FINISH GRADE MANHOLE OPENING FINISH GRADE
[ OUTSIDE DIAMETER f
OF HOPE PIPE:
j =
* : MANHOLE/STRUCTURE WALL 4 PF ae
a 4 FIRST COUPLER SHOULD BE Exe ee,
i 1 (ots) PROM WALL OR BE het
vanes | 2 ed
B BEDDING oe
fis ed | uspisturaep
INSURE BACKEILLIS
PLACED UNDER Pot NATIVE SOIL
AND PROPERLY L curs oR nexckewe PER
ConpacreD ASW DZ301, COMPACTED IN
rai | sy210._| Iu OF aon ase STANOARO
SUITABLE FOUNDATION wn wn
PROCTOR DENSITY
notes:
1. MAXIMUM INSERTION ANGLE SHALL NOT EXCEED REQUIREMENTS AS SPECIFIED BY THE MANUFACTURER.
2. SEE STANDARD DETAILS STD-202 AND 202A THROUGH STD-204 (A+) FOR STRUCTURE CONNECTIONS, PRODUCT INFORMATION
[AND DIMENSIONAL PIPE DATA. INSTALLATION RECOMMENDATIONS ARE ALSO SPECIFIED IN TECHNICAL NOTE 5.04: HOPE.
CONNECTIONS TO MANHOLES AND STRUCTURES,
3, PERFORMANCE HIGHLY DEPENDENT ON INSTALLATION. CONTRACTOR MUST INSURE MANHOLE GASKET IS UNIFORMLY SEATED
‘AROUND STRUCTURE ADAPTER, EXTRA PRECAUTIONSMUST BE TAKEN TO PREVENT DIFFERENTIAL SETTLEMENT BETWEEN THE
PIPE AND MANHOLE.
ae hae Morena Ar ae Rca caawan Ciameneen: | “momunon bea ad
EELS PSS Us Pega ae RGIS ASN ne one aI
(Best Practices and Advances in Program Management) Crispin Piney - Earned Benefits Program Management - Aligning, Realizing, and Sustaining Strategy-Auerbach Publications - CRC Press (2018) PDF