20
14814.30
14680.20
14531.25
100 Cft.
100 Cft.
100 Cft.
100 Cft.
960.70
2108.85
3283.65
5153.30
cu.m
cu.m
cu.m
cu.m
339.30
744.85
1159.80
1820.15
100 Cft.
834.25
cu.m
294.65
22.3
(A) to
(C) &
22.4
Labour
Unit
Composite
Spec.
No.
Labour
first floor
second floor
third floor
fourth floor
chapter-8(Stone masonary)
Page 58
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
100 Cft.
Labour
2337.25
Composite
Unit
cu.m
Labour
825.50
Spec.
No.
Composite
-
hammer dressed
rough tooled dressed
chisel dressed
fine dressed
22.12
22.7
100 Cft.
100 Rft.
10834.55
10834.55
cu.m
Rm.
3826.75
355.35
11 Dressing stones:a)
b)
c)
d)
Remarks
22.2
100 Sft.
100 Sft.
100 Sft.
100 Sft.
4342.80
8152.30
9889.45
20122.10
100 Sft.
8619.75
Per Cft.
Per Cft.
sq.m
sq.m
sq.m
sq.m
467.30
877.20
1064.10
2165.15
14475.05
sq.m
927.50
1557.50
402.90
432.90
cu.m
14230.45
15290.05
226.85
259.85
cu.m
8012.35
9177.90
chapter-8(Stone masonary)
22.13
Page 59
9. ROOFING
Rates for all finished works include the removal of surplus debris unused material and byproducts.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
100Sft.
6089.70
11404.25
sq.m
655.25
1227.10
23.1
100Sft.
4725.60
8456.95
sq.m
508.50
909.95
23.2
100Sft.
256.95
852.80
sq.m
27.65
473.00
2704.55
sq.m
50.90
291.00
903.55
248.40
1288.05
830.25
97.20
26.75
138.60
89.35
100Sft.
1480.15
6002.90
159.25
645.90
a)
b)
c)
Jack arch roofing 4" (113 mm) thick laid in 1:5 cement
mortar, including an average depth of 4" (100 mm) cement
concrete in haunches and over crown, with 3" (75 mm)
earth and 1" (25 mm) plaster, soffits of arches cement
plaster 1:6 and " (13 mm) thick. The rate also includes
bitumen coating, centring, laying skew bricks in cement
mortar (1:3), and encasing exposed flanges of the joints
with fine cement concrete 1:2:4 using stone aggregate:-
sq.m
Remarks
ditto
ditto
23.3 to
23.5
ditto
chapter-9(Roofing)
Page 60
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
a)
b)
7
100Sft.
ditto
Labour
6695.05
6695.05
Composite
17414.95
18727.00
Unit
sq.m
ditto
Labour
720.40
720.40
Spec.
No.
Composite
1873.85
2015.05
Jack arch roofing 4" (113 mm) thick laid in 1:5 cement
mortar, including an average depth of 4" (100 mm) cement
concrete in haunches and over crown, with " (13 mm)
cement plaster 1:6 on top (except earth filling mud plaster
and gobri) soffit of arches cement plastered. The rate also
includes bitumen coating, centring, laying skew bricks in
cement sand mortar (1:3), and encasing exposed flanges
of the joints with fine cement concrete 1:2:4 using stone
aggregate:a)
b)
23.3
to
23.5
100Sft.
ditto
5443.70
5443.70
100Sft.
1203.85
100Sft.
7821.00
17048.50
17231.20
16022.30
sq.m
ditto
585.75
585.75
1834.40
1854.10
sq.m
129.55
sq.m
841.55
1724.00
ditto
23.3
to
23.5
23.1
to
23.3
a)
3" (75 mm) thick earth filling and 1" (25 mm) mud
plaster
100Sft.
672.05
964.95
sq.m
72.30
103.85
b)
100Sft.
881.65
1230.35
sq.m
94.85
132.40
100Sft.
87.90
101.80
sq.m
9.45
10.95
ditto
100Sft.
533.30
1671.25
sq.m
57.40
179.85
23.1
13 Providing & Fixing corrugated galvanized iron sheets with G.I. bolts,
nuts, limpet and bitumen washers, wind ties, complete in
all respects without valleys and ridges:20 BWG
22 BWG
24 BWG
a)
b)
c)
Remarks
23.7
100Sft.
100Sft.
100Sft.
Rft.
946
946
946
13303.35
11409.6
9280.65
sq.m
sq.m
sq.m
101.8
101.8
101.8
1431.45
1227.65
998.6
67.55
90.05
Metre
221.55
295.35
chapter-9(Roofing)
ditto
ditto
23.10
Page 61
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Each
254.75
439.30
Each
Each
439.30
23.10
Each
254.75
826.70
Each
254.75
826.70
23.10
Per Rft.
Per Rft.
52.10
52.10
151.35
172.30
Metre
Metre
170.90
170.90
496.45
565.15
Per Sft.
52.10
124.45
sq.m
560.60
1339.10
19 Providing and fixing 1/16" (1.5 mm) thick lead flashing over
roof expansion joint complete in all respects.
Per Sft.
15.05
81.45
Sq.m
161.95
876.40
a)
b)
23.11
Per Rft.
Per Rft.
47.30
47.30
209.90
186.00
Metre
Metre
155.15
155.15
688.45
610.10
Each
195.45
502.60
Each
195.45
502.60
22 Shoes, bends or offsets for cast iron rain water down pipe,
including fixing and painting.
Each
70.95
313.25
Each
70.95
313.25
Each
217.15
332.30
Each
217.15
332.30
23.10
100Sft.
5009.40
22203.70
sq.m
539.00
2389.10
26.1
100Sft.
100Sft.
3029.40
3029.40
15024.80
13598.05
sq.m
sq.m
325.95
325.95
1616.65
1463.15
23.60
100Sft.
2085.60
5992.20
sq.m
224.40
644.75
23.8
chapter-9(Roofing)
Page 62
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
--
sq.m
27.15
Metre
80.70
Spec.
No.
Remarks
Composite
ridges, etc).
27 Extra labour for erection of GI sheets, flat sheet or
asbestos sheet roofing, above 20' (6.10 m) height in
difficult position, including lifting with care and special
scaffolding along live electric wires.
100Sft.
252.30
Per Rft.
24.60
74.05
23.6
242.90
23.6
Per Rft.
65.15
213.70
1416.00
Per Rft.
85.15
279.30
1386.60
Per Rft.
85.15
279.30
1585.20
Per Rft.
42.55
139.55
510.05
Each
946.00
Each
946.00
1559.25
Each
283.80
Each
283.80
33 Making drip course 2"x" (50x13 mm) under RCC slab edges
in outer opening, in cement, sand mortar 1:2.
Per Rft.
12.20
13.55
Metre
40.00
44.45
Per Sft.
35.75
280.65
sq.m
384.65
3019.80
100Sft.
100Sft.
100Sft.
2286.90
2286.90
2290.65
6921.65
7047.65
7177.40
sq.m
sq.m
sq.m
246.05
246.05
246.45
744.75
758.35
772.30
14.20
297.95
Metre
46.60
977.30
b)
c)
23.8
1559.25
--
23.11
23.10
Rft.
chapter-9(Roofing)
Page 63
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
15.05
25.90
17.05
29.50
Metre
Metre
49.35
84.95
55.90
96.75
i)
Each
62.70
69.30
Each
62.70
69.30
ii)
Each
30.10
33.25
Each
30.10
33.25
Each
275.20
Each
275.20
Each
40.55
Each
40.55
Each
Each
Each
Each
Each
39.30
55.05
68.80
91.75
110.10
Each
Each
Each
Each
Each
39.30
55.05
68.80
91.75
110.10
Each
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
110.10
137.60
183.50
211.70
229.35
250.20
275.20
305.80
393.15
423.40
458.70
Each
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
110.10
137.60
183.50
211.70
229.35
250.20
275.20
305.80
393.15
423.40
458.70
Each
ditto
ditto
85.45
189.95
227.90
Each
ditto
ditto
85.45
189.95
227.90
chapter-9(Roofing)
Page 64
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
iv)
v)
vi)
vii)
viii)
Labour
ditto
ditto
ditto
ditto
ditto
284.90
310.80
341.90
427.35
683.75
Each
378.40
Composite
Unit
ditto
ditto
ditto
ditto
ditto
284.90
310.80
341.90
427.35
683.75
Each
378.40
653.45
P.Sqm
P.Sqm
P.Sqm
37.30
37.30
37.30
653.45
Labour
Spec.
No.
Remarks
Composite
1" thick
1-1/2" thick
2" thick
% Sft
% Sft
% Sft
346.50
346.50
346.50
5,512.50
8,158.50
10,552.50
chapter-9(Roofing)
593.15
877.85
1,135.45
Page 65
10. FLOORING
Rates for all finished works include the removal of surplus debris, unused material and byproducts
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
100 Sft.
2722.50
3991.85
sq.m
292.95
429.50
100 Sft.
933.90
1212.90
sq.m
100.50
130.50
100 Cft.
2135.75
4190.75
cum.
754.35
1480.15
100 Sft.
1694.55
2129.70
sq.m
182.35
229.15
24.2
100 Sft.
861.95
4402.45
sq.m
92.75
473.70
24.12
100 Sft.
1559.45
6834.55
sq.m
167.80
735.40
24.12
100 Sft.
844.80
1355.10
sq.m
90.90
145.80
100 Sft.
1528.55
5940.95
sq.m
164.45
639.25
24.4
100 Sft.
1,945.70
8,396.50
sq.m
209.35
903.45
24.4
10
100 Sft.
1,910.70
4,135.50
sq.m
205.60
445.00
ditto
100 Sft.
2,098.80
5,761.20
sq.m
225.85
619.90
24.4
100 Sft.
1,254.65
6,269.65
sq.m
135.00
674.60
24.7
11
12
chapter-10(Flooring)
Remarks
24.1
Page 66
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
mortar 1:2.
13
14
15
16
24.8
100 Sft.
ditto
ditto
1,254.65
1,254.65
1,254.65
4,402.30
5,643.60
8,089.60
sq.m
ditto
ditto
135.00
135.00
135.00
473.70
607.25
870.45
100 Sft.
1,254.65
6,299.15
sq.m
135.00
677.80
100 Sft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
1,343.10
1,343.10
1,711.05
1,711.05
2,079.00
2,145.65
2,446.95
2,446.95
2,446.95
2,606.90
2,887.15
3,535.40
3,828.85
4,544.20
4,871.95
5,377.30
5,745.65
6,071.65
sq.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
144.50
144.50
184.10
184.10
223.70
230.85
263.30
263.30
263.30
100 Sft.
ditto
ditto
1,992.85
1,992.85
2,548.90
3,768.25
3,956.65
4,794.50
sq.m
ditto
ditto
214.45
214.45
274.25
405.45
425.75
515.90
995.05
sq.m
50.90
107.05
sq.m
43.05
17
100 Sft.
473.00
18
100 Sft
399.95
19
24.9
24.10
280.50
310.65
380.40
412.00
488.95
524.20
578.60
618.25
653.30
24.7
24.5
100 Sft.
ditto
4,106.65
4,106.65
5,766.60
6,027.00
chapter-10(Flooring)
sq.m
ditto
441.90
441.90
620.50
648.50
Page 67
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
20
Unit
Labour
24.10
100 Sft.
ditto
ditto
1,709.40
1,338.50
982.60
11,770.85
6,483.90
3,661.35
sq.m
ditto
ditto
183.95
144.00
105.75
1266.55
697.65
393.95
100 Sft.
ditto
6,069.35
6,069.35
8,765.85
9,002.80
sq.m
ditto
653.05
653.05
943.20
968.70
Remarks
Composite
22
Composite
Spec.
No.
21
Labour
100 Sft.
ditto
6,069.35
6,069.35
8,964.20
9,543.20
sq.m
ditto
653.05
653.05
964.55
1026.85
23
100 Sft.
3,486.50
7,646.30
sq.m
375.15
822.75
24.8
24
100 Sft.
4,517.70
11,112.90
sq.m
486.10
1195.75
24.7
25
100 Sft.
4,517.70
11,661.20
sq.m
486.10
1254.75
ditto
26
100 Sft.
1,273.80
1,407.50
sq.m
137.05
151.45
27
100 Sft.
1,356.95
1,493.40
sq.m
146.00
160.70
chapter-10(Flooring)
Page 68
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
28
100 Sft.
180.85
226.35
sq.m
19.45
24.35
24.6
29
100 Sft.
3,762.00
38,362.25
sq.m
404.80
4127.80
24.13
30
100 Sft.
4,257.00
50,384.35
sq.m
458.05
5421.35
ditto
31
100 Sft.
3,619.00
49,589.15
sq.m
389.40
5335.80
ditto
32
100 Sft.
3,923.70
40,976.35
sq.m
422.20
4409.05
24.13
33
100 Sft.
3,619.00
79,387.70
sq.m
389.40
8542.10
ditto
34
251.40
251.40
2744.05
1520.45
ditto
100 Sft.
Per Inch
thickness
ditto
2,336.40
2,336.40
25,502.15
14,130.65
sq.m
per cm
thickness
ditto
100 Sft.
ditto
2,050.60
3,344.55
7,502.05
10,726.35
sq.m
ditto
220.65
359.85
807.20
1154.15
100 Sft.
2,493.20
3,146.80
sq.m
268.25
338.60
36
Remarks
chapter-10(Flooring)
Page 69
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
ditto
ditto
2,493.20
166.65
2,953.05
434.30
ditto
ditto
268.25
17.95
317.75
46.75
37
100 Sft.
5,560.50
12,155.70
sq.m
598.30
1307.95
24.7
38
100 Sft.
5,560.50
12,686.70
sq.m
598.30
1365.10
ditto
39
100 Sft.
ditto
7,293.00
7,293.00
8,705.10
9,583.95
sq.m
ditto
784.75
784.75
936.65
1031.25
100 Sft.
ditto
7,293.00
7,293.00
9,592.20
9,903.95
sq.m
ditto
784.75
784.75
1032.10
1065.65
17.50
80.40
sq.m
188.30
865.10
Remarks
Per Sft.
41
Per Rft.
4.20
Metre
13.80
42
6.60
4.60
Metre
ditto
21.65
15.10
73.90
84.00
106.70
Sq.m
Sq.m
Sq.m
24.14
Providing and laying Tuff pavers, having 7000 PSI, crushing strength
of approved manufacturer, over 2" to 3" sand cushion i/c grouting
with sand in joints i/c finishing to require slope . complete in all
respect.
(50% Grey / 50% Coloured)
a)
b)
c)
50-mm thick
60-mm thick
80-mm thick
P.Sft
P.Sft
P.Sft
12.20
12.20
12.20
chapter-10(Flooring)
131.00
131.00
131.00
795.35
903.80
1,147.85
Page 70
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Unit
Labour
25.7
100 Sft.
ditto
396.70
559.15
475.15
716.10
sq.m
ditto
42.70
60.15
51.15
77.05
ditto
a)
100 Sft.
358.00
436.45
sq.m
38.50
46.95
b)
ditto
358.00
514.95
ditto
38.50
55.40
100 Sft.
1123.30
1297.20
sq.m
120.85
139.60
b)
ditto
1123.30
1470.95
ditto
120.85
158.25
ditto
100 Sft.
ditto
1123.30
1123.30
1587.35
1866.00
sq.m
ditto
120.85
120.85
170.80
200.80
100 Sft.
2901.35
5743.20
sq.m
312.20
617.95
ditto
ditto
100 Sft.
ditto
ditto
951.20
951.20
951.20
2682.80
2564.00
2495.60
sq.m
ditto
ditto
102.35
102.35
102.35
288.65
275.90
268.55
25.1 to 25.6
a)
Remarks
Composite
a)
b)
Composite
Spec.
No.
