You are on page 1of 273

DAFTAR HARGA SATUAN UPAH

DINAS PEKERJAAN UMUM KABUPATEN REMBANG


UNTUK TAHUN 2011

NO.

JENIS PEKERJAAN

SATUAN

HARGA SATUAN
(Rp)

1 Pekerja

Hr

34,500.00

2 Mandor

Hr

46,000.00

3 Tukang Kayu

Hr

48,875.00

4 Tukang Batu

Hr

48,875.00

5 Tukang Besi

Hr

48,875.00

6 Tukang Cat

Hr

48,875.00

7 Tukang Leideng

Hr

48,875.00

8 Tukang Gali

Hr

46,000.00

9 Tukang Plitur

Hr

46,000.00

10 T u k a n g K e p a l a

Hr

49,450.00

11 K e p . T u k a n g K a y u

Hr

51,750.00

12 K e p . T u k a n g B a t u

Hr

51,750.00

13 K e p . T u k a n g C a t

Hr

51,750.00

14 K e p . T u k a n g P l i t u r

Hr

51,750.00

15 K e p . T u k a n g G a l i

Hr

51,750.00

16 M e k a n i k

Hr

43,125.00

17 P e m b . M e k a n i k

Hr

43,125.00

18 Operator alat berat

Hr

49,450.00

19 P e m b . Operator

Hr

40,250.00

20 S o p i r

Hr

46,575.00

21 P e m b . Sopir

Hr

34,500.00

Rembang,

Januari 2011

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 19620715 199011 1 002

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

DAFTAR HARGA SATUAN UPAH


EKERJAAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011
edisi januari 2011

KETERANGAN

KEPALA DINAS PEKERJAAN UMUM

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

DAFTAR HARGA SATUAN BAHAN


DINAS PEKERJAAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011
HARGA
NO.

J E N I S

1
I

B A H A N

SATUAN

2
BAHAN DASAR
1 BATU KALI

2 KERIKIL

3 BATU BATA
4 PASIR

5 TANAH

6 KAPUR

Bulat Utuh
Bulat Belah
Pecah
Pecah
Tempel
Batu apung
Sawur / Koral
Beton 0,5 / 1
Beton 1 / 1
Beton 1 / 2
Beton 2 / 3
Biasa
Ex lokal I

(Rp)
4

m3
m3
m3
m3
m2
kg
m3
m3
m4
m3
m3
m3
bh

98,000
99,400
123,500
189,600
62,500
5,500
25,000
237,500
216,700
226,300
224,400
25,850
365

Urug
Pasang
Beton (Muntilan)
Beton (Cepu)
Sirtu (pasir batu)
Sirtu royalty
Grosok
Abu batu
Abu batu (Tayu)
Batu alam
Padas
Liat
Biasa
Pilihan

m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m3
m3
m3
m3

56,300
138,500
281,300
156,300
96,900
24,800
93,800
106,300
192,000
81,900
30,600
50,000
45,400
62,500

Pasang (padam)
Labor

m3
Kg

178,200
2,500

PC 50 kg
PC 40 kg
PC 50 kg Sm. Warna
Semen warna

zak
zak
zak
kg

64,800
51,900
81,300
4,600

Adukan beton K 175 ready mix


Adukan beton K 225 ready mix
Adukan beton K 300 ready mix

m3
m3
m3

816,200
866,250
903,870

5/7
3/5

7 PORTLAND CEMENT

7 BETON

II

BAHAN

PE N U T U P ATAP

1 SIRAP

(100 lbr)

pak

235,400

2 GENTENG BETON

Genteng Beton Warna standard

bh

2,500

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

HARGA
NO.

J E N I S

B A H A N

SATUAN

2
Kerpus Beton Warna Standard

3
bh

Mantili
Nok kerpus Mantili
Plentong Mantili besar
Genteng biasa
Genteng pres
Genteng Beton
Genteng keramik
Sirap
Genteng kerpus jatiwangi
Genteng kerpus lokal
Genteng kerpus Beton
Genteng kerpus keramik
Genteng Jatiwangi

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

900
2,650
1,100
600
900
4,000
10,100
5,700
9,600
2,900
8,250
17,600
3,500

Asbes gelombang ( 80 x 210 ) cm


Asbes gel. Kecil 5 mm (90 x 180)
Asbes gel. Kecil 5 mm (120 x 240)
Asbes gel. Besar 5 mm (90 x 180)
Asbes gel. Besar 5 mm (120 x 240)
Asbes gel. Kecil 0,8 x 1,80 m
Asbes gel. Kecil 0,8 x 2,40 m

bh
lbr
lbr
lbr
lbr
lbr
lbr

41,700
48,950
73,500
62,500
96,300
43,400
56,300

- 100cm X 100 cm X 5 mm
- 100cm X 200 cm X 5 mm
- 100cm X 240 cm X 5 mm
Sekrup asbes

bh
bh
bh
bh

17,300
48,000
61,600
1,300

BJLS 0,30 panjang 180 cm


BJLS 0,30 panjang 240 cm
BWG 28 x 80
BWG 28 x 90

m'
m'
m'
m'

49,850
64,750
38,250
42,900

Seng gel. Kecil 0,70 x 1,80 m


Seng gel. Kecil 0,70 x 2,10 m
BJLS 0,28
BJLS 0,28 panjang 180 cm
BJLS 0,28 panjang 240 cm

lbr
lbr
m'
lbr
lbr

49,700
57,400
73,800
43,800
58,800

Seng talang BJLS 26 lebar 0,60


Seng talang BJLS 26 lebar 0,90
Seng talang BJLS 26 lebar 1,20

m'
m'
m'

21,300
30,400
46,200

Papan
Balok/pesagen

m3
m3

14,687,500
14,687,500

Papan
Balok/pesagen

m3
m3

8,125,000
8,125,000

(Rp)
4
8,250

3 GENTENG TANAH LIAT

5 ASBES GELOMBANG

6 ASBES PLAT

7 SENG PLAT

8 SENG GELOMBANG

9 SENG TALANG

III . B A H A N K A Y U
1 JATI

2 KAMPER

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

HARGA
NO.

J E N I S

B A H A N

SATUAN

(Rp)

2
Papan
Balok/pesagen

3
m3
m3

4
5,937,500
5,937,500

4 MERANTI

Papan
Balok/pesagen

m3
m3

3,125,000
3,125,000

5 LANAN

Papan
Balok/pesagen

m3
m3

3,125,000
3,125,000

6 BENGKIRAI

Papan
Balok/pesagen

m3
m3

8,125,000
8,750,000

7 DOLKEN

Kayu dolken sengon 8-10 cm,4m.


Kayu perancah

bt
m3

32,450
1,875,000

Kayu randu (papan)


Bambu
Bambu Apus
Kayu hutan lokal sekwalitas Kruing (A)
Kayu hutan lokal sekwalitas Kruing (B)
Glugu
Kayu lis 2/3

m3
bt
bt
m3
m3
m'
m'

573,900
15,500
3,800
4,413,750
2,354,000
187,500
5,900

m2
m2
m2

28,200
21,700
26,100

m2
m2
m2
m2
m2
m2
m2
m2

45,200
40,400
36,200
32,800
50,600
43,800
48,100
39,700

m2
m2
m2

552,200
926,750
1,255,550

4 GRANITO
Granito 40 x 40 polished (lokal)
Granito 40 x 40 polished (import)
Granito 60 x 60 polished (lokal)
Granito 60 x 60 polished (import)

m2
m2
m2
m2

420,750
459,050
419,100
437,500

5 GRANIT
Granit lokal
Granit import
Batu Tempel

m2
m2
m2

119,350
219,800
61,250

3 KRUING

8 LAIN-LAIN

IV . BAHAN PENUTUP DINDING / LANTAI


1 UBIN (TEGEL BIASA)
PC polos
30 X 30 cm
20 X 20 cm
20 X 20 cm
2 KERAMIK
Keramik warna (KW-1)
Keramik warna (KW-2)
Keramik putih (KW-1)
Keramik putih (KW-2)
Keramik 10 x 20 cm
Keramik 20 x 20 cm
Keramik 20 x 25 cm
Keramik 10 x 20 cm
3 MARMER
Marmer Tulung Agung
Marmer Kalimantan
Marmer Itali

30 X 30 cm
30 X 30 cm
30 X 30 cm
30 X 30 cm

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

Warna

HARGA
NO.

J E N I S

1
V . BAHAN C E TAK
1 BUIS BETON O dan U
15 cm - 100 cm
20 cm - 100 cm
25 cm - 100 cm
30 cm - 100 cm
40 cm - 100 cm
50 cm - 100 cm
60 cm - 100 cm
80 cm - 100 cm
100 cm - 100 cm
U 15 cm - 100 cm
U 20 cm - 100 cm
U 30 cm - 100 cm

B A H A N
2

SATUAN

(Rp)

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

35,500
50,000
53,200
62,500
78,700
98,200
116,900
177,500
292,200
49,100
38,600
47,500

kg
kg
kg

10,100
16,850
13,800

2 BESI PLAT
Besi Strip

kg

14,700

3 BAJA
Baja profil " L" dan "C"
Baja profil "IWF"

kg
kg

16,850
17,650

4 KAWAT
Kawat Ikat beton/bendrat
Kawat bronjong
Kawat las listrik

kg
kg
kg

16,200
16,850
30,000

m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

4,100
6,000
10,250
13,000
20,200
30,500
43,750
62,650
93,550
154,375
200,400
316,650
499,500
796,100
1,342,050

m'

108,450

VI . B A H A N B E S I
1 BESI BETON
Besi beton polos
Besi beton prestress
Besi beton ulir

VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC. S. 12,5 1/2"
Pipa PVC. S. 12,5 3/4"
Pipa PVC. S. 12,5 1"
Pipa PVC. S. 12,5 1-1/4"
Pipa PVC. S. 12,5 1-1/2"
Pipa PVC. S. 12,5 2"
Pipa PVC. S. 12,5 2-1/2"
Pipa PVC. S. 12,5 3"
Pipa PVC. S. 12,5 4"
Pipa PVC. S. 12,5 5"
Pipa PVC. S. 12,5 6"
Pipa PVC. S. 12,5 8"
Pipa PVC. S. 12,5 10"
Pipa PVC. S. 12,5 12"
Pipa PVC. S. 12,5 16"
2 Pipa Medium B Galvanis - SII
Pipa Galvanis ( 1" )
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

HARGA
NO.

J E N I S

B A H A N
2

Pipa Galvanis ( 1 1/2" )


Pipa Galvanis ( 2" )
VIII . B A H A N L A N G I T - L A N G I T
PLY WOOD
- Teak wood
120 X 240
X 4 mm
- Tripleks
120 X 240
X 3 mm
120 X 240
X 4 mm
120 X 240
X 6 mm
- Multipleks
. 120 X 240
X 9 mm
. 120 X 240
X 12 mm
Harplek 60 x 200
Harplek 50 x 200
Harplek 40 x 200
Harplek 30 x 200
Harplek 5 mm (90 x 180)
Harplek 5 mm (120 x 240)
Gypsum 6 mm
Gypsum 9 mm
Gypsum 12 mm
Gypsum 20 mm
Eternit 4 mm ( 100 x 100)
List Kayu Profil
Formika ukuran pintu
IX . B A H A N F I N I S H I N G
1 KAYU
Menie
Plamur kayu
Ambril/amplas
Batu Apung
Cat kayu (cukup)
Cat kayu (baik)
Siralax
Spiritus
Dempul
Plinkut
Wood filer (INFRA)
Oker putih
Oker warna
Melamin
Kuwas 3"
Thinner Super daimaru
Thinner A
Foxi Cat
2 TEMBOK
Kapur sirih
Plamur
Cat Tembok dalam (cukup)
Cat Tembok dalam (baik)
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

SATUAN

(Rp)

3
m'
m'

4
147,300
276,100

lbr

89,600

lbr
lbr
lbr

50,700
65,700
83,600

lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m'
lbr

122,900
184,400
16,500
14,300
8,350
10,650
27,250
100,000
61,900
75,000
50,750
54,250
22,900
6,900
229,550

kg
kg
lbr
kg
kg
kg
kg
ltr
kg
kg
kg
kg
kg
kg
bh
liter
liter
Kg

20,400
19,200
3,200
5,500
39,700
51,000
47,300
10,800
18,500
18,800
31,300
20,900
22,900
69,400
6,900
24,600
19,200
33,200

kg
kg
kg
kg

800
17,500
14,400

HARGA
NO.

J E N I S

B A H A N
2

Cat Tembok luar (cukup)


Cat Tembok luar (baik)
Roll cat
3 BESI
Menie
Cat besi (baik)
Cat besi (cukup)
Minyak cat
Lem Aica Aibon
Amplas Besi
Ampelas norton no.3
Ampelas Dico no.280
Ampelas Dico no.120
X . BAHAN KACA
Bening
Rayband

5 mm
5 mm

XI . BAHAN INSTALASI LISTRIK


Stop Kontak
XII . ALAT - ALAT PENGUNCI & PENGGANTUNG
1 KUNCI TANAM
Besar
Kecil
2 ENGSEL DAN GERENDEL
Engsel H
Engsel Nylon
Grendel
Hak Angin

SATUAN
3
kg

(Rp)
4
17,100

bh

15,500

kg
kg
kg
ltr
kg
lbr
buah
buah
buah

23,700
46,700
45,700
14,600
20,700
5,600
6,100
3,400
3,400

m2
m2

87,500
96,900

bh

7,150

bh
bh

140,700
59,400

bh
bh
bh
bh

5,400
6,500
9,500
17,700

bh
bh
bh
bh

531,300
112,500
456,300
237,500

kg
kg
kg
buah
bh
kg
kg

15,200
22,700
20,700
4,500
16,650
12,450
45,650

buah
buah
buah

2,410,320
4,217,400
6,179,250

XIII . BAHAN SANITAIR


1 Kloset duduk
2 Kloset jongkok
3 Westafel
4 Bak Cuci Stainlist
XIV . ALAT PENGIKAT KAYU
1 Paku - ukuran 1" s/d 4"
2 Paku - payung
3 Paku - sekrup
4 Mur Baut 3/8 "
5 Lem kayu (fox)
6 Tali Ijuk
7 Lem kuning (aica aibon)

Porselen
Counter top

XV . POMPA AIR DAN TANGKI AIR


1 POMPA AIR LISTRIK
Mesin pompa 1 lt / dt
Mesin pompa 1-1/2 lt / dt
Tangki air fiber glass 3.000 lt 5mm
X VI . PAVING BLOCK
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

HARGA
NO.
1
1
2
3
4
5
6
7
8
9
10
11

J E N I S

B A H A N

2
Paving Blok Holland t: 6 cm (ALDAS)
Paving Blok Holland t: 6 cm (lokal)
Paving Blok Holland t: 8 cm (ALDAS)
Paving Blok Holland t: 8 cm (lokal)
Paving blok warna 6 cm (lokal)
Paving blok warna 8 cm (lokal)
Kanstin 10/12,5 x 30 x 50 (ALDAS)
Paving Blok Hexagonal Kecil t: 6 cm, (ALDAS)
Paving Blok Hexagonal Kecil t: 8 cm, (ALDAS)
Kanstin 10 x 20 x 50 (ALDAS)
Kanstin 10/12,5 x 25 x 50 (ALDAS)

XVII. RTH (JALUR HIJAU DAN TAMAN)


1 PUPUK
KCL, KS, ZK
Pupuk Kandang
Pupuk Kompos
Pupuk Organik/Bokhasi
Pupuk Phonska
SP 36
Urea
2 OBAT - OBATAN
Fastac 25 EC
3 TANAMAN HIAS
Agape
Angsana
Apinika
Bambu Hias
Bambu Jepang
Bougenville Biasa
Bougenville Parigata
Cemara Bola
Cemara Buaya
Cemara Gimbal
Cemara Kipas
Cemara Non Flok/Ventris
Daun Walisongo
Glodogan
Glodogan Pecut
Jaranan
Kamboja Jepang
Ketapang
Krokot Putih
Lamtana Rebah
Lamtana Tegak
Mahoni 1 Meter
Mimbo
Mirten
Palem Botol
Palem Ekor Tupai
Palem Kuning
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

SATUAN

(Rp)

3
m2
m2
m2
m2
m2
m2
bh
m2
m2
bh
bh

Kg
Ton
Ton
Kg
Kg
Kg
Kg

4,950
275,000
825,000
2,200
2,750
2,750
2,750

50 mL

Batang
Batang
Buah
Rumpun
Buah
Batang
Batang
Buah
Buah
Batang
Batang
Batang
Buah
Batang
Batang
Batang
Batang
Batang
Rumpun
Batang
Batang
Batang
Batang
Buah
Batang
Batang
Batang

54,100
33,400
92,800
43,800
47,100
50,000
20,200
69,700
93,900
10,100
16,500

11,000

66,000
11,000
2,750
26,400
18,150
24,200
36,300
9,680
6,600
55,000
26,620
72,600
11,000
72,600
205,700
6,600
48,400
33,000
2,750
2,750
18,150
10,164
6,050
11,000
347,300
172,500
23,000

HARGA
NO.

J E N I S

B A H A N
2

Palem Merah
Palem Raja/Putri
Palem Wergu
Pangkas Kuning
Pangkas Merah
Pinisium
Rumput Jepang
Sawo Kecik
Sikas
Tanaman Taiwan
Tanjung
Teh - tehan
4 ALAT - ALAT PERTAMANAN
Ajir Tanaman
Ajir Tanaman Mangrove
Batu Asahan
Bambu Usuk
Busi Mesin Potong Rumput
Cetok
Chain Saw 038 STIHL
Chain Saw 070 STIHL
Gunting Dahan
Membran Karburator Chain Saw
Membran Oli Chain Saw
Mesin Potong Rumput Dorong
Mesin Potong Rumput Gendong
Mesin Pompa Air G x 160 + 2"
Patok Batas
Pisau M. Ptng Rmput Dorong/Gendong
Piston Set Chain Saw
Piston Set M. Ptng Rmpt Drong/Gndong
Pot Tanaman Hias
Pot Tanaman Palem
Rantai Chain Saw 038 STIHL
Rantai Chain Saw 070 STIHL
Seal Ker As Mesin M. Ptng Rmput
Srumbung Bambu
Srumbung Kayu
Selang Biasa 2"
Selang Lipat 2"
Selang Spiral
Tali Starter Chain Saw
Trucuk Bambu
5 BAHAN KEND. TDK. BERMOTOR
As Belakang
Buah
As Tengah
Buah
Ban Dalam
Buah
Ban Luar
Buah
Bos Samping
Buah
Laker
Buah
Pedal
Buah
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

SATUAN
3
Batang
Batang
Batang
Batang
Batang
Batang
M2
Batang
Batang
Buah
Batang
Rumpun

Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Meter
Meter
Meter
Buah
Batang

Buah
Buah
Buah
Buah
Buah
Buah
Buah

(Rp)
4
28,000
115,000
28,500
4,000
4,000
34,500
4,600
50,600
575,000
3,500
69,000
14,000

500
700
12,000
6,000
11,000
20,900
11,000,000
13,750,000
125,400
165,000
55,000
6,600,000
7,700,000
3,575,000
5,500
550,000
660,000
660,000
275,000
137,500
275,000
280,000
60,500
35,000
22,000
14,000
6,000
39,000
17,000
7,000

11,000
19,000
15,000
50,000
15,000
7,000
12,000

HARGA
NO.

J E N I S

1
Pelek
Per
Rantai
Ruji
Sadel

B A H A N

2
Buah
Buah
Buah
Buah
Buah

6 PERALATAN KEBERSIHAN DAN BHN. PEMBERSIH


Angkus
Buah
Bendo
Buah
Cangkul
Buah
Ekrak
Buah
Ganco
Buah
Gunting Pangkas
Buah
Linggis
Buah
Sabit
Buah
Sapu Lidi
Buah
Skrap
Buah
XVIII. LAMPU PENERANGAN JALAN UMUM (LPJU)
1 Baut 3/8
2 Besi L
3 Box KWH Meter 1 Phasa
4 Box Trafo
5 Conector
6 Contactor SN 35
7 Cor Ornamen Tiang Listrik
8 Cup Piring
9 Cupit Urang
10 Fitting E 40
11 Fitting WD 27
12 Fotto cell 10 A
13 Fotto cell 6 A
14 Groundhing/ardhe
15 Housing Lamp 125 W
16 Housing Lamp 250 W
17 Ignisitor
18 Isolasi
19 Kabel LVTC 2 x 10 mm
20 Kabel LVTC 2 x 16 mm
21 Kabel NYM 2 x 2,5 mm
22 Kabel NYM 2 x 4 mm
23 Kabel NYY 2 x 4 mm
24 Kabel NYY 2 x 6 mm
25 Kapasitor
26 Konsul Besi 1,25" MG
27 Konsul Besi 2" MG
28 Kotak APP/Double cover
29 KWH Meter 20/60 A
30 KWH Meter 50/20 A
31 L Booh 1"
32 Lampu HPIT 250 W
33 Lampu Mercury 250 W
34 Lampu Mercury 125 W
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

SATUAN

(Rp)

3
Buah
Buah
Buah
Buah
Buah

Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah

17,000
22,000
30,800
8,800
33,000
105,000
13,750
19,250
6,600
5,500

Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Meter
Meter
Meter
Meter
Meter
Meter
Buah
Batang
Batang
Buah
Buah
Buah
Buah
Buah
Buah
Buah

56,000
35,000
12,000
500
18,000

1,000
60,000
299,000
38,500
6,250
423,500
350,000
25,000
3,300
32,500
17,500
125,400
84,700
23,000
800,000
1,540,000
52,000
10,000
65,000
7,500
8,000
20,000
16,000
18,200
48,750
185,000
225,000
750,000
475,000
397,500
2,000
240,500
87,500
42,500

HARGA
NO.
1
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64

J E N I S

B A H A N
2

Lampu Mercury 80 W
Lampu Selang
Lampu Son T 150 W
Lampu Son T 250 W
M C B 25 A
M C B 63 A
OK KWH Meter
Pal Besi 2" dan 1" MG
Pal Besi 4 & 3 MG
Pemasangan LPJU
Pole Band 8,5
SJ. 5
Soket Lampu Selang
T Does/Boxlit
Terminal Box Meter
Trafo Mercury 125 W
Trafo Mercury 250 W
Trafo BSN 150 W
Trafo BSN 250 W
Lampu Hias Christmas
Lampu Hias Windmill
Lampu Hias Cotton Rose
Lampu Hias Number One
Lampu Hias Dragon Phoenix
Lampu Hias Hepla
Tangga Besar 12 m
Tangga Kecil 6 m
Crystalite
Lampu XL 18 Watt
Sabuk Pengaman

SATUAN
3
Buah
Meter
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Unit
Buah
Buah
Meter
Buah
Buah
Buah
Buah
Buah
Buah
Unit
Unit
Unit
Unit
Unit
Unit
Buah
Buah
Buah
Buah
Buah

(Rp)
4
40,000
30,000
98,000
115,700
31,000
173,500
28,000
499,000
1,550,000
90,000
26,000
42,400
13,500
19,500
26,000
114,500
188,500
197,000
235,000
26,812,500
21,000,000
20,687,500
20,312,500
19,625,000
19,625,000
8,562,500
4,375,000
112,500
37,500
2,775,000

XIX. ALAT PEMADAM KEBEKARAN


1 Selang Pemadam Kebakaran fire house Appron/Murata/ Yamato with Machino Working Pressure 10 Kg/cm2
- 1,5 x 30 m, W/Coupling
roll
1,643,375
- 1,5 x 20 m, W/Coupling
roll
1,343,750
- 2 x 30 m, W/Coupling
roll
1,593,750
- 2 x 20 m, W/Coupling
roll
1,381,250
- 2,5 x 40 m
roll
2,650,500
- 2,5 x 30 m, W/Coupling
roll
2,437,500
- 2,5 x 20 m, W/Coupling
roll
1,981,250
2 Without Coupling
- 1,5 x 20 m
- 1,5 x 30 m
- 2 x 20 m
- 2 x 30 m
- 2,5 x 20 m
- 2,5 x 30 m
- 2,5 x 40 m

Tertera
Tertera
Tertera
Tertera
Tertera
Tertera
Tertera

334,800
502,800
502,800
765,600
612,000
931,200
1,239,600

3 Hydrant Box Kosong


- A1 (66 x 52 x 15 cm)
- A1 (100 x 80 x 18 cm)

Appron
Appron

780,000
2,122,200

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

HARGA
NO.
1

J E N I S

B A H A N

2
- A1 (125 x 75 x 18 cm)
- A1 (95 x 66 x 20 cm)
- A1KACA + Kunci, Tempered 5 mm
- A2KACA + Kunci, Tempered 5 mm
- B KACA + Kunci, Tempered 5 mm
- C KACA + Kunci, Tempered 5 mm
4 Fire Fighting Equipment Machino Coupling material Brass
- 1,5
- 2
- 2,5
- 3

SATUAN

(Rp)

3
Appron
Appron
Appron
Appron
Appron
Appron

4
2,543,400
2,122,200
1,441,800
2,478,600
2,899,800
2,478,600

Tertera
Tertera
Tertera
Tertera

107,500
131,250
192,500
305,000

5 Straight Nozzle (Machino Coupling) With Nozzle tip, Material Brass/ Branch pipa with straight Nozzle
- 1,5 Seamless
Tertera
420,000
- 2 Seamless
Tertera
532,500
- 2,5 Seamless, Short, W/O Grip
Tertera
582,500
- 2,5 Seamless, Long, W/O Grip
Tertera
725,000
- 2,5 Seamless, Long, W/ Grip
Tertera
746,250
- 1,5
Appron
42,250
- 2
Appron
593,125
- 2,5
Appron
966,875
6 Hydrant Valve (Machino Coupling) 90
Material Brass. 10 K
- 1,5
- 2
- 2,5

Tertera
Tertera
Tertera

207,600
290,000
472,800

7 Hydrant Valve (Machino Coupling) 90


Material Brass. 20 K
- 1,5
- 2
- 2,5

Tertera
Tertera
Tertera

429,600
666,250
898,750

8 Hose Rack
- 1,5, 1,24 COMB
- 2,5, 1,24 COMB

Unit
Unit

536,250
585,000

9 Spray Nozzle Head


- 1,5
- 2

Tertera
Tertera

258,750
390,000

10 Hose Reel
- 1 Hose Reel, Swing Type Complete
With box Siamese Conention
4 x 2,5 x 2,5 Machino Coupling

Tertera

1,860,000

11 Hydrant Pillar
- H14 AP 4 x 2,5 x 2,5
- H13 AP 3 x 2,5

Tertera
Tertera

5,768,400
3,084,200

12 On Trollen
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

HARGA
NO.