Labour
100 Sft.
ditto
ditto
1123.30
1123.30
1407.10
1776.90
1971.10
2714.30
sq.m
ditto
ditto
chapter-11(Surface Rendering)
120.85
120.85
151.40
191.20
212.10
292.05
25.1
to
25.6
Page 71
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
1:2
1:3
1:4
ditto
100 Sft.
ditto
ditto
1123.30
1123.30
1407.10
1583.15
1736.40
2326.75
sq.m
ditto
ditto
120.85
120.85
151.40
170.35
186.85
250.35
ditto
100 Sft.
ditto
ditto
1123.30
1123.30
1407.10
1530.50
1641.70
2215.15
sq.m
ditto
ditto
120.85
120.85
151.40
164.70
176.65
238.35
ditto
100 Sft.
ditto
ditto
1273.80
1273.80
1273.80
2057.60
1863.20
1810.55
sq.m
ditto
ditto
137.05
137.05
137.05
221.40
200.50
194.80
100 Sft.
ditto
ditto
1123.30
1123.30
1407.10
1485.10
1562.50
2130.70
sq.m
ditto
ditto
120.85
120.85
151.40
159.80
168.15
229.25
100 Sft.
ditto
ditto
1123.30
1123.30
1407.10
1420.30
1517.15
2001.10
sq.m
ditto
ditto
120.85
120.85
151.40
13
100 Sft.
640.20
899.40
sq.m
68.90
14
100 Sft.
839.50
958.95
sq.m
90.35
103.20
25.8
15
100 Sft.
1273.80
1393.25
sq.m
137.05
149.90
ditto
16
25.1 to 25.6
a)
b)
Remarks
Composite
12
Labour
a)
b)
c)
11
Unit
10
Composite
Spec.
No.
Labour
ditto
152.80
163.25
215.30
96.80 25.4 to 25.6
ditto
100 Sft.
ditto
1123.30
1123.30
1612.55
1498.45
sq.m
ditto
chapter-11(Surface Rendering)
120.85
120.85
173.50
161.25
Page 72
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
17
18
19
ratio 1:2
ratio 1:3
Labour
Composite
Unit
Labour
Spec.
No.
Composite
100 Sft.
839.50
1328.75
sq.m
90.35
142.95
100 Sft.
ditto
1273.80
1273.80
1763.05
1648.90
sq.m
ditto
137.05
137.05
189.70
177.40
ditto
25.8
100 Sft.
ditto
1007.15
1007.15
1166.70
1382.30
sq.m
ditto
108.35
108.35
125.55
148.75
100 Sft.
ditto
1875.70
1875.70
2035.25
2250.85
sq.m
ditto
201.85
201.85
219.00
242.20
20
100 Sft.
601.90
sq.m
64.75
ditto
21
100 Sft.
300.95
sq.m
32.40
ditto
22
100 Sft.
113.50
121.15
sq.m
12.20
23
Distempering:a)
b)
24
b)
25
13.05
100 Sft.
ditto
ditto
122.15
180.70
239.25
203.35
286.50
369.65
sq.m
ditto
ditto
13.15
19.45
25.75
21.90
30.85
39.75
100 Sft.
ditto
112.00
180.70
168.55
237.30
sq.m
ditto
12.05
19.45
18.15
25.55
25.10
100 Sft.
ditto
104.25
156.35
132.90
198.25
sq.m
ditto
11.20
16.80
14.30
21.35
100 Sft.
ditto
104.25
156.35
121.95
185.40
sq.m
ditto
11.20
16.80
13.10
19.95
White washing:a)
25.11
ditto
Colour washing:a)
Remarks
25.9
100 Sft.
ditto
104.25
156.35
127.65
191.40
sq.m
ditto
chapter-11(Surface Rendering)
11.20
16.80
13.75
20.60
Page 73
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
iii)
b)
26
three coats
old surface:i)
one coat
ii)
two coats
Labour
Composite
Unit
Labour
Spec.
No.
Composite
ditto
202.45
249.15
ditto
21.80
26.80
100 Sft.
ditto
104.25
156.35
121.80
185.55
sq.m
ditto
11.20
16.80
13.10
19.95
Gobri leeping:a)
b)
on walls
over roofs
25.7
100 Sft.
ditto
123.55
105.50
127.55
109.50
sq.m
ditto
13.30
11.35
13.70
11.80
27
100 Sft.
150.50
sq.m
16.20
28
100 Sft.
205.55
sq.m
22.10
29
100 Sft.
567.60
922.00
sq.m
61.05
99.20
30
100 Sft.
567.60
595.30
sq.m
61.05
64.05
31
100 Sft.
188.10
288.60
sq.m
20.25
31.05
32
1273.80
1273.80
1733.60
1886.90
sq.m
ditto
137.05
137.05
186.55
203.05
Rft.
8.95
38.55
Metre
29.35
126.45
Each
Each
198.65
397.30
252.70
505.35
Each
Each
198.65
397.30
252.70
505.35
i)
ii)
33
34
Single
Double
Remarks
25.8
Each
414.75
558.85
Each
414.75
558.85
36
Each
207.35
279.40
Each
207.35
279.40
37
Each
414.75
529.95
Each
414.75
529.95
38
100 Sft.
Per
coat
17.35
sq.m
Per
coat
1.85
chapter-11(Surface Rendering)
Page 74
No extra rate is to be paid for sawing as the rates are inclusive of these.
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Deodar wood
Shisham wood
Deodar wood
Shisham wood
Labour
26.1
Per Cft.
ditto
662.10
752.40
4555.85
3128.65
cu.m
ditto
23385.35
26574.75
160912.60
110503.90
26.1
Per Cft.
ditto
428.85
428.85
4353.10
2874.70
cu.m
ditto
15147.00
15147.00
153751.50
101534.40
26.1
to
26.3
&
26.7
Per Sft.
ditto
ditto
114.45
114.45
114.45
1464.45
1367.40
1272.65
sq.m
ditto
ditto
1231.50
1231.50
1231.50
15757.50
14713.20
13693.70
26.8
to
26.10
teak wood framing 1" (45 mm) thick with wire gauze
fixed in position:i) without springs or spring hinges.
Remarks
Composite
Unit
Composite
Spec.
No.
Labour
Per Sft.
20.90
597.00
sq.m
224.90
6423.70
ditto
20.90
600.70
ditto
224.90
6463.55
Per Sft.
ditto
20.90
20.90
550.75
554.95
sq.m
ditto
224.90
224.90
5926.05
5971.25
chapter-12(Wood Work)
Page 75
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
c)
Per Sft.
37.6
186.35
sq.m
404.6
2005.15
d)
Per Sft.
35.25
575.90
sq.m
379.30
6196.70
Per Sft.
47.05
295.95
sq.m
506.25
3184.40
Per Sft.
47.05
434.15
sq.m
506.25
4671.45
26.1 to
26.3 & 26.7
Per Sft.
ditto
ditto
111.45
111.45
111.45
1181.45
1105.00
1052.05
sq.m
ditto
ditto
1199.20
1199.20
1199.20
12712.40
11889.90
11320.05
Remarks
26.1, 26.2
& 26.4
Per Sft.
125.40
827.90
sq.m
1349.30
8908.20
ditto
115.75
714.25
ditto
1245.45
7685.35
Per Sft.
142.95
466.15
sq.m
1538.15
5015.75
1453.15
26.1, 26.2
26.4 to
8681.70
26.6
Per Sft.
135.05
806.85
sq.m
chapter-12(Wood Work)
Page 76
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Engineer incharge:i)
ii)
b)
i)
ii)
Per Sft.
ditto
58.80
64.65
611.25
641.50
sq.m
ditto
632.70
695.65
b)
c)
-ditto-
Per Sft.
ditto
58.80
64.65
250.30
280.55
sq.m
ditto
632.70
695.65
2693.25
3018.70
26.8 to
26.10
Per Sft.
ditto
62.70
62.70
510.80
514.95
sq.m
ditto
674.65
674.65
5496.20
5540.85
Per Sft.
ditto
62.70
62.70
475.25
477.65
sq.m
ditto
674.65
674.65
5113.70
5139.50
Per Sft.
47.05
170.85
sq.m
506.25
1838.35
Per Sft.
70.55
440.45
sq.m
759.10
4739.25
Per Sft.
104.50
546.85
sq.m
1124.40
5884.10
Per Sft.
25.05
134.45
sq.m
269.55
1446.70
6577.05
6902.55
Remarks
26.1
26.2
chapter-12(Wood Work)
Page 77
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
b)
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Sft.
25.05
103.35
sq.m
269.55
1112.05
Per Sft.
ditto
38.80
45.50
116.60
134.80
sq.m
ditto
417.50
489.60
1254.60
1450.45
Per Sft.
door area
3.60
31.65
sq.m
door area
38.75
340.55
Each
75.25
227.65
Each
75.25
227.65
Each
ditto
ditto
ditto
70.55
70.55
70.55
70.55
132.95
174.95
173.75
330.95
Each
ditto
ditto
ditto
70.55
70.55
70.55
70.55
132.95
174.95
173.75
330.95
Per Sft.
2.15
12.45
sq.m
23.15
133.95
ditto
2.15
9.95
ditto
23.15
107.05
Each
225.70
436.90
Each
225.70
436.90
Each
313.50
504.30
Each
313.50
504.30
Per Sft.
47.05
258.70
sq.m
506.25
2783.60
ditto
47.05
364.50
ditto
506.25
3922.00
single rebate
double rebate
26.2
chapter-12(Wood Work)
Page 78
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
23 a)
b)
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Sft.
150.50
1684.45
sq.m
1619.15
18124.80
Per Sft.
112.85
624.05
sq.m
1214.35
6714.90
Per Sft.
90.60
389.85
Sq.m
974.85
4194.90
ii)
Remarks
Per Sft.
173.65
784.65
sq.m
1868.25
8442.60
ditto
169.60
1055.25
ditto
1824.75
11354.50
Per Sft.
67.35
643.05
Sq.m
724.75
6919.00
Per Sft.
ditto
33.45
20.90
500.20
389.90
Sq.m
ditto
359.80
224.90
5382.10
4195.10
Teak wood
Deodar wood
chapter-12(Wood Work)
Page 79
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
c)
Shisham wood
ditto
Labour
Composite
25.10
184.30
Unit
ditto
Labour
269.85
Spec.
No.
Composite
1982.80
26.1
26.2
Sft.
ditto
ditto
37.60
37.60
37.60
357.15
277.15
197.55
sq.m
ditto
ditto
404.80
404.80
404.80
3842.75
2982.30
2125.45
ditto
Sft.
ditto
ditto
37.60
37.60
37.60
357.15
516.75
676.35
sq.m
ditto
ditto
404.80
404.80
404.80
3842.75
5560.05
7277.35
Each
45.15
136.95
Each
45.15
136.95
b)
Each
60.20
106.60
Each
60.20
106.60
c)
Each
6.25
59.40
Each
6.25
59.40
d)
Each
2.00
10.90
Each
2.00
10.90
30 a)
Shisham wood
Teak wood
Remarks
26.1 and
26.2
ditto
Per Rft.
ditto
172.90
128.15
331.05
695.95
Metre
ditto
567.20
420.35
1085.90
2282.65
Per Rft.
64.05
269.45
Metre
210.15
883.85
100Sft.
ditto
752.40
1003.20
sq.m
ditto
80.95
107.95
100Sft.
ditto
443.92
667.15
sq.m
ditto
47.75
71.80
26.1
26.2
Soft wood
Hard wood
chapter-12(Wood Work)
Page 80
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Sft.
52.65
434.35
sq.m
566.70
4673.75
Per Sft.
62.70
134.55
sq.m
674.65
1447.75
Each
225.70
8678.50
Each
225.70
8678.50
Per Rft.
16.10
--
Metre
52.90
Per Rft.
248.80
2708.60
Metre
816.15
8884.15
100Sft.
ditto
ditto
1175.65
1175.65
1175.65
14398.30
15910.30
16162.30
sq.m
ditto
ditto
126.50
126.50
126.50
1549.25
1711.95
1739.05
100Sft.
ditto
ditto
1410.75
1410.75
1410.75
16049.65
26391.00
19577.65
sq.m
ditto
ditto
151.80
151.80
151.80
1726.95
2839.65
2106.55
100Sft.
ditto
ditto
ditto
2306.55
2306.55
2306.55
2306.55
9893.20
12533.20
12413.20
11813.20
sq.m
ditto
ditto
ditto
248.20
248.20
248.20
248.20
1064.50
1348.55
1335.65
1271.10
36 Making and fixing 1" (25 mm) thick kail or chir wooden
notice board with frame.
Remarks
26.1
ditto
ditto
-26.1
b)
Hard board
Chip board
Ply wood " (6 mm) thick
Masonite
b)
In case of acoustic
Thermopore sheet, the
composite rate will be
increased by Rs.9.00 per Sft.
100Sft.
ditto
2582.70
2582.70
10858.75
10934.60
sq.m
ditto
277.90
277.90
1168.40
1176.55
chapter-12(Wood Work)
Page 81
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
100Sft.
ditto
2582.70
2582.70
Each
Composite
Unit
Labour
Spec.
No.
Composite
6906.25
7032.25
sq.m
ditto
277.90
277.90
743.10
756.65
354.75
Each
354.75
ditto
sq.m
177.40
289.15
61.00
43 a)
b)
44 a)
ditto
Per Sft.
177.40
26.85
b)
Per Sft.
33.85
95.85
sq.m
364.30
1031.15
Per Sft.
50.40
110.25
sq.m
542.50
1186.40
46 a)
Per Sft.
18.80
19.90
sq.m
202.40
214.40
Per Sft.
28.20
50.20
sq.m
303.60
540.05
b)
Remarks
656.20
26.12
26.12
47 Glazing with plate glass 1/4" (6 mm) thick including the cost
of deodar wood fillets and putty:a)
Per Sft.
43.25
112.40
sq.m
465.50
1209.55
b)
Per Sft.
43.25
112.60
sq.m
465.50
1211.65
Per Sft.
160.80
747.40
sq.m
1730.10
8041.90
Per Sft.
160.80
704.95
sq.m
1730.10
7585.25
49 Providing and fixing 1" (40 mm) thick hollow flush doors
and windows with commercial ply (3 ply) on both faces of
deodar wood shutter frame 1" (30 mm) thick and partal
wood braces at about 3" (75 mm) apart and deodar wood
lipping 1"x3/8" (40 mmx10 mm) fixed with M.S. chowkat
(frame) including chromium plated fittings, etc. complete
in all respects (without sliding bolt or lock):i)
Per Sft.
111.45
598.10
chapter-12(Wood Work)
sq.m
1199.40
6435.30
Page 82
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
ii)
50 Providing and fixing 1" (40mm) thick solid flush door shutter
(Approved Factory Manufactured) with commercial ply (5 mm thick)
on both sides double pressed and deodar wood lipping
1"x3/8" (40mm x 10mm) around shutter including
chromium plated fitting, iron hinges with aluminium kick
plate 22 SWG on both sides & finger plate complete in all
respect.
Per Sft.
Labour
111.45
Composite
567.00
Unit
sq.m
Labour
1199.40
Spec.
No.
Remarks
Composite
6100.90
Per Sft.
61.40
353.95
sq.m
660.90
3808.50
Per Sft.
105.20
312.15
sq.m
1131.80
3358.80
Per Rft.
22.55
36.35
Metre
74.05
119.20
Per Rft.
9.40
139.30
Metre
30.85
456.95
Per Sft.
54.30
178.90
sq.m
584.20
1925.15
Per Sft.
19.15
62.40
sq.m
206.10
671.30
Per Sft.
ditto
23.50
23.50
112.10
73.10
sq.m
ditto
253.00
253.00
1206.20
786.30
Rate shall be paid as per surface
area of dolly frame
e-g 0.75' x (3.5' + (2 x 7))
chapter-12(Wood Work)
Page 83
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Sft.
ditto
57.90
57.90
366.20
360.05
sq.m
ditto
622.75
622.75
3940.35
3874.10
Per Sft.
ditto
10.60
10.60
69.80
43.40
sq.m
ditto
113.85
113.85
751.00
466.95
Per Sft
Per Sft
Per Sft
Per Sft
122.60
122.60
122.60
122.60
565.95
617.55
616.30
667.90
sq.m
sq.m
sq.m
sq.m
1319.35
1319.35
1319.35
1319.35
6089.80
6645.05
6631.15
7186.40
chapter-12(Wood Work)
Page 84
The rates for all finished works include the removal of surplus debris, unused material and by products
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
a)
100 Sft.
133.30
167.70
sq.m
14.35
18.05
b)
100 Sft.
88.90
136.80
sq.m
9.55
14.70
27.7
100 Sft.
266.65
--
sq.m
28.70
27.3
100 Sft.
1066.55
--
sq.m
114.75
27.9
b)
e)
f)
312.20
236.50
489.90
327.25
sq.m
ditto
33.60
25.45
52.70
35.20
100 Sft.
ditto
189.20
160.80
283.70
237.90
sq.m
ditto
20.35
17.30
30.55
25.60
100 Sft.
ditto
312.20
236.50
493.65
374.50
sq.m
ditto
33.60
25.45
53.10
40.30
100 Sft.
ditto
189.20
160.80
283.70
237.90
sq.m
ditto
20.35
17.30
30.55
25.60
100 Lft.
ditto
160.80
113.50
255.30
190.60
Metre
ditto
5.30
3.70
8.35
6.25
d)
100 Sft.
ditto
c)
27.1
27.3 &
27.9
Remarks
Page 85
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
i) first coat
ii) each subsequent coat
g)
Composite
Unit
Labour
Spec.
No.
Composite
100 Nos.
ditto
459.55
417.70
637.25
512.15
100 Nos.
ditto
459.55
417.70
637.25
512.15
100 Nos
ditto
1050.35
620.40
1579.85
885.15
100 Nos
ditto
1050.35
620.40
1579.85
885.15
100 Sft.
ditto
456.20
160.95
686.90
382.20
sq.m
ditto
49.10
17.30
73.90
41.10
100 Sft.
ditto
193.15
136.20
352.90
261.75
sq.m
ditto
20.80
14.65
37.95
28.15
i) priming coat.
ii) each subsequent coat of paint.
100 Sft.
ditto
456.20
160.95
683.15
382.20
sq.m
ditto
49.10
17.30
73.50
41.15
100 Sft.
ditto
301.40
136.20
439.10
261.75
sq.m
ditto
32.45
14.65
47.25
28.15
100 Lft.
ditto
241.25
90.80
345.45
194.00
Metre
ditto
7.90
3.00
11.35
6.35
100 Nos.
ditto
709.5
347.30
1260.75
786.05
100 Nos.
ditto
709.5
347.30
1260.75
786.05
c)
d)
e)
f)
27.1
27.2 &
27.9
b)
Remarks
Labour
Page 86
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
g)
h)
Composite
Unit
Labour
Spec.
No.
100 Nos.
ditto
1983.30
598.40
2883.60
1385.15
100 Sft.
30.10
45.75
100 Nos.
ditto
sq.m
1983.30
598.40
2883.60
1385.15
3.25
4.90
first coat
second coat
27.10
100 Sft.
ditto
236.50
191.35
418.35
308.40
sq.m
ditto
25.45
20.60
45.00
33.20
2315.65
1240.80
2383.85
1277.35
sq.m
ditto
249.15
133.50
256.50
137.45
100 Sft.
ditto
ditto
189.20
70.95
70.95
322.70
172.10
151.15
sq.m
ditto
ditto
20.35
7.65
7.65
34.70
18.50
16.25
100 Sft.
ditto
ditto
222.20
213.30
176.00
903.35
562.75
525.45
sq.m
ditto
ditto
23.90
22.95
18.95
97.20
60.55
56.55
Per No.
9.45
10.10
Per No.
9.45
10.10
27.1
Per Letter
9.45
9.85
Per Letter
9.45
9.85
27.1
10.85
11.75
ditto
on new work
on old work
27.6
100 Sft.
ditto
Remarks
Composite
Labour
first coat
second coat
third coat
per inch
per 25 mm
height
height
ditto
10.85
11.75
ditto
13 Coaltar painting:
a)
b)
100 Sft.
ditto
198.65
120.40
729.10
459.15
sq.m
ditto
21.35
12.95
78.45
49.40
27.8
to
27.11
Page 87
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
14 Solignum painting:a)
b)
27.8
100 Sft.
ditto
165.55
250.80
192.70
294.25
sq.m
ditto
17.80
27.00
20.75
31.65
15 Creosote painting:a)
b)
ditto
100 Sft.
ditto
198.65
300.95
316.50
498.60
sq.m
ditto
21.35
32.40
34.05
53.65
100 Sft.
735.25
750.85
sq.m
79.10
80.80
27.3
100 Sft.
266.65
274.35
sq.m
28.70
29.50
ditto
Each
47.30
54.20
Each
47.30
54.20
27.1
Per Rft.
94.60
310.30
354.05
ditto
Per Lft.
47.30
155.15
168.75
27.1
Per Lft.
144.75
474.80
496.70
22 a)
b)
c)
ditto
Each
ditto
101.35
177.40
149.20
254.20
Each
ditto
101.35
177.40
149.20
254.20
27.1
Each
ditto
13.50
23.65
19.20
33.55
Each
ditto
13.50
23.65
19.20
33.55
Each
ditto
113.50
187.30
144.60
240.20
Each
ditto
113.50
187.30
144.60
240.20
100 Sft.
533.30
sq.m
57.40
Remarks
Khanki paint
Aluminium paint
27.12
27.1
100 Sft.
ditto
1066.55
1066.55
sq.m
ditto
114.75
114.75
Page 88
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
per letter
per inch
height
15.15
100 Sft.
799.90
841.90
100 Sft.
1066.55
100 Sft.
Unit
Labour
Spec.
No.
Composite
15.15
15.15
27.1
sq.m
86.05
90.60
27.9
27.10
1098.95
sq.m
114.75
118.25
27.12
888.80
904.20
sq.m
95.65
97.30
100 Sft.
266.65
288.35
sq.m
28.70
31.05
27.9
Each
188.10
196.20
Each
188.10
196.20
27.3
first coat
2nd and each subsequent coat
27.12
100 Sft.
ditto
230.65
177.15
417.85
324.45
sq.m
ditto
24.80
19.05
44.95
34.90
27.12
new surface:
i) 1st coat
ii) 2nd and subsequent coat
b)
Remarks
100 Sft.
ditto
230.65
177.15
319.10
254.50
sq.m
ditto
24.80
19.05
34.35
27.40
100 Sft.
ditto
230.65
177.15
267.65
213.50
sq.m
ditto
24.80
19.05
28.80
23.00
i) 1st coat
ii) 2nd coat
%sft
%sft
834.25
454.75
1309.20
661.75
sq.m
sq.m
89.75
48.95
140.85
71.20
old surface:
%sft
454.75
661.75
sq.m
48.95
71.20
1.40
2.30
Metre
4.65
7.60
old surface:
i) 1st coat
ii) 2nd and subsequent coat
b)
new surface:
33 Painting traffic lane 5" (125 mm) wide, with road marking
enamel.
Per Rft.
Page 89
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Rft.
1.60
9.85
Metre
5.25
32.30
Per Job
53.75
87.35
Job
53.75
87.35
Per Job
125.40
246.00
Job
125.40
246.00
Per Rft.
ditto
ditto
1.15
2.30
3.80
3.75
4.30
6.80
Metre
ditto
ditto
3.75
7.50
12.55
7.55
14.05
22.35
Per Job
24.85
73.10
Job
24.85
73.10
100 Sft.
per coat
85.35
sq.m
9.20
AASHTO
M248-91
(2000)
Page 90
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
The rates also include curing for specified period wherever necessary.
Nominal dimension of tile or brick shall be taken for the purpose of measurement and payment.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
in bed
on slope
in bed
on slope
in bed
on slope
in bed
on slope
in bed
on slope
100Sft.
ditto
593.60
810.50
100Sft.
1378.10
sq.m
ditto
63.85
87.20
1928.90
sq.m
148.30
Composite
207.55
in bed
b)
on slope
100Sft.
ditto
1009.10
1244.75
1282.35
1518.00
sq.m
ditto
108.60
133.95
138.00
163.35
ditto
100Sft.
ditto
1009.10
1244.75
1494.20
1729.85
sq.m
ditto
108.60
133.95
160.80
186.15
ditto
100Sft.
ditto
1244.75
1528.55
2403.05
2686.85
sq.m
ditto
133.95
164.45
100Cft.
ditto
5733.75
6588.45
16350.70
17205.40
cu.m
ditto
258.55
289.10
2025.15
2327.05
100Cft.
5733.75
17969.25
cu.m
2025.15
ditto
6588.45
18823.95
ditto
2327.05
6648.60
in bed
on slope
ditto
ditto
Remarks
28.1 to 28.3
Labour
Unit
Composite
Spec.
No.
Labour
28.2
100Cft.
ditto
5733.75
6588.45
21570.70
22425.40
cu.m
ditto
chapter-14(Lining of canal)
2025.15
2327.05
7618.75
7920.65
Page 91
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Composite
Unit
Labour
Spec.
No.
in bed
on slope
ditto
100Cft.
ditto
5733.75
6588.45
23189.25
24043.95
cu.m
ditto
2025.15
2327.05
8190.45
8492.30
20.1, 28.1
& 28.3
b)
Remarks
Composite
10
Labour
100Cft.
ditto
ditto
5167.80
5167.80
5167.80
20506.20
17704.20
15679.80
cu.m
ditto
ditto
1825.25
1825.25
1825.25
7242.80
6253.10
5538.10
100Cft.
ditto
ditto
5953.20
5953.20
5953.20
21291.60
18489.60
16465.20
cu.m
ditto
ditto
2102.65
2102.65
2102.65
7520.20
6530.55
5815.50
chapter-14(Lining of canal)
Page 92
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
2
3
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per
cut
150.50
Per
cut
150.50
29.129.3
Per cut
222.70
Per cut
222.70
ditto
100Sft.
3624.70
sq.m
390.00
ditto
Driving steel piles,more than 15' (4.6 m) and less than 25'
(7.5 m).
100Sft.
3474.25
sq.m
373.85
ditto
ditto
100Sft.
2571.35
sq.m
276.70
ditto
ditto
Dolleying piles.
Each
227.05
Each
227.05
ditto
Each
20.70
Each
20.70
ditto
Per Ft.
3396.80
Metre
11141.50
ditto
Turning Machine, 90
Per
Job
5074.10
Per
Job
5074.10
29.1 to
29.3
10
Per
Job
6277.90
Per
Job
6277.90
ditto
11
Per
Job
8548.30
Per
Job
8548.30
29.1 to
29.3
12
Per
Chain
10100.65
30 M.
10100.65
ditto
o.
chapter-15(Sheet piling)
Page 93
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
13
Ton
197.30
Tonne
14
Each
20798.35
15
Each
23998.10
16
per
chain
4106.50
Labour
Spec.
No.
Composite
194.20
ditto
Each
20798.35
ditto
Each
23998.10
ditto
30 M
4106.50
ditto
chapter-15(Sheet piling)
Remarks
Page 94
3
4
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
The composite rates of the items in which stone, boulders, shingle spawl are used do not contain the carriage
of the these stone materials, which will be paid separately by road, and/or rail, whichever means of transport is
adopted. The supply and carriage to site of work of all other material required in the item, is included in the
composite rates.
The carriage of stone or spawl will be paid on the basis of actual stack measurement (without any reduction
factor) of the stone, boulders, shingle or spawl carried.
Where stone, boulder or spawl is issued from stock and contractor is paid for its carriage and/or labour only;
or where such stone product is supplied, carried or handled by the contractor in which no laying is required,
the actual stack measurement (without any reduction factor) shall from the basis of payment of supply or
carriage of the stone, boulder or spawl, etc. The quantity of finished and completed item of work shall form the
basis of laying.
In case of the items in which the rates include carriage of stakes, bushing, Pilchi, sarkanda or farash, etc. within
one mile (1.6 Km.)
i)
the cost of the carriage within one mile (one Km) shall not be deducted from the carriage charges to follow thereafter
from the point of supply.
ii)
if the site of work happens to be within one mile (one Km.) of the source of supply, the materials will be collected
and measured at site of work and no extra carriage would be admissible in such cases.
iii) where the site of the work is situated at more than one mile (one Km.) distance from the source of supply, the point
of supply will be fixed carefully by the Engineer-in-charge in such a way that the carriage charges would
be arrived at, most economically. Extra carriage will be admissible from the place of supply of the
material which will be considered its starting point. The demarcation of the place of supply will be
pre-determined before calling the tenders.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
100Cft.
1013.25
cu.m
357.80
Weaving matresses.
100Cft.
1919.80
cu.m
678.00
a)
Per
Bag
30.00
44.85
Per Baq
30.00
44.85
b)
ditto
46.65
61.50
Per Baq
46.65
61.5
Per
Bag
71.80
125.25
Per
Bag
71.80
125.25
ditto
102.55
156.00
ditto
102.55
156.00
4.00 a)
b)
Remarks
Page 95
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100 Nos
266.65
b)
Per chain
per 100
Nos
96.00
ditto
37.35
c)
Labour
% Nos
266.65
Per 30 m
96.00
ditto
37.35
a)
b)
c)
100 Nos
1066.55
% Nos
1066.55
per chain
per 100Nos
373.30
Per 30 m
per %Nos
373.30
ditto
144.00
ditto
144.00
100Sft.
599.95
sq.m
64.55
b)
100Sft.
999.90
sq.m
107.60
c)
ditto
1166.55
ditto
125.50
100 Nos
933.25
969.05
% Nos
933.25
969.05
100Cft.
1299.85
1403.05
cu.m
459.10
495.55
100Cft.
639.95
cu.m
226.00
Page 96
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Cft.
1930.45
cu.m
681.75
b)
ditto
1290.55
ditto
455.75
c)
ditto
1530.50
ditto
540.50
Each
83.35
128.20
Each
83.35
128.2
100Sft.
ditto
ditto
993.30
1064.25
1064.25
1325.95
2144.25
2757.70
sq.m
ditto
ditto
106.90
114.50
114.50
142.65
230.70
296.75
100Sft.
ditto
ditto
1277.10
1419.00
1419.00
1777.15
3035.75
3953.75
sq.m
ditto
ditto
137.40
152.70
152.70
191.2
326.65
425.45
100Cft.
666.60
996.60
cu.m
235.40
351.95
100Cft.
ditto
ditto
1166.55
1166.55
899.90
1628.55
1496.55
1955.90
cu.m
ditto
ditto
411.95
411.95
317.85
575.1
528.5
690.85
b)
stone or boulder
shingle or spawl
brick bats
stone or boulder
shingle or spawl
brick bats
100Cft.
ditto
ditto
2097.50
2097.50
1830.85
2559.50
2427.50
2886.85
cu.m
ditto
ditto
740.85
740.85
646.65
904
857.40
1019.65
100Cft.
1619.00
2675.00
cu.m
571.80
944.8
100Cft.
1952.30
16712.30
cu.m
689.55
5902.8
Page 97
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
i)
ii)
stone or boulder
shingle or spawl
Labour
100Cft.
ditto
2218.90
2218.90
100Cft.
Composite
Unit
Labour
Spec.
No.
Composite
2680.90
2548.90
cu.m
ditto
783.70
783.70
234.65
cu.m
82.90
100Cft.
1173.20
cu.m
414.40
100Sft.
666.60
1176.60
sq.m
71.75
126.6
30.1
100Sft.
1666.50
1717.50
sq.m
179.30
184.80
ditto
100Sft.
3972.25
5081.80
sq.m
427.40
546.80
100Sft.
1306.15
1409.35
sq.m
140.55
100Sft.
2236.10
2358.50
sq.m
240.60
253.75
100Cft.
1419.00
2148.00
cu.m
501.20
758.65
100Cft.
3692.70
4340.70
cu.m
1304.25
1533.15
100Cft.
ditto
3128.40
2795.10
3776.40
3443.10
cu.m
ditto
1104.95
987.25
1333.85
1216.1
Remarks
946.90
900.30
151.65
one slope
on level
on level
100Cft.
854.70
1154.70
cu.m
301.90
407.85
b)
on slope
ditto
1027.75
1327.75
ditto
363.00
468.95
Page 98
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Cft.
ditto
ditto
4080.65
3747.35
2196.80
6810.90
6477.60
5008.05
cu.m
ditto
ditto
1441.30
1323.55
775.90
2405.60
2287.90
1768.85
100Sft.
ditto
1442.70
1216.05
5611.65
3298.30
sq.m
ditto
155.25
130.85
603.8
354.90
100Sft.
483.80
1113.80
sq.m
52.05
119.85
100Cft.
833.25
1985.25
cu.m
294.30
701.2
100Cft.
2956.00
cu.m
1044.05
100Cft.
1066.55
cu.m
376.70
100Cft.
854.70
2006.70
cu.m
301.90
708.75
100Cft.
854.70
1622.70
cu.m
301.90
573.15
100Cft.