J E N I S

B A H A N

(Rp)

- Type AC 15 kapasitas 6 kg
- Type AC 50 kapasitas 23 kg

3
buah
buah

4
2,048,150
5,830,500

13 Pemancar Pemadam Kebakaran


- 1,5 (Variable)
- 2,5 (Variable)

Tertera
Tertera

2,160,000
3,000,000

buah
buah
kg
kg
unit

11,354,970
4,455,000
110,400
72,000
32,500,000

lot
kg
ltr
ltr
liter
ltr
liter
Kg
m2
m2
m3
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
kg
daun
/lb
/lb
/lb
/lb
/lb
/lb
unit
unit
unit
ltr
lbr

12,500
8,500
2,000
4,500
4,500
3,600
31,300
18,200
12,450
66,000
88,275
37,500,000
31,250,000
15,625,000
8,750,000
6,875,000
6,250,000
5,625,000
4,375,000
4,062,500
3,750,000
494,500
123,500
494,500
309,000
53,000
49,500
441,500
515,000
809,500
367,500
441,500
735,500
184,000
213,500
228,500
20,000
118,800

14
15
16
17
18

SATUAN

Noksel Foam
Foise Cabang 2 (dua)
Liquite
Pengisian Tabung Pemadam Kebakaran
Selang Isap 2,3 4 M

XX . L A I N - L A I N
1 Alat bantu (harga rata-rata)
2 Aspal
3 Minyak aspal
4 Bensin
5 Solar
6 Minyak tanah
7 Olie (minyak pelumas)
8 Stempet
9 Gebalan rumput
10 Wiremesh MS
11 Kayu bakar
12 Pintu Ronsel Doble 200 x 200 x 300
13 Pintu Ronsel Doble 150 x 150 x 300
14 Pintu Ronsel Engkel 100 x 100 x 300
15 Pintu Intake 100 x 100 x 300
16 Pintu Intake 90 x 100 x 300
17 Pintu Intake 80 x 80 x 300
18 Pintu Intake 60 x 60 x 300
19 Pintu Intake 50 x 50 x 300
20 Pintu Intake 40 x 40 x 300
21 Pintu Intake 30 x 40 x 300
22 Nomenklatur Marmer ( 30 x 40 )
23 Nomenklatur Marmer ( 15 x 20 )
24 Pile Scale ( 20 x 100 )
25 Pile Scale ( 12 x 100 )
26 Lapisan kedap air
27 Nako lengkap
28 PAGAR BRC.
Pagar BRC 90 A1
Pagar BRC 120 A1
Pagar BRC 150 A1
Pagar BRC 90 A2
Pagar BRC 120 A2
Pagar BRC 150 A2
Pipa Tiang BRC 90 - 2"
Pipa Tiang BRC 120 - 2"
Pipa Tiang BRC 150 - 2"
29 Minyak Beton & bekisting
30 Allumunium sheet 0,3 mm (90 x 180)
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

HARGA
NO.

J E N I S

1
31 Shear Connector

B A H A N
2

SATUAN
3
kg

rasionalisasi
tidak ada bahan, harga tahun kemarin tambah 5%
perbedaan tll mencolok
sama dengan harga tahun kemarin

(Rp)
4
10,000
Rembang,

KEPALA DINAS PEK


KABUPATEN R

NIP. 19620715 1

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

MUBAROK
PANCUR

ARDI KARYA
REMBANG

70,000

RAMAI

SARANG
7

SINAR LAUT
SLUKE
8

AL HASAN

SEDAN

200,000
100,000
125,000
60,000
15,000
225,000

170,000
165,000

225,000
225,000

275

300

130,000
130,000

350

110,000
175,000
350,000
175,000
85,000
85,000
145,000
175,000

55,000
40,000
55,000

80,000

53,000

800,000
1,500
52,500

52,000

41,500

51,000

41,000
65,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

MUBAROK
PANCUR

ARDI KARYA
REMBANG

800

RAMAI

SARANG
7

500

1,000

650

5,500

7,500
2,000

8,800
3,500

17,000
1,600

17,500

AL HASAN

800

600
1,500
4,900

SINAR LAUT
SLUKE

800

SEDAN

550

500

550

300
550

1,100
5,000

1,500
2,500

31,000
27,500
51,000
55,000
70,000
27,000
37,000

27,000

33,000

12,500

17,500
80,000

750

2,500

40,000
47,000
55,000
68,000
15,000
22,500

22,500

16,000
27,500

17,000,000
17,000,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

12,000
12,000

11,000
12,000

MUBAROK
PANCUR

ARDI KARYA
REMBANG

5
4,500,000
4,500,000

6
6,000,000
6,000,000

4,000,000
4,000,000

6,000,000
6,000,000

7,000,000
7,000,000

9,000,000
9,000,000

RAMAI

SARANG
7

SINAR LAUT
SLUKE
8
4,000,000
4,000,000

6,500,000
6,500,000

400,000

25,000

5,000

21,000
20,000
22,000

35,000
33,000
30,000
28,000

42,000
38,000
28,000
26,000

28,000
27,000
26,000

27,000
26,000
25,000
23,500

35,000

40,000
43,000

35,000
34,000

32,500
31,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

AL HASAN
9

SEDAN

MUBAROK
PANCUR
5

ARDI KARYA
REMBANG
6

RAMAI

SARANG
7

SINAR LAUT
SLUKE
8

AL HASAN

SEDAN

40,000
30,000
50,000
70,000
85,000
115,000
165,000

55,000
70,000
80,000
100,000
115,000
185,000

19,000
27,500

30,000
33,000
50,000

12,500

15,000

13,000
17,000

13,000

6,000
7,000
9,000

17,500
22,000
27,000

10,000
13,000

13,000
25,000
31,000
44,000
62,000

27,000

26,000

18,000
22,500
28,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

21,000

52,500

50,000

MUBAROK
PANCUR
5

ARDI KARYA
REMBANG
6

RAMAI

SARANG
7

SINAR LAUT
SLUKE
8

AL HASAN

SEDAN

95,000
40,000
65,000

45,000
60,000
70,000

38,000

34,000

65,000

55,000

115,000

95,000

60,000
60,000
60,000

12,500

15,000

11,000

90,000

25,000

35,000
50,000
75,000
8,500

20,000
20,000
5,000
35,000
52,000
75,000
12,000
20,000
25,000
25,000
25,000

15,000

35,000
12,000

12,500
10,000
2,500

36,000
55,000
8,000

9,000

40,000
5,000

24,000

18,000

12,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

3,500
33,000
37,000
60,000
8,000

25,000

20,000
35,971

12,000

35,000
60,000

5,000

MUBAROK
PANCUR
5

ARDI KARYA
REMBANG
6

3,555
12,500

25,000
50,000
35,000

90,000

RAMAI

SARANG
7

8,000
22,000
16,000

20,000
52,000
35,000
15,000

SINAR LAUT
SLUKE

17,000
38,000
12,000

9
7,000

11,000

12,000

30,000
36,000
16,000

2,000
2,000

225,000
55,000

55,000
25,000

950,000
100,000
300,000
450,000

250,000
82,500
250,000
150,000

15,000
30,000

11,500

12,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

13,000
20,000

SEDAN

62,000

5,000
5,000
5,000
5,000

13,000
16,000

AL HASAN

8,000

90,000

11,000
17,500

13,000
20,000

11,000

9,000

MUBAROK
PANCUR
5

ARDI KARYA
REMBANG
6

RAMAI

SARANG
7

28,000
28,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

SINAR LAUT
SLUKE
8

AL HASAN
9

SEDAN

MUBAROK
PANCUR
5

ARDI KARYA
REMBANG
6

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

RAMAI

SARANG
7

SINAR LAUT
SLUKE
8

AL HASAN
9

SEDAN

MUBAROK
PANCUR
5

ARDI KARYA
REMBANG
6

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

RAMAI

SARANG
7

SINAR LAUT
SLUKE
8

AL HASAN
9

SEDAN

MUBAROK
PANCUR
5

ARDI KARYA
REMBANG
6

essure 10 Kg/cm2

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

RAMAI

SARANG
7

SINAR LAUT
SLUKE
8

AL HASAN
9

SEDAN

MUBAROK
PANCUR
5

ARDI KARYA
REMBANG
6

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

RAMAI

SARANG
7

SINAR LAUT
SLUKE
8

AL HASAN
9

SEDAN

MUBAROK
PANCUR
5

ARDI KARYA
REMBANG
6

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

RAMAI

SARANG
7

SINAR LAUT
SLUKE
8

AL HASAN
9

SEDAN

MUBAROK
PANCUR

ARDI KARYA
REMBANG

Rembang,

April 2010

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 19620715 199011 1 002

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

RAMAI

SARANG
7

SINAR LAUT
SLUKE
8

AL HASAN
9

SEDAN

LISA
GUNEM
10

UMBUL REJEKI
BULU

BAROKAH
SUMBER

KALIORI

SUMBER LAUT
LASEM

11

12

13

14

75,000

90,000

150,000
90,000

300

150,000
150,000
170,000
170,000

175,000
175,000

270

280

100,000

75,000
95,000

300

110,000
95,000

110,000
60,000

20,000

1,000
52,000

53,000

52,000

75,000

90,000

62,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

52,500

LISA
GUNEM
10

UMBUL REJEKI
BULU

BAROKAH
SUMBER

KALIORI

SUMBER LAUT
LASEM

11

12

13

14

600

700

850
300
500

1,050

540

2,000

38,000
45,000

23,000

23,000

74,000

13,000
26,000

40,000
45,000

19,000
26,000

8,000,000
8,000,000
8,000,000
8,000,000
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

15,500
22,500

LISA
GUNEM
10

UMBUL REJEKI
BULU
11
7,000,000
7,000,000

7,000,000
7,000,000

BAROKAH
SUMBER

KALIORI

SUMBER LAUT
LASEM

12

13

14

7,500,000
7,500,000

20,000

30,500
27,500
27,500
25,000

31,000
27,000
26,000
25,000

27,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

27,500

LISA
GUNEM
10

UMBUL REJEKI
BULU

BAROKAH
SUMBER

KALIORI

SUMBER LAUT
LASEM

11

12

13

14

25,000
35,000
42,500
65,000
70,000
90,000
122,500
240,000

55,000

85,000
160,000

17,500
25,000

19,000
29,000

15,000

15,000

25,000

23,000

21,000

8,500
12,500
17,000

12,000
14,000
16,000

22,000

17,500
21,500
27,000

35,000

20,000

14,000

15,500

15,000

27,000

120,000

56,000
210,000
371,000
647,500

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

LISA
GUNEM
10

UMBUL REJEKI
BULU

BAROKAH
SUMBER

KALIORI

SUMBER LAUT
LASEM

11

12

13

14

100,000
38,000

42,000
60,000

47,000
65,000
75,000

43,000
70,000

110,000
140,000

15,000
3,750
36,000
60,000
7,500

17,500
18,000
3,000
30,000
40,000
55,000
8,000

20,000
3,000

95,000
127,500

12,000

11,000

21,000
21,000
3,000

12,500
11,500
3,125
37,000

70,000
8,000
20,000

25,000
6,000
15,000

15,000
4,000

45,000
5,000

9,000

22,500

18,000

19,000

65,000
8,500

55,000
8,000

21,000
26,000
20,000
20,000

20,000
25,000

4,000
25,000

6,500
24,000
18,500
48,000

29,000

8,000

10,000
9,000
15,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

40,000
47,500
62,500

20,000
12,000
8,800

LISA
GUNEM
10

9,500

UMBUL REJEKI
BULU

BAROKAH
SUMBER

KALIORI

SUMBER LAUT
LASEM

11

12

13

14

12,000

3,750

20,000
60,000
42,000
20,000
45,000
3,000

2,000
2,000

3,000
3,000

65,000

95,000

27,500

120,000
100,000

36,000

15,000

40,000
5,000
5,000
3,000
3,000

10,500

6,500
45,000
3,500

12,000
33,500
9,500

30,000
37,000
35,000
18,500
3,000
4,000
2,000
2,000

60,000

95,000
65,000

95,000

90,000

155,000

175,000

165,000

165,000

11,000
27,000

12,000
25,000

15,000
24,000

14,000
18,500

12,000
20,000

2,000
12,000

11,500

12,000

11,000

10,500
5,000

45,000

40,000

45,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

LISA
GUNEM
10

UMBUL REJEKI
BULU

BAROKAH
SUMBER

KALIORI

SUMBER LAUT
LASEM

11

12

13

14

23,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

LISA
GUNEM
10

UMBUL REJEKI
BULU

BAROKAH
SUMBER

KALIORI

SUMBER LAUT
LASEM

11

12

13

14

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

LISA
GUNEM
10

UMBUL REJEKI
BULU

BAROKAH
SUMBER

KALIORI

SUMBER LAUT
LASEM

11

12

13

14

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

LISA
GUNEM
10

UMBUL REJEKI
BULU

BAROKAH
SUMBER

KALIORI

SUMBER LAUT
LASEM

11

12

13

14

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

LISA
GUNEM
10

UMBUL REJEKI
BULU

BAROKAH
SUMBER

KALIORI

SUMBER LAUT
LASEM

11

12

13

14

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

LISA
GUNEM
10

UMBUL REJEKI
BULU

BAROKAH
SUMBER

KALIORI

SUMBER LAUT
LASEM

11

12

13

14

24,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

LISA
GUNEM
10

UMBUL REJEKI
BULU

BAROKAH
SUMBER

KALIORI

SUMBER LAUT
LASEM

11

12

13

14

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

HARTONO

LASEM

15

RIMBA RAYA
PAMOTAN
16

71,429

150,000
150,000
150,000

BAROKAH
SULANG

SIDODADI
SALE

17

65,000

18

100,000

75,000
100,000
125,000

120,000
110,000

155,000
160,000
150,000

275

REJO - KRAGAN
19

250

107,143

140,000

60,000
45,000
50,000

60,000

55,000

52,000

41,000

25,000
25,000
30,000

52,000
80,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

HARTONO

LASEM

15

RIMBA RAYA
PAMOTAN
16

BAROKAH
SULANG

SIDODADI
SALE

17

REJO - KRAGAN

18

19

500

500

550

600

800

800
300
500
1,500

600
650
650

650

800
1,200
4,500
5,000

12,000
2,250

5,000
1,500
5,000

2,000

2,000
27,000
33,000
47,000

30,000

35,000
40,000

12,000

12,000

500

33,000
43,000
17,000
22,000

6,500,000
6,500,000
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

19,500
25,000

15,000
22,000

HARTONO

LASEM

15

RIMBA RAYA
PAMOTAN
16
3,500,000
3,500,000

BAROKAH
SULANG
17

SIDODADI
SALE

REJO - KRAGAN

18

19

6,000,000
6,000,000

5,000
10,000

20,000
15,000
19,000

20,000
17,000
22,000

27,000
25,000
23,000
20,000

27,500
26,500
25,000
24,000

30,000
30,000

35,000
35,000
25,000

85,000
100,000
85,000
100,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

25,000

37,500

29,500

37,000
35,000

HARTONO

LASEM

15

RIMBA RAYA
PAMOTAN
16

BAROKAH
SULANG
17

SIDODADI
SALE

REJO - KRAGAN

18

14,000

19

14,000

12,000
22,000

4,200
5,000
6,300

8,500
12,500
15,000

11,700

20,000

13,000

50,000

49,000
88,000
153,000
208,000
353,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

11,500
14,500

HARTONO

LASEM

15

RIMBA RAYA
PAMOTAN
16

BAROKAH
SULANG

SIDODADI
SALE

17

REJO - KRAGAN

18

19

45,000
35,000
45,000
55,000

38,000
45,000
65,000

90,000
115,000

95,000
110,000

11,000

12,000

15,000

40,000
50,000
60,000

45,500

130,000

15,000

17,500
2,000

20,000

37,500

9,000
12,500

13,000
3,500
25,000
36,000
65,000
9,000
13,000
30,500

30,000
30,000

20,000

5,000

5,000

8,000
12,000

7,500
14,000

15,000

8,000
10,000

6,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

37,000

HARTONO

LASEM

15

RIMBA RAYA
PAMOTAN
16

BAROKAH
SULANG

SIDODADI
SALE

17

REJO - KRAGAN

18

19

12,000
20,000
10,000

15,000

20,000
37,500

5,000

8,000

10,000

3,500

80,000

150,000
70,000

90,000
225,000
175,000
12,000
20,000

9,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

13,000
21,000

13,000
18,000

11,000

13,000

10,000
20,000

HARTONO
15

LASEM

RIMBA RAYA
PAMOTAN
16

BAROKAH
SULANG
17

SIDODADI
SALE

REJO - KRAGAN

18

19
27,500

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

HARTONO
15

LASEM

RIMBA RAYA
PAMOTAN
16

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

BAROKAH
SULANG
17

SIDODADI
SALE
18

REJO - KRAGAN
19

HARTONO
15

LASEM

RIMBA RAYA
PAMOTAN
16

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

BAROKAH
SULANG
17

SIDODADI
SALE
18

REJO - KRAGAN
19

HARTONO
15

LASEM

RIMBA RAYA
PAMOTAN
16

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

BAROKAH
SULANG
17

SIDODADI
SALE
18

REJO - KRAGAN
19

HARTONO
15

LASEM

RIMBA RAYA
PAMOTAN
16

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

BAROKAH
SULANG
17

SIDODADI
SALE
18

REJO - KRAGAN
19

HARTONO
15

LASEM

RIMBA RAYA
PAMOTAN
16

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

BAROKAH
SULANG
17

SIDODADI
SALE
18

REJO - KRAGAN
19

HARTONO
15

LASEM

RIMBA RAYA
PAMOTAN
16

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

BAROKAH
SULANG
17

SIDODADI
SALE
18

REJO - KRAGAN
19

KURNIA PASAR
REMBANG

KEBOEN RAYA
REMBANG

REMBANG JAYA
DIESEL

ANEKA PUNDITIRTA
JAKARTA (UNILON)

20

21

22

23

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

ANEKA PUNDITIRTA
JAKARTA (POLY
UNGGUL)
24

KURNIA PASAR
REMBANG

KEBOEN RAYA
REMBANG

REMBANG JAYA
DIESEL

ANEKA PUNDITIRTA
JAKARTA (UNILON)

20

21

22

23

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

ANEKA PUNDITIRTA
JAKARTA (POLY
UNGGUL)
24

KURNIA PASAR
REMBANG

KEBOEN RAYA
REMBANG

REMBANG JAYA
DIESEL

ANEKA PUNDITIRTA
JAKARTA (UNILON)

20

21

22

23

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

ANEKA PUNDITIRTA
JAKARTA (POLY
UNGGUL)
24

KURNIA PASAR
REMBANG

KEBOEN RAYA
REMBANG

REMBANG JAYA
DIESEL

ANEKA PUNDITIRTA
JAKARTA (UNILON)

20

21

22

23

3,800
5,700
9,620
11,880
18,770
28,390
40,970
60,210
88,120
144,050
190,000
295,450
466,220
743,260
1,245,690

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

ANEKA PUNDITIRTA
JAKARTA (POLY
UNGGUL)
24

3000
5833
7667
12042
18708
27625
40833
59167
85542
184583
288333
451250
712500

KURNIA PASAR
REMBANG

KEBOEN RAYA
REMBANG

REMBANG JAYA
DIESEL

ANEKA PUNDITIRTA
JAKARTA (UNILON)

20

21

22

23

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

ANEKA PUNDITIRTA
JAKARTA (POLY
UNGGUL)
24

KURNIA PASAR
REMBANG

KEBOEN RAYA
REMBANG

REMBANG JAYA
DIESEL

ANEKA PUNDITIRTA
JAKARTA (UNILON)

20

21

22

23

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

ANEKA PUNDITIRTA
JAKARTA (POLY
UNGGUL)
24

KURNIA PASAR
REMBANG

KEBOEN RAYA
REMBANG

REMBANG JAYA
DIESEL

ANEKA PUNDITIRTA
JAKARTA (UNILON)