799.90
cu.m
282.55
Each
27.50
Each
27.50
b)
ditto
30.90
ditto
30.90
c)
Each
41.20
ditto
41.20
d)
ditto
103.05
ditto
103.05
Page 99
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
a)
b)
Composite
100 Nos
1333.20
100 Nos
567.60
iii) Driving pegs 3.5' (1.07 m) long, 3" to 6" (75 to 150
mm) dia (driven 1.0' (300 mm) below the available bed
or ground (average).
100 Nos
842.70
Per Chain
of One
Row
66.65
97.85
ditto
938.50
100 Nos
86.85
100 Nos
567.60
iii) Driving pegs 4' (1.20 m) long, 3" to 6" (75 to 150
mm) dia (driven 1.0' (300 mm) below the available bed
or ground (average).
100 Nos
991.20
Per
Chain of
one row
66.65
Labour
ditto
2418.90
100 Nos
108.60
100 Nos
597.70
1365.75
Unit
Labour
Spec.
No.
Composite
% Nos
1333.20
100 Nos
567.60
100 Nos
842.70
Per 30
Metre
of one
row
66.65
97.85
1113.35
ditto
938.50
1113.35
123.85
100 Nos
86.85
123.85
100 Nos
567.60
100 Nos
991.20
Per
30 M of
one row
66.65
154.95
Remarks
1365.75
ditto
2418.90
100 Nos
108.60
154.95
100 Nos
597.70
Page 100
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Unit
100 Nos
100 Nos
1135.20
Per
Chain of
one row
66.65
97.85
Per chain
of one row
1128.60
1373.20
100 Nos
2666.40
100 Nos
iii) Driving pegs 6' (1.8 m) long, 3" to 6" (75 to 150
mm) dia (driven 1.75' (530 mm) below the available
bed or ground (average).
iv) Tying pegs with Munj, Patha ban (one line,
incuding tying around the pegs).
Composite
iii) Driving pegs 5' (1.5 m) long, 3" to 6" (75 to 150
mm) dia (driven 1.5' (450 mm) below the available bed
or ground (average).
Labour
Per
30 M
of one
row
Labour
1135.20
Spec.
No.
Composite
-
66.65
97.85
Per 30 M
of one row
1128.60
1373.20
2722.00
100 Nos
2666.40
2722
711.20
100 Nos
711.20
100 Nos
1362.25
100 Nos
1362.25
Per
Chain of
one row
66.65
Per Chain
97.85 of one row
66.65
97.85
ditto
2752.20
3049.25
ditto
2752.20
3049.25
100 Nos
1999.80
2115.10
100 Nos
1999.80
2115.10
100 Nos
908.15
100 Nos
908.15
100 Nos
1502.40
100 Nos
1502.40
Remarks
Page 101
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Per chain
of one row
Composite
66.65
Unit
83.95 Per 30 M
of one row
Labour
Spec.
No.
Remarks
Composite
66.65
83.95
Per 30 M
of one row
3128.40
3477.85
Per
Chain of
one row
3128.40
3477.85
100 Nos
7200.00
100 Nos
7200.00
100 Nos
794.65
100 Nos
794.65
100 Nos
1646.05
100 Nos
1646.05
iv) Tying Bamboos 2" to 5" (63 to 125 mm) dia with
Munj, Patha Ban, two lines, including tying around
the Bamboos.
Per
Chain of
one row
100.00
148.95
Per 30 M
of one
Row
100.00
148.95
ditto
3837.90
4291.75
ditto
3837.90
4291.75
10800.00
100 Nos
100 Nos
100 Nos
908.15
100 Nos
908.15
100 Nos
1786.20
100 Nos
1786.20
iv) Tying Bamboos 2" to 5" (63 to 125 mm) dia with
S.W.G. No. 10 wire, two lines, including tying around
the Bamboos and third tie around the top end only.
Per chain
of one
row
333.30
Per 30 M
1142.00 of one Row
333.30
10800
1142.00
Page 102
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
d)
4692.60
Composite
Unit
5269.20
ditto
11400.00
100 Nos
Labour
4692.60
5269.20
100 Nos
1021.70
100 Nos
1021.70
100 Nos
2043.35
100 Nos
2043.35
iv) Tying Bamboos 2" to 5" (63 to 125 mm) dia with
S.W.G. No. 10 wire, two lines, including tying around
the Bamboos and third tie around the top end only.
Per chain
of one row
333.30
ditto
5547.30
100 Nos
100 Nos
1135.20
100 Nos
1135.20
100 Nos
2270.40
100 Nos
2270.40
Per Chain
of one
Row
333.30
1142.00
Per 30 M
of one
Row
333.30
1142.00
ditto
6390.10
7158.90
ditto
6390.10
7158.90
13200.00
100 Nos
100 Nos
100 Nos
1362.25
6211.30
ditto
12600.00
100 Nos
100 Nos
11400.00
333.30
1142.00
5547.30
6211.30
1362.25
Remarks
Composite
100 Nos
Per 30 M
1142.00 of one row
Spec.
No.
ditto
Labour
12600.00
13200.00
Page 103
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
100 Nos
2724.50
Spec.
No.
Remarks
Composite
100 Nos
2724.50
iv) Tying Bamboos 2" to 5" (63 to 125 mm) dia with
S.W.G. No. 10 wire, two lines, including tying around
the Bamboos and third tie around the top end only.
Per Chain
of one
row
333.30
1142.00
Per 30 M
of one
row
333.30
1142.00
ditto
8009.10
8987.45
ditto
8009.10
8987.45
100Cft.
333.30
403.05
cu.m
117.70
142.35
100Cft.
266.65
cu.m
94.20
Per
Chain
639.95
Per
30 M
639.95
46 a)
b)
100Sft.
100Sft.
3466.30
2933.05
Sq.m
Sq.m
373.00
315.60
Page 104
17. OUTLETS
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Job
1111.00
Job
1111.00
b)
Job
1466.50
Job
1466.50
c)
Job
2222.00
Job
2222.00
d)
Job
2999.70
Job
2999.70
e)
Job
4444.00
Job
4444.00
Dismantling outlets:-
17.1
to
17.5
18.1
a)
Each
1111.00
Each
1111.00
b)
ditto
1666.50
ditto
1666.50
c)
ditto
2222.00
ditto
2222.00
d)
ditto
2777.50
ditto
2777.50
e)
ditto
1666.50
ditto
1666.50
f)
ditto
2222.00
ditto
2222.00
g)
ditto
2777.50
ditto
2777.50
Each
468.25
Each
468.25
Job
984.70
Job
984.70
18.1, 21.1
& 21.2
Each
984.70
Each
984.70
18.1, 21.1
& 21.2
839.65
Remarks
17.1
to
17.2
chapter-17(Outlet)
Page 105
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
a)
b)
Labour
Each
ditto
2666.40
3599.65
Composite
Unit
Labour
Each
ditto
2666.40
3599.65
Each
533.95
1048.75
Each
533.95
Each
1042.80
1884.00
Each
1042.80
for channel
for channel
for channel
for channel
for channel
depth of
depth of
depth of
depth of
depth of
5.0'. (1.5 m)
4.0'. (1.2 m)
3.0'. (900 mm)
2.0'. (600 mm)
less than 2.0'. (600 mm)
1277.40
993.60
823.30
677.40
531.50
Each
ditto
ditto
ditto
ditto
1135.20
851.40
681.10
567.60
454.10
1277.40
993.60
823.30
677.40
531.50
Each
468.25
681.25
Each
468.25
681.25
Per Lft.
22.70
Metre
74.50
Each
542.15
to
1111.00
Each
389.20
12
Each
542.15
to
1111.00
13
Each
389.20
14
ditto
21.1, 21.2
& 17.1 to
17.5
At the discretion of the
Engineer-in-charge depending upon
the distance and source of supply.
17.1 to 17.5
& 21.1 to
21.2
Rft.
ditto
101.40
43.35
110.90
52.85
Metre
ditto
332.75
142.25
363.85
173.35
16
1135.20
851.40
681.10
567.60
454.10
11
15
Composite
Each
ditto
ditto
ditto
ditto
Remarks
10
a)
b)
Spec.
No.
Rft.
ditto
88.90
33.35
Rft.
ditto
121.15
60.55
Metre
ditto
291.60
109.35
Metre
ditto
397.40
198.70
17.1
to
17.5
130.60
70.05
chapter-17(Outlet)
428.5
229.8
Page 106
Specification No. correspond to Book of "Standard Specification for Road and Bridge Construction 1971".
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
The rates include the provision and maintenance of field test laboratory, pay of laboratory staff, cost of material for testing, etc.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Cft.
3125.55
17178.75
cu.m
1103.95
6067.55
521-1
to
521-6
100Cft.
2326.80
3800.40
cu.m
821.85
1342.30
501-1
to
501-6
a)
i)
ii)
ditto
100Cft.
100Cft.
2326.8
2326.8
2794.8
3478.8
100Cft. of
consolidated
sub-base
cu.m
cu.m
821.85
821.85
987.1
1228.7
1) The carriage of the whole distance
to the site of work shall be
calculated on the basis of the rates
of the actual means of transport
used in carriage, i.e. road and/or rail,
as the case may be.
Page 107
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
aggregate for payment of carriage shall
be taken as per actual loose volume but
not more than 120 Cft.
a)
b)
100Cft.
2703.00
5800.20
cu.m
954.70
2048.65
501-1
to
501-6
100Cft. of
consoledated
base
Providing and laying road edging of 3" (75 mm) wide and
9" (225 mm) deep brick on end, complete in all respects.
Per Rft.
7.50
35.85
Metre
24.70
117.65 552-1 to
552-5
100Sft.
133.30
685.70
sq.m
14.35
73.80 601-1 to
601-6
100Sft.
133.30
450.00
sq.m
14.35
48.40 611-1 to
611-5
612-1 to
612-6
Page 108
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
1) 1st coat:i) 40 lbs. bitumen, and 5.5 Cft. bajri of nominal size 1" (25
100Sft.
119.70
1772.15
Sq.m
12.90
190.70
100Sft.
119.70
1537.70
Sq.m
12.90
165.45
100Sft.
92.10
1101.15
Sq.m
9.90
118.50
100Sft.
92.10
819.35
Sq.m
9.90
88.15
100Sft.
63.00
626.45
sq.m
6.80
67.40
sq.metre.
ii) 18 lbs. bitumen, and 2.0 Cft. bajri of nominal size 3/8"
(10 mm) per %Sft. or 0.89 Kg bitumen and 0.006 cu.metre
b)
100Cft.
cu.m
Page 109
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
a)
11
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
612-1
to
612-6
100Sft.
79.80
970.45
sq.m
8.60
104.40
ii) 20 lbs. bitumen, and 2.0 Cft. bajri of nominal size 3/8"
(10 mm) per % Sft. or 0.79 Kg bitumen and 0.006
cu.metre bajri per sq.metre.
100Sft.
79.80
879.05
sq.m
8.60
94.60
100Cft.
cu.m
per inch
thickness
per 100Sft.
-do-do-do-do-do-do-do100Cft.
per 25mm
thickness
per Sq.m
-do-do-do-do-do-do-docu.m
b)
10
Labour
783.70
783.70
783.70
783.70
783.70
783.70
783.70
2380.35
2573.75
2767.20
2960.60
3153.90
3347.45
3540.85
100Sft.
222.20
Per Rft.
116.95
641-1 to
642-6
84.35
84.35
84.35
84.35
84.35
84.35
84.35
256.20
277.05
297.85
318.70
339.50
360.30
381.15
Sq.m
23.90
Metre
383.75
I ncidental Construction
12
898.05
2946.35
901-1
to
901-4
Page 110
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
13
14
Each Set
of one
end
15
Per
Cu. Inch
16
Per Rft.
17
Each
18
19
Labour
Per Rft. of
3 rows of
Pipes
91.55
Composite
Unit
Labour
300.35
Spec.
No.
Composite
695.20
Metre
2280.80
2400.00
Each set
of one
end
18.00
cu.cm
75.25
171.70
Metre
246.85
563.35 921-1 to
921-4
37.60
342.00
Each
37.60
342.00 931-1 to
933-4
1.10
ditto
Each
Each
Each
2245.00
109.65
212.25
4581.80
338.75
578.25
Each
Each
Each
2245.00
109.65
212.25
a) Mandatory.
b) Warning/Direction/Informatory.
Each
Each
722.30
699.60
4457.65
4194.45
Each
Each
722.30
699.60
4457.65
4194.45
100Cft.
2851.55
16904.75
cu.m
1007.15
5970.75
ditto
2400.00 911-1 to
911-6
Remarks
Page 111
Rates for all finished works include the removal of surplus debris, unused material & by products.
The material used shall conform to Schedule of Rates, Vol. I, Part I, (Specifications for Materials of
Construction, 1964, and the work will be executed according to Buildings & Roads Department Specifications,
Vol II, 1966 (Public Health Works).
The rates include cutting and making good of the surface of walls, roof, floor, etc. where necessary.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Unit
Labour
Remarks
Composite
white
coloured
Each
Each
376.20
376.20
2,111.85
2,297.85
Each
Each
376.20
376.20
2,111.85
2,297.85
Each
Each
3.90
3.90
333.90
231.90
Each
Each
3.90
3.90
333.90
231.90
Each
Each
271.45
271.45
1,185.75
1,389.75
Each
Each
271.45
271.45
1,185.75
1,389.75
Composite
Spec.
No.
Labour
bakelite
plastic
white
coloured
Each
271.45
2,023.45
Each
271.45
2,023.45
Each
271.45
609.75
Each
271.45
609.75
Each
Each
Each
Each
354.75
354.75
313.10
313.10
2,460.75
2,646.75
1,717.10
1,765.10
Each
Each
Each
Each
354.75
354.75
313.10
313.10
2,460.75
2,646.75
1,717.10
1,765.10
Providing and fixing stainless steel sink with drain board, size
120x60 cm (48"x24") including bracket set, waste pipe and
waste coupling.
Each
313.10
4,405.15
Each
313.10
4,405.15
Each
313.10
1,105.25
Each
313.10
1,105.25
Page 112
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
60x45 cm (24"x18")
37.5x45 cm (15"x18")
10
11
Unit
Labour
Remarks
Composite
white
coloured
Each
Each
313.10
313.10
1,682.45
1,502.45
Each
Each
313.10
313.10
1,682.45
1,502.45
Each
188.10
890.95
Each
188.10
890.95
Each
Each
313.10
313.10
1,312.70
1,390.70
Each
Each
313.10
313.10
1,312.70
1,390.70
Each
Each
313.10
313.10
1,150.70
1,150.70
Each
Each
313.10
313.10
1,150.70
1,150.70
Each
313.10
1,337.80
Each
313.10
1,337.80
Each
Each
331.90
331.90
2,454.60
1,614.60
Each
Each
331.90
331.90
2,454.60
1,614.60
Each
18.80
190.85
Each
18.80
190.85
Each
Each
18.80
18.80
478.85
226.85
Each
Each
18.80
18.80
478.85
226.85
Each
25.10
410.40
Each
25.10
410.40
Each
Each
25.10
25.10
355.15
295.15
Each
Each
25.10
25.10
355.15
295.15
white
coloured
13
Providing and fixing white enameled cast iron low down flushing
cistern 13.63 litres (3 gallons) capacity, including bracket
set, copper connection, etc.
14
15
16
white
coloured
17
18
19
Composite
Spec.
No.
12
Labour
Each
47.05
379.15
Each
47.05
379.15
Page 113
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
20
Composite
Each
Each
58.80
37.60
381.70
83.20
Each
Each
58.80
37.60
381.70
83.20
White
Coloured
Each
Each
58.80
58.80
936.10
1,068.10
Each
Each
58.80
58.80
936.10
1,068.10
Each
Each
Each
Each
18.80
25.10
25.10
25.10
158.50
223.20
247.20
428.80
Each
Each
Each
Each
18.80
25.10
25.10
25.10
158.50
223.20
247.20
428.80
Each
Each
25.10
25.10
541.10
697.10
Each
Each
25.10
25.10
541.10
697.10
Each
Each
25.10
25.10
277.10
181.10
Each
Each
25.10
25.10
277.10
181.10
Each
36.90
491.30
Each
36.90
491.30
Each
Each
25.10
25.10
349.10
331.10
Each
Each
25.10
25.10
349.10
331.10
Each
25.10
451.10
Each
25.10
451.10
Each
Each
25.10
25.10
331.10
409.10
Each
Each
25.10
25.10
331.10
409.10
24
Labour
23
Unit
Remarks
22
Composite
Spec.