20

21

22

23

6,000
125,000
1,000,000
700
2,300
2,000
1,600

6,500

12500 - 75000

15000 - 25000
15000 - 25000
5000 - 75000
7500 - 75000
5000 - 25000
7500 - 25000
7500 - 25000
7500 - 25000
17500 - 75000
7500 - 50000
5000 - 35000
5000 - 35000
15000 - 75000
5000 - 25000
2500 - 5000
2500 - 5000
2500 - 5000

2500 - 5000
15000 - 250000
7500 - 150000
7500 - 150000
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

ANEKA PUNDITIRTA
JAKARTA (POLY
UNGGUL)
24

KURNIA PASAR
REMBANG
20

KEBOEN RAYA
REMBANG
21
15000 - 150000
7500 - 60000
15000 - 35000
2500 - 15000
2500 - 15000

REMBANG JAYA
DIESEL

ANEKA PUNDITIRTA
JAKARTA (UNILON)

22

23

10,000
10000 - 35000
45000 - 150000
2500 - 7500
5000 - 15000
2500 - 15000

10,000
25,000
6,700,000
30,000

1,000,000
1,300,000
35,000

165,000
15,000
7,500

3,200
22,500
5,000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

ANEKA PUNDITIRTA
JAKARTA (POLY
UNGGUL)
24

KURNIA PASAR
REMBANG

KEBOEN RAYA
REMBANG

REMBANG JAYA
DIESEL

ANEKA PUNDITIRTA
JAKARTA (UNILON)

20

21

22

23

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

ANEKA PUNDITIRTA
JAKARTA (POLY
UNGGUL)
24

KURNIA PASAR
REMBANG

KEBOEN RAYA
REMBANG

REMBANG JAYA
DIESEL

ANEKA PUNDITIRTA
JAKARTA (UNILON)

20

21

22

23

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

ANEKA PUNDITIRTA
JAKARTA (POLY
UNGGUL)
24

KURNIA PASAR
REMBANG

KEBOEN RAYA
REMBANG

REMBANG JAYA
DIESEL

ANEKA PUNDITIRTA
JAKARTA (UNILON)

20

21

22

23

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

ANEKA PUNDITIRTA
JAKARTA (POLY
UNGGUL)
24

KURNIA PASAR
REMBANG

KEBOEN RAYA
REMBANG

REMBANG JAYA
DIESEL

ANEKA PUNDITIRTA
JAKARTA (UNILON)

20

21

22

23

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

ANEKA PUNDITIRTA
JAKARTA (POLY
UNGGUL)
24

KURNIA PASAR
REMBANG

KEBOEN RAYA
REMBANG

REMBANG JAYA
DIESEL

ANEKA PUNDITIRTA
JAKARTA (UNILON)

20

21

22

23

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

ANEKA PUNDITIRTA
JAKARTA (POLY
UNGGUL)
24

SENTRAL INDO
SAFETY
SEMARANG
25

HARGA RATA - RATA


26

102,900
78,061
112,500
75,000
15,000
187,500

20%
2.5%
22.5%
27

DI
BULAT
KAN
28

126,053
95,625
137,813
183,750
91,875
18,375

167,143
163,571

229,688
189,875
204,750
200,375

289

354

NAIK
ATAU
TURUN
29

126,100
95,700
137,900
183,800
91,900
18,400
26,300
229,700
190,000
204,800
200,400
27,200
400

28,100
(3,700)
14,400
(5,800)
29,400
12,900
(7,800)
(26,700)
(21,500)
(24,000)
35

138,333
80,000
65,000
97,500
142,500

59,115
144,750
214,375
169,458
98,000
79,625
119,438
174,563

58,333

71,458

40,000
46,000

49,000
42,000
56,350

59,200
144,800
214,400
169,500
98,000
79,700
119,500
174,600
201,600
71,500
32,200
49,000
42,000
56,400

1,250

187,110
1,531

187,200
1,600

9,000
(900)

49,375

60,484

(4,300)

74,400

91,140

60,500
54,500
91,200
4,900

118,163

857,100
909,600
949,100

247,200
2,700
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

2,900
6,300
(66,900)
13,200
1,100
54,900
25,700
68,300
(10,400)
(1,000)
(3,400)
(6,100)

9,900

SENTRAL INDO
SAFETY
SEMARANG
25

HARGA RATA - RATA


26

20%
2.5%
22.5%
27

DI
BULAT
KAN
28

NAIK
ATAU
TURUN
29
8,700

600

735

783
388
614
1,325
4,975

960
475
752
1,623
6,094

6,575
1,936
3,750
15,500
1,950

8,054
2,371
4,594
18,988
2,389

800
2,800
1,000
500
800
1,700
6,100
6,000
8,100
2,400
4,600
19,000
2,400

(100)

32,000
28,875
49,000
55,000
72,000
31,667
38,500

39,200
35,372
60,025
67,375
88,200
38,792
47,163

39,200
35,400
60,100
67,400
88,200
38,800
47,200

(2,500)
(13,550)
(13,400)
4,900
(8,100)
(4,600)
(9,100)

12,857
32,500

15,750
39,813

(1,500)
(8,100)

1,250

1,531

15,800
39,900
64,700
1,600

(100)
(100)
(100)
(2,300)
(4,000)
(1,500)
(500)
(3,650)
1,400
(1,100)

300

52,400
68,000
40,200
45,100
40,000
46,000

49,000
56,350

44,000
55,500

53,900
67,988

16,714
23,929

20,475
29,313

20,500
29,400
48,600

(800)
(1,000)

12,500,000
12,500,000

15,312,500
15,312,500

15,312,500
15,312,500

625,000
625,000

7,250,000
7,250,000

8,881,250
8,881,250

8,881,300
8,881,300

756,300
756,300

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

49,000
56,400
77,500
53,900
68,000

(700)
(1,000)
10,100
9,200

SENTRAL INDO
SAFETY
SEMARANG
25

HARGA RATA - RATA


26
5,000,000
5,000,000

20%
2.5%
22.5%
27
6,125,000
6,125,000

DI
BULAT
KAN
28
6,125,000
6,125,000

NAIK
ATAU
TURUN
29
187,500
187,500

3,281,250
3,281,250

3,281,300
3,281,300

156,300
156,300

3,281,300
3,281,300
7,166,667
7,166,667

8,779,167
8,779,167

8,779,200
8,779,200

654,200
29,200

1,968,750

34,100
1,968,800

93,800

5,000

6,125

602,600
16,300
4,000
4,634,500
2,471,700
196,900
6,200

23,917
17,333
21,000

29,298
21,233
25,725

29,300
21,300
25,800

1,100
(400)
(300)

30,833
28,750
26,444
24,500

37,771
35,219
32,394
30,013

(7,400)
(5,100)
(3,800)
(2,700)

34,917
33,750
25,000

42,773
50,505
41,685

37,800
35,300
32,400
30,100
53,200
42,800
50,600
41,700

16,275
3,990

800
200

300

(1,000)
2,500
2,000

579,900
973,100
1,318,400

85,000
100,000
85,000
100,000

441,788
482,003
440,055
459,375

441,800
482,100
440,100
459,400

125,400
230,800
64,400
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

21,050
23,050
21,000
21,900

SENTRAL INDO
SAFETY
SEMARANG
25

HARGA RATA - RATA


26

20%
2.5%
22.5%
27

DI
BULAT
KAN
28

32,500

39,813

40,000
54,375
71,667
85,000
101,250
158,125
240,000

49,000
66,609
87,792
104,125
124,031
193,703
294,000
51,555
34,650
40,272

32,875

39,900
52,500
49,000
66,700
87,800
104,200
124,100
193,800
294,000
51,600
35,000
40,300

NAIK
ATAU
TURUN
29

4,400
(4,200)
4,200
9,100
6,000
7,200
16,300
1,800
2,500
(3,600)
(7,200)

10,700
17,700
14,500

15,500

17,700
18,600

14,000
17,000
23,000

17,150
20,825
28,175

17,200
20,900
28,200

1,000
4,050
(1,800)

3,400
5,767
8,643
11,961
18,739
28,008
40,902
59,688
86,831
144,050
187,292
291,892
458,735
727,880
1,245,690

4,131
7,007
10,502
14,532
22,768
34,029
49,696
72,521
105,499
175,021
227,559
354,648
557,363
884,374
1,513,513

4,200
7,100
10,600
14,600
22,800
34,100
49,700
72,600
105,500
175,100
227,600
354,700
557,400
884,400
1,513,600

100
1,100
350
1,600
2,600
3,600
5,950
9,950
11,950
20,725
27,200
38,050
57,900
88,300
171,550

113,900
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

SENTRAL INDO
SAFETY
SEMARANG
25

HARGA RATA - RATA


26

20%
2.5%
22.5%
27

DI
BULAT
KAN
28
154,700
290,000

NAIK
ATAU
TURUN
29

80,000

98,000

98,000

8,400

40,179
52,083
63,864

49,219
63,802
78,233

49,300
63,900
78,300

(1,400)
(1,800)
(5,300)

100,000

122,500
171,500

122,500
171,500
17,400
15,100
8,800
11,200
28,700
105,000
73,500
73,500
53,300
57,000
15,300
7,300
241,100

(400)
(12,900)

700
800

60,000
60,000

105,000
73,500
73,500

12,438

15,236
241,028

16,636
16,214
3,238

20,380
19,863
3,966

32,056
40,857
63,500
8,875
16,375
20,500
26,083
20,250
20,833

39,268
50,050
77,788
10,872
20,059
25,113
31,952
24,806
25,521
55,125
7,044
30,013
23,625
35,525

20,400
19,900
4,000
5,800
39,300
50,100
77,800
10,900
20,100
25,200
32,000
24,900
25,600
55,200
7,100
30,100
23,700
35,600

20,417
14,317
25,690

900
20,500
14,400
25,700

5,750
24,500
19,286

16,667
11,688
20,971
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

5,000
11,600
(1,500)

(7,600)
11,550

(400)
(900)
30,500
100
1,600
6,400
700
4,000
2,700
(14,200)
200
5,500
4,500
2,400

3,000
-

SENTRAL INDO
SAFETY
SEMARANG
25

17,426
25,167
11,636

21,347
30,829
14,255

DI
BULAT
KAN
28
21,400
30,900
14,300

22,125
44,071
37,000
12,111
43,333
3,821
4,667
2,833
2,833

27,103
53,988
45,325
14,836
53,083
4,681
5,717
3,471
3,471

27,200
54,000
45,400
14,900
53,100
4,700
5,800
3,500
3,500

3,500
7,300
(300)
300
32,400
(900)
(300)
100
100

75,000

91,875

91,900
91,900

(5,000)

HARGA RATA - RATA


26

20%
2.5%
22.5%
27

NAIK
ATAU
TURUN
29
4,300
(1,200)

7,600

123,750
54,500

151,594
66,763

151,600
66,800

10,900
7,400

5,700
6,900
10,000
18,600

450,000
88,438
205,000

551,250
108,336
367,500
251,125

551,300
108,400
367,500
251,200

20,000
(4,100)
(88,800)
13,700

12,643
21,214

15,488
25,988

300
3,300

2,000
11,125
5,000
43,333

2,450
13,628
13,073
53,083

15,500
26,000
21,800
2,500
13,700
13,100
53,100

2,530,900
4,428,300
6,488,300
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

(2,000)
(2,950)
650
7,450

SENTRAL INDO
SAFETY
SEMARANG
25

HARGA RATA - RATA


26

20%
2.5%
22.5%
27

DI
BULAT
KAN
28
56,900
32,100
97,500
46,000
49,500
52,500
21,300
73,200
98,600
10,700
17,400

NAIK
ATAU
TURUN
29

26,167
28,000

32,054
97,440

6,000

700
2,300
2,000
1,600

7,350
288,750
866,250
858
2,818
2,450
1,960

7,400
288,800
866,300
900
2,900
2,500
2,000

2,450
13,800
41,300
(1,300)
150
(250)
(750)

6,500

7,963

8,000

(3,000)

12500 - 75000

15313 - 91875

15000 - 25000
15000 - 25000
5000 - 75000
7500 - 75000
5000 - 25000
7500 - 25000
7500 - 25000
7500 - 25000
17500 - 75000
7500 - 50000
5000 - 35000
5000 - 35000

18375 - 30625
18375 - 30625
6125 - 91875
9188 - 91875
6125 - 30625
9188 - 30625
9188 - 30625
9188 - 30625
21438 - 91875
9188 - 61250
6125 - 42875
6125 - 42875

15000 - 75000
5000 - 25000
2500 - 5000
2500 - 5000
2500 - 5000

18375 - 91875
6125 - 30625
3063 - 6125
3063 - 6125
3063 - 6125

2500 - 5000
15000 - 250000
7500 - 150000
7500 - 150000

3063 - 6125
18375 - 306250
9188 - 183750
9188 - 183750

15400 - 91900
11,600
2,900
18400 - 30700
18400 - 30700
6200 - 91900
9200 - 91900
6200 - 30700
9200 - 30700
9200 - 30700
9200 - 30700
21500 - 91900
9200 - 61300
6200 - 42900
6200 - 41900
7,000
18400 - 91900
6200 - 30700
3100 - 6200
3100 - 6200
3100 - 6200
10,700
6,400
3100 - 6200
18400 - 306300
9200 - 183800
9200 - 183800

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

(1,300)
4,700

SENTRAL INDO
SAFETY
SEMARANG
25

26
15000 - 150000
7500 - 60000
15000 - 35000
2500 - 15000
2500 - 15000

20%
2.5%
22.5%
27
18375 - 183750
9188 - 73500
18375 - 42875
3063 - 18375
3063 - 18375

10,000
10000 - 35000
45000 - 150000
2500 - 7500
5000 - 15000
2500 - 15000

12,250
12250 -- 42875
55125 - 183750
3063 - 9188
6125 - 18375
3063 - 18375

HARGA RATA - RATA

10,000
25,000

12,250
30,625
11,550,000
131,670

8,085,000
3,753,750
577,500

288,750
63,525
36,750

6,300
40,950
17,850

DI
BULAT
KAN
28
18400 - 183800
9200 - 73500
18400 - 42900
3100 - 18400
3100 - 18400
36,300
12,300
12300 - 42900
55200 - 183800
3100 - 9200
6200 - 18400
3100 - 18400

600
800
12,600
6,300
12,300
30,700
11,550,000
14,437,500
131,700
173,300
57,800
6,930,000
8,085,000
3,753,800
5,800
577,500
693,000
693,000
288,800
144,400
288,800
294,000
63,600
36,800
23,100
14,700
6,300
41,000
17,900
7,400

11,600
20,000
15,800
52,500
15,800
7,400
12,600
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

NAIK
ATAU
TURUN
29

7,700

1,300
9,800
550,000
6,300

385,000
178,800
27,500

13,800
3,100
1,800

300
2,000
900

SENTRAL INDO
SAFETY
SEMARANG
25

HARGA RATA - RATA


26

20%
2.5%
22.5%
27

DI
BULAT
KAN
28
58,800
36,800
12,600
600
18,900

17,900
23,100
32,400
9,300
34,700
110,300
14,500
20,300
7,000
5,800

1,100
63,000
314,000
40,500
6,600
444,700
367,500
26,300
3,500
34,200
18,400
131,700
89,000
24,200
840,000
1,617,000
54,600
10,500
68,300
7,900
8,400
21,000
16,800
19,200
51,200
194,300
236,300
787,500
498,800
417,400
2,100
252,600
91,900
44,700
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

NAIK
ATAU
TURUN
29

SENTRAL INDO
SAFETY
SEMARANG
25

HARGA RATA - RATA


26

20%
2.5%
22.5%
27

DI
BULAT
KAN
28
42,000
31,500
102,900
121,500
32,600
182,200
29,400
524,000
1,627,500
94,500
27,300
44,600
14,200
20,500
27,300
120,300
198,000
206,900
246,800
28,153,200
22,050,000
21,721,900
21,328,200
20,606,300
20,606,300
8,990,700
4,593,800
118,200
39,400
2,913,800

NAIK
ATAU
TURUN
29

1,988,470
1,625,977.5
1,928,439.5
1,671,312.5
3,207,105
2,949,375
2,397,312.5

1,988,470
1,625,977.5
1,928,439.5
1,671,312.5
3,207,105
2,949,375
2,397,312.5

2,435,876
1,991,822
2,362,338
2,047,358
3,928,704
3,612,984
2,936,708

2,435,900
1,991,900
2,362,400
2,047,400
3,928,800
3,613,000
2,936,800

792,525
648,150
768,650
666,150
1,278,300
1,175,500
955,550

405,130
608,410
608,410
926,365
748,520
1,126,785
1,499,905

405,130
608,410
608,410
926,365
748,520
1,126,785
1,499,905

496,284
745,302
745,302
1,134,797
916,937
1,380,312
1,837,384

496,300
745,400
745,400
1,134,800
917,000
1,380,400
1,837,400

161,500
242,600
242,600
369,200
305,000
449,200
597,800

943,800
2,567,895

943,800
2,567,895

1,156,155
3,145,671

1,156,200
3,145,700

376,200
1,023,500

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

SENTRAL INDO
SAFETY
HARGA RATA - RATA
SEMARANG
25
26
3,677,525
3,677,525
2,567,895
2,567,895
1,744,600
1,744,600
2,999,150
2,999,150
3,508,780
3,508,780
2,999,150
2,999,150

20%
2.5%
22.5%
27
4,504,968
3,145,671
2,137,135
3,673,959
4,298,256
3,673,959

DI
BULAT
KAN
28
4,505,000
3,145,700
2,137,200
3,674,000
4,298,300
3,674,000

NAIK
ATAU
TURUN
29
1,961,600
1,023,500
695,400
1,195,400
1,398,500
1,195,400

130,075
158,812.5
232,925
369,050

130,075
158,813
232,925
369,050

159,342
194,545
285,333
452,086

159,400
194,600
285,400
452,100

51,900
63,350
92,900
147,100

508,200
644,325
704,825
877,350
902,962.5
51,122.5
717,695
1,169,905

508,200
644,325
704,825
877,350
902,963
51,123
717,695
1,169,905

622,545
789,298
863,411
1,074,754
1,106,129
62,625
879,176
1,433,134

622,600
789,300
863,500
1,074,800
1,106,200
62,700
879,200
1,433,200

202,600
256,800
281,000
349,800
359,950
20,450
286,075
466,325

230,000
250,000
570,000

230,000
250,000
570,000

281,750
306,250
698,250

281,800
306,300
698,300

74,200
16,300
225,500

512,500
782,850
1,250,500

512,500
782,850
1,250,500

627,813
958,991
1,531,863

627,900
959,000
1,531,900

198,300
292,750
633,150

600,000
675,500

600,000
675,500

735,000
827,488

735,000
827,500

198,750
242,500

315,500
500,000

315,500
500,000

386,488
612,500

386,500
612,500

127,750
222,500

2,100,000

2,100,000

2,572,500

2,572,500

2,572,500

1,953,000

1,953,000

93,000

6,979,775
3,731,915

8,550,224
4,571,596

8,550,300
4,571,600

2,781,900
1,487,400

6,979,775
3,731,915

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

SENTRAL INDO
SAFETY
HARGA RATA - RATA
SEMARANG
25
26
2,478,245
2,478,245
7,054,905
7,054,905

20%
2.5%
22.5%
27
3,035,850
8,642,259

DI
BULAT
KAN
28
3,035,900
8,642,300

NAIK
ATAU
TURUN
29
987,750
2,811,800

2,613,600
3,630,000

2,613,600
3,630,000

3,201,660
4,446,750

3,201,700
4,446,800

1,041,700
1,446,800

6,500,000
3,500,000
133,595
87,120
39,325,000

6,500,000
3,500,000
133,595
87,120
39,325,000

7,962,500
4,287,500
163,654
106,722
48,173,125

7,962,500
4,287,500
163,700
106,800
48,173,200

(3,392,470)
(167,500)
53,300
34,800
15,673,200

8,925

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

13,200
9,000
2,100
4,800
4,800
3,800
32,900
19,200
13,100
69,300
92,700
37,500,000
31,250,000
15,625,000
8,750,000
6,875,000
6,250,000
5,625,000
4,375,000
4,062,500
3,750,000
519,300
129,700
519,300
324,500
55,700
52,000
463,600
540,800
850,000
385,900
463,600
772,300
193,200
224,200
240,000
21,000
124,800

500

SENTRAL INDO
SAFETY
SEMARANG
25

HARGA RATA - RATA


26

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

20%
2.5%
22.5%
27

DI
BULAT
KAN
28
10,500

NAIK
ATAU
TURUN
29

KET.
30

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

KET.
30

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

KET.
30

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

KET.
30

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

KET.
30

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

KET.
30

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

KET.
30

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

KET.
30

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

KET.
30

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

KET.
30

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

KET.
30

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

KET.
30

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

KET.
30

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

DAFTAR HARGA SATUAN BAHAN


DINAS PEKERJAAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011
NO.

J E N I S

1
I

B A H A N
2

BAHAN DASAR
1 BATU KALI

2 KERIKIL

3 BATU BATA
4 PASIR

Bulat Utuh
Bulat Belah
Pecah
Pecah
Tempel
Batu apung
Sawur / Koral
Beton 0,5 / 1
Beton 1 / 1
Beton 1 / 2
Beton 2 / 3
Biasa
Ex lokal I

5/7
3/5

MEREK

SATUAN

m3
m3
m3
m3
m2
kg
m3
m3
m4
m3
m3
m3
bh

Urug
Pasang
Beton (Muntilan)
Beton (Cepu)
Sirtu (pasir batu)
Sirtu royalty
Grosok
Abu batu
Abu batu (Tayu)
Batu alam
Padas
Liat
Biasa
Pilihan

m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m3
m3
m3
m3

Pasang (padam)
Labor

m3
Kg

PC 50 kg
PC 40 kg
PC 50 kg Sm. Warna
Semen warna

zak
zak
zak
kg

7 BETON

Adukan beton K 175 ready mix


Adukan beton K 225 ready mix
Adukan beton K 300 ready mix

m3
m3
m3

8 TRAS (TANAH KAPUR)

Tras

m3

5 TANAH

6 KAPUR
7 PORTLAND CEMENT

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

94

1
II

2
BAHAN

PE N U T U P ATAP

1 SIRAP

(100 lbr)

pak

2 GENTENG BETON

Genteng Beton Warna standard


Kerpus Beton Warna Standard

bh
bh

Mantili
Nok kerpus Mantili
Plentong Mantili besar
Genteng biasa
Genteng pres
Genteng Beton
Genteng keramik
Sirap
Genteng kerpus jatiwangi
Genteng kerpus lokal
Genteng kerpus Beton
Genteng kerpus keramik
Genteng Jatiwangi

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

Asbes gelombang ( 80 x 210 ) cm


Asbes gel. Kecil 5 mm (90 x 180)
Asbes gel. Kecil 5 mm (120 x 240)
Asbes gel. Besar 5 mm (90 x 180)
Asbes gel. Besar 5 mm (120 x 240)
Asbes gel. Kecil 0,8 x 1,80 m
Asbes gel. Kecil 0,8 x 2,40 m

bh
lbr
lbr
lbr
lbr
lbr
lbr

- 100cm X 100 cm X 5 mm
- 100cm X 200 cm X 5 mm
- 100cm X 240 cm X 5 mm
Sekrup asbes

bh
bh
bh
bh

3 GENTENG TANAH LIAT

5 ASBES GELOMBANG

6 ASBES PLAT

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

95

7 SENG PLAT
BJLS 0,30 panjang 180 cm
BJLS 0,30 panjang 240 cm
BWG 28 x 80
BWG 28 x 90

m'
m'
m'
m'

Seng gel. Kecil 0,70 x 1,80 m


Seng gel. Kecil 0,70 x 2,10 m
BJLS 0,28
BJLS 0,28 panjang 180 cm
BJLS 0,28 panjang 240 cm

lbr
lbr
m'
lbr
lbr

Seng talang BJLS 26 lebar 0,60


Seng talang BJLS 26 lebar 0,90
Seng talang BJLS 26 lebar 1,20

m'
m'
m'

Papan
Balok/pesagen

m3
m3

2 KAMPER

Papan
Balok/pesagen

m3
m3

3 KRUING

Papan
Balok/pesagen

m3
m3

4 MERANTI

Papan
Balok/pesagen

m3
m3

5 LANAN

Papan
Balok/pesagen

m3
m3

6 BENGKIRAI

Papan
Balok/pesagen

m3
m3

7 DOLKEN

Kayu dolken sengon 8-10 cm,4m.