No.
21
Labour
2 cm (")
1.5 cm (")
2 cm (")
1.5 cm (")
25
26
27
28
1.5x10 cm ("x4")
2x15 cm ("x6")
Page 114
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
29
30
31
30 mm (1") dia
40 mm(1") dia
50 mm(2") dia
65 mm(2") dia
80 mm(3") dia
Each
Labour
31.35
Composite
1,555.35
Each
Each
Each
Each
Each
37.60
37.60
37.60
37.60
37.60
439.60
589.60
817.60
1,285.60
1,897.60
Each
Each
Each
Each
Each
37.60
37.60
37.60
37.60
37.60
439.60
589.60
817.60
1,285.60
1,897.60
Each
Each
Each
25.10
37.60
50.15
373.10
637.60
776.15
Each
Each
Each
25.10
37.60
50.15
373.10
637.60
776.15
Each
Each
25.10
25.10
145.10
229.10
Each
Each
25.10
25.10
145.10
229.10
Each
Each
75.25
75.25
395.30
395.30
Each
Each
75.25
75.25
395.30
395.30
Each
Each
62.70
62.70
460.70
130.70
Each
Each
62.70
62.70
460.70
130.70
Each
94.05
700.75
Each
94.05
700.75
Per foot
Per foot
31.80
12.70
229.00
97.15
Metre
Metre
104.30
41.70
751.05
318.60
Per foot
Per foot
7.00
2.80
148.00
81.55
Metre
Metre
23.00
9.20
485.50
267.45
13 mm (") dia
20 mm (") dia
34
1,555.35
Unit
Remarks
33
31.35
Composite
Spec.
No.
32
Each
Labour
10x5 cm (4"x2")
10x7.5 cm (4"x3")
35
36
ii)
Page 115
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
37
Composite
60 (2)" mm i/d
80 (3") mm i/d
100 (4") mm i/d
150 (6") mm i/d
Per foot
Per foot
Per foot
Per foot
5.60
6.25
7.00
9.35
30.30
71.15
106.00
131.90
25.85
15.75
154.15
114.65
Composite
Metre
Metre
Metre
Metre
18.40
20.40
23.00
30.65
99.35
233.40
347.65
432.55
Kg
Kg
25.85
15.75
154.15
114.65
Each
Each
Each
37.60
37.60
61.25
193.60
865.60
1,465.25
Each
Each
Each
37.60
37.60
61.25
193.60
865.60
1,465.25
Per foot
15.90
63.90
Metre
52.15
209.60
i)
single way
ii) two way
iii) three way
Each
Each
Each
25.10
37.60
50.15
199.10
301.60
494.15
Each
Each
Each
25.10
37.60
50.15
199.10
301.60
494.15
42
Each
18.80
49.70
Each
18.80
49.70
43
3.90
142.50
93.90
105.90
Each
Each
3.90
142.50
93.90
105.90
Each
Each
6.25
6.25
84.25
126.25
Each
Each
6.25
6.25
84.25
126.25
Each
376.20
Each
376.20
40
41
a)
b)
15 mm (") dia
20 mm (") dia
45
Remarks
44
Labour
39
Unit
Spec.
No.
38
Labour
15 mm (") dia
20 mm (") dia
Replacement
1
Page 116
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
i)
ii)
2
37.60
37.60
121.60
127.60
Each
Each
37.60
37.60
121.60
127.60
3 cm (1")
4 cm (1")
Each
Each
1.50
1.50
48.30
55.50
Each
Each
1.50
1.50
48.30
55.50
3 cm (1")
4 cm (1")
Each
Each
18.80
18.80
45.20
51.20
Each
Each
18.80
18.80
45.20
51.20
3 cm (1")
4 cm (1")
Each
Each
16.70
16.70
43.10
49.10
Each
Each
16.70
16.70
43.10
49.10
3 cm (1") i/d
4 cm (1")
Each
Each
37.60
37.60
553.60
673.60
Each
Each
37.60
37.60
553.60
673.60
Each
Each
37.60
37.60
167.20
184.00
Each
Each
37.60
37.60
167.20
184.00
Each
Each
15.05
15.05
47.45
85.85
Each
Each
15.05
15.05
47.45
85.85
Each
Each
Each
Each
Each
Each
31.35
31.35
31.35
31.35
31.35
31.35
235.35
301.35
361.35
391.35
547.35
925.35
Each
Each
Each
Each
Each
Each
31.35
31.35
31.35
31.35
31.35
31.35
235.35
301.35
361.35
391.35
547.35
925.35
Each
Each
Composite
Labour
Unit
Remarks
Composite
Spec.
No.
3 cm (1")
4 cm (1")
Labour
Page 117
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
B)
Labour
Composite
17.1
100Rft
ditto
1,075.15
1,075.15
4,295.95
4,098.70
Metre
ditto
35.25
35.25
140.90
134.45
100Rft
ditto
1,612.50
1,612.50
6,253.35
5,955.05
ditto
ditto
52.90
52.90
205.10
195.35
ratio 1:3
ratio 1:5
ratio 1:6
17.1
100Sft.
ditto
ditto
1,584.80
1,584.80
1,584.80
6,071.35
5,755.55
5,666.70
Sqm.
ditto
ditto
170.50
170.50
170.50
653.30
619.30
609.75
Unit
ratio 1:3
ratio 1:5
ratio 1:6
17.1
100Sft.
ditto
ditto
2,246.65
2,246.65
2,246.65
9,010.75
8,504.35
8,378.25
Sqm.
ditto
ditto
241.75
241.75
241.75
969.55
915.05
901.50
Remarks
Composite
Spec.
No.
Labour
ratio 1:3
ratio 1:5
ratio 1:6
17.2
100Sft.
ditto
ditto
1,528.55
1528.55
1528.55
6,015.10
5699.3
5610.5
chapter-20(Surface Drainage)
Sqm.
ditto
ditto
164.45
164.45
164.45
647.25
613.25
603.7
Page 118
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Unit
Labour
ratio 1:3
ratio 1:5
ratio 1:6
Type I
Type II
Type III
Type IV
Type V
Type VI
Type VII
Type VIII
Type IX
Type X
Type XI
Type XII
Laying R.C.C hume pipes in position, including jointing:a) 6" to 12" (150 mm to 300 mm ) dia
b) 12" to 24" (300 mm to 600 mm) dia
c) 24" to 36" (600 mm to 900 mm) dia
Remarks
Composite
17.2
100Sft.
ditto
ditto
2,372.30
2,372.30
2,372.30
9,136.45
8,630.00
8,503.95
Sqm.
ditto
ditto
255.25
255.25
255.25
983.10
928.60
915.00
Composite
Spec.
No.
Labour
17.1
Per Rft
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
36.50
72.95
96.35
114.90
152.00
174.90
193.85
216.50
290.75
319.30
356.70
380.25
96.65
178.70
233.30
278.20
379.35
434.85
479.15
538.15
761.75
834.90
928.45
985.20
Metre
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
119.65
239.30
316.05
376.80
498.55
573.60
635.80
710.10
953.65
1,047.35
1,169.95
1,247.25
317.00
586.15
765.20
912.50
1,244.30
1,426.35
1,571.55
1,765.05
2,498.50
2,738.50
3,045.40
3,231.50
Per Lft.
ditto
ditto
68.40
108.35
136.75
71.90
115.45
147.40
Metre
ditto
ditto
224.25
355.45
448.55
235.90
378.70
483.55
chapter-20(Surface Drainage)
Page 119
21. SEWERAGE
1
2
Specification No. correspond to Book of Specification of B&R Department Vol. II, 1966 (Public Health Works).
Rate for all finished works include the removal of surplus debris, unused material and byproducts.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Composite
Unit
Labour
Spec.
No.
Chapter - 8
Rft.
Rft.
Rft.
18.20
21.95
42.50
86.35
130.30
334.15
Metre
Metre
Metre
59.70
72.00
139.40
283.25
427.40
1096.00
ditto
Rft.
Rft.
Rft.
Rft.
Rft.
13.65
16.45
26.40
28.35
28.80
53.85
72.45
98.15
117.30
128.70
Metre
Metre
Metre
Metre
Metre
44.75
53.95
86.60
93.00
94.45
176.65
237.65
321.95
384.75
422.15
Remarks
Composite
Labour
ditto
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
43.35
54.40
65.50
81.90
94.35
139.90
167.80
209.00
257.15
334.6
630.55
871.4
1108.8
1738.9
2158.55
402.05
493.55
539.10
689.00
822.90
1138.35
1221.85
1427.60
1909.65
2475.8
3309.3
4150.4
4752.1
5746.55
6530.50
chapter-21(Sewerage)
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
142.20
178.45
214.85
268.65
309.45
458.85
550.40
685.50
843.45
1097.5
2068.2
2858.2
3636.85
5703.6
7080.05
1318.70
1618.85
1768.25
2259.90
2699.10
3733.80
4007.65
4682.55
6263.65
8120.6
10854.5
13613.3
15586.9
18848.7
21420.05
Page 120
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Composite
Unit
Labour
Remarks
Chapter-8
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
43.35
54.40
65.50
81.90
94.35
139.90
167.80
209.00
257.15
334.60
640.30
885.05
1125.80
1766.20
2192.65
498.65
613.20
763.35
930.70
1082.20
1290.55
1558.45
1744.40
2276.20
2934.50
3636.95
4587.35
5652.40
7378.25
9139.50
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
142.10
178.45
214.80
268.70
309.45
458.90
550.35
685.50
843.50
1097.45
2100.20
2902.90
3692.70
5793.10
7191.85
1635.55
2011.30
2503.80
3052.70
3549.60
4233.00
5111.70
5721.65
7465.95
9625.15
11929.20
15046.50
18539.85
24200.65
29977.55
Spec.
No.
Composite
Labour
Chapter - 8
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
43.35
54.40
65.50
81.90
94.35
139.90
167.80
209.00
257.15
334.60
640.30
885.05
1125.80
1766.20
2192.65
589.30
737.20
885.05
1037.05
1224.65
1581.45
1825.55
2043.05
2816.40
3456.90
4337.45
5638.15
7094.95
9337.25
11098.55
chapter-21(Sewerage)
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
142.10
178.45
214.80
268.70
309.45
458.90
550.35
685.50
843.50
1097.45
2099.95
2903.10
3692.70
5793.10
7191.85
1932.90
2417.95
2903.00
3401.60
4016.90
5187.20
5987.90
6701.20
9237.80
11338.65
14226.95
18492.95
23271.45
30626.20
36403.15
Page 121
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Composite
Unit
Labour
Spec.
No.
Rft of
laid sewer
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
Metre of
270.75 laid sewer
506
ditto
873.15
ditto
1267.65
ditto
1779.2
ditto
2200.1
ditto
2630.70
ditto
3020.40
ditto
3255.70
ditto
3757.70
ditto
4184.65
ditto
4643.50
ditto
Remarks
Composite
Labour
888
1659.7
2864
4157.9
5835.7
7216.25
8628.65
9906.95
10678.65
12325.25
13725.70
15230.70
16.2
a)
Each
761.25
3186.65
Each
761.25
3186.65
b)
ditto
761.25
2961.65
ditto
761.25
2961.65
Each
2288.75
8790.15
Each
2288.75
8790.15
ditto
100Sft.
941.50
1479.35
Sq.m
101.30
159.20
14.4
10
100Sft.
1377.75
3310.15
Sq.m
148.25
356.15
13.1
11
100Sft.
835.55
2197.25
Sq.m
89.90
236.45
13.1
12
13.1
a)
Carpetted road, with 2" (50 mm) carpet and 10" (250
mm) depth of stone metal for sub-base and base.
100Sft.
2207.25
6689.75
Sq.m
237.50
719.80
b)
Carpeted road, with 1" (38 mm) carpet and 6" (150
mm) depth of stone metal, for sub-base and base.
100Sft.
1564.10
4907.65
Sq.m
168.30
528.05
c)
100Sft.
858.20
3354.20
Sq.m
92.35
360.90
chapter-21(Sewerage)
Page 122
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
13
Labour
Composite
Unit
Labour
Spec.
No.
Composite
14.7
Each
80.85
222.35
Each
80.85
222.35
14
Per
set
214.30
Per
set
214.30
ditto
15
Per
set
140.45
2973.80
Per
set
140.45
2973.80
ditto
Per
set
301.80
4208.60
Per
set
301.80
4208.60
Per
set
270.35
2382.35
Per
set
270.35
2382.35
ditto
17
Per
set
224.85
3660.85
Per
set
224.85
3660.85
ditto
18
100Cft.
761.85
816.10
cum
269.10
288.25
16.2
19
14.6
b)
Remarks
Per Cwt
ditto
ditto
ditto
213.70
237.40
256.40
268.30
2674.30
2704.90
2722.20
2734.40
%kg
ditto
ditto
ditto
420.60
467.35
504.75
528.15
5264.35
5324.60
5358.65
5382.70
Per Cwt
ditto
ditto
ditto
190.10
204.85
219.30
264.00
2646.95
2661.10
2675.35
2719.90
%kg
ditto
ditto
ditto
374.15
403.20
431.75
519.70
5210.55
5238.35
5266.50
5354.10
chapter-21(Sewerage)
Page 123
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
c)
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
20
Labour
Per Cwt
ditto
ditto
169.05
217.35
253.55
Per well
Per well
5923.50
11761.20
2626.65
2671.95
2707.45
%kg
ditto
ditto
332.75
427.80
499.10
5170.55
5259.80
5329.65
chapter-21(Sewerage)
Per well
Per well
5923.50
11761.20
Page 124
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
Well curbs to be laid at spring level or as deep as possible.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
b)
c)
1000 Cft.
cu.m
ditto
ditto
ditto
ditto
3962.25
4138.25
4655.55
5343.45
ditto
ditto
ditto
ditto
139.95
146.15
164.45
188.75
1000 Cft.
ditto
ditto
ditto
4826.20
5044.85
5514.10
6202.05
cu.m
ditto
ditto
ditto
170.45
178.20
194.75
219.05
1000 Cft.
ditto
ditto
ditto
10409.65
10782.90
11241.55
12068.15
cu.m
ditto
ditto
ditto
367.65
380.85
397.05
426.25
1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
21331.20
26664.00
31996.80
37329.60
42662.40
47995.20
53328.00
58660.80
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
753.40
941.75
1130.15
1318.50
1506.85
1695.20
1883.55
2071.90
1000 Cft.
ditto
ditto
ditto
ditto
29330.40
34663.20
39996.00
45328.80
50661.60
cu.m
ditto
ditto
ditto
ditto
1035.95
1224.30
1412.65
1601.00
1789.35
in hard soil
i) from 0' to 5'(0 to 1.5 metre) depth
ii) from 5.1' to 10'(1.5 to 3.0 metre) depth
iii) from 10.1' to 15'(3.0 to 4.5 metre) depth
iv) from 15.1' to 20'(4.5 to 6.0 metre) depth
in hard strata, such as shingle, gravel, etc.
i) from 0' to 5'(0 to 1.5 metre) depth
ii) from 5.1' to 10'(1.5 to 3.0 metre) depth
iii) from 10.1' to 15'(3.0 to 4.5 metre) depth
iv) from 15.1' to 20'(4.5 to 6.0 metre ) depth
Labour
b)
chapter-22(Sinking of Wells)
Page 125
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Remarks
Composite
ditto
ditto
ditto
55994.40
61327.20
66660.00
ditto
ditto
ditto
1977.70
2166.10
2354.45
1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
39996.00
45328.80
50661.60
51328.20
61327.20
66660.00
71992.80
77325.60
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
1412.65
1601.00
1789.35
1812.90
2166.10
2354.45
2542.80
2731.15
1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
32378.80
68805.00
84683.10
110088.00
122320.00
137610.00
141138.45
144852.65
157268.55
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
1143.60
2430.20
2991.00
3888.30
4320.35
4860.40
4985.00
5116.20
5554.75
1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
44330.25
55412.80
66495.35
88660.45
102300.55
110825.55
120900.65
125462.90
132990.70
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
* 841-1
to
841-9
* 841-1
to
841-9
* 841-1
to
Unit
Composite
Spec.
No.
Labour
1565.75
1957.20
2348.60
3131.50
3613.25
3914.35
4270.20
4431.35
4697.25
Page 126
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Ratio 1:1:3
ratio 1:2:4
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
841-9
1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
60450.30
73883.70
88660.45
120900.65
132990.70
147767.45
154640.35
158322.25
174987.75
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
2135.10
2609.55
3131.50
4270.20
4697.25
5219.15
5461.90
5591.95
6180.55
83156.40
Per Cft.
907.50
2354.35
cu.m
32052.90
Each
300.95
Each
300.95
* 841-1
to
841-9
Per Cft.
ditto
197.75
197.75
421.75
392.45
cu.m
ditto
6984.05
6984.05
14896.55
13860.70
100Kg
709.50
9822.60
100Kg
709.50
9822.60
10
100Cft.
6440.05
20904.05
cu.m
2274.65
7383.30
841-1 to
841-9
21.1 to
The rate includes dismantling of false
21.5 & 18.1 masonry, scraping bricks obtained
from dismantling and credit of
byproducts.
Specification No. correspond to Book of "Standard Specification for Road and Bridge Construction, 1971".
chapter-22(Sinking of Wells)
Page 127
Specification No. correspond to Book of "Specification for B&R Department, 1966, Vol. II (Public Health Works)".
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Unit
Labour
Remarks
Composite
Chap. 2
Per Rft.
of bore
ditto
ditto
ditto
ditto
ditto
ditto
ditto
189.10
258.05
467.60
710.85
926.20
1171.25
1270.55
1911.80
2028.30
Composite
Spec.
No.
Labour
ditto
Per Rft.
of bore
ditto
ditto
ditto
ditto
ditto
786.95
1107.70
1255.40
1435.20
1559.65
2243.55
2360.00
ditto
Per Rft.
of bore
ditto
ditto
ditto
ditto
ditto
1099.55
1418.30
1582.55
1784.25
1887.55
2464.90
2585.40
Chap. 2
Rft of bore
chapter-23(Tubewell)
1911.75
Page 128
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
b)
c)
d)
e)
5
10"
12"
15"
18"
ditto
ditto
ditto
ditto
Composite
651.00
684.35
919.30
923.05
Unit
Labour
of bore
ditto
ditto
ditto
Spec.
No.
2135.30
2244.70
3015.35
3027.50
ditto
Per Rft.
of bore
ditto
445.80
641.10
Per Metre
of bore
ditto
1462.20
2102.85
Rft
of bore
ditto
445.80
641.10
Per Metre
of bore
ditto
1462.20
2102.85
ditto
Per Rft.
of bore
ditto
1005.40
1359.75
Per Metre
of bore
ditto
3297.65
4459.95
ditto
ditto
1005.40
1359.75
ditto
ditto
3297.65
4459.95
Job for
complete bore
696.10
13689.70
Job for
complete bore
696.10
13689.70
Per Set
of 2
bottles
118.80
170.70
Per Set
of 2
bottles
118.80
170.70
Remarks
Composite
Labour
ditto
Chap. 2
ditto
Per Rft.
Per Rft.
27.95
27.95
chapter-23(Tubewell)
91.70
91.70
2536.95
3718.25
Page 129
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
n)
o)
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Labour
37.30
42.25
46.60
54.70
66.80
66.80
75.45
75.45
76.70
88.25
88.25
104.40
105.65
Composite
1420.15
1673.95
1793.80
2149.45
2767.40
2823.05
2908.35
3680.10
4188.50
5159.75
5863.25
6476.85
7436.75
Unit
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Labour
122.25
138.60
152.85
179.35
219.10
219.10
247.50
247.50
251.55
289.45
289.45
342.45
346.50
Spec.
No.
Composite
4658.00
5490.55
5883.65
7050.10
9077.10
9259.60
9539.45
12070.75
13738.25
16923.95
19231.45
21244.10
24392.55
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
128.25
128.25
214.10
214.10
289.05
289.05
356.25
356.25
356.25
427.55
427.55
514.25
559.30
559.30
593.40
783.35
1502.10
1886.30
2382.25
2759.95
3061.80
3394.40
4331.95
5208.55
6405.70
7304.20
8102.25
8910.70
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
128.25
128.25
214.10
214.10
289.05
289.05
356.25
356.25
356.25
427.55
427.55
514.25
559.30
559.30
593.40
783.35
1502.10
1886.30
2382.25
2759.95
3061.80
3394.40
4331.95
5208.55
6405.70
7304.20
8102.25
8910.70
Remarks
Chap. 2
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
20.65
23.55
24.95
29.25
39.90
40.85
40.85
Per Rft.
14.45
121.45
178.35
240.95
317.25
759.90
1132.85
1516.85
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
67.70
77.20
81.85
96.00
130.80
133.95
133.95
398.30
584.95
790.35
1040.60
2492.40
3715.70
4975.20
47.35
177.2
chapter-23(Tubewell)
Page 130
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
b)
c)
d)
e)
f)
g)
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
14.75
14.90
20.65
23.45
24.95
45.30
60.35
91.70
186.25
292.25
426.95
615.30
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
48.45
48.90
67.75
77.00
81.85
148.65
198
300.8
610.9
958.65
1400.4
2018.25
Each
Each
Each
Each
Each
Each
Each
Each
10.50
11.80
12.85
16.75
19.90
21.00
24.45
24.45
63.30
83.80
124.45
181.15
353.50
489.00
660.45
684.45
Each
Each
Each
Each
Each
Each
Each
Each
10.50
11.80
12.85
16.75
19.90
21.00
24.45
24.45
63.30
83.80
124.45
181.15
353.50
489.00
660.45
684.45
Each
Each
Each
Each
Each
Each
Each
7.15
7.55
7.85
10.50
11.80
12.85
16.75
34.75
48.35
67.85
90.90
118.60
166.45
217.15
Each
Each
Each
Each
Each
Each
Each
7.15
7.55
7.85
10.50
11.80
12.85
16.75
34.75
48.35
67.85
90.90
118.60
166.45
217.15
a)
b)
c)
d)
e)
f)
g)
h)
ii)
a)
b)
c)
d)
e)
f)
g)
Chap.
2
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
77.30
77.30
96.70
96.70
138.00
138.00
161.05
161.05
161.05
193.30
193.30
236.65
255.05
255.05
258.20
337.10
442.05
784.90
951.60
1087.20
1338.45
1512.25
1933.45
2278.30
2799.55
3477.00
3855.45
4215.45
chapter-23(Tubewell)
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
253.55
253.55
317.20
317.20
452.65
452.65
528.25
528.25
528.25
634.00
634.00
776.20
836.55
836.55
846.95
1105.70
1449.90
2574.50
3121.25
3566.00
4390.15
4960.20
6341.70
7472.80
9182.50
11404.55
12645.80
13826.75
Page 131
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Remarks
ditto
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
27.15
30.70
32.15
38.60
51.30
53.55
63.95
60.85
127.05
181.45
241.85
332.00
503.10
755.55
1043.15
1232.65
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
89.00
100.75
105.45
125.15
168.30
175.65
209.70
199.55
416.65
595.20
793.25
1087.50
1650.20
2478.20
3421.45
4043.05
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
17.05
17.40
18.45
23.35
30.70
32.15
39.40
52.15
63.30
88.65
178.15
288.10
418.25
595.60
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
56.00
57.05
60.55
76.65
100.75
105.45
129.20
171.10
207.60
290.80
584.40
945.05
1371.85
1953.50
ii)
786.15
31.50
953.10
Per
Hour
ditto
108.35
cu.m
786.15
953.10
1112.55
3826.90
a)
b)
c)
d)
e)
f)
g)
h)
Chap.
2
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
53.05
65.75
82.60
97.40
117.10
177.15
208.00
268.20
chapter-23(Tubewell)
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
1) Pipes to be supplied by
Government.
2) Providing and installing specials
and valves is not included in the
rate, which is payable separately.
173.95
215.60
270.85
319.45
384.05
581.10
682.15
879.65
Page 132
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
i)
Labour
Per Rft.
Composite
Unit
Labour
Spec.
No.
Composite
1158.40
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
23.95
26.50
37.80
41.60
48.85
67.80
79.55
109.60
139.50
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
11.55
13.15
16.95
19.00
25.90
32.75
38.90
55.80
66.80
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
a)
b)
c)
d)
e)
f)
g)
h)
i)
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
1) Pipes to be supplied by
Government.
2) Providing and installing specials
and valves is not included in the
rate, which is payable separately.
Chap. 2
1) Pipes to be supplied by
Government.
2) Providing and installing specials
and valves is not included in the
rate, which is payable separately.
37.90
43.20
55.60
62.35
84.95
107.35
127.65
182.95
219.10
Chap.
2
Light Quality
" i/d (15 mm) 2mm thick
" i/d (20 mm) 2.35mm thick
1" i/d (25 mm) 2.65mm thick
1" i/d (32 mm) 2.65mm thick
1" i/d (40 mm) 2.9mm thick
2" i/d (50 mm) 2.9mm thick
2" i/d (65 mm) 3.25mm thick
3" i/d (75 mm) 3.25mm thick
4" i/d (100 mm) 3.65mm thick
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
9.60
10.45
11.80
11.90
12.00
13.45
14.05
16.20
17.40
57.30
78.15
107.65
137.70
173.45
215.95
292.25
342.30
477.60
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
31.55
34.30
38.70
39.00
39.35
44.15
46.10
53.10
57.15
187.90
256.35
353.15
451.70
568.90
708.25
958.55
1122.70
1566.55
ditto
78.50
86.90
123.90
136.45
160.20
222.45
260.85
359.30
457.55
Remarks
Per Rft.
Per Rft.
9.60
10.45
chapter-23(Tubewell)
31.55
34.30
222.00
279.60
Page 133
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
c)
d)
e)
f)
g)
h)
i)
j)
k)
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
11.8
11.90
12.20
13.45
14.05
16.20
17.40
20.20
20.50
123.6
156.80
180.15
247.15
314.10
402.60
572.35
768.50
904.40
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
38.7
39.00
40.00
44.15
46.10
53.10
57.15
66.20
67.20
405.35
514.35
590.85
810.70
1030.30
1320.55
1877.30
2520.65
2966.50
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
9.60
10.45
11.80
11.90
12.20
13.45
14.05
16.20
17.40
20.20
20.50
93.55
121.10
178.00
228.45
259.05
354.65
443.80
570.15
775.25
958.60
1131.65
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
31.55
34.30
38.70
39.00
40.00
44.15
46.10
53.10
57.15
66.20
67.20
306.9
397.15
583.8
749.25
849.65
1163.3
1455.7
1870.05
2542.8
3144.25
3711.75
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
PS 428 &
ISO 160
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
12.95
13.70
18.80
25.90
33.70
42.90
49.55
55.90
65.90
77.45
92.30
98.25
107.65
121.00
219.90
286.80
453.50
759.35
1034.10
1366.55
1969.45
2501.05
3116.00
3832.60
5288.25
8404.50
9619.65
14822.90
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
42.55
45.00
61.60
84.90
110.50
140.75
162.50
183.35
216.20
254.05
302.80
322.30
353.15
396.90
721.30
940.65
1487.40
2490.70
3391.80
4482.30
6459.80
8203.50
10220.40
12570.95
17345.45
27566.75
31552.50
48619.05
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
12.95
13.70
18.80
25.90
33.70
42.90
49.55
219.90
314.95
542.85
857.30
1195.65
1664.00
2869.10
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
42.55
45.00
61.60
84.90
110.50
140.75
162.50
721.30
1033.00
1780.50
2811.85
3921.75
5457.90
9410.60
chapter-23(Tubewell)
PS 428 &
ISO 160
Page 134
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Rft.
Per Rft.
Per Rft.
Per Rft.
55.90
65.90
77.45
93.55
3665.10
4496.65
5350.35
7531.85
Per Metre
Per Metre
Per Metre
Per Metre
183.35
216.20
254.05
306.80
12021.50
14749.05
17549.20
24704.40
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
12.95
13.70
18.80
25.90
33.70
42.90
49.55
55.90
65.90
77.45
219.90
357.80
650.55
1148.60
1695.05
2471.85
4135.90
5341.95
6430.55
7847.35
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
42.55
45.00
61.60
84.90
110.50
140.75
162.50
183.35
216.20
254.05
721.30
1173.50
2133.80
3767.35
5559.75
8107.60
13565.85
17521.65
21092.30
25739.25
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
3.85
4.90
6.00
6.35
9.00
11.85
14.70
18.90
3.15
3.80
4.85
5.95
6.25
105.75
158.70
219.90
305.60
469.80
727.90
1013.45
1214.15
74.75
161.70
267.40
399.75
573.55
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
12.65
16.10
19.70
20.75
29.45
38.90
48.15
62.05
10.30
12.50
15.95
19.45
20.45
b)
Per Kg.
Per Kg.
Per Kg.