Kayu perancah

bt
m3

Kayu randu (papan)


Bambu
Bambu Apus
Kayu hutan lokal sekwalitas Kruing (A)
Kayu hutan lokal sekwalitas Kruing (B)
Glugu
Kayu lis 2/3

m3
bt
bt
m3
m3
m'
m'

8 SENG GELOMBANG

9 SENG TALANG

III . B A H A N K A Y U
1 JATI

8 LAIN-LAIN

IV . BAHAN PENUTUP DINDING / LANTAI


1 UBIN (TEGEL BIASA)
PC polos
30 X 30 cm
20 X 20 cm
20 X 20 cm

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

Warna

96

m2
m2
m2

2 KERAMIK
Keramik warna (KW-1)
Keramik warna (KW-2)
Keramik putih (KW-1)
Keramik putih (KW-2)
Keramik 10 x 20 cm
Keramik 20 x 20 cm
Keramik 20 x 25 cm
Keramik 10 x 20 cm
3 MARMER
Marmer Tulung Agung
Marmer Kalimantan
Marmer Itali

30 X 30 cm
30 X 30 cm
30 X 30 cm
30 X 30 cm

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

4 GRANITO
Granito 40 x 40 polished (lokal)
Granito 40 x 40 polished (import)
Granito 60 x 60 polished (lokal)
Granito 60 x 60 polished (import)

m2
m2
m2
m2

5 GRANIT
Granit lokal
Granit import
Batu Tempel
V . BAHAN C E TAK
1 BUIS BETON O dan U
15 cm - 100 cm
20 cm - 100 cm
25 cm - 100 cm
30 cm - 100 cm
40 cm - 100 cm
50 cm - 100 cm
60 cm - 100 cm
80 cm - 100 cm
100 cm - 100 cm
U 15 cm - 100 cm
U 20 cm - 100 cm
U 30 cm - 100 cm

m2
m2
m2

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

VI . B A H A N B E S I
1 BESI BETON
Besi beton polos
Besi beton prestress
Besi beton ulir

kg
kg
kg

2 BESI PLAT
Besi Strip

kg

3 BAJA
Baja profil " L" dan "C"

kg

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

97

Baja profil "IWF"

kg

4 KAWAT
Kawat Ikat beton/bendrat
Kawat bronjong
Kawat las listrik

kg
kg
kg

VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC. S. 12,5 1/2"
Pipa PVC. S. 12,5 3/4"
Pipa PVC. S. 12,5 1"
Pipa PVC. S. 12,5 1-1/4"
Pipa PVC. S. 12,5 1-1/2"
Pipa PVC. S. 12,5 2"
Pipa PVC. S. 12,5 2-1/2"
Pipa PVC. S. 12,5 3"
Pipa PVC. S. 12,5 4"
Pipa PVC. S. 12,5 5"
Pipa PVC. S. 12,5 6"
Pipa PVC. S. 12,5 8"
Pipa PVC. S. 12,5 10"
Pipa PVC. S. 12,5 12"
Pipa PVC. S. 12,5 16"
2 Pipa PVC AW
Pipa PVC. AW 1/2"
Pipa PVC. AW 3/4"
Pipa PVC. AW 1"
Pipa PVC. AW 1 1/2"
Pipa PVC. AW 2"
Pipa PVC. AW 3"
Pipa PVC. AW 4"
3 Pipa Medium B Galvanis - SII
Pipa Galvanis ( 1" )
Pipa Galvanis ( 1 1/2" )
Pipa Galvanis ( 2" )

m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

VIII . B A H A N L A N G I T - L A N G I T
PLY WOOD
- Teak wood
120 X 240
X 4 mm
- Tripleks
120 X 240
X 3 mm
120 X 240
X 4 mm
120 X 240
X 6 mm
- Multipleks
. 120 X 240
X 9 mm
. 120 X 240
X 12 mm
Harplek 60 x 200
Harplek 50 x 200

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr

98

Harplek 40 x 200
Harplek 30 x 200
Harplek 5 mm (90 x 180)
Harplek 5 mm (120 x 240)
Gypsum 6 mm
Gypsum 9 mm
Gypsum 12 mm
Gypsum 20 mm
Eternit 4 mm ( 100 x 100)
List Kayu Profil
Formika ukuran pintu

4
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m'
lbr

IX. BOX CULVERT


BC 780.175.120.25 (Top)
BC 780.175.120.25 (Bottom)
BC 420.150.120.25 (Top)
BC 420.150.120.25 (Bottom)
BC 400.175.120.25 (Top)
BC 400.175.120.25 (Bottom)
BC 400.100.120.25 (Top)
BC 400.100.120.25 (Bottom)
BC 400.75.120.25 (Top)
BC 400.75.120.25 (Bottom)
BC 380.175.120.20 (Top)
BC 380.175.120.20 (Bottom)
BC 380.175.120.25 (Top)
BC 380.175.120.25 (Bottom)
BC 300.50.120.20 (Top)
BC 300.50.120.20 (Bottom)
BC 200.75.120.20 (Top)
BC 200.75.120.20 (Bottom)
BC 200.50.120.20 (Top)
BC 200.50.120.20 (Bottom)
BC 150.75.120.15 (Top)
BC 150.75.120.15 (Bottom)
BC 150.50.120.15 (Top)
BC 150.50.120.15 (Bottom)
BC 100.50.120.15 (Top)
BC 100.50.120.15 (Bottom)

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

X. U-GUTTER
1 U-Gutter 100.100.120
2 Cover 240.120.20

bh
bh

XI. CIRCLE CULVERT


1 CC 50.250
2 CC 80.250

bh
bh

XII . B A H A N F I N I S H I N G
1 KAYU
Menie

kg

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

99

Plamur kayu
Ambril/amplas
Cat kayu (cukup)
Cat kayu (baik)
Siralax
Spiritus
Dempul
Plinkut
Wood filer (INFRA)
Oker putih
Oker warna
Melamin
Kuwas 3"
Thinner Super daimaru
Thinner A
Foxi Cat
2 TEMBOK
Kapur sirih
Plamur
Cat Tembok dalam (cukup)
Cat Tembok dalam (baik)
Cat Tembok luar (cukup)
Cat Tembok luar (baik)
Roll cat

kg
lbr
kg
kg
kg
ltr
kg
kg
kg
kg
kg
kg
bh
liter
liter
Kg
kg
kg
kg
kg
kg
bh

3 BESI
Menie
Cat besi (baik)
Cat besi (cukup)
Minyak cat
Lem Aica Aibon
Amplas Besi
Ampelas norton no.3
Ampelas Dico no.280
Ampelas Dico no.120
XIII. B A H A N K A C A
Bening
Rayband

kg
kg
kg
ltr
kg
lbr
buah
buah
buah

5 mm
5 mm

m2
m2

XIV. BAHAN INSTALASI LISTRIK


Stop Kontak

bh

XV . ALAT - ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM
Besar
Kecil
2 ENGSEL DAN GERENDEL
Engsel H
Engsel Nylon
Grendel

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

bh
bh
bh
bh
bh

100

Hak Angin
XVI. BAHAN SANITAIR
1 Kloset duduk
2 Kloset jongkok
3 Westafel
4 Bak Cuci Stainlist
XVII. ALAT PENGIKAT KAYU
1 Paku - ukuran 1" s/d 4"
2 Paku - payung
3 Paku - sekrup
4 Mur Baut 3/8 "
5 Lem kayu (fox)
6 Tali Ijuk
7 Lem kuning (aica aibon)

bh

Porselen

bh
bh
bh
bh

Counter top

kg
kg
kg
buah
buah
kg
kg

XVIII. POMPA AIR DAN TANGKI AIR


1 POMPA AIR LISTRIK
Mesin pompa 1 lt / dt
Mesin pompa 1-1/2 lt / dt
Tangki air fiber glass 3.000 lt 5mm
XIX . PAVING BLOCK
1 Paving Blok Holland t: 6 cm (ALDAS)
2 Paving Blok Holland t: 6 cm (lokal)
3 Paving Blok Holland t: 8 cm (ALDAS)
4 Paving Blok Holland t: 8 cm (lokal)
5 Paving blok warna 6 cm (lokal)
6 Paving blok warna 8 cm (lokal)
7 Kanstin 10/12,5 x 30 x 50 (ALDAS)
8 Paving Blok Hexagonal Kecil t: 6 cm, (ALDAS)
9 Paving Blok Hexagonal Kecil t: 8 cm, (ALDAS)
10 Kanstin 10 x 20 x 50 (ALDAS)
11 Kanstin 10/12,5 x 25 x 50 (ALDAS)
13 Paving Block Holland t: 6 cm K250 (NUSA JAYA)
XX. RTH (JALUR HIJAU DAN TAMAN)
1 PUPUK
KCL, KS, ZK
Pupuk Kandang
Pupuk Kompos
Pupuk Organik/Bokhasi
Pupuk Phonska
SP 36
Urea

buah
buah
buah
m2
m2
m2
m2
m2
m2
bh
m2
m2
bh
bh
m2

Kg
Ton
Ton
Kg
Kg
Kg
Kg

2 OBAT - OBATAN
Fastac 25 EC

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

50 mL

101

2
3 TANAMAN HIAS
Agape
Angsana
Apinika
Bambu Hias
Bambu Jepang
Bougenville Biasa
Bougenville Parigata
Cemara Bola
Cemara Buaya
Cemara Gimbal
Cemara Kipas
Cemara Non Flok/Ventris
Daun Walisongo
Glodogan
Glodogan Pecut
Jaranan
Kamboja Jepang
Ketapang
Krokot Putih
Lamtana Rebah
Lamtana Tegak
Mahoni 1 Meter
Mimbo
Mirten
Palem Botol
Palem Ekor Tupai
Palem Kuning
Palem Merah

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

Kecil
Besar

Batang
Batang
Batang
Buah
Rumpun
Rumpun
Buah
Buah
Batang
Batang
Batang
Batang
Buah
Buah
Buah
Buah
Batang
Batang
Batang
Batang
Batang
Batang
Buah
Buah
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Rumpun
Rumpun
Batang
Batang
Batang
Batang
Batang
Batang
Buah
Buah
Batang
Batang
Batang
Batang
Batang
Batang
Batang

Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar

Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil

102

Palem Raja/Putri
Palem Wergu
Pangkas Kuning
Pangkas Merah
Pinisium
Rumput Jepang
Sawo Kecik
Sikas
Tanaman Taiwan
Tanjung
Teh - tehan

Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar

Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
M2
Batang
Batang
Batang
Batang
Buah
Buah
Batang
Batang
Rumpun
Rumpun

Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar
Kecil
Besar

4 ALAT - ALAT PERTAMANAN


Ajir Tanaman
Ajir Tanaman Mangrove
Batu Asahan
Bambu Usuk
Busi Mesin Potong Rumput
Cetok
Chain Saw 038 STIHL
Chain Saw 070 STIHL
Gunting Dahan
Membran Karburator Chain Saw
Membran Oli Chain Saw
Mesin Potong Rumput Dorong
Mesin Potong Rumput Gendong
Mesin Pompa Air G x 160 + 2"
Patok Batas
Pisau M. Ptng Rmput Dorong/Gendong
Piston Set Chain Saw
Piston Set M. Ptng Rmpt Drong/Gndong
Pot Tanaman Hias
Pot Tanaman Palem
Rantai Chain Saw 038 STIHL
Rantai Chain Saw 070 STIHL
Seal Ker As Mesin M. Ptng Rmput
Srumbung Bambu
Srumbung Kayu
Selang Biasa 2"
Selang Lipat 2"
Selang Spiral

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Meter
Meter
Meter

103

Tali Starter Chain Saw


Trucuk Bambu

4
Buah
Batang

5 BAHAN KEND. TDK. BERMOTOR


As Belakang
As Tengah
Ban Dalam
Ban Luar
Bos Samping
Laker
Pedal
Pelek
Per
Rantai
Ruji
Sadel

Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah

6 PERALATAN KEBERSIHAN DAN BHN. PEMBERSIH


Angkus
Bendo
Cangkul
Ekrak
Ganco
Gunting Pangkas
Linggis
Sabit
Sapu Lidi
Skrap

Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah

XXI. LAMPU PENERANGAN JALAN UMUM (LPJU)


1 Baut 3/8
2 Besi L
3 Box KWH Meter 1 Phasa
4 Box Trafo
5 Conector
6 Contactor SN 35
7 Cor Ornamen Tiang Listrik
8 Cup Piring
9 Capit Urang
10 Fitting E 40
11 Fitting WD E27
12 Fotto cell 10 A
13 Fotto cell 6 A
14 Groundhing/ardhe
15 Housing Lamp 125 W
16 Housing Lamp 250 W
17 Ignisitor
18 Isolasi
Kecil
Besar
19 Kabel LVTC 2 x 10 mm
20 Kabel LVTC 2 x 16 mm

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

Unibell
Nachitape

104

Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Meter
Meter

1
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64

2
Kabel NYM 2 x 2,5 mm2
Kabel NYM 2 x 4 mm2
Kabel NYY 2 x 4 mm2
Kabel NYY 2 x 6 mm2
Kapasitor
Konsul Besi 1,25" MG
Konsul Besi 2" MG
Kotak APP/Double cover
KWH Meter 20/60 A
KWH Meter 50/20 A
L Booh 1"
Lampu HPIT 250 W
Lampu Mercury 250 W
Lampu Mercury 125 W
Lampu Mercury 80 W
Lampu Selang
Lampu Son T 150 W
Lampu Son T 250 W
M C B 25 A
M C B 63 A
OK KWH Meter
Pal Besi 2" dan 1" MG
Pal Besi 4 & 3 MG
Pemasangan LPJU
Pole Band 8,5
SJ. 5
Soket Lampu Selang
T Doss/Boxlit
Terminal Box Meter
Trafo Mercury 125 W
Trafo Mercury 250 W
Trafo BSN 150 W
Trafo BSN 250 W
Lampu Hias Christmas
Lampu Hias Windmill
Lampu Hias Cotton Rose
Lampu Hias Number One
Lampu Hias Dragon Phoenix
Lampu Hias Hepla
Tangga Besar 12 m
Tangga Kecil 6 m
Crystalite
Lampu TL 18 Watt
Sabuk Pengaman

Supreme
Supreme

Meter
Meter
Meter
Meter
Buah
Batang
Batang
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Meter
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Unit
Buah
Buah
Meter
Buah
Buah
Buah
Buah
Buah
Buah
Unit
Unit
Unit
Unit
Unit
Unit
Buah
Buah
Buah
Buah
Buah

Supreme

BBC

Phillips

XXII. ALAT PEMADAM KEBEKARAN


1 Selang Pemadam Kebakaran fire house Appron/Murata/ Yamato with Machino Working Pressure 10 Kg/cm2
- 1,5 x 30 m, W/Coupling
Tertera
roll
- 1,5 x 20 m, W/Coupling
Tertera
roll
- 2 x 30 m, W/Coupling
Tertera
roll
- 2 x 20 m, W/Coupling
Tertera
roll

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

105

Tertera
Tertera
Tertera

roll
roll
roll

2 Without Coupling
- 1,5 x 20 m
- 1,5 x 30 m
- 2 x 20 m
- 2 x 30 m
- 2,5 x 20 m
- 2,5 x 30 m
- 2,5 x 40 m

Tertera
Tertera
Tertera
Tertera
Tertera
Tertera
Tertera

unit
unit
unit
unit
unit
unit
unit

3 Hydrant Box Kosong


- A1 (66 x 52 x 15 cm)
- A1 (100 x 80 x 18 cm)
- A1 (125 x 75 x 18 cm)
- A1 (95 x 66 x 20 cm)
- A1KACA + Kunci, Tempered 5 mm
- A2KACA + Kunci, Tempered 5 mm
- B KACA + Kunci, Tempered 5 mm
- C KACA + Kunci, Tempered 5 mm

Appron
Appron
Appron
Appron
Appron
Appron
Appron
Appron

unit
unit
unit
unit
unit
unit
unit
unit

4 Fire Fighting Equipment Machino Coupling material Brass


- 1,5
- 2
- 2,5
- 3

Tertera
Tertera
Tertera
Tertera

unit
unit
unit
unit

- 2,5 x 40 m
- 2,5 x 30 m, W/Coupling
- 2,5 x 20 m, W/Coupling

5 Straight Nozzle (Machino Coupling) With Nozzle tip, Material Brass/ Branch pipa with straight Nozzle
- 1,5 Seamless
Tertera
unit
- 2 Seamless
Tertera
unit
- 2,5 Seamless, Short, W/O Grip
Tertera
unit
- 2,5 Seamless, Long, W/O Grip
Tertera
unit
- 2,5 Seamless, Long, W/ Grip
Tertera
unit
- 1,5
Appron
unit
- 2
Appron
unit
- 2,5
Appron
unit
6 Hydrant Valve (Machino Coupling) 90
Material Brass. 10 K
- 1,5
- 2
- 2,5

Tertera
Tertera
Tertera

unit
unit
unit

7 Hydrant Valve (Machino Coupling) 90


Material Brass. 20 K
- 1,5
- 2
- 2,5

Tertera
Tertera
Tertera

unit
unit
unit

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

106

8 Hose Rack
- 1,5, 1,24 COMB
- 2,5, 1,24 COMB

Tertera
Tertera

Unit
Unit

9 Spray Nozzle Head


- 1,5
- 2

Tertera
Tertera

Unit
Unit

Tertera

Unit

Tertera

Unit

11 Hydrant Pillar
- H14 AP 4 x 2,5 x 2,5
- H13 AP 3 x 2,5

Tertera
Tertera

Unit
Unit

12 On Trollen
- Type AC 15 kapasitas 6 kg
- Type AC 50 kapasitas 23 kg

Appron
Appron

buah
buah

13 Pemancar Pemadam Kebakaran


- 1,5 (Variable)
- 2,5 (Variable)

Tertera
Tertera

Unit
Unit

10 Hose Reel
- 1 Hose Reel, Swing Type Complete
With box Siamese Conention
- 4 x 2,5 x 2,5 Machino Coupling

14
15
16
17
18

Noksel Foam
Foise Cabang 2 (dua)
Liquite
Pengisian Tabung Pemadam Kebakaran
Selang Isap 2,3 4 M

buah
buah
kg
kg
unit

XXIII. L A I N - L A I N
1 Alat bantu (harga rata-rata)
2 Aspal
3 Minyak aspal
4 Bensin
5 Solar
6 Minyak tanah
7 Olie (minyak pelumas)
8 Stempet
9 Gebalan rumput
10 Wiremesh MS
11 Kayu bakar
12 Pintu Ronsel Doble 200 x 200 x 300
13 Pintu Ronsel Doble 150 x 150 x 300
14 Pintu Ronsel Engkel 100 x 100 x 300
15 Pintu Intake 100 x 100 x 300
16 Pintu Intake 90 x 100 x 300
17 Pintu Intake 80 x 80 x 300
18 Pintu Intake 60 x 60 x 300

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

lot
kg
ltr
ltr
liter
ltr
liter
Kg
m2
m2
m3
buah
buah
buah
buah
buah
buah
buah

107

19
20
21
22
23
24
25
26
27
28

Pintu Intake 50 x 50 x 300


Pintu Intake 40 x 40 x 300
Pintu Intake 30 x 40 x 300
Nomenklatur Marmer ( 30 x 40 )
Nomenklatur Marmer ( 15 x 20 )
Pile Scale ( 20 x 100 )
Pile Scale ( 12 x 100 )
Lapisan kedap air
Nako lengkap
PAGAR BRC.
Pagar BRC 90 A1
Pagar BRC 120 A1
Pagar BRC 150 A1
Pagar BRC 90 A2
Pagar BRC 120 A2
Pagar BRC 150 A2
Pipa Tiang BRC 90 - 2"
Pipa Tiang BRC 120 - 2"
Pipa Tiang BRC 150 - 2"
29 Minyak Beton & bekisting
30 Allumunium sheet 0,3 mm (90 x 180)
31 Shear Connector

buah
buah
buah
buah
buah
buah
buah
kg
daun
/lb
/lb
/lb
/lb
/lb
/lb
unit
unit
unit
ltr
lbr
kg

Rembang,

Januari 2011

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 19620715 199011 1 002

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

108

R HARGA SATUAN BAHAN


AAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011
edisi januari 2011

HARGA (Rp)
TH. 2011
6

126,100
95,700
137,900
208,550
91,900
18,400
27,500
261,250
238,400
248,950
246,850
28,450
425
61,950
144,800
309,430
171,950
106,600
79,700
119,500
116,950
211,200
90,100
33,650
55,000
49,950
68,750
196,000
2,750
65,625
54,500
91,200
11,250
897,850
952,875
994,250
116,600

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

109

258,950
2,750
9,075
1,000
2,900
1,200
1,200
1,000
4,400
11,100
6,300
10,550
3,200
9,075
19,350
3,850
45,850
53,850
80,850
88,200
105,950
47,750
61,950

19,050
52,800
67,750
1,450

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

110

54,850
71,225
42,075
47,200
54,700
63,150
81,200
53,900
68,000
23,450
33,450
50,850

15,312,500
15,312,500
8,881,300
8,881,300
6,125,000
6,125,000
3,281,300
3,281,300
3,281,300
3,281,300
8,779,200
8,779,200
35,700
2,062,500
602,600
17,050
4,200
4,855,125
2,589,400
206,250
6,500

31,050
23,900
28,750

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

111

48,750
44,450
39,850
38,400
55,650
48,200
52,900
43,700
607,450
1,019,425
1,381,100

462,825
505,000
461,000
481,250

131,300
241,800
67,375

39,050
55,000
58,550
68,750
87,800
108,050
128,600
195,250
294,000
54,000
42,450
52,250

11,100
18,550
15,200

16,200

18,500

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

112

6
19,400

17,850
18,550
33,000

4,500
7,100
11,275
14,600
22,800
34,100
49,700
72,600
105,500
175,100
227,600
354,700
557,400
875,700
1,513,600
5,800
6,900
8,600
16,000
23,500
43,500
65,000
119,300
162,050
303,700

98,550
55,800
72,300
91,950
135,200
202,850
18,200
15,750

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

113

6
9,200
11,700
29,975
110,000
73,500
82,500
55,825
59,675
25,200
7,600
252,500

16,387,070
16,387,070
11,644,299
11,644,299
11,996,842
11,996,842
10,210,106
10,210,106
9,491,386
9,491,386
10,102,330
10,102,330
11,543,665
11,543,665
5,645,878
5,645,878
4,641,488
4,641,488
3,896,149
3,896,149
3,159,900
3,159,900
2,761,260
2,761,260
1,922,429
1,922,429

2,389,240
1,428,350

1,238,769
2,603,493

22,450

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

114

6
21,150
3,550
44,400
56,100
77,800
11,900
20,350
25,200
34,450
24,900
25,200
76,350
7,600
30,100
23,700
36,550
900
19,250
20,000
25,700
21,400
25,700
18,600

16,100
54,000
50,300
16,050
53,100
6,150
6,700
3,750
3,750

96,250
106,600

7,900

154,800
66,800
5,950
7,150
10,450

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

115

6
19,500

584,450
123,750
501,950
261,250
16,750
26,000
22,800
4,950
18,300
13,700
53,100

2,651,350
4,639,150
6,797,175
59,500
36,750
102,100
46,000
51,800
55,000
22,250
76,700
103,300
11,100
18,150
71,250

9,800
302,500
907,500
2,450
3,025
5,000
5,000

12,100

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

116

15,400
91,900
12,100
3,025
18,400
30,700
18,400
30,700
6,200
91,900
9,200
91,900
6,200
30,700
9,200
30,700
9,200
30,700
9,200
30,700
21,500
91,900
9,200
61,300
6,200
42,900
6,200
41,900
7,250
18,400
91,900
6,200
30,700
3,100
6,200
3,100
6,200
3,100
6,200
10,700
6,650
3,100
6,200
18,400
306,300
9,200
183,800
9,200
183,800
18,400

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

117

6
183,800
9,200
73,500
18,400
42,900
3,100
18,400
3,100
18,400
37,950
12,300
12,300
42,900
55,200
183,800
3,100
9,200
6,200
18,400
3,100
18,400

600
800
13,200
6,300
12,300
30,700
12,100,000
15,125,000
137,950
181,500
60,500
7,260,000
8,470,000
3,932,500
6,050
605,000
726,000
726,000
302,500
151,250
302,500
308,000
66,550
38,500
24,200
15,400
6,600
42,900

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

118

6
18,700
7,700

12,705
21,945
17,325
57,750
17,325
8,085
13,860
64,680
40,425
13,860
578
20,790

10,000
24,200
27,500
7,800
36,300
115,500
12,500
17,500
10,000
6,050

1,100
66,000
328,900
42,350
6,875
465,850
385,000
27,500
3,650
35,750
19,250
137,950
93,200
25,300
880,000
1,694,000
57,200
2,600
30,600
71,500
8,250

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

119

6
8,800
22,000
17,600
20,020
53,625
203,500
247,500
825,000
522,500
437,250
2,200
264,550
96,250
46,750
44,000
33,000
107,800
127,300
34,100
190,850
30,800
548,900
1,705,000
99,000
28,600
46,650
14,850
21,450
28,600
125,950
207,350
216,700
258,500
29,493,750
23,100,000
22,756,250
22,343,750
21,587,500
21,587,500
9,418,750
4,812,500
123,750
32,000
3,052,500

/Murata/ Yamato with Machino Working Pressure 10 Kg/cm2


2,435,900
1,991,900
2,362,400
2,047,400

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

120

6
3,928,800
3,613,000
2,936,800

496,300
745,400
745,400
1,134,800
917,000
1,380,400
1,837,400

1,156,200
3,145,700
4,505,000
3,145,700
2,137,200
3,674,000
4,298,300
3,674,000

159,400
194,600
285,400
452,100

622,600
789,300
863,500
1,074,800
1,106,200
62,700
879,200
1,433,200

281,800
319,000
698,300

627,900
959,000
1,531,900

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

121

735,000
827,500

386,500
612,500

2,572,500
1,953,000

8,550,300
4,571,600

3,035,900
8,642,300

3,201,700
4,446,800
12,490,450
4,900,500
163,700
106,800
48,173,200

13,750
9,500
2,200
4,500
4,500
10,000
20,000
20,050
13,700
72,600
97,100
41,250,000
37,500,000
17,187,500
9,625,000
7,562,500
6,875,000
6,187,500

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

122

6
4,812,500
4,468,750
4,125,000
543,950
135,850
543,950
339,900
58,300
54,450
485,650
566,500
890,450
404,250
485,650
809,050
193,200
224,200
240,000
22,000
130,680
11,000

Rembang,

Januari 2011

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 19620715 199011 1 002

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

123

DAFTAR ANALISA SATUAN PEKERJAAN


DINAS PEKERJAAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011
No. KODE
1

KOEF

SAT.

URAIAN PAKERJAAN

6
PEKERJAAN PERSIAPAN

A.1
1.2500
2.5000
1.2000
0.0050
0.0090
0.0720
0.0600
0.4500

Btg
Kg
Lbr
m3
m3
m3
Kg
Kg

1M' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m


Kayu Dolken diameter 8 - 10 / 400 cm
Portland Semen
Seng Gelombang 3" - 5"
Pasir Pasang
Koral Beton
Kayu 5/7X4m Kayu Meranti
Paku Biasa 2" - 5"
Meni Besi

0.2000
0.4000
0.0200
0.0200

OH
OH
OH
OH

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

0.0120
0.0200
0.0070

m3
Kg
m3

1M' Pengukuran dan Pemasangan Bouwplank


Kayu 5/7x 4m Kayu Kruing
Paku Biasa 2" - 5"
Kayu Papan 3/20 Kayu Kruing

0.1000
0.1000
0.0100
0.0050

OH
OH
OH
OH

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

Btg
m3
Kg
Kg
Kg

1M2 Pembuatan Kantor Sementara dg Lantai Plesteran


Kayu Dolken 8 - 10 / 4 m
Kayu
Paku Biasa 2" - 5"
Besi Strip
Portland Sement

A.2

A.3
1.2500
0.1800
0.8500
1.1000
35.0000

124

0.2500
0.1500
30.0000
0.2500
2.0000
0.0800
0.1500
0.3000
0.0600

m3
m3
buah
Lbr
daun
m2
buah
buah
Lbr

2.0000
1.0000
2.0000
0.3000
0.0500

OH
OH
OH
OH
OH

Tukang Kayu
Tukang Batu
Pekerja
Kepala Tukang
Mandor

1.7000
0.2100
0.3000
10.5000
0.0300
0.0500
1.5000

Btg
m3
Kg
Kg
m3
m3
Lbr

1M2 Pembuatan Gudang Semen dan Alat-alat


Kayu Dolken diameter 8 - 10 / 400 cm
Kayu
Paku Biasa 2" - 5"
Portland Semen
Pasir Beton (Cepu)
Koral Beton
Seng Gelombang BJLS 32

2.0000
1.0000
0.2000
0.0500

OH
OH
OH
OH

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

OH
OH

1M2 Membersihkan Lapangan dan Perataan


Pekerja
Mandor

A.4

A.5
0.1000
0.0500

Pasir pasang
Koral Beton
Batu bata Merah
Seng Plat
Jendela Naco
Kaca Polos
Kunci Tanam
Engsel
Plywood 4 mm

125

A.6
1.0000
0.2500

Btg
Kg

1M2 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm


Bambu diameter 6 - 8 / 600 cm
Tali Ijuk

0.1700
0.2500
0.0020
0.0013

OH
OH
OH
OH

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

OH
OH

1M3 Bongkaran Beton Bertulang


Pekerja
Mandor

OH
OH

1M3 Bongkaran Dinding Tembok Bata Merah


Pekerja
Mandor

3.0000
0.0900

Org
Org

1 M3 MEMBONGKAR DINDING BATA / BATU (Batu / bata dipakai lag


Pekerja
Mandor

2.0000
0.2000

Org
Org

1 M3 MEMBONGKAR DINDING BATA / BATU (bongkaran tidak dipak


Pekerja
Mandor

Org
Org

1M2 MEMBONGKAR PLESTERAN DINDING


pekerja
Mandor

Org
Org

1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran tidak dipakai la


pekerja
Mandor

Org
Org

1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran dipakai lagi)


pekerja
Mandor

Org
Org
Org

1M2 MEMBONGKAR RANGKA ATAP/RENG KASO (bongkaran tidak


Pekerja
Tukang Kayu
Kepala tukang kayu

A.7
6.6670
0.3330

A.8
6.6670
0.0330
A.9

A.10

A.11
0.1250
0.0125
A.12
0.1000
0.0100
A.13
0.5000
0.0500
A.14
0.1500
0.0750
0.0075

126

0.0150

Org

Mandor

Org
Org
Org
Org

1M2 MEMBONGKAR RANGKA ATAP / RENG KASO (bongkaran dipa


Pekerja
Tukang Kayu
Kepala tukang kayu
Mandor

Org
Org
Org
Org

1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran di


Pekerja
Tukang Kayu
Kepala tukang kayu
Mandor

Org
Org
Org

1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran tidak dipakai lagi


Pekerja
Tukang Kayu
Mandor

Org
Org
Org
Org

1M2 MEMBONGKAR PLAFOND (bongkaran dipakai lagi)


Pekerja
Tukang Kayu
Kepala tukang kayu
Mandor

Org
Org

1M2 MEMBONGKAR PLAFOND (bongkaran tidak dipakai lagi)


Pekerja
Mandor

A.15
0.2000
0.1000
0.0100
0.0200
A.16
4.0000
6.0000
0.6000
0.4000
A.17
4.0000
3.0000
0.4000
A.18
0.1000
0.3000
0.0300
0.0100
A.19
0.1500
0.0150
A.20

Biaya setiap jarak pengangkutan/langsiran 1 m3 Material

127

= K : (

a
275.0000

A.21

II

Biaya setiap jarak pengangkutan / langsiran 1 zak semen

= K : (

a
275.0000

PEKERJAAN TANAH

B.1
0.400
0.040

OH
OH

1M3 Galian Tanah Biasa Sedalam 1 m


Pekerja
Mandor

1.000
0.032

OH
OH

1M3 Galian Tanah Keras Sedalam 1 m


Pekerja
Mandor

1.500
0.060

OH
OH

1M3 Galian Tanah Cadas Sedalam 1 m


Pekerja
Mandor

OH
OH

1M3 Galian Tanah Lumpur Sedalam 1 m


Pekerja
Mandor

OH
OH

1M2 Pekerjaan Striping Setinggi 1 m


Pekerja
Mandor

OH
OH

1M3 Membuang Tanah Sejauh 30 m'


Pekerja
Mandor

B.2

B.3

B.4
1.200
0.045
B.5
0.050
0.005
B.6
0.330
0.010
Suppl. B 6

1 M3 PEK. PEMBUANGAN LEBIH DARI RADIUS 30 M


Keterangan :
MENGGUNAKAN RUMUS = K :

( L + 75 )

275

B.7
B.8
0.500
0.050

OH
OH

1M3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)


1M3 Pemadatan Tanah
Pekerja
Mandor

128

B.9
1.200

m3

1M3 Urugan Pasir


Pasir Urug

0.300
0.010

OH
OH

Pekerja
Mandor

0.300
0.010

OH
OH

1M3 Urugan Tanah Biasa (Tanah Tersedia)


Pekerja
Mandor

0.400
0.135
0.948

m3
m3
m3

1M3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL


Pasir Urug
Kapur Padam
Tanah Liat

0.800
0.400
0.040
0.080

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

6.000

kg

1M2 Pemasangan Lapisan Ijuk tebal 10 cm


Ijuk

0.150
0.015

OH
OH

Pekerja
Mandor

1.200

m3

1M3 Urugan Sirtu


Sirtu

0.250
0.025

OH
OH

Pekerja
Mandor

0.526
0.052

OH
OH

1 M3 Galian Tanah Biasa Sedalam 2 meter


Pekerja
Mandor

0.735
0.073
0.050

org
org
lot

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 3 M' TENAGA


Pekerja
Mandor
Alat bantu

B.9a

B.10

B.11

B.12

B.13

B.14

129

B.15
org
org
lot

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 4 M' TENAGA


Pekerja
Mandor
Alat bantu

org
org
lot

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 5 M' TENAGA


Pekerja
Mandor
Alat bantu

1.500
0.050
0.250

org
org
lot

1 M3 PEK. GALIAN TANAH BANYAK TERDAPAT BATU-BATU BUNDA


MAX KEDALAMAN 1 M' TENAGA MANUSIA
Pekerja
Mandor
Alat bantu

0.625
0.125
0.250

org
org
lot

1 M3 PEK. GALIAN TANAH BERBATU MAX KEDALAMAN 1 M' TNG M


Pekerja
Mandor
Alat bantu

0.005
0.704
0.018
0.005
0.005
0.005
0.005
0.002

unit
liter
liter
Kg
org
org
org
org

1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 2 M' DENGAN ALAT EXAVATOR 0,7
Excavator 0,7 m3
Solar
Olie (minyak pelumas)
Stempet
Operator Alat Berat
Pemb. Operator Alat Berat
Pekerja
Mandor

unit
liter
liter
Kg
org
org
org
org

1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 5 M' DENGAN ALAT EXAVATOR 0,7
Excavator 0,7 m3
Solar
Olie (minyak pelumas)
Stempet
Operator Alat Berat
Pemb. Operator Alat Berat
Pekerja
Mandor

0.944
0.094
0.050
B.16
1.153
0.115
0.050
B.17

B.18

B.19

B.20
0.006
0.921
0.024
0.006
0.006
0.006
0.006
0.001
B.21
0.0101
0.2515

buah
liter

MENGANGKUT HASIL GALIAN DENGAN DUMP TRUCK . M3/KM.


Dump Truck
Solar
130

0.0101
0.0050
0.0101
0.0101
0.0025

liter
Kg
org
org
org

B.22
0.0137
0.3430
0.0137
0.0069
0.0137
0.0137
0.0034

buah
liter
liter
Kg
org
org
org

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN D


KURANG DARI 1,5 KM.
Dump Truck
Solar
Olie
Stempet
Sopir
Pekerja
Mandor

buah
liter
liter
Kg
org
org
org

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN D


JARAK ANTARA 1,5 S/D 3 KM.
Dump Truck
Solar
Olie
Stempet
Sopir
Pekerja
Mandor

buah
liter
liter
Kg
org
org
org

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN D


JARAK ANTARA 3 S/D 5 KM.
Dump Truck
Solar
Olie
Stempet
Sopir
Pekerja
Mandor

B.23
0.0229
0.5717
0.0229
0.0114
0.0229
0.0229
0.0057
B.24
0.0320
0.8003
0.0320
0.0160
0.0320
0.0320
0.0080

Olie (minyak pelumas)


Stempet
Sopir
Pekerja
Mandor

131

B.25
0.2500
0.0100
0.1250

org
org
lot

1 M3 MERATAKAN TANAH
Pekerja
Mandor
Alat bantu

1.2000
0.3000
0.0100
0.1000

m3
org
org
lot

1 M3 PEK. URUGAN TANAH PILIHAN


Tanah pilihan
Pekerja
Mandor
Alat bantu

0.2000
1.0000
1.0000
0.5000
0.0500
0.0100

m3
m3
org
org
org
org

1 M3 PEK. LAPISAN PUDEL 1 KP : 3 TL


Kapur padam
Tanah liat
Pekerja
Tukang batu
Kepala tukang batu
Mandor

1.0000
0.2000
1.0000
0.5000
0.0500
0.0100

m3
m3
org
org
org
org

1 M3 PEK. LAPISAN PUDEL 1 KP : 5 PS


Pasir pasang
Kapur padam
Pekerja
Tukang batu
Kepala tukang batu
Mandor

0.2500
0.0100
0.1250

org
org
lot

1 M3 MERATAKAN TANAH DAN DITIMBRIS


Pekerja
Mandor
Alat bantu

0.1500
0.0150
0.0125

org
org
lot

1 M2 MENGAMBIL DAN PASANGAN GEBALAN


Pekerja
Mandor
Alat bantu

0.0500
0.0050
0.0125

org
org
lot

1 M' MENGANGKUT GEBALAN RUMPUT


Pekerja
Mandor
Alat bantu

B.26

B.27

B.28

B.29

B.30

B.31

B.32

1 M2 PEKERJAAN GEBALAN RUMPUT SAMPAI TUMBUH


132

1.2000
0.2000
0.0150
0.0125

m2
org
org
lot

Gembalan rumput biasa


Pekerja
Mandor
Alat bantu

0.6000
0.6000
5.0000
1.2000

m3
m3
m3
m3

1 M2 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN (U/5000 M3)
Pekerjaan galian (10 org) 50 % (Analis B1)
Pek. Galian tanah berbatu (10 org) 50 % (Analis B17)
Pek. Grading plant (10) 50 % (5 x Analis B5)
Beli tanah biasa + angkut max 10 km

B.33

III

PEKERJAAN PONDASI

C.1
1.200
202.000
0.485

m3
Kg
m3

1M3 Pasang Pondasi Batu Kali 1Pc : 3 Ps


Batu Belah 15/20
Portland Sement
Pasir Pasang

1.500
0.600
0.060
0.075

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.1000
163.0000
0.5200
1.5000
0.6000
0.0600
0.0750

m3
zak
m3
org
org
org
org

1 M3 PASANGAN BATU BELAH 1 : 4


Batu Belah 15/20
PC (50 kg)
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor

1.200
136.000
0.544

m3
Kg
m3

1M3 Pasang Pondasi Batu Kali 1Pc : 5 Ps


Batu Belah 15/20
Portland Sement
Pasir Pasang

C.1a

C.2

133

1.500
0.600
0.060
0.075

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.200
61.000
0.147
0.492

m3
kg
m3
m3

1M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 Ps


Batu Belah 15/20
Portland Sement
Kapur Pasang
Pasir Pasang

1.500
0.600
0.060
0.075

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.200
0.432

m3
m3

1M3 Pasang Pondasi Batu Kosong


Batu Belah 15/20
Pasir Urug

0.700
0.390
0.039
0.039

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.480
126.000
194.000
0.312
0.468
1.800

m3
Kg
Kg
m3
m3
Kg

1M3 Pasang Pondasi Siklop 60% Beton Camp. 1PC : 2PS : 3KR &
40% Batu Belah
Batu Belah 15/20
Besi Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton
Kawat Beton

3.000
0.850
0.085
0.015

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

m3
Kg
m3
m3

1M3 Pasang Pondasi Sumuran diameter 100 cm


Batu Belah 15/20 cm
Portland Semen
Pasir Pasang
Koral Beton

C.3

C.4

C.5

C.6
0.450
194.000
0.312
0.468

134

2.380
0.300
0.030
0.080

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.019
0.094
0.150
60.500
45.000
0.900
0.032
0.120
0.090
0.240

m3
m3
m3
Kg
Kg
Kg
m3
Kg
Lt
Kg

1M' Pembuatan Tiang Pancang (40x40) cm, Beton Bertulang


Pasir Urug Darat
Pasir Beton (Cepu)
Koral Beton
Portland Semen
Besi Beton
Kawat beton
Kayu Kaso 5/7
Paku
Minyak Bekisting
Plamuur Tembok

1.000
0.670
0.067
0.050

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.1250
0.0125
0.1500
0.0100
0.0100

org
org
org
org
lot

SEBUAH TIANG PANCANG DICINCIN DAN DILANCIPKAN (KAYU HU


Tukang Kayu
Kepala Tukang
Pekerja
Mandor
alat bantu

0.0400
0.0040
1.8000
0.0430
0.0100

org
org
org
org
lot

1 M' TIANG DIPANCANGKAN DIDALAM TANAH LUNAK


Tukang Kayu
Kepala Tukang
Pekerja
Mandor
alat bantu

C.7

C.8

C.9

135

C.10
org
org
org
org
lot

1 M' TIANG DIPANCANGKAN DIDALAM TANAH BIASA


Tukang Kayu
Kepala Tukang
Pekerja
Mandor
alat bantu

0.0600
0.0060
2.7000
0.0645
0.0150

org
org
org
org
lot

1 M' TIANG DIPANCANGKAN DIDALAM TANAH KERAS


Tukang Kayu
Kepala Tukang
Pekerja
Mandor
alat bantu

0.0800
0.0080
3.6000
0.0860
0.0200

org
org
org
org
lot

1 M' TIANG DIPANCANGKAN DIDALAM TANAH PASIR


Tukang Kayu
Kepala Tukang
Pekerja
Mandor
Alat bantu

1.2000
8.3333
0.6667
2.0333
0.0517

m3
kg
org
org
org

1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 3 MM


Batu kali
Kawat bronjong
Penganyam
Pekerja
Mandor

1.2000
15.0000
0.7333
2.1000
0.0517

m3
kg
org
org
org

1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 4 MM


Batu kali
Kawat bronjong
Penganyam
Pekerja
Mandor

m3
kg
org
org
org

1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 5 MM


Batu kali
Kawat bronjong
Penganyam
Pekerja
Mandor

0.0500
0.0050
2.2500
0.0538
0.0125
C.11

C.12

C.13

C.14

C.15
1.2000
23.3333
0.8333
2.1667
0.0517
IV

P E K E R J AAN

136

DINDING

D.1
70.0000
18.9500
0.0380

Buah
Kg
m3

0.3000
0.1000
0.0100
0.0150

OH
OH
OH
OH

D.2
70.0000
14.3700
0.0400

Buah
Kg
m3

0.3000
0.1000
0.0100
0.0150

OH
OH
OH
OH

70.0000
4.5000
0.0500
0.0150

Buah
Kg
m3
m3

0.3000
0.1000
0.0100
0.0150

OH
OH
OH
OH

D.3

1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 2 Ps


Bata Merah 5 x 11 x 22
Portland Semen
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Ps
Bata Merah 5 x 11 x 22
Portland Semen
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps
Bata Merah 5 x 11 x 22
Portland Semen
Pasir Pasang
Kapur Padam
Pekerja
Tukang Batu
Kepala Tukang
Mandor

137

D.4
70.0000
11.5000
0.0430
0.3200
0.1000
0.0100
0.0150

bh
kg
m3
org
org
org
org

1 M2 PASANGAN 1/2 BATA MERAH 1 : 4


Bata merah
P C (50 kg)
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor

70.0000
9.6800
0.0450
0.3200
0.1000
0.0100
0.0150

bh
kg
m3
org
org
org
org

1 M2 PASANGAN 1/2 BATA MERAH 1 : 5


Bata merah
P C (50 kg)
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor

m2
zak
m3
org
org
org
org
lot

1 M2 PASANGAN BATU TEMPEL + SIARAN


Batu tempel
PC (50 kg)
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Peralatan

500.0000
4.1176
0.3330
4.5000
1.5000
0.1500
0.2250

bh
zak
m3
org
org
org
org

1 M3 PASANGAN BATA MERAH 1 PC : 2 PS


Bata merah
P C (50 kg)
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor

500.0000
2.5328
0.4060
4.5000
1.5000
0.1500
0.2250

bh
zak
m3
org
org
org
org

1 M3 PASANGAN BATA MERAH 1 PC : 4 PS


Bata merah
P C (50 kg)
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor

D.5

D.6
1.1000
0.1200
0.0310
0.1875
0.2250
0.3750
0.3380
0.0250
D.7

D.8

138

D.9
500.0000
0.9384
0.1100
0.3680
4.5000
1.5000
0.1500
0.2250
V

bh
zak
m3
m3
org
org
org
org

1 M3 PASANGAN BATA MERAH 1 PC : 3 KP : 10 PS


Bata merah
P C (50 kg)
Kapur pasang
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
PEKERJAAN