21.35
11.65
8.80
119.90
110.20
107.35
Per Kg
Per Kg
Per Kg
21.35
11.65
8.80
PS 428 &
ISO 160
Chap
2
ditto
9.1
346.90
520.45
721.30
1002.35
1541.00
2387.50
3324.15
3982.45
245.15
530.40
877.10
1311.20
1881.30
Remarks
119.90
110.20
107.35
chapter-23(Tubewell)
Page 135
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
flanged joints:i)
3" to 6" (75 to 150 mm) i/d
ii) 8" to 12" (200 to 300 mm) i/d
iii) 15" to 18" (375 to 450 mm) i/d
c)
Per Kg
Per Kg
Per Kg
8.85
2.35
3.90
107.40
100.90
100.90
Per Kg
Per Kg
Per Kg
8.85
2.35
3.90
107.40
100.90
100.90
Per Kg
Per Kg
Per Kg
11.80
11.80
11.80
110.35
110.35
110.35
Per Kg
Per Kg
Per Kg
11.80
11.80
11.80
110.35
110.35
110.35
9.1
Per Kg
Per Kg
Per Kg
12.15
6.30
5.05
110.70
104.85
103.55
Per Kg
Per Kg
Per Kg
12.15
6.30
5.05
110.70
104.85
103.55
9.1
Each
Each
Each
Each
Each
Each
Each
Each
Each
767.45
835.15
1503.30
1602.60
1871.20
3191.85
3586.80
4757.30
5475.35
6671.45
7855.15
9663.30
13002.60
22751.20
29351.85
37966.80
58757.30
119475.35
Each
Each
Each
Each
Each
Each
Each
Each
Each
767.45
835.15
1503.30
1602.60
1871.20
3191.85
3586.80
4757.30
5475.35
6671.45
7855.15
9663.30
13002.60
22751.20
29351.85
37966.80
58757.30
119475.35
9.1
Each
Each
Each
Each
Each
Each
Each
Each
425.55
517.30
645.55
1046.65
1338.80
1589.30
1876.10
2217.70
5465.55
6277.30
10605.55
19046.65
24018.80
29789.30
57076.10
101817.70
Each
Each
Each
Each
Each
Each
Each
Each
425.55
517.30
645.55
1046.65
1338.80
1589.30
1876.10
2217.70
5465.55
6277.30
10605.55
19046.65
24018.80
29789.30
57076.10
101817.70
Each
58.00
4738.00
Each
58.00
4738.00
9.1
chapter-23(Tubewell)
Page 136
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
ditto
a)
single
Each
123.25
3363.25
Each
123.25
3363.25
b)
double
Each
123.25
7623.25
Each
123.25
7623.25
ditto
a)
Per Kg
33.00
110.05
Per Kg
33.00
110.05
b)
Per Kg
20.75
97.75
Per Kg
20.75
97.75
c)
Per Kg
17.65
94.65
Per Kg
17.65
94.65
55.00
68.65
63.25
Per cm i/d
of pipe
ditto
ditto
Per Inch
i/d of pipe
ditto
ditto
22.00
27.45
25.30
ii)
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
17.25
17.25
18.40
18.50
21.45
24.40
24.40
264.05
358.95
448.25
573.10
779.45
962.75
1135.00
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
56.55
56.55
60.35
60.65
70.40
80.00
80.15
866.05
1177.40
1470.25
1879.75
2556.65
3157.80
3722.75
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
19.65
18.45
20.75
20.80
24.00
27.15
27.30
205.65
277.00
351.90
448.70
637.85
854.20
1004.05
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
64.45
60.55
68.10
68.25
78.70
89.00
89.50
674.45
908.60
1154.20
1471.75
2092.20
2801.75
3293.25
chapter-23(Tubewell)
Page 137
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
ii)
Each
Each
Each
Each
91.25
104.05
130.10
134.20
217.25
374.05
658.10
903.40
Each
Each
Each
Each
91.25
104.05
130.10
134.20
217.25
374.05
658.10
903.40
Each
Each
Each
Each
Each
Each
Each
60.95
65.30
70.25
91.25
104.05
130.10
134.20
94.55
101.30
142.25
278.45
539.65
1126.10
1550.20
Each
Each
Each
Each
Each
Each
Each
60.95
65.30
70.25
91.25
104.05
130.10
134.20
94.55
101.30
142.25
278.45
539.65
1126.10
1550.20
Each
Each
Each
Each
136.85
158.00
192.30
201.30
616.85
1094.00
2064.30
2157.30
Each
Each
Each
Each
136.85
158.00
192.30
201.30
616.85
1094.00
2064.30
2157.30
Each
Each
Each
Each
Each
Each
Each
93.00
98.25
104.90
136.85
158.00
192.30
201.30
225.00
257.85
314.90
598.85
1094.00
2052.30
2121.30
Each
Each
Each
Each
Each
Each
Each
93.00
98.25
104.90
136.85
158.00
192.30
201.30
225.00
257.85
314.90
598.85
1094.00
2052.30
2121.30
Each
Each
Each
Each
Each
Each
Each
Each
63.95
76.75
95.95
100.05
144.40
169.10
195.90
219.45
147.95
226.75
305.95
388.05
792.40
1909.10
4275.90
3459.45
Each
Each
Each
Each
Each
Each
Each
Each
63.95
76.75
95.95
100.05
144.40
169.10
195.90
219.45
147.95
226.75
305.95
388.05
792.40
1909.10
4275.90
3459.45
Each
38.20
61.00
Each
38.20
61.00
ii)
ii)
chapter-23(Tubewell)
Page 138
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Each
Each
Each
Each
Each
Each
42.55
47.50
63.95
76.75
95.95
100.05
73.75
97.90
218.75
362.35
623.95
1024.05
Each
Each
Each
Each
Each
Each
42.55
47.50
63.95
76.75
95.95
100.05
73.75
97.90
218.75
362.35
623.95
1024.05
Each
Each
Each
Each
Each
Each
Each
Each
91.25
104.05
130.10
134.20
189.95
214.65
250.50
274.05
133.25
158.05
198.50
215.80
325.55
388.65
464.10
541.65
Each
Each
Each
Each
Each
Each
Each
Each
91.25
104.05
130.10
134.20
189.95
214.65
250.50
274.05
133.25
158.05
198.50
215.80
325.55
388.65
464.10
541.65
Each
Each
Each
60.95
65.30
70.25
81.35
92.90
105.05
Each
Each
Each
60.95
65.30
70.25
81.35
92.90
105.05
ii)
Connection
ditto
ction
ditto
ditto
ditto
ditto
Per
1521.30
1921.25
2709.30
3709.20
4547.25
5897.10
7085.10
chapter-23(Tubewell)
Connection
ditto
ction
ditto
ditto
ditto
ditto
1521.30
1921.25
2709.30
3709.20
4547.25
5897.10
7085.10
Page 139
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
15 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
80 mm i/d
38.4
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
18.35
18.35
18.35
22.95
22.95
27.30
34.75
65.15
79.35
102.05
131.55
158.60
196.25
305.15
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
60.20
60.20
60.20
75.25
75.25
89.55
114.00
213.65
260.20
334.75
431.50
520.20
643.65
1,000.95
Remarks
15 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
80 mm i/d
38.3
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
27.55
27.55
28.65
28.65
31.30
43.00
68.80
71.55
87.15
111.50
136.55
165.50
211.15
339.30
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
90.30
90.30
94.05
94.05
102.60
141.10
225.70
234.70
285.85
365.80
447.95
542.90
692.55
1,112.95
16 mm i/d
20 mm i/d
25 mm i/d
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
12.75
12.75
12.75
12.75
14.35
17.65
33.90
39.40
44.80
49.40
62.35
76.15
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
41.80
41.80
41.80
41.80
47.05
57.90
111.15
129.25
147.00
162.05
204.45
249.75
38.3 &
38.7
Per Rft.
Per Rft.
Per Rft.
24.60
24.60
27.55
46.80
51.80
59.30
Per Metre
Per Metre
Per Metre
chapter-24(Electric Installation)
80.60
80.60
90.30
153.50
169.85
194.50
Page 140
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
iv)
v)
vi)
3
Per Metre
Per Metre
Per Metre
94.05
98.15
102.60
Composite
214.30
252.20
296.50
12 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
38.3 &
38.5
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
22.20
22.95
25.50
27.55
28.65
29.90
32.85
36.10
42.85
51.10
60.85
73.95
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
72.80
75.25
83.60
90.30
94.05
98.15
107.70
118.45
140.50
167.60
199.55
242.50
12 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
5.75
5.75
5.75
6.55
6.55
7.90
17.05
19.50
24.90
33.10
43.15
60.05
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
18.80
18.80
18.80
21.50
21.50
25.95
56.00
64.00
81.70
108.60
141.55
197.05
12 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
80 mm i/d
38.4
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
15.00
16.00
16.55
20.00
21.85
24.00
32.05
60.15
76.95
102.00
124.70
140.80
182.55
349.75
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
49.25
52.50
54.35
65.65
71.60
78.80
105.05
197.25
252.45
334.60
408.95
461.85
598.80
1,147.10
Supply and erection PVC pipe for recessed wiring (main and
sub-main) purpose, including bends, specials, etc. in floor,
wall or trenches:i)
ii)
iii)
65.35
76.90
90.40
Labour
28.65
29.90
31.30
Unit
Remarks
Per Rft.
Per Rft.
Per Rft.
Composite
Spec.
No.
32 mm i/d
40 mm i/d
50 mm i/d
Labour
50 mm i/d
80 mm i/d
100 mm i/d
38.2 &
38.3
Per Rft.
Per Rft.
Per Rft.
29.90
34.40
34.40
75.65
96.85
122.55
Per Metre
Per Metre
Per Metre
98.15
112.85
112.85
248.05
317.70
401.90
Supply and erection of PVC pipe for surface wiring (main and
sub-main) including clamps, inspection boxes, pull boxes
bends etc., complete with all specials:-
chapter-24(Electric Installation)
Page 141
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
i)
ii)
iii)
50 mm i/d
80 mm i/d
100 mm i/d
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Rft.
Per Rft.
Per Rft.
7.90
11.45
13.10
54.80
90.65
114.50
Per Metre
Per Metre
Per Metre
25.95
37.60
43.00
179.80
297.30
375.50
Per Rft.
2.30
4.60
Per Metre
7.50
15.10
38.8
Per Rft.
2.30
13.85
Per Metre
7.50
45.45
38.8
38.1
b)
Remarks
3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")
19/1.32 mm (19/0.052")
19/1.63 mm (19/0.064")
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
4.60
4.60
4.60
5.10
5.75
7.05
16.40
19.10
11.00
11.45
15.30
22.20
31.40
74.65
121.90
166.15
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
15.05
15.05
15.05
16.70
18.80
23.15
53.75
62.70
36.10
37.50
50.15
72.85
103.00
244.90
399.85
545.00
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
5.10
5.10
5.10
5.40
6.05
6.95
11.50
11.95
15.80
22.50
31.70
74.55
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
16.70
16.70
16.70
17.70
19.80
22.80
37.75
39.20
51.80
73.85
104.00
244.55
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
4.60
4.60
4.60
5.10
5.75
10.60
13.55
17.85
25.20
35.25
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
15.05
15.05
15.05
16.70
18.80
34.70
44.50
58.55
82.70
115.65
3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")
3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
chapter-24(Electric Installation)
Page 142
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
vi)
7/1.63 mm (7/0.064")
Per Rft.
Labour
7.05
Composite
68.25
Unit
Per Metre
Labour
23.15
Spec.
No.
Composite
223.85
7/1.63 mm (7/0.064")
19/1.32 mm (19/0.052")
19/1.63 mm (19/0.064")
19/2.11 mm (19/0.083")
37//1.83 mm (37/0.072")
37/2.11 mm (37/0.083")
37/2.62 mm (37/0.103")
38.1 to
38.7
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
6.95
7.65
8.35
9.20
15.80
19.10
27.00
76.85
128.40
173.20
329.10
457.80
574.25
880.45
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
22.80
25.10
27.35
30.10
51.90
62.70
88.50
252.15
421.20
568.05
1,079.50
1,501.60
1,883.55
2,887.85
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
5.10
5.10
5.10
5.40
6.05
6.95
18.35
25.20
33.75
48.60
68.50
134.95
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
16.70
16.70
16.70
17.70
19.80
22.80
60.25
82.70
110.75
159.45
224.70
442.55
3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
5.40
5.40
5.40
6.05
6.35
7.30
26.80
37.50
50.35
73.00
103.40
207.70
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
17.70
17.70
17.70
19.80
20.90
23.90
87.90
122.95
165.10
239.40
339.20
681.35
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
5.75
5.75
6.05
6.05
6.35
7.30
10.20
34.00
46.80
63.65
93.35
133.50
270.00
503.05
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
18.80
18.80
19.80
19.80
20.90
23.90
33.45
111.45
153.55
208.85
306.15
437.90
885.65
1,649.95
d)
3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")
c)
ditto
b)
Remarks
3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")
19/1.32 mm (19/0.052")
chapter-24(Electric Installation)
Page 143
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
19/1.32 mm (19/0.052")
19/1.63 mm (19/0.064")
19/1.83 mm (19/0.072")
19/2.11 mm (19/0.083")
37//1.83 mm (37/0.072")
37/2.11 mm (37/0.083")
37/2.36 mm (37/0.093")
37/2.62 mm (37/0.103")
10.20
10.90
11.45
12.40
12.75
15.30
18.35
22.95
560.65
748.70
1,013.25
1,417.20
1,929.45
2,438.80
2,972.40
3,699.50
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
33.45
35.85
37.60
40.65
41.80
50.15
60.20
75.25
1,839.00
2,455.70
3,323.45
4,648.35
6,328.50
7,999.25
9,749.50
12,134.40
10 x 10 cm (4"x4")
17.5 x 10 cm (7"x4")
22.5 x 10 cm (9"x4")
20 x 25 cm (8"x10")
25 x 30 cm (10"x12")
30 x 35 cm (12"x14")
38.1
to
38.7
Each
Each
Each
Each
Each
Each
75.25
94.05
125.40
150.50
188.10
250.80
145.50
192.35
246.00
354.90
467.70
608.10
Each
Each
Each
Each
Each
Each
75.25
94.05
125.40
150.50
188.10
250.80
145.50
192.35
246.00
354.90
467.70
608.10
Each
21.50
34.80
Each
21.50
34.80
17.5 x 10 cm (7"x4")
22.5 x 10 cm (9"x4")
20 x 25 cm (8"x10")
25 x 30 cm (10"x12")
30 x 35 cm (12"x14")
Remarks
38.1
38.1
Each
Each
Each
Each
Each
30.10
30.10
33.45
37.60
43.00
87.15
99.50
116.45
157.90
213.95
Each
Each
Each
Each
Each
30.10
30.10
33.45
37.60
43.00
87.15
99.50
116.45
157.90
213.95
Each
Each
Each
Each
Each
30.10
30.10
33.45
37.60
43.00
66.75
85.30
100.40
120.65
142.70
Each
Each
Each
Each
Each
30.10
30.10
33.45
37.60
43.00
66.75
85.30
100.40
120.65
142.70
17.5 x 10 cm (7"x4")
22.5 x 10 cm (9"x4")
20 x 25 cm (8"x10")
25 x 30 cm (10"x12")
30 x 35 cm (12"x14")
38.1
double pole:
i)
15/20 Amp.
Each
501.60
1,555.40
Each
chapter-24(Electric Installation)
501.60
1,555.40
Page 144
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
ii)
iii)
iv)
b)
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Each
Each
Each
501.60
752.40
752.40
1,845.85
2,416.15
2,972.35
Each
Each
Each
501.60
752.40
752.40
1,845.85
2,416.15
2,972.35
Each
Each
752.40
501.60
2,133.75
2,315.55
Each
Each
752.40
501.60
2,133.75
2,315.55
Each
Each
Each
501.60
752.40
985.65
2,488.60
3,160.85
3,907.05
Each
Each
Each
501.60
752.40
985.65
2,488.60
3,160.85
3,907.05
triple pole:
i)
ii)
c)
30/35 Amp.
60/65 Amp.
100 Amp.
Labour
15/20 Amp.
30/35 Amp.
30/35 Amp.
60/65 Amp.
100 Amp.
38.1
Each
Each
Each
Each
Each
Each
Each
752.40
985.65
985.65
2,257.20
2,257.20
3,197.70
3,385.80
3,205.25
4,476.75
6,041.50
9,871.60
11,280.60
15,225.20
19,220.85
Each
Each
Each
Each
Each
Each
Each
752.40
985.65
985.65
2,257.20
2,257.20
3,197.70
3,385.80
3,205.25
4,476.75
6,041.50
9,871.60
11,280.60
15,225.20
19,220.85
ditto
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
250.80
250.80
250.80
250.80
250.80
250.80
250.80
250.80
250.80
250.80
250.80
376.20
376.20
376.20
376.20
376.20
376.20
658.40
658.40
732.55
794.35
837.60
893.25
942.65
998.30
1,078.65
1,140.45
1,196.05
783.80
789.95
851.75
919.75
963.00
1,031.00
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
chapter-24(Electric Installation)
250.80
250.80
250.80
250.80
250.80
250.80
250.80
250.80
250.80
250.80
250.80
376.20
376.20
376.20
376.20
376.20
376.20
658.40
658.40
732.55
794.35
837.60
893.25
942.65
998.30
1,078.65
1,140.45
1,196.05
783.80
789.95
851.75
919.75
963.00
1,031.00
Page 145
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Each
Each
Each
Labour
376.20
376.20
376.20
Composite
1,086.60
1,136.05
1,222.55
Unit
Each
Each
Each
Labour
376.20
376.20
376.20
Spec.
No.
Composite
1,086.60
1,136.05
1,222.55
21 Supply and erection of bus bars, for 500 volts 3 phase A.C.
supply with four copper bars, including glazed porcelain
bridges, on angle iron board, fixed with rag bolts and M.S.
sheet box 1.5 mm thick, etc. complete:i)
ii)
38.1
Each
897.60
3,004.80
Each
897.60
3,004.80
Each
897.60
3,004.80
Each
897.60
3,004.80
Each
1,419.00
3,625.10
Each
1,419.00
3,625.10
Each
1,692.90
3,899.00
Each
1,692.90
3,899.00
Each
1,085.70
3,899.45
Each
1,085.70
3,899.45
Each
15.70
107.80
Each
15.70
107.80
Per Rft.
--
1.65
Per Metre
--
38.1
5.45
Each
31.35
240.60
Each
31.35
240.60
38.1
Each
47.30
390.25
Each
47.30
390.25
ditto
Each
48.95
112.60
Each
48.95
112.60
ditto
Each
67.55
428.30
Each
67.55
428.30
ditto
Each
10.85
50.25
Each
10.85
50.25
ditto
Each
47.30
232.65
Each
47.30
232.65
38.1
chapter-24(Electric Installation)
Remarks
Page 146
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Each
9.40
211.90
Each
9.40
211.90
38.1
Each
15.70
35.70
Each
15.70
35.70
ditto
Each
Each
Each
Each
Each
Each
Each
15.05
15.05
15.05
15.05
20.90
20.90
20.90
32.60
32.60
27.40
49.90
50.10
43.90
45.15
Each
Each
Each
Each
Each
Each
Each
15.05
15.05
15.05
15.05
20.90
20.90
20.90
32.60
32.60
27.40
49.90
50.10
43.90
45.15
ditto
open type
piano type
ring type, recessed
plate type, recessed
double control, open type
double control, ring type recessed
double control, piano type
open type
recessed type
ditto
Each
Each
15.05
15.05
41.75
51.65
Each
Each
15.05
15.05
41.75
51.65
Each
15.05
78.85
Each
15.05
78.85
ditto
Each
15.05
54.15
Each
15.05
54.15
ditto
open type
recessed type
ditto
Each
Each
15.05
15.05
47.95
85.05
Each
Each
15.05
15.05
47.95
85.05
5 Amp
10/15 Amp
37 Supply and erection of 3 pin 10/15 Amp. wall socket with shoe,
open type.
ditto
Each
Each
15.05
15.05
68.50
94.20
Each
Each
15.05
15.05
68.50
94.20
Each
15.05
146.85
Each
15.05
146.85
open type
recessed type
ditto
Each
Each
8.35
8.35
35.10
41.25
Each
Each
8.35
8.35
35.10
41.25
ditto
38.1
Each
Each
9.40
9.40
28.70
41.05
Each
Each
9.40
9.40
28.70
41.05
Each
12.55
44.20
Each
12.55
44.20
chapter-24(Electric Installation)
ditto
Page 147
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Each
Labour
8.35
Composite
28.90
Unit
Each
Labour
8.35
Spec.