E.1

PLESTERAN

7.7600
0.0230

Kg
m3

1M2 Plesteran 1 Pc : 3 Ps Tebal 15 mm


Portland Semen
Pasir Pasang

0.2000
0.1500
0.0015
0.0100

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

3.0000
0.0050
0.0200

Kg
m3
m3

1M2 Plesteran 1 Pc : 2 Kp : 8 Ps Tebal 15 mm


Portland Semen
Kapur Padam
Pasir Pasang

0.2200
0.1200
0.0120
0.0110

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

E.2

139

E.3
1.8400
0.0060
0.0140

Kg
m3
m3

1M2 Plesteran 1 Pc : 3 Kp : 10 Ps Tebal 15 mm


Portland Semen
Kapur Padam
Pasir Pasang

0.2000
0.1500
0.0015
0.0100

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

10.3680
0.0310

Kg
m3

1M2 Plesteran 1 Pc : 3 Ps Tebal 20 mm


Portland Semen
Pasir Pasang

0.2600
0.2000
0.0200
0.0125

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

5.1840
0.0260

Kg
m3

1M2 Berapen 1 Pc : 5 Ps Tebal 15 mm


Portland Semen
Pasir Pasang

0.1500
0.0700
0.0070
0.0080

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

OH
OH
OH
OH

1M' Plesteran Skoning 1 Pc : 2 Ps lebar 10 mm


Pekerja
Tukang batu
Kepala Tukang
Mandor

4.3200
0.0060

Kg
m3

1M2 Plesteran Ciprat 1 Pc : 2 Ps


Portland Semen
Pasir Pasang

0.2500
0.1000
0.0100
0.0130

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

E.4

E.5

E.6
0.0570
0.0380
0.0380
0.0030
E.7

140

E.8
6.3400
0.0120

Kg
m3

1M2 Finishing Siar Pas. Batu Kali Adukan 1 Pc : 2 Ps


Portland Semen
Pasir Pasang

0.3000
0.1400
0.0140
0.0150

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

3.2500

Kg

1M2 Acian
Portland Semen

0.1500
0.1000
0.0100
0.0080

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala Tukang
Mandor

1.1000
1.2500
1.0000

m3
Kg
Kg

PEKERJAAN K A Y U
1M3 Membuat Kosen Pintu & Jendela Kayu klas I
Kayu Klas I (Jati) , Balok
Paku Biasa 2" - 5 "
Lem Kayu

6.0000
20.0000
2.0000
0.3000

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.1000
1.2500
1.0000

m3
Kg
Kg

1M3 Membuat Kosen Pintu & Jendela Kayu Bengkirai


Kayu Bengkirai, Balok
Paku Biasa 2" - 5 "
Lem Kayu

6.0000
20.0000
2.0000
0.3000

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0400
0.0500

m3
Kg

1M2 Membuat Pintu Klamp Standard Kayu Bengkirai


Kayu Bengkirai, papan
Paku Biasa 2" - 5 "

0.3500
1.0500

OH
OH

Pekerja
Tukang Kayu

E.9

VI

F
F.1

F.2

F.3

141

0.1050
0.0180

OH
OH

Kepala Tukang
Mandor

0.0400
0.0500

m3
kg

1M2 Membuat Daun Pintu Panel Kayu Bengkirai


Kayu Bengkirai, papan
Lem Kayu

1.0000
2.5000
0.2500
0.0500

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0350
0.3000

m3
kg

1M2 Membuat Pintu & Jendela Kaca Kayu Bengkirai


Kayu Bengkirai, papan
Lem Kayu

0.8000
2.0000
0.2000
0.0400

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0640
0.5000

m3
kg

1M2 Membuat Pintu & Jendela Jalusi Kayu Kelas I (Jati)


Kayu Kelas I (Jati), papan
Lem Kayu

1.0000
3.0000
0.3000
0.3000

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0250
0.0300
0.5000
1.0000

m3
Kg
Kg
Lbr

1M2 Membuat Pintu Plywood Rangkap rangka Kayu Bengkirai lbr s


Kayu Bengkirai, papan
Paku Biasa 1/2" - 1"
Lem Kayu
Plywood tebal 4 mm

0.6000
2.0000
0.2000
0.0400

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

m3
Kg

1M2 Membuat Pintu Plywood rangkap, rangka expose kayu Bengkir


Kayu Bengkirai, papan
Paku Biasa 1/2" - 1"
Lem Kayu

F.4

F.5

F.6

F.7

F.8
0.0256
0.0300
0.5000

Kg

142

1.0000

Lbr

Plywood tebal 4 mm uk.90x220cm

0.8000
2.0000
0.2000
0.0400

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0600
0.1500

m3
Kg

1M2 Membuat Jalusi mati Kosen Kayu Kelas I (Jati)


Kayu Kelas I (Jati), papan
Paku Biasa 1/2" - 1"

0.5000
2.0000
0.2000
0.0250

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0600
0.1500

m3
Kg

1M2 Membuat Jalusi mati Kosen Kayu Bengkirai


Kayu Bengkirai, papan
Paku Biasa 1/2" - 1"

0.5000
2.0000
0.2000
0.0250

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.9

F.10

143

F.11
0.0250
0.0300
0.3000
1.0000

m3
Kg
Kg
Lbr

1M2 Membuat Pintu Teakwood Rangkap Rangka Kayu Kelas I (jati)


Kayu Kelas I (Jati), papan
Paku Biasa 1/2" - 1"
Lem Kayu
Teakwood tebal 4 mm

0.8000
2.0000
0.2000
0.0400

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0250
0.0300
0.0800
1.0000
0.5000

m3
Kg
Kg
Lbr
Lbr

1M2 Membuat Pintu Teakwood Rangkap Lapis Formika Rangka eks


Kayu Bengkirai
Kayu Bengkirai, papan
Paku Biasa 1/2" - 1"
Lem Kayu
Teakwood tebal 4 mm
Formika

0.8000
2.5000
0.2500
0.0400

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0150
1.0000
1.2000
0.2000
0.5000

m3
lbr
m2
kg
kg

1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS ALUMINIUM ( KM/WC


Rangka kayu bengkirai (ram pintu)
Triplek 4 mm
Aluminium sheet 0,3 mm
Paku triplek
Lem putih ( FOX )

0.3000
1.3000
0.1300
0.0130

org
org
org
org

Pekerja
Tukang kayu
Kepala tukang kayu
Mandor

0.0150
1.0000
0.5000
0.2000
0.5000
0.2000

m3
lbr
lbr
kg
kg
kg

1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS FORMIKA ( KM/WC )


Rangka kayu bengkirai (ram pintu)
Triplek 4 mm ukuran pintu
Formika
Paku triplek
Lem putih ( FOX )
Lem kuning ( aica aibon )

F.12

F.13

F.14

144

0.5000
1.3000
0.1300
0.0130

org
org
org
org

Pekerja
Tukang kayu
Kepala tukang kayu
Mandor

1.1000
15.0000
0.8000

m3
Kg
Kg

1M3 Memasang Konstruksi Kuda-kuda Konvensional Kayu Bengkir


Bentang 6 M
Kayu Bengkirai, balok
Besi Strip
Paku Biasa 2" - 5"

4.0000
12.0000
1.2000
2.0000

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.1000
15.0000
5.6000

m3
Kg
Kg

1M3 Memasang Konstruksi Kuda-kuda Ekspose Kayu Jati


Kayu Jati, balok
Besi Strip
Paku Biasa 2" - 5"

6.0000
20.0000
2.0000
0.3000

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.1000
15.0000
3.0000

m3
Kg
Kg

1M3 Memasang Konstruksi Gording Kayu Bengkirai


Kayu Bengkirai, balok
Besi Strip
Paku Biasa 2" - 5"

2.4000
7.2000
0.7200
0.1200

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.15

F.16

F.17

145

F.18
0.0196
0.0300
0.3000
0.5000
1.0000

m3
Kg
Kg
Lbr
Lbr

1M2 Pasang Pintu Plywood & Formika Rangka Kayu Bengkirai


Kayu Bengkirai, papan
Paku Biasa 1/2" - 1"
Lem Kayu
Plywood tebal 4 mm
Formika

0.8000
2.5000
0.2500
0.0400

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0196
0.0300
1.2000
1.0000
1.0000

m3
Kg
Kg
Lbr
Lbr

1M2 Pasang Pintu Formika Double, Rangka Kayu Jati


Kayu Jati, papan
Paku Biasa 1/2" - 1"
Lem Kayu
Plywood tebal 4 mm
Formika

1.0000
2.6000
0.2600
0.0500

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0086
0.0036
0.2500

m3
m3
Kg

1M2 Memasang Rangka Atap Genteng Keramik, Kayu Bengkirai


Kayu Klas II (Bengkirai), Kaso-kaso (5x7) cm
Reng (2x3) cm
Paku Biasa 2" - 5"

0.1000
0.1000
0.0100
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0086
0.0043
0.2500

m3
m3
Kg

1M2 Memasang Rangka Atap Genteng Beton, Kayu Bengkirai


Kayu Bengkirai Kaso-kaso (5x7) cm
Reng (2x3) cm
Paku Biasa 2" - 5"

0.1000
0.1000
0.0100
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.19

F.20

F.21

146

F.22
0.1650
0.2000

m3
Kg

1M2 Pasang Rangka Atap Sirap Kayu Bengkirai


Kayu Bengkirai, balok
Paku Biasa 2" - 5"

0.1200
0.1200
0.0120
0.0060

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0072
0.1000

m3
Kg

1M' Pasang Listplank Uk. (3x20)cm Kayu Bengkirai


Kayu Bengkirai, papan
Paku Biasa 2" - 5"

0.1000
0.2000
0.0250
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0110
0.0500

m3
Kg

1M' Pasang Listplank Uk. (3x30)cm Kayu Bengkirai


Kayu Bengkirai, papan
Paku Biasa 2" - 5"

0.1000
0.2000
0.0200
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0145
0.1500

m3
Kg

1M' Pasang Listplank Uk. 2x(3x20)cm Kayu Bengkirai


Kayu Bengkirai, papan
Paku Biasa 2" - 5"

0.1500
0.2500
0.0250
0.0075

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0280
0.1500

m3
Kg

1M2 Pasang Rangka Dinding Pemisah Kayu Bengkirai


Kayu Bengkirai, balok
Paku Biasa 2" - 5"

0.1500
0.4500
0.0450

OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang

F.23

F.24

F.25

F.26

147

0.0800

OH

Mandor

0.0280
0.1500
0.8600
0.5600

m3
Kg
Lbr
Kg

1M2 Pas. Dinding Pemisah Teakwood Rangkap Rangka Kayu Bengk


Kayu Bengkirai, balok
Paku Biasa 2" - 5"
Teakwood tebal 4mm
Lem kayu

0.1500
0.4500
0.0450
0.0080

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0070
0.1000
0.1500

m3
Kg
Kg

1M2 Pasang Dinding Lambriziring dari Papan jati


Kayu Jati, balok
Paku Biasa 2" - 5"
Paku Sekrup 3,5"

0.6000
1.8000
0.1800
0.0300

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.4000
0.5000

Lbr
Kg

1M2 Pasang Plywood tebal 4mm unt Dinding


Plywood tebal 4mm
Paku Biasa 1/2" - 1"

0.0250
0.0750
0.0075
0.0013

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.5000
0.0140
0.0500
0.0030

m2
m3
Kg
m'

1M2 Pasang Dinding Bilik, Rangka Kayu Klas III / IV


Bilik Bambu
Kayu Klas III (Meranti)
Paku Biasa 1/2" - 1"
List Kayu 2/4

0.1000
0.0500
0.0050
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.27

F.28

F.29

F.30

VII

PEKERJAAN PERKERASAN DAN BETON

148

G.1
247.0000
0.6207
0.7400

Kg
m3
m3

1M3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c =
Portland Semen
Pasir Beton (Cepu)
Kerikil (maksimum 30 mm)

1.6500
0.2750
0.0280
0.0830

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

276.0000
0.5914
0.7496

Kg
m3
m3

1M3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c =
Portland Semen
Pasir Beton (Cepu)
Kerikil (maksimum 30 mm)

1.6500
0.2750
0.0280
0.0830

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

299.0000
0.5707
0.7533

Kg
m3
m3

1M3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (122)cm, w/c
Portland Semen
Pasir Beton (Cepu)
Kerikil (maksimum 30 mm)

1.6500
0.2750
0.0280
0.0830

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

230.0000
0.6379
0.7607

Kg
m3
m3

1M3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,8
Portland Semen
Pasir Beton (Cepu)
Kerikil (maksimum 30 mm)

1.2000
0.2000
0.0200
0.0060

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kg
m3
m3

1M3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c
Portland Semen
Pasir Beton (Cepu)
Kerikil (maksimum 30 mm)

G.2

G.3

G.4

G.5
326.0000
0.5429
0.7622

149

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

352.0000
0.5221
0.7637

Kg
m3
m3

1M3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (122)cm,w/c =


Portland Semen
Pasir Beton (Cepu)
Kerikil (maksimum 30 mm)

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

371.0000
0.4986
0.7756

Kg
m3
m3

1M3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c
Portland Semen
Pasir Beton (Cepu)
Kerikil (maksimum 30 mm)

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

384.0000
0.4943
0.7696

Kg
m3
m3

1M3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm,w/c =


Portland Semen
Beton (Muntilan)
Kerikil (maksimum 30 mm)

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

406.0000
0.4886
0.7600

Kg
m3
m3

1M3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (122)cm, w/c =
Portland Semen
Beton (Muntilan)
Kerikil (maksimum 30 mm)

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

G.6

G.7

G.8

G.9

150

G.10
413.0000
0.4864
0.7563

Kg
m3
m3

1M3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (122)cm,w/c =


Portland Semen
Beton (Muntilan)
Kerikil (maksimum 30 mm)

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

439.0000
0.4786
0.7452

Kg
m3
m3

1M3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (122)cm,w/c =


Portland Semen
Beton (Muntilan)
Kerikil (maksimum 30 mm)

2.1000
0.3500
0.0350
0.1050

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

G.11

151

G.12
448.0000
0.4764
0.7407

Kg
m3
m3

1M3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (122)cm, w/c
Portland Semen
Beton (Muntilan)
Kerikil (maksimum 30 mm)

2.1000
0.3500
0.0350
0.1050

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.0500
0.0150

Kg
Kg

1KG Pembesian dg Besi Polos


Besi Beton (polos)
Kawat Beton

0.0070
0.0070
0.0007
0.0004

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

G.13

G.13a 110 KG Besi Beton Terpasang (polos)


G.13b 125 KG Besi Beton Terpasang (polos)
G.14

ax
ax

1.0500
0.0100

Kg
Kg

1KG Kabel Presstresed Polos/strand


Besi presstred polos
Kawat Beton

0.0050
0.0050
0.0005
0.0003

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

0.0400
0.3000
0.1000

m3
Kg
Ltr

1M2 Pasang Bekisting untuk Pondasi


Kayu Terentang (perancah)
Paku Biasa 2" - 5"
Minyak Bekisting

0.5200
0.2600
0.0260
0.0260

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.3996

m3

1M3 Pasang Bekisting Sloof, Ringbalk, Kolom, Balok Lantai dengan


Kayu Perancah

G.15

G.15a

152

0.4000

Kg

Paku biasa 2" - 5"

0.3000
0.5000
0.0500
0.0100

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0450
0.3000
0.1000

m3
Kg
Ltr

1M2 Pasang Bekisting untuk Sloof


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting

0.5200
0.2600
0.0260
0.0260

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0400
0.4000
0.2000
0.0150
0.3500
2.0000

m3
Kg
Ltr
m3
Lbr
Btg

1M2 Pasang Bekisting untuk Kolom


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu
Plywood tebal 9mm
Dolken diameter 8 - 10 cm / 4 m

0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0400
0.4000
0.2000
0.0180
0.3500
2.0000

m3
Kg
Ltr
m3
Lbr
Btg

1M2 Pasang Bekisting untuk Balok


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu
Plywood tebal 9mm
Dolken diameter 8 - 10 cm / 4 m

0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

G.16

G.17

G.18

153

G.19
0.0400
0.4000
0.2000
0.0150
0.3500
6.0000

m3
Kg
Ltr
m3
Lbr
Btg

1M2 Pasang Bekisting untuk Lantai


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood tebal 9mm
Dolken diameter 8 - 10 cm / 4 m

0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0300
0.4000
0.2000
0.0200
0.3500
3.0000
4.0000

m3
Kg
Ltr
m3
Lbr
Btg
Buah

0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0300
0.4000
0.1500
0.0150
0.3500
2.0000

m3
Kg
Ltr
m3
Lbr
Btg

1M2 Pasang Bekisting untuk Tangga


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu
Plywood tebal 9mm
Dolken diameter 8 - 10 cm / 4 m

0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

m3
Kg
Btg

1 M2 Pasang Bekisting Jembatan Cor


Kayu Terentang
Paku Biasa 2" - 5"
Dolken Kayu Galam diameter 8 - 10 / 4 m

G.20

G.21

G.22
0.0264
0.6000
0.5000

1M2 Pasang Bekisting untuk Dinding


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu
Plywood tebal 9mm
Dolken diameter 8 - 10 cm / 4 m
Formite/Penjaga jarak / Spacer (alat bantu)

154

0.1500
0.0500
0.0050
0.0080

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0170
0.0240
0.4000

m3
m3
kg

1 M2 BEKESTING DENGAN PAPAN


Kaso lanan 5/7 (2x pakai) 50 %
Papan terentang (2x pakai) 75 %
Paku

0.3000
0.1500
0.1500
0.0500

org
org
org
org

Pekerja
Tukang kayu
Kepala tukang kayu
Mandor

m3
lbr
kg
org
org
org
org

1 M2 BEKESTING DENGAN MULTIPLEX 9 MM


Kaso lanan 5/7 (2x pakai) 50 %
Multiplex 9 mm (2x pakai) 75 %
Paku
Pekerja
Tukang kayu
Kepala tukang kayu
Mandor

G.23

G.24
0.0170
0.3470
0.4000
0.1200
0.1500
0.1500
0.0500

155

G.25
0.2000
1.5000
0.4000
157.5000
2.2500
336.0000
0.5400
0.8100

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3

1 M3 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton

5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.2700
2.0000
0.6000
210.0000
3.0000
336.0000
0.5400
0.8100

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3

1 M3 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.4000
4.0000
2.0000
315.0000
4.5000
336.0000
0.5400
0.8100
0.1500

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3

1 M3 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton
Kayu Balok

G.26

G.27

156

3.5000
20.0000

Lbr
Btg

Plywood 9 mm
Dolken diameter 8 / 4mm

7.0500
0.2750
1.6500
2.1000
0.4030
0.3530

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.3200
3.2000
1.6000
210.0000
3.0000
336.0000
0.5400
0.8100
0.1400
2.8000
18.0000

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3
Lbr
Btg

1 M3 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken diameter 8 / 4mm

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

G.28

157

G.29
0.3200
3.2000
1.6000
157.5000
2.2500
336.0000
0.5400
0.8100
0.1200
2.8000
32.0000

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3
Lbr
Btg

1 M3 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken diameter 8 / 4mm

5.3000
0.2750
1.3000
1.0500
0.2650
0.2650

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.2400
3.2000
1.6000
157.5000
2.2500
336.0000
0.5400
0.8100
0.1600
2.8000
24.0000

m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3
Lbr
Btg

1 M3 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken diameter 8 / 4mm

5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m3
Kg
Ltr

1 M3 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)


Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting

G.30

G.31
0.2500
3.0000
1.2000

158

210.0000
3.0000
336.0000
0.5400
0.8100
0.1050
2.5000
14.0000

Kg
Kg
Kg
m3
m3
m3
Lbr
Btg

Besi Beton Polos


Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken diameter 8 / 4mm

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.0020
0.0100
3.0000
0.4500
4.0000
0.0060
0.0090

m3
Kg
Kg
Kg
Kg
Kg
m3

1 M' Membuat Kolom Penguat Beton Bertulang (11 x 11) cm


Kayu Terentang
Paku Biasa 2" - 5"
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton

0.1800
0.0200
0.0200
0.0200
0.0060
0.0090

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

G.32

159

G.33
0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150

m3
Kg
Kg
Kg
Kg
Kg
m3

1 M' Membuat Ring Balok Beton Bertulang (10 x 15) cm


Kayu albasia
Paku Biasa 2" - 5"
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton

0.2970
0.0330
0.0330
0.0330
0.0100
0.0050

OH
OH
OH
OH
OH
OH

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

1.0000
2.5000
0.2500
0.1000
0.0100
0.0450

m3
org
org
org
org
lot

1 M3 PAS. BETON K-175 READY MIX 6 M3 BERIKUT SLANG


Adukan K-175 Ready Mix
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Alat bantu (Slang + Tes Lab.)

1.0000
2.5000
0.2500
0.1000
0.0100
0.0450

m3
org
org
org
org
lot

1 M3 PAS. BETON K-225 READY MIX 6 M3 BERIKUT SLANG


Adukan K-225 Ready Mix
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Alat bantu (Slang + Tes Lab.)

1.0000
2.5000
0.2500
0.1000
0.0100
0.0450

m3
org
org
org
org
lot

1 M3 PAS. BETON K-300 READY MIX 6 M3 BERIKUT SLANG


Adukan K-300 Ready Mix
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Alat bantu (Slang + Tes Lab.)

0.0010
0.0010

org
org

1 KG PEK. ERECTION KONST. KUDA-KUDA BESI


Pekerja
Tukang besi profil

G.34

G.35

G.36

G.37

160

0.0002
0.0001
0.0002
0.0200
0.0002
0.0100
0.0010
0.0002

org
org
org
org
ls
lt
lt
lot

Kepala tukang besi profil


Mandor
Operator alat berat
Pembantu operator
Sewa alat
Bahan Bakar solar
Pelumas
Alat bantu

kg
org
org
org
org
lot

1 KG PEKERJAAN BAJA IWF


Besi IWF
Pekerja
Tukang besi profil
Kepala tukang besi profil
Mandor
Peralatan (oksigen,solar,elpiji,kawat las)

kg
org
org
org
org
lot

1 KG PEKERJAAN KONSTUKSI BESI SIKU / PROFIL


Besi profil/besi siku
Pekerja
Tukang besi profil
Kepala tukang besi profil
Mandor
Peralatan (oksigen,solar,elpiji,kawat las)

kg
lt
lt
org
org
org
org
lot

1 CM PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL KAWAT 4 M


Kawat las listrik
Bahan bakar solar
Pelumas
Pekerja
Tukang besi profil
Kepala tukang besi profil
Mandor
Alat bantu (mesin las listrik)

G.38
1.1000
0.0600
0.0300
0.0150
0.0075
0.1250
G.39
1.1000
0.0600
0.0300
0.0150
0.0075
0.1250
G.40
0.0400
0.0300
0.0040
0.0100
0.0050
0.0050
0.0025
0.2500

161

G.41
0.0500
0.0200
0.0030
0.0010
0.2500

org
org
org
org
lot

1 TITIK MELUBANG KONSTRUKSI BESI DENGAN BOR


Pekerja
Tukang besi profil
Kepala tukang besi profil
Mandor
Alat bantu (mesin bor listrik)

m2
kg
org
org
org

1 M2 PEKERJAAN WIREMESH M8
Wiremesh M8
Kawat las listrik
Pekerja
Tukang besi profil
Mandor

G.42
1.0100
0.1000
0.1000
0.0750
0.0100
VIII

PEKERJAAN PENUTUP ATAP

H.1
25.0000

Buah

0.1500
0.0750
0.0080
0.0080

OH
OH
OH
OH

20.0000

Buah

0.1500
0.0600
0.0060
0.0080

OH
OH
OH
OH

5.0000
8.0000
0.0320

Buah
Kg
m3

0.4000
0.2000
0.0200
0.0020

OH
OH
OH
OH

H.2

H.3

H.4

1 M2 Pasang Atap Genteng Mantili Kecil


Genteng mantili
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Atap Genteng Mantili Besar


Genteng Mantili Besar
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1 M' Pasang Genteng Bubung Mantili
Genteng Bubung Mantili
Portland Semen
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1 M2 Pasang Atap Asbes Gelombang (80 x 210 cm) x 5 mm
162

0.6000
0.1200

Lbr
Kg

Asbes Gelombang
Paku Pancing 60 x 230

0.1400
0.0750
0.0080
0.0080

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

11.0000
0.0300

bh
Kg

1 M2 Pasang Atap Genteng Beton


Genteng Beton Standard
Paku Biasa 2" - 5"

0.2000
0.1000
0.0100
0.0100

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

60.0000
0.2000

Lbr
Kg

1 M2 Pasang Atap Sirap


Genteng Sirap
Paku Biasa 1/2" - 1"

0.1660
0.2500
0.0250
0.0080

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

H.5

H.6

H.7
3.5000
0.0500
10.8000
0.0320

Buah
Kg
Kg
m3

0.4000
0.2000
0.0200
0.0200

OH
OH
OH
OH

1 M' Pasang Nok Genteng Beton


Nok Genteng Beton
Paku Biasa 2" - 5"
Portland Semen
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

163

H.8
0.4000
0.0600
0.5000
0.0040

Lbr
Kg
Kg
m3

1 M' Pasang Nok Sirap


Seng Plaat 3" x 6" BJLS 28
Paku Biasa 1/2" - 1"
Paku Biasa 2" - 5"
Kayu Bengkirai Papan Tebal 3 cm

0.1250
0.2500
0.0250
0.0060

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.7000
0.0200

Lbr
Kg

1 M2 Pasang Atap Seng Gelombang


Seng Gelombang 3" x 6" BJLS 28
Paku Biasa 1/2" - 1"

0.1200
0.0600
0.0060
0.0060

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.3000
0.0400

Lbr
Kg

1 M' Pasang Atap Nok Seng


Seng Plaat 3" x 6" BJLS 28
Paku Biasa 1/2" - 1"

0.1500
0.0700
0.0080
0.0060

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

H.9

H.10

IX

PEKERJAAN LANGIT - LANGIT

I.1
1.1000
0.0100

Lbr
Kg

1 M2 Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm


Plat Asbes tebal 5 mm
Paku

0.0300
0.0700
0.0070
0.0020

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Lbr

1 M2 Memasang Langit-langit Tripleks Uk (120x240) cm,


Tebal 3 mm, 4 mm & 6 mm
Tripleks (4 mm)

I.2
0.3750

164

0.0300

Kg

Paku Tripleks

0.0700
0.1000
0.0100
0.0040

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0150
0.0100

m3
Kg

1 M2 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm


Kayu Jati,Papan
Paku

0.6000
0.8000
0.0800
0.0300

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.3640
0.1100

Lbr
Kg

1 M2 Langit-langit Gypsum Board, tebal 9 mm


Gypsum Board
Paku Sekrup

0.1000
0.0500
0.0050
0.0050

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.0500
0.0100

m1
Kg

1 M' List Langit-Langit Kayu Profil


List Kayu Profil
Paku

0.0500
0.0500
0.0050
0.0030

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

I.3

I.4

I.5

165

I.6
0.0154
0.2000

m3
Kg

1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu Bengkirai


Kayu Bengkirai, balok
Paku Biasa 2" - 5"

0.1500
0.2500
0.0250
0.0750

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0084
0.2000

m3
Kg

1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu Kruing


Kayu Kruing, balok
Paku Biasa 2" - 5"

0.1500
0.2500
0.0250
0.0750

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0163
0.2500

m3
Kg

1M2 Pasang Rangka Langit-langit (60x60) cm, kayu Bengkirai


Kayu Bengkirai, balok
Paku Biasa 2" - 5"

0.2000
0.3000
0.0300
0.0100

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

I.6a

I.7

J
J.1
1.0000

Buah

3.3000
1.1000
0.0010
0.1600

OH
OH
OH
OH

1.0000
6.0000
0.0100

Buah
Kg
m3

1.0000
1.5000
1.5000

OH
OH
OH

J.2

PEKERJAAN SANITASI, JALAN, SALURAN DAN BOX CULVERT


1 UNIT Memasang Closet Duduk Porselin
Kloset Duduk
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1 UNIT Memasang Closet Jongkok
Kloset Jongkok
Portland Semen
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
166

0.1600

OH

1.0000
0.3000
6.0000
0.0100

Buah
Kg
m3

1.2000
0.1450
0.1500
0.1000

OH
OH
OH
OH

J.3

J.4
1.1000
0.0270
0.6800
0.0560
0.0240

Buah
m3
Kg
m3
m3

0.1400
0.0700
0.0070
0.0070

OH
OH
OH
OH

J.5

Mandor
1 UNIT Memasang Wastafel
Wastafel
Perlengkapan 30% Harga Wastafel
Portland Semen
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1 M' Memasang Pipa Beton, 15 cm - 20 cm
Pipa Beton
Batu Bata
Portland Semen
Pasir Pasang
Pasir Urug
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1 M' Memasang Pipa Beton, 30 cm - 100 cm
Pipa Beton
Batu Bata
Portland Semen
Pasir Pasang
Pasir Urug

1.1000
0.5500
10.3000
0.0610
0.0690

Buah
m3
Kg
m3
m3

0.3800
0.1900
0.0190
0.0190

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.0100
0.3500

m'

1 M' Memasang Pipa PVC type AW "


Pipa PVC
Perlengkapan 35% Harga Pipa

0.0360
0.0600
0.0060
0.0018

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

J.6

167

J.7
1.0100
0.3500

m'

1 M' MEMASANG PIPA PVC type AW 3/4"


Pipa PVC
Perlengkapan 35% Harga Pipa

0.0396
0.0660
0.0066
0.0020

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

1.0100
0.3500

m'

1 M' MEMASANG PIPA type AW PVC 1"


Pipa PVC
Perlengkapan 35% Harga Pipa

0.0432
0.0720
0.0072
0.0022

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

1.0100
0.3500

m'

1 M' MEMASANG PIPA PVC type AW 11/4"


Pipa PVC
Perlengkapan 35% Harga Pipa

0.0468
0.0780
0.0078
0.0023

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

1.0100
0.3500

m'

1 M' MEMASANG PIPA PVC type AW 11/2"


Pipa PVC
Perlengkapan 35% Harga Pipa

0.0504
0.0840
0.0084
0.0025

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

1.0100
0.3500

m'

1 M' Memasang Pipa PVC type AW 2"


Pipa PVC
Perlengkapan 35% Harga Pipa

0.0540
0.0900
0.0090
0.0027

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

J.8

J.9

J.10

J.11

168

J.12
1.0100
0.3500

m'

1 M' MEMASANG PIPA PVC type AW 21/2"


Pipa PVC
Perlengkapan 35% Harga Pipa

0.0675
0.1125
0.0113
0.0034

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

1.0100
0.3500

m'

1 M' Memasang Pipa PVC type AW 3"


Pipa PVC
Perlengkapan 35% Harga Pipa

0.0810
0.1350
0.0135
0.0041

OH
OH
OH
OH

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

0.5600
0.1370
0.3150

m3
m3
m3

1M' PEMASANGAN PIPA PVC 150 mm


Galian Tanah (B.1)
Urugan Pasir (B.9)
Urugan Tanah (B.9a)

0.1350
0.0130
0.4000
0.0200
0.0750

OH
OH
OH
OH
lot

Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

0.4000
0.1110
0.2800

m3
m3
m3

1M' PEMASANGAN PIPA PVC 100 mm


Galian Tanah (B.1)
Urugan Pasir (B.9)
Urugan Tanah (B.9a)

0.0850
0.0080
0.2550
0.0120
0.0500

OH
OH
OH
OH
lot

Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

0.1200
0.0300

m3
m3

1M' PEMASANGAN PIPA PVC 50 mm


Galian Tanah (B.1)
Urugan Tanah (B.9a)

0.2000

OH

Tukang Pipa

J.13

J.14

J.15

J.16

169

0.0900
0.0150
0.0030

OH
OH
lot

Pekerja
Mandor
Alat Bantu

0.2000
0.1000
0.1000

m3
m3
m3

1M' PEMASANGAN PIPA PVC 45 mm


Galian Tanah (B.1)
Urugan Pasir (B.9)
Urugan Tanah (B.9a)

0.0650
0.0060
0.1950
0.0090
0.0250

OH
OH
OH
OH
lot

Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

0.1200
0.0200

m3
m3

1M' PEMASANGAN PIPA PVC 40 mm


Galian Tanah (B.1)
Urugan Tanah (B.9a)

0.1700
0.0700
0.0100
0.0020

OH
OH
OH
lot

Tukang Pipa
Pekerja
Mandor
Alat Bantu

0.0600
0.0100

m3
m3

1M' PEMASANGAN PIPA PVC 25 mm


Galian Tanah (B.1)
Urugan Tanah (B.9a)

0.0400
0.0600
0.0600
0.0010

OH
OH
OH
lot

Tukang Pipa
Pekerja
Mandor
Alat Bantu

0.0600
0.0100
0.0010

m3
m3
lot

1M' MEMASANG PIPA PVC 1"


Galian Tanah (B.1)
Urugan Tanah (B.9a)
Alat Bantu

0.0600
0.0400
0.0600

OH
OH
OH

Pekerja
Tukang Ledeng
Mandor

m3
m3
lot

1M' MEMASANG PIPA PVC 1 1/4"


Galian Tanah (B.1)
Urugan Tanah (B.9a)
Alat Bantu

J.17

J.18

J.19

J.20

J.21
0.1200
0.0200
0.0020

170

0.0700
0.1700
0.0100

OH
OH
OH

Pekerja
Tukang Ledeng
Mandor

0.2000
0.1000
0.1000
0.0250

m3
m3
m3
lot

1M' MEMASANG PIPA PVC 1 1/2"


Galian Tanah (B.1)
Urugan Pasir (B.9)
Urugan Tanah (B.9a)
Alat Bantu

0.1950
0.0060
0.0650
0.0090

OH
OH
OH
OH

Pekerja
Kepala Tukang
Tukang Ledeng
Mandor

0.1200
0.0300
0.0030

m3
m3
lot

1M' MEMASANG PIPA PVC 2"


Galian Tanah (B.1)
Urugan Tanah (B.9a)
Alat Bantu

0.0900
0.2000
0.0150

OH
OH
OH

Pekerja
Tukang Ledeng
Mandor

0.0400
0.1110
0.2800
0.0500

m3
m3
m3
lot

1M' MEMASANG PIPA PVC 4"


Galian Tanah (B.1)
Urugan Pasir (B.9)
Urugan Tanah (B.9a)
Alat Bantu

0.2550
0.0080
0.0850
0.0120

OH
OH
OH
OH

Pekerja
Kepala Tukang
Tukang Ledeng
Mandor

0.5600
0.1370
0.3150
0.0750

m3
m3
m3
lot

1M' MEMASANG PIPA PVC 6"


Galian Tanah (B.1)
Urugan Pasir (B.9)
Urugan Tanah (B.9a)
Alat Bantu

0.4000
0.0130
0.1350
0.0200

OH
OH
OH
OH

Pekerja
Kepala Tukang
Tukang Ledeng
Mandor

J.22

J.23

J.24

J.25

171

J.26
1.0100
0.1000
0.2000
0.3000
0.0300
0.0250
0.0500

m2
m3
Org
Org
Org
Org
lot

1 M2 PASANG PAVING BLOK 6 CM K : 300


Paving blok 6 Holand cm K : 300 (ALDAS)
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Peralatan

1.0100
0.1000
0.2000
0.3000
0.0300
0.0250
0.0500

m2
m3
Org
Org
Org
Org
lot

1 M2 PASANG PAVING BLOK 6 CM K : 175


Paving blok Holand 6 cm K : 175
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Peralatan

J.27

172

J.28
1.0100
0.1000
0.2000
0.3000
0.0300
0.0250
0.0500

m2
m3
Org
Org
Org
Org
lot

1 M2 PASANG PAVING BLOK 8 CM K ; 300


Paving blok Holand 8 cm K : 300 (ALDAS)
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Peralatan

1.0100
0.1000
0.2000
0.3000
0.0300
0.0250
0.0500

m2
m3
Org
Org
Org
Org
lot

1 M2 PASANG PAVING BLOK 8 CM K: 175


Paving blok Holand 8 cm K : 175
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Peralatan

1.0100
0.1000
0.2000
0.3000
0.0300
0.0250
0.0500

m2
m3
Org
Org
Org
Org
lot

1 M2 PASANGAN PAVING BLOK WARNA 6 CM K: 175


Paving blok warna 6 cm K : 175
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Peralatan

1.0100
0.1000
0.2000
0.3000
0.0300
0.0250
0.0500

m2
m3
Org
Org
Org
Org
lot

1 M2 PASANG PAVING BLOK 6 CM K: 250


Paving blok 6 Holand cm K : 250 (NUSA JAYA)
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Peralatan

m2
m3
Org
Org
Org
Org
lot

1 M2 PASANGAN PAVING BLOK WARNA 8 CM K: 175


Paving blok warna 8 cm K : 175
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Peralatan

J.29

J.30

J.30a

J.31
1.0100
0.1000
0.2000
0.3000
0.0300
0.0250
0.0500

173

J.32
0.0300
0.0140
0.0050
0.0050
0.1000
0.0050
3.0000
0.0180

m3
m3
m3
m3
org
org
kg
lot

1 M2 LAPISAN PENGISI / PENUTUP DENGAN ASPAL PANAS TEBAL


Batu pecah mesin 2/3
Batu pecah mesin 1/2
Batu pecah mesin 0.5/1
Kayu bakar
Pekerja
Mandor
Aspal
Peralatan

1.0000
1.0000
1.0000
6.0000
20.0000
0.5000
0.5000
0.5000
0.2500

org
org
org
org
ltr
ltr
ltr
ltr
ltr
hari

MENGGILAS JALAN 1 HARI DIPERLUKAN


Operator
Pembantu Operator
Penjaga
Pekerja
Solar
Oli Sae 40
Oli Sae 50
Oli Sae 140
Stenveet
Pemeliharaan Alat

J.33

1 Bulan dihitung 25 hari menggilas


a=
J.34a
J.34b
J.34c
J.34d

MENGGILAS 1 M2 LAPIS KULIT PENAHAN


MENGGILAS 1 M2 LAPIS KULIT PERTEGARAN
MENGGILAS LAPIS AUS ( PENETRASI )
MENGGILAS RINGAN 1 M2 OPERPENTING

J.35
125.0000
1.0000
0.9000
0.4000
8.3500

kg
m3
m3
org
org

J.36

25.0000
ax
ax
ax
ax

100 M2 PENGASPALAN SHEET (LATASIR) TEBAL 1 CM JERENG


Aspal
Abu batu
Kayu bakar
Mandor
Pekerja
1M2 ASPAL SAND SHEET TEBAL 2 CM JERENG ( 1 CM PADAT )

2/100
1/500
1/200
1/2

x
x
x
x

Biaya menggilas
Sewa motor walls
Aspal untuk lem 0,5 kg

174

J.37

1M2 ASPAL SAND SHEET TEBAL 3 CM JERENG ( 2 CM PADAT )


3/100
1/500
1/200
1/2

x
x
x
x

1.2000
0.3750
0.0180
0.1200

m3
Org
Org
lot

1 M3 PASIR DIBAWAH ALAS JALAN TIAP 1 M3 LAPIS PASIR


Pasir Urug / Sirtu
Pekerja
Mandor
Peralatan

0.0500
0.2000
0.3750
0.0190
0.1200

m3
m3
Org
Org
lot

1 M2 PAS ONDERLAG BATU BELAH TEBAL 15 CM


Pasir Urug / Sirtu
Batu Belah
Pekerja
Mandor
Peralatan

0.0200
0.0800
0.0750
0.0038
0.1200

m3
m3
Org
Org
lot

1 M2 PAS BATU LAPIS ATAS TEBAL 6 CM


Pasir Urug / Sirtu
Batu Pecah 4/6 5/7
Pekerja
Mandor
Peralatan

1.0000

Btg

1 BTG/4 M PENGADAAN DAN PEMASANGAN CERUCUK


Kayu Dolken

0.0400
0.0040
0.2500
0.0250
0.1000

OH
OH
OH
OH
lot

Tukang Kayu
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1.0000
0.5000

bh
jam

1 UNIT BOX PRECAST 100 x 100 x 15,TERPASANG


Box Precast 100 x 100 x 120 x 15
Excavator (+ operator)

1.0000
3.0000
0.3000
1.0000

OH
OH
OH
lot

Tukang
Pekerja
Mandor
Alat Bantu

J.38

J.39

J.40

J.41

J.42

Biaya menggilas
Sewa motor walls
Aspal untuk lem 0,5 kg

175

J.43
1.0000
0.5000

bh
jam

1 UNIT BOX PRECAST 150 x 100 x 120 x 15,TERPASANG


Box Precast 150 x 100 x 120 x 15
Excavator (+ operator)

1.0000
3.1000
0.3000
1.0000

OH
OH
OH
lot

Tukang
Pekerja
Mandor
Alat Bantu

1.0000
0.6000

bh
jam

1 UNIT BOX PRECAST 150 x 150 x 120 x 15,TERPASANG


Box Precast 150 x 150 x 120 x 15
Excavator (+ operator)

1.1000
3.2000
0.4000
1.0000

OH
OH
OH
lot

Tukang
Pekerja
Mandor
Alat Bantu

1.0000
1.0000

bh
jam

1 UNIT BOX PRECAST 200 x 150 x 120 x 20,TERPASANG


Box Precast 200 x 150 x 120 x 20
Excavator (+ operator)

1.2000
3.3000
0.5000
1.0000

OH
OH
OH
lot

Tukang
Pekerja
Mandor
Alat Bantu

1.0000
1.5000

bh
jam

1 UNIT BOX PRECAST 300 x 100 x 120 x 20,TERPASANG


Box Precast 300 x 100 x 120 x 20
Excavator (+ operator)

1.3000
3.4000
0.6000
1.0000

OH
OH
OH
lot

Tukang
Pekerja
Mandor
Alat Bantu

1.0000
2.5000

bh
jam

1 UNIT BOX PRECAST 380 x 350 x 120 x 20,TERPASANG


Box Precast 380 x 350 x 120 x 20
Excavator (+ operator)

1.4000
3.5000
0.7000
1.0000

OH
OH
OH
lot

Tukang
Pekerja
Mandor
Alat Bantu

J.44

J.45

J.46

J.47

176

J.48
1.0000
2.5000

bh
jam

1 UNIT BOX PRECAST 420 x 300 x 120 x 25,TERPASANG


Box Precast 420 x 300 x 120 x 25
Excavator (+ operator)

1.5000
3.6000
0.8000
1.0000

OH
OH
OH
lot

Tukang
Pekerja
Mandor
Alat Bantu

1.0000
0.4500

bh
jam

1 UNIT, RCP 800 x 2500, TERPASANG


RCP 800 x 2500
Excavator (+ operator)

1.0000
2.4250
0.2500
1.0000

OH
OH
OH
lot

Tukang
Pekerja
Mandor
Alat Bantu

1.0000
0.4500

bh
jam

1 UNIT, RCP 500 x 2500, TERPASANG


RCP 500 x 2500
Excavator (+ operator)

1.0000
2.4250
0.2500
1.0000

OH
OH
OH
lot

Tukang
Pekerja
Mandor
Alat Bantu

1.1500
0.0600

Kg
Kg

PEKERJAAN BESI & ALLUMUNIUM


1 Kg Memasang Besi Profil
Besi Profil
Meni Besi

0.0600
0.0600
0.0060
0.0030

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

1.1500

kg

1 Kg Memasang Rangka Kuda-kuda Baja IWF


Besi Baja IWF

0.0600
0.0600
0.0060
0.0030

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

J.49

J.50

XI

K
K.1

K.2

177

K.3
1.0500
0.0150
0.0190

Lbr
Kg
m3

1 M' Memasang Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm


Seng Plaat
Paku Biasa 1 - 2,5 cm
Kayu Papan Klas II atau III

0.2000
0.4000
0.0250
0.0100

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.0500
0.0100
0.5000

Lbr
Kg
Kg

1 M' Memasang Talang 1/2 Lingkaran 15 cm, Seng Plaat BJLS 30


Lebar 45 cm
Seng Plaat
Paku Biasa 1 - 2,5 cm
Besi strip

0.1500
0.3000
0.0300
0.0070

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

K.4

XII

L
L.1
1.0000

Buah

0.0100
0.5000
0.0100
0.0050

OH
OH
OH
OH

L.2
1.0000

Buah

0.0050
0.5000
0.0050
0.0025

OH
OH
OH
OH

L.3
1.0000

Buah

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

PEKERJAAN KUNCI dan KACA


1 BUAH Pasang Kunci Tanam Biasa
Kunci Tanam Biasa
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1 BUAH Pasang Kunci Tanam Kamar Mandi
Kunci Tanam Kamar Mandi
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1 BUAH Pasang Engsel Pintu
Engsel Pintu
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
178

L.4
1.0000

Buah

0.0100
0.1000
0.0100
0.0050

OH
OH
OH
OH

1 BUAH Pasang Engsel Jendela Kupu-kupu


Engsel Jendela
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

179

L.5
1.0000

Buah

0.0200
0.2000
0.0200
0.0100

OH
OH
OH
OH

L.6
1.0000

Buah

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

L.7
1.0000

Buah

0.0200
0.2000
0.0200
0.0010

OH
OH
OH
OH

L.8

Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1 BUAH Pasang Kait Angin
Kait Angin
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1 BUAH Pasang Kunci Selot
Kunci Selot
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1 BUAH Pasang Kunci Lemari
Kunci Lemari