No.
Composite
28.90
15/20 Amp
30/35 Amp
60/65 Amp
100 Amp
200 Amp
300 Amp
400 Amp
500 Amp
Each
Each
Each
Each
Each
Each
Each
Each
15.30
16.70
25.55
28.70
32.80
32.80
43.45
43.45
47.75
49.15
71.90
118.35
159.50
320.20
398.80
574.90
Each
Each
Each
Each
Each
Each
Each
Each
15.30
16.70
25.55
28.70
32.80
32.80
43.45
43.45
47.75
49.15
71.90
118.35
159.50
320.20
398.80
574.90
38.1
i)
Per set
271.45
1,229.60
ii)
single rod (40 watts) with one choke and one starter.
ditto
217.15
iii) round tube, 32 watt, with one choke and one starter,
without cover.
Each
iv)
ditto
Per set
271.45
1,229.60
656.20
ditto
217.15
656.20
217.15
714.30
Each
217.15
714.30
180.95
801.70
ditto
180.95
801.70
44 Providing and fixing M.S. iron box for housing main switches,
made of 1.5 mm (1/16") thick M.S. sheet, with locking
arrangement, including painting:i)
ii)
iii)
iv)
60x35x15 cm (24"x14"x6")
95x40x20 cm (38"x16"x8")
105x52.5x22.5 cm (42"x21"x9")
135x70x27.5 cm (54"x28"x11")
ditto
ditto
round tube, 32 watt with one chock and one starter, with
cover.
Remarks
ditto
Each
Each
Each
Each
566.35
817.85
1,243.70
1,367.85
2,030.45
2,526.15
3,504.10
4,863.05
Each
Each
Each
Each
566.35
817.85
1,243.70
1,367.85
2,030.45
2,526.15
3,504.10
4,863.05
Each
36.20
151.15
Each
36.20
151.15
38.1
&
38.10
Each
47.30
899.20
Each
47.30
899.20
ditto
Each
50.70
1,231.40
Each
50.70
1,231.40
38.1
chapter-24(Electric Installation)
Page 148
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Each
67.55
513.70
Each
67.55
513.70
49 Supply and erection of 3/8" (10 mm) dia M.S. bar fan hook,
placed at the time of casting of slab.
Each
19.30
36.60
Each
19.30
36.60
ditto
Each
613.15
2,586.55
Each
613.15
2,586.55
38.12
Each
Each
134.35
156.75
581.00
1,272.45
Each
Each
134.35
156.75
581.00
1,272.45
Per Rft.
9.10
22.90
Per Metre
29.80
75.20
38.14
Per Rft.
13.10
35.75
Per Metre
43.00
117.20
ditto
Per Rft.
57.35
260.40
Per Metre
188.10
854.20
Per Rft.
53.00
254.00
Per Metre
173.80
833.10
Each
283.80
2,508.60
Each
283.80
2,508.60
Each
35.45
202.35
Each
35.45
202.35
38.12
Each
35.45
84.90
Each
35.45
84.90
ditto
Per Kg
18.45
1,072.75
Per Kg
18.45
1,072.75
38.1
Per Kg
18.45
133.40
Per Kg
18.45
133.40
ditto
chapter-24(Electric Installation)
Page 149
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
3/0.74 mm (3/0.029")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
Remarks
38.12
Per Rft.
ditto
ditto
ditto
4.80
4.80
4.80
4.80
12.80
21.15
27.80
36.95
Per Metre
ditto
ditto
ditto
15.75
15.75
15.75
15.75
42.00
69.45
91.25
121.25
Per Rft.
8.80
22.10
Per Metre
28.95
72.55
Each
236.50
995.30
Each
236.50
995.30
Each
ditto
473.00
473.00
2,895.55
3,278.70
Each
ditto
473.00
473.00
2,895.55
3,278.70
Each
ditto
180.95
217.15
1,107.95
2,009.35
Each
ditto
180.95
217.15
1,107.95
2,009.35
Each
7,947.30
22,760.25
Each
7,947.30
22,760.25
38.13
Each
7,699.45
33,822.65
Each
7,699.45
33,822.65
38.13
38.1
G.E.C. design
Philips design
chapter-24(Electric Installation)
Page 150
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Job
1,042.80
Composite
Unit
Labour
Job
1,042.80
Spec.
No.
Remarks
Composite
4,154.05
4,154.05
38.11
Per Rft.
ditto
10.80
25.45
56.30
72.05
Per Metre
ditto
35.50
83.40
184.70
236.30
ditto
G.I. wire:
i)
ii)
Per Rft.
ditto
4.60
4.60
11.25
6.35
Per Metre
ditto
15.05
15.05
36.85
20.85
Per Rft.
ditto
4.60
4.60
11.90
7.40
Per Metre
ditto
15.05
15.05
39.05
24.35
Per Rft.
17.30
21.95
Per Metre
56.75
72.00
38.11
Each
695.20
4,558.40
Each
695.20
4,558.40
ditto
Per Rft.
ditto
25.45
25.45
266.90
317.25
Per Metre
ditto
83.40
83.40
875.50
1,040.60
Job
473.00
2,809.05
Job
473.00
2,809.05
b)
8 SWG
16 SWG
Copper wire:
i)
ii)
16 SWG
20 SWG
38.1
single phase:
i)
Each
188.10
2,324.10
Each
chapter-24(Electric Installation)
188.10
2,324.10
Page 151
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
ii)
b)
Labour
Composite
Unit
Labour
Spec.
No.
Composite
ditto
188.10
2,324.10
ditto
188.10
2,324.10
Each
ditto
ditto
376.20
542.85
542.85
6,131.40
6,298.05
6,298.05
Each
ditto
ditto
376.20
542.85
542.85
6,131.40
6,298.05
6,298.05
365.50
407.15
983.10
1,130.40
Each
ditto
365.50
407.15
983.10
1,130.40
Remarks
250.80
250.80
679.30
760.25
Each
ditto
250.80
250.80
679.30
760.25
Each
300.95
882.70
Each
300.95
882.70
Each
47.05
108.85
Each
47.05
108.85
38.1
Each
37.60
62.35
Each
37.60
62.35
ditto
Each
47.05
170.65
Each
47.05
170.65
ditto
Each
94.05
207.35
Each
94.05
207.35
Each
182.50
220.65
Each
182.50
220.65
chapter-24(Electric Installation)
Page 152
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Lft.
1766.55
Metre
57.95
100Lft.
584.50
Metre
19.15
100Lft.
4596.90
Metre
150.80
Each
4424.65
Each
4424.65
Each
Point
483.80
Each
Point
483.80
Each
566.60
Each
566.60
100 Nos
5343.70
100 Nos
5343.70
100 Nos
673.10
100 Nos
673.10
Per Cwt
2795.10
7674.40
100 Kg
5502.15
15107.05
Per Cwt
999.90
5637.30
100 Kg
1968.30
11097.00
Per Cwt
315.35
100 Kg
620.75
100 Sft.
1135.20
sq.m
122.15
Per Cwt
550.00
100 Kg
1082.70
I RON WORK
9
chapter-25(Iron work)
Page 153
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Cwt
334.75
100 Kg
658.90
Per Cwt
162.55
100 Kg
319.95
Per Cwt
2148.30
100 Kg
4228.95
Per Cut
Per Cut
212.85
313.90
Per Cut
Per Cut
212.85
313.90
Per
Cut
101.35
Per Cwt
Cut
101.35
Per
Bend
108.40
Per
Bend
108.40
20 Drilling holes, in plates upto " (13 mm) thick, per inch
dia, (25mm) or part thereof.
Per
Hole
42.75
Per
Hole
42.75
21 Extra for drilling holes in plates over " (13 mm) thick, per
inch dia, (25 mm) or part thereof.
Per
Hole
23.80
Per
Hole
23.80
100 Nos
569.80
100 Nos
569.80
100 Nos
1806.75
100 Nos
1806.75
Per Lft.
71.05
Metre
233.05
Per bar
40.55
Per bar
40.55
Each
Cut
22.25
Each
Cut
22.25
481.80
28.40
Per
Notch
sq.m
481.80
Per
Notch
Per Sft.
Per Sft.
16.70
sq.m
179.65
Per Sft.
176.15
680.35
sq.m
1895.60
7320.35
Per Sft.
182.90
779.95
sq.m
1967.90
8392.30
7649.25
Remarks
15057.60
360.30
649.80
chapter-25(Iron work)
360.30
649.80
305.35
Page 154
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Sft.
70.45
327.60
sq.m
758.20
3525.00
Per Rft.
340.50
788.70
Metre
1117.10
2587.65
Per Rft.
175.20
512.35
Metre
574.85
1680.95
Per Rft.
126.60
546.20
Metre
415.35
1791.99
Per Sft.
255.55
654.25
sq.m
2749.85
7039.90
Per Sft.
56.30
215.70
sq.m
605.60
2320.75
Per Rft.
26.55
133.55
Metre
87.10
438.15
chapter-25(Iron work)
-do-
Page 155
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
39 Providing and fixing stair railing of 2" (63 mm) i/d G.I.
pipe, welded with 5/8"x5/8" (16x16 mm) square M.S. bars
2'-9" (838 mm) high, fixed in each step, complete in all
respects, including painting, polishing three coats.
Per Rft.
150.00
648.80
Metre
492.20
2128.65
Per Sft.
25.10
63.60
sq.m
269.85
684.55
a)
64.80
64.80
64.80
64.80
64.80
304.90
307.40
311.10
317.30
329.65
sq.m
ditto
ditto
ditto
ditto
697.40
697.40
697.40
697.40
697.40
3280.95
3307.55
3347.45
3413.95
3546.95
b)
Per Sft.
ditto
ditto
ditto
ditto
91.05
91.05
91.05
91.05
91.05
369.40
371.85
375.55
381.75
394.10
sq.m
ditto
ditto
ditto
ditto
979.85
979.85
979.85
979.85
979.85
3974.55
4001.15
4041.05
4107.55
4240.50
Per Sft.
59.45
317.65
Sq.m
639.45
3418.05
ditto
57.55
197.80
ditto
619.20
2128.50
Remarks
chapter-25(Iron work)
Page 156
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Sft.
67.20
395.70
Sq.m
723.05
4257.60
Per Sft.
84.35
461.60
Per Sft.
907.75
4966.85
Each
564.30
603.85
Each
564.30
603.85
Per Sft.
108.55
213.65
sq.m
1168.20
2298.65
Per Lft.
47.30
Metre
155.15
Per Rft.
79.55
726.40
Metre
261.00
2383.30
100Rft.
1743.70
9658.10
Metre
57.20
316.85
100Rft.
2862.25
12284.10
Metre
93.90
403.00
chapter-25(Iron work)
Remarks
Page 157
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Sft
92.90
530.20
sq. m
999.60
5704.95
Per Sft
133.75
426.45
sq. m
1439.15
4588.60
1.6 mm thick
2 mm thick
Per Sft
Per Sft
90.65
90.65
659.50
745.90
chapter-25(Iron work)
Sqm
Sqm
975.40
975.40
7096.20
8025.90
Page 158
26. MISCELLANEOUS
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Sft.
61.55
72.00
Per
sq.m
662.20
774.95
Each
78.40
Each
78.40
100Lft.
Remarks
6,470.45
23,990.90
L.m.
212.30
787.10
Each
39.35
169.10
Each
39.35
169.10
100Nos.
125.40
143.10
100Nos.
125.40
143.10
Supplying wooden pegs for levelling, 1" (40 mm) dia, 6"
(150mm) long.
6
100Nos.
300.95
504.90
100Nos.
300.95
504.90
Per Lft.
70.95
79.85
Per
L.M.
232.80
261.95
Each
47.30
cost of hooks.
8
Each
47.30
Each
208.55
385.55
Each
208.55
385.55
Per cut
47.30
Per cut
47.30
chapter-26( Misc)
Page 159
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
11
12
Threading pipe ends, 1" (40 mm) to 4" (100 mm) dia.
13
14
a)
b)
c)
in ordinary soil
in clay
in shingle
15
16
Per cut
Labour
Composite
86
Unit
Per cut
Labour
Spec.
No.
Remarks
Composite
86
Each
End
59.85
Each
End
59.85
100Lft.
219.05
Per Metre
7.20
Per Lft.
Per Lft.
Per Lft.
77.15
152.15
227.12
Per Metre
Per Metre
Per Metre
253.10
499.10
745.15
Per Lft.
34.20
Per Metre
112.15
Each
150.50
Each
150.50
Per bed
499.95
531.10
Per bed
499.95
531.10
18
Washing Durries.
100Sft.
666.60
740.75
sq.m
71.75
79.75
19
Recaning chairs:
office chairs, single caning seat only.
office chairs, double canning seat only.
office chairs, single caning back only.
office chairs, double caning back only.
easy chairs, single caning seat only.
easy chairs, double caning seat only.
easy chairs, single caning only, back and seat in one
piece.
viii) easy chairs, double caning back & seat in one piece
or couches with caned area about 16 Sft (1.5 Sqm).
Each
Each
Each
Each
Each
Each
Each
263.35
338.60
188.10
300.95
188.10
526.70
752.40
299.05
389.00
190.35
320.30
236.00
598.10
1,046.55
Each
Each
Each
Each
Each
Each
Each
263.35
338.60
188.10
300.95
188.10
526.70
752.40
299.05
389.00
190.35
320.30
236.00
598.10
1,046.55
Each
1,128.60
1,843.00
Each
1,128.60
1,843.00
20
Each
135.45
498.80
Each
135.45
498.80
21
Weaving charpoy.
Each
489.05
Each
489.05
22
Sweeping chimney.
Each
111.10
112.40
Each
111.10
112.40
23
Per Lft.
38.75
124.70
Per LM
127.15
409.10
24
100Kg
148.80
100Kg
148.80
25
100Kg
311.65
100Kg
311.65
i)
ii)
iii)
iv)
v)
vi)
vii)
chapter-26( Misc)
Page 160
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
26
27
28
Supplying manure.
29
30
Washing:a)
b)
table cloth
napkins, dusters, etc.
Labour
Composite
100Kg of
Charcoal
502.95
100Cft.
1,366.55
Cart
Load
Unit
Labour
Spec.
No.
Composite
100Kg of
Charcoal
502.95
1,369.65
cu.m
482.65
483.75
166.65
302.60
Cart
Load
166.65
302.60
Each
150.50
Each
150.50
Each
Each
37.60
25.10
Each
Each
37.60
25.10
31
Each
No.
59.40
Each
No.
59.40
32
Each
No.
67.75
Each
No.
67.75
33
Dredging Sumps.
Per
Shift
2,499.75
Per
Shift
2,499.75
34
Each
180.95
Each
180.95
35
cu.m
ditto
70.65
7.85
13.95
Per Nos.
118.25
a)
b)
by hand
by pump
36
37
38
Laying 2" (50 mm) thick sand and bitumen carpet, on top
of foundation of oil tank.
39
1000 Cft.
1000 Cft.
1,999.80
221.70
Per Nos.
118.25
Remarks
1.15
2.25
2.70
3.60
sq.m
sq.m
12.15
24.30
29.30
38.65
100Sft.
1,313.30
5,042.50
sq.m
141.30
542.55
Per
Hole
202.70
Per
Hole
202.70
chapter-26( Misc)
Page 161
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) DISTRICT LAHORE
Sr.
No.
Description
Labour
Composite
40
Per
Plank
177.40
41
Per hole
per inch
depth
66.65
42
100Sft. of
each
spray
75.25
213.60
43
24,600.50
27,060.30
i)
ii)
100Rft.
100Rft.
chapter-26( Misc)
Unit
Labour
Spec.
No.
Composite
Per
Plank
177.40
Per hole
per c.m
depth
26.65
sq.m of
each
spray
8.10
23.00
252.05
277.30
806.90
887.60
Per Metre
Per Metre
Remarks
Page 162