1.0000

Buah

0.0250
0.2500
0.0250
0.0013

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.1000

m2

1 M2 Pasang Kaca tebal 5 mm


Kaca tebal 5mm

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

L.9

XIII

1 BUAH Pasang Engsel Angin


Engsel Angin

M
M.1
26.5000
10.4000

Buah
Kg

PEKERJAAN PENUTUP LANTAI dan DINDING


1 M2 Pasang lantai Ubin PC Abu-abu Uk. 20 x 20 cm
Ubin Abu-abu 20x20 cm
Portland Semen
180

0.0135

m3

Pasir Pasang

0.2700
0.1300
0.0130
0.0140

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

M.2

1 M2 Pasang lantai Ubin Granito Uk. 40 x 40 cm


Ubin Granito 40x40 cm
Portland Semen
Pasir Pasang
Semen Warna

6.9300
9.8000
0.0450
1.3000

Buah
Kg
m3
Kg

0.2500
0.1200
0.0120
0.0130

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.1870
10.0000
0.0450
1.5000

m2
Kg
m3
Kg

1 M2 Pasang Lantai Keramik 30 x 30 cm


Ubin Keramik 30 x 30 cm
Portland Semen
Pasir Pasang
Semen Warna

0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

M.3

181

M.4

1 M2 Pasang Lantai Keramik 20 x 20 cm


Ubin Keramik 20 x 20 cm
Portland Semen
Pasir Pasang
Semen Warna

26.5000
10.4000
0.0450
1.6200

Buah
Kg
m3
Kg

0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.0600
8.1900
0.0450
0.6500

m2
Kg
m3
Kg

1M2 Memasang Lantai Marmer ukuran 1.00x1.00 m


Marmer
Portland Semen
Pasir Pasang
Semen Warna

0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

M.5

M.6
53.0000
9.3000
0.0180
2.7500

Buah
Kg
m3
Kg

0.6000
0.4500
0.0450
0.0300

OH
OH
OH
OH

26.5000
9.3000
0.0180
2.7500

Buah
Kg
m3
Kg

0.6000
0.4500
0.0450

OH
OH
OH

M.7

1 M2 Pasang Dinding Keramik 10x20 cm,


Keramik 10x20 cm
Portland Semen
Pasir Pasang
Semen Warna
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1 M2 Pasang Dinding Keramik 20x20 cm,
Keramik 20x20 cm
Portland Semen
Pasir Pasang
Semen Warna
Pekerja
Tukang Batu
Kepala Tukang
182

0.0300

OH

1.0200
2.0000
12.4400
0.0250
0.6500

Buah
Kg
Kg
m3
Kg

0.7200
0.6500
0.0650
0.0350

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.1000
11.7500
0.0350

m2
Kg
m3

1 M2 Pasang Dinding Batu Paros / Batu Tempel Hitam


Batu Paros
Portland Semen
Pasir Pasang

0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.0000
0.2600
0.0300
1.0000
1.0000
3.0000
0.2000
0.1000
0.4800

m2
zak
m3
lot
org
org
org
org
lot

1 M2 DINDING GRANIT IMPORT


Granit import
P C (50 kg)
Pasir pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Alat bantu

M.8

M.9

M.10

Mandor
1M2 Memasang Dinding Marmer ukuran 1.00x1.00 m
Marmer
Paku 12 cm
Portland Semen
Pasir Pasang
Semen Warna

183

M.11
1.0000
0.2600
0.0300
1.0000
0.5000
1.5000
0.1000
0.0250
0.0320

m2
zak
m3
lot
org
org
org
org
lot

1 M2 LANTAI GRANIT IMPORT


Granit import
P C (50 kg)
Pasir pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Alat bantu

1.0000
0.2600
0.0300
0.7500
0.2500
0.6000
0.0500
0.0250
0.0240

m2
zak
m3
lot
org
org
org
org
lot

1 M2 LANTAI GRANITO UKURAN 60 X 60 POLISHED


Granito 60 x 60 polished lokal
P C (50 kg)
Pasir pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Alat bantu

m2
zak
m3
lot
org
org
org
org
lot

1 M2 DINDING GRANITO UKURAN 60 X 60 POLISHED


Granito 60 x 60 polished lokal
P C (50 kg)
Pasir pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Alat bantu

m2
zak
m3
lot
org
org
org
org
lot

1 M2 LANTAI MARMER ITALY


Marmer Italy
P C (50 kg)
Pasir pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Alat bantu

M.12

M.13
1.0000
0.2600
0.0300
0.7500
0.2500
0.7000
0.0500
0.0250
0.0400
M.14
1.0000
0.2600
0.0300
1.0000
0.5000
1.5000
0.1000
0.0250
0.0320
M.15

1 M2 DINDING MARMER ITALY


184

1.0000
0.2600
0.0300
1.0000
1.0000
3.0000
0.2000
0.0250
0.4800
XIV

m2
zak
m3
lot
org
org
org
org
lot

marmer italy
P C (50 kg)
Pasir pasang
Campuran kedap air
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Alat bantu
PEKERJAAN PENGECATAN

N.1
0.0800
0.0200
0.1000

Kg
Kg
lbr

1 M2 Mendempul dan Menggosok Kayu


Dempul Jadi
Minyak Cat
Amplas

0.0400
0.0400
0.0040
0.0025

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

0.1500
0.1700
0.1700

Kg
Kg
Kg

1 M2 Pengecatan Bidang Lama


Plamir
Cat Dasar
Cat Penutup

0.0700
0.0750
0.0075
0.0025

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

N.2

185

N.3
0.2000
0.1500
0.1700
0.2600

Kg
Kg
Kg
Kg

1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)


1 lap.Cat Dasar & 2 lap.Cat Penutup
Cat Meni
Plamir
Cat Dasar
Cat Penutup 2 kali

0.0700
0.0090
0.0060
0.0025

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

0.2000
0.1500
0.1700
0.3500

Kg
Kg
Kg
Kg

1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)


1 lap.Cat Dasar & 3 lap.Cat Penutup
Cat Meni
Plamir
Cat Dasar
Cat Penutup 2 kali

0.0700
0.1050
0.0040
0.0025

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

0.1000
0.1000
0.2600

Kg
Kg
Kg

1 M2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar


2 lap. Cat Penutup)
Plamir
Cat Dasar
Cat Penutup 2 kali

0.0200
0.0630
0.0063
0.0025

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

0.1000
0.1800

Kg
Kg

1 M2 Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup)


Cat Dasar
Cat Penutup 2 kali

0.0280
0.0420
0.0042
0.0025

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

N.4

N.5

N.6

186

N.7
0.1000
0.0100

Kg
Kg

1 M2 Pengecatan Permukaan Baja dg Meni Besi


Meni Besi
Perekat / Lem

0.0200
0.2000
0.0020
0.0100

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

0.1000
0.0100
0.0020

Kg
Kg
m3

1 M2 Pengecatan Permukaan Baja dg Meni Besi & Perancah


Meni Besi
Perekat / Lem
Perancah Kayu

0.2500
0.2250
0.0225
0.0075

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

0.1100
0.1700
0.0800

Kg
Kg
Kg

1 M2 Pengecatan Permukaan Baja lapis Seng (Galvanis) secara


Manual sistem 3 lap. Cat Konvensional dg Tebal 200 m
Cat dasar
Cat Antara
Cat Penutup

0.5000
0.8000
0.3000
0.2000

OH
OH
OH
OH

Pekerja
Tukang Cat
Kepala Tukang
Mandor

N.8

N.9

187

N.10
0.0300
0.2000
0.0200
0.0100
0.2000
0.0100
0.1000
0.2000
0.1000
0.2500
0.2850
0.0400
0.0200

kg
kg
kg
kg
kg
kg
bh
ltr
lbr
org
org
org
org

1 M2 PLITURAN BANGUNAN ( BIASA )


Dempul plitur (dempul kasar)
Wood Filler (INFRA)
Oker putih
Oker warna
Batu apung (gosok)
Sirlak
kwas 3"
Spritus
Ampelas kayu
Pekerja
Tukang cat
Kepala tukang cat
Mandor

0.0300
0.2000
0.3500
0.0200
0.0100
0.1000
0.2000
0.0100
0.2000
0.1000
0.2500
0.2850
0.0400
0.0200

kg
kg
kg
kg
kg
kg
kg
bh
ltr
lbr
org
org
org
org

1 M2 PLITURAN MEUBELAIR
Dempul plitur (dempul kasar)
Wood Filler (INFRA)
Melamik
Oker putih
Oker warna
Batu apung (gosok)
Sirlak
kwas 3"
Spritus
Ampelas kayu
Pekerja
Tukang cat
Kepala tukang cat
Mandor

N.11

Rembang,

KEPALA DINAS

NIP. 19620

188

ANALISA SATUAN PEKERJAAN


JAAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011
edisi januari 2011

HARGA SAT.
Rp
7

JUMLAH
Rp
8=(4X7)

dari Seng Gelombang Tinggi 2,00 m


35,700.00
1,312.50
54,850.00
144,800.00
261,250.00
3,281,300.00
16,750.00
16,100.00

386,835.10
44,625.00
3,281.25
65,820.00
724.00
2,351.25
236,253.60
1,005.00
7,245.00

48,875.00
34,500.00
51,750.00
46,000.00

9,775.00
13,800.00
1,035.00
920.00

4,855,125.00
16,750.00
4,855,125.00

101,667.38
58,261.50
335.00
33,985.88

48,875.00
34,500.00
51,750.00
46,000.00

4,887.50
3,450.00
517.50
230.00

35,700.00
3,281,300.00
16,750.00
16,200.00
1,312.50

1,182,872.00
44,625.00
590,634.00
14,237.50
17,820.00
45,937.50

189

144,800.00
261,250.00
425.00
54,850.00
54,450.00
96,250.00
66,800.00
5,950.00
98,550.00

36,200.00
39,187.50
12,750.00
13,712.50
108,900.00
7,700.00
10,020.00
1,785.00
5,913.00

48,875.00
48,875.00
34,500.00
51,750.00
46,000.00

97,750.00
48,875.00
69,000.00
15,525.00
2,300.00

35,700.00
3,281,300.00
16,750.00
1,312.50
171,950.00
261,250.00
54,850.00

1,013,965.25
60,690.00
689,073.00
5,025.00
13,781.25
5,158.50
13,062.50
82,275.00

48,875.00
34,500.00
51,750.00
46,000.00

97,750.00
34,500.00
10,350.00
2,300.00

34,500.00
46,000.00

5,750.00
3,450.00
2,300.00

190

48,875.00
34,500.00
51,750.00
46,000.00

37,572.05
17,050.00
3,425.00
8,308.75
8,625.00
103.50
59.80

34,500.00
46,000.00

245,329.50
230,011.50
15,318.00

34,500.00
46,000.00

231,529.50
230,011.50
1,518.00

34,500.00
46,000.00

107,640.00
103,500.00
4,140.00

R DINDING BATA / BATU (bongkaran tidak dipakai lagi)


34,500.00
46,000.00

78,200.00
69,000.00
9,200.00

34,500.00
46,000.00

4,887.50
4,312.50
575.00

34,500.00
46,000.00

3,910.00
3,450.00
460.00

34,500.00
46,000.00

19,550.00
17,250.00
2,300.00

RANGKA ATAP/RENG KASO (bongkaran tidak dipakai lagi)


34,500.00
48,875.00
51,750.00

9,918.75
5,175.00
3,665.63
388.13

17,050.00
13,700.00

R DINDING BATA / BATU (Batu / bata dipakai lagi)

GENTENG / SIRAP (bongkaran tidak dipakai lagi)

GENTENG / SIRAP (bongkaran dipakai lagi)

191

46,000.00

690.00

RANGKA ATAP / RENG KASO (bongkaran dipakai lagi)


34,500.00
48,875.00
51,750.00
46,000.00

13,225.00
6,900.00
4,887.50
517.50
920.00

KUDA-KUDA GORDING/BALOK (bongkaran dipakai lagi)


34,500.00
48,875.00
51,750.00
46,000.00

480,700.00
138,000.00
293,250.00
31,050.00
18,400.00

A-KUDA GORDING/BALOK (bongkaran tidak dipakai lagi)


34,500.00
48,875.00
46,000.00

303,025.00
138,000.00
146,625.00
18,400.00

34,500.00
48,875.00
51,750.00
46,000.00

20,125.00
3,450.00
14,662.50
1,552.50
460.00

34,500.00
46,000.00

5,865.00
5,175.00
690.00

PLAFOND (bongkaran tidak dipakai lagi)

( L + 75 ))

Keterangan :
K = Biaya
a = Upah Pekerja
L = Jarak angkut

192

Keterangan :
K = Biaya
a = Upah Pekerja
L = Jarak angkut

( L + 75 ))/25

34,500.00
46,000.00

15,640.00
13,800.00
1,840.00

34,500.00
46,000.00

35,972.00
34,500.00
1,472.00

34,500.00
46,000.00

54,510.00
51,750.00
2,760.00

34,500.00
46,000.00

43,470.00
41,400.00
2,070.00

34,500.00
46,000.00

1,955.00
1,725.00
230.00

34,500.00
46,000.00

11,845.00
11,385.00
460.00

K = Biaya
a = Upah Pekerja
L = Jarak pembuangan

(dihitung 1/3 kali indeks pekerjaan galian)


34,500.00
46,000.00

193

19,550.00
17,250.00
2,300.00

61,950.00

85,150.00
74,340.00

34,500.00
46,000.00

10,350.00
460.00

34,500.00
46,000.00

10,810.00
10,350.00
460.00

61,950.00
196,000.00
55,000.00

156,280.00
24,780.00
26,460.00
52,140.00

34,500.00
48,875.00
51,750.00
46,000.00

27,600.00
19,550.00
2,070.00
3,680.00

13,700.00

88,065.00
82,200.00

34,500.00
46,000.00

5,175.00
690.00

106,600.00

137,695.00
127,920.00

34,500.00
46,000.00

8,625.00
1,150.00

34,500.00
46,000.00

20,539.00
18,147.00
2,392.00

ANAH BIASA MAX KEDALAMAN 3 M' TENAGA MANUSIA


34,500.00
46,000.00
13,750.00

29,403.00
25,357.50
3,358.00
687.50

194

ANAH BIASA MAX KEDALAMAN 4 M' TENAGA MANUSIA


34,500.00
46,000.00
13,750.00

37,579.50
32,568.00
4,324.00
687.50

ANAH BIASA MAX KEDALAMAN 5 M' TENAGA MANUSIA


34,500.00
46,000.00
13,750.00

45,756.00
39,778.50
5,290.00
687.50

ANAH BANYAK TERDAPAT BATU-BATU BUNDAR


34,500.00
46,000.00
13,750.00

57,487.50
51,750.00
2,300.00
3,437.50

ANAH BERBATU MAX KEDALAMAN 1 M' TNG MANUSIA


34,500.00
46,000.00
13,750.00

30,750.00
21,562.50
5,750.00
3,437.50

H MAX KEDALAMAN 2 M' DENGAN ALAT EXAVATOR 0,7 M3


500,000.00
4,500.00
20,000.00
20,050.00
49,450.00
40,250.00
34,500.00
46,000.00

6,586.63
2,286.63
3,169.27
365.86
91.69
226.15
184.07
157.78
105.18

500,000.00
4,500.00
20,000.00
20,050.00
49,450.00
40,250.00
34,500.00
46,000.00

8,544.52
2,990.21
4,144.43
478.43
119.91
295.73
240.71
206.32
68.77

250,000.00
4,500.00

4,880.46
2,515.18
1,131.83

H MAX KEDALAMAN 5 M' DENGAN ALAT EXAVATOR 0,7 M3

L GALIAN DENGAN DUMP TRUCK . M3/KM.

195

20,000.00
20,050.00
46,575.00
34,500.00
46,000.00

201.21
100.86
468.58
347.10
115.70

HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK


250,000.00
4,500.00
20,000.00
20,050.00
46,575.00
34,500.00
46,000.00

6,655.46
3,429.94
1,543.47
274.40
137.54
639.00
473.33
157.78

HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK


250,000.00
4,500.00
20,000.00
18,200.00
46,575.00
34,500.00
46,000.00

11,071.29
5,716.57
2,572.46
457.33
208.08
1,065.00
788.89
262.96

HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK


250,000.00
4,500.00
20,000.00
20,050.00
46,575.00
34,500.00
46,000.00

196

15,529.41
8,003.20
3,601.44
640.26
320.93
1,491.00
1,104.44
368.15

34,500.00
46,000.00
13,750.00

10,803.75
8,625.00
460.00
1,718.75

68,750.00
34,500.00
46,000.00
13,750.00

94,685.00
82,500.00
10,350.00
460.00
1,375.00

196,000.00
55,000.00
34,500.00
48,875.00
51,750.00
46,000.00

156,185.00
39,200.00
55,000.00
34,500.00
24,437.50
2,587.50
460.00

144,800.00
196,000.00
34,500.00
48,875.00
51,750.00
46,000.00

245,985.00
144,800.00
39,200.00
34,500.00
24,437.50
2,587.50
460.00

34,500.00
46,000.00
13,750.00

10,803.75
8,625.00
460.00
1,718.75

34,500.00
46,000.00
13,750.00

6,036.88
5,175.00
690.00
171.88

34,500.00
46,000.00
13,750.00

2,126.88
1,725.00
230.00
171.88
24,201.88

197

13,700.00
34,500.00
46,000.00
13,750.00

16,440.00
6,900.00
690.00
171.88

15,640.00
30,750.00
1,955.00
49,950.00

97,549.00
9,384.00
18,450.00
9,775.00
59,940.00

95,700.00
1,312.50
144,800.00

537,823.00
114,840.00
265,125.00
70,228.00

34,500.00
48,875.00
51,750.00
46,000.00

51,750.00
29,325.00
3,105.00
3,450.00

95,700.00
1,312.50
144,800.00
34,500.00
48,875.00
51,750.00
46,000.00

482,133.50
105,270.00
213,937.50
75,296.00
51,750.00
29,325.00
3,105.00
3,450.00

95,700.00
1,312.50
144,800.00

459,741.20
114,840.00
178,500.00
78,771.20

AT BESAR TANAH DARI LUAR DIPADATKAN (U/5000 M3)

198

34,500.00
48,875.00
51,750.00
46,000.00

51,750.00
29,325.00
3,105.00
3,450.00

95,700.00
1,312.50
196,000.00
144,800.00

382,586.10
114,840.00
80,062.50
28,812.00
71,241.60

34,500.00
48,875.00
51,750.00
46,000.00

51,750.00
29,325.00
3,105.00
3,450.00

95,700.00
61,950.00

188,625.90
114,840.00
26,762.40

34,500.00
48,875.00
51,750.00
46,000.00

24,150.00
19,061.25
2,018.25
1,794.00

Siklop 60% Beton Camp. 1PC : 2PS : 3KR &

2,057,336.90
95,700.00
11,100.00
1,312.50
171,950.00
261,250.00
17,850.00

45,936.00
1,398,600.00
254,625.00
53,648.40
122,265.00
32,130.00

34,500.00
48,875.00
51,750.00
46,000.00

103,500.00
41,543.75
4,398.75
690.00

95,700.00
1,312.50
144,800.00
261,250.00

567,137.60
43,065.00
254,625.00
45,177.60
122,265.00

199

34,500.00
48,875.00
51,750.00
46,000.00

82,110.00
14,662.50
1,552.50
3,680.00

61,950.00
171,950.00
261,250.00
1,312.50
11,100.00
17,850.00
46,215.49
16,750.00
22,000.00
19,250.00

734,601.50
1,177.05
16,163.30
39,187.50
79,406.25
499,500.00
16,065.00
1,478.90
2,010.00
1,980.00
4,620.00

34,500.00
48,875.00
51,750.00
46,000.00

34,500.00
32,746.25
3,467.25
2,300.00

48,875.00
51,750.00
34,500.00
46,000.00
13,750.00

12,528.75
6,109.38
646.88
5,175.00
460.00
137.50

48,875.00
51,750.00
34,500.00
46,000.00
13,750.00

66,377.50
1,955.00
207.00
62,100.00
1,978.00
137.50

g Pancang (40x40) cm, Beton Bertulang

CANG DICINCIN DAN DILANCIPKAN (KAYU HUTAN)

200

48,875.00
51,750.00
34,500.00
46,000.00
13,750.00

82,971.88
2,443.75
258.75
77,625.00
2,472.50
171.88

48,875.00
51,750.00
34,500.00
46,000.00
13,750.00

99,566.25
2,932.50
310.50
93,150.00
2,967.00
206.25

48,875.00
51,750.00
34,500.00
46,000.00
13,750.00

132,755.00
3,910.00
414.00
124,200.00
3,956.00
275.00

126,100.00
18,550.00
48,875.00
34,500.00
46,000.00

411,013.33
151,320.00
154,583.33
32,583.33
70,150.00
2,376.67

126,100.00
18,550.00
48,875.00
34,500.00
46,000.00

540,238.33
151,320.00
278,250.00
35,841.67
72,450.00
2,376.67

126,100.00
18,550.00
48,875.00
34,500.00
46,000.00

702,009.17
151,320.00
432,833.33
40,729.17
74,750.00
2,376.67

TU BRONJONG UNTUK KAWAT 3 MM

TU BRONJONG UNTUK KAWAT 4 MM

TU BRONJONG UNTUK KAWAT 5 MM

201

425.00
1,312.50
144,800.00

76,569.28
29,750.00
24,871.88
5,502.40

34,500.00
48,875.00
51,750.00
46,000.00

10,350.00
4,887.50
517.50
690.00

425.00
1,312.50
144,800.00

70,847.63
29,750.00
18,860.63
5,792.00

34,500.00
48,875.00
51,750.00
46,000.00

10,350.00
4,887.50
517.50
690.00

425.00
1,312.50
144,800.00
196,000.00

62,281.25
29,750.00
5,906.25
7,240.00
2,940.00

34,500.00
48,875.00
51,750.00
46,000.00

10,350.00
4,887.50
517.50
690.00

rah Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps

202

425.00
1,312.50
144,800.00
34,500.00
48,875.00
51,750.00
46,000.00

68,205.15
29,750.00
15,093.75
6,226.40
11,040.00
4,887.50
517.50
690.00

425.00
1,312.50
144,800.00
34,500.00
48,875.00
51,750.00
46,000.00

66,106.00
29,750.00
12,705.00
6,516.00
11,040.00
4,887.50
517.50
690.00

91,900.00
65,625.00
144,800.00
34,500.00
48,875.00
51,750.00
46,000.00
13,750.00

166,217.43
101,090.00
7,875.00
4,488.80
6,468.75
10,996.88
19,406.25
15,548.00
343.75

425.00
65,625.00
144,800.00
34,500.00
48,875.00
51,750.00
46,000.00

777,610.90
212,500.00
270,217.50
48,218.40
155,250.00
73,312.50
7,762.50
10,350.00

425.00
65,625.00
144,800.00
34,500.00
48,875.00
51,750.00
46,000.00

684,178.80
212,500.00
166,215.00
58,788.80
155,250.00
73,312.50
7,762.50
10,350.00

203

425.00
65,625.00
196,000.00
144,800.00
34,500.00
48,875.00
51,750.00
46,000.00

595,603.90
212,500.00
61,582.50
21,560.00
53,286.40
155,250.00
73,312.50
7,762.50
10,350.00

1,312.50
144,800.00

28,284.28
10,185.00
3,330.40

34,500.00
48,875.00
51,750.00
46,000.00

6,900.00
7,331.25
77.63
460.00

1,312.50
196,000.00
144,800.00

22,395.50
3,937.50
980.00
2,896.00

34,500.00
48,875.00
51,750.00
46,000.00

7,590.00
5,865.00
621.00
506.00

204

1,312.50
196,000.00
144,800.00

20,387.08
2,415.00
1,176.00
2,027.20

34,500.00
48,875.00
51,750.00
46,000.00

6,900.00
7,331.25
77.63
460.00

1,312.50
144,800.00

38,451.80
13,608.00
4,488.80

34,500.00
48,875.00
51,750.00
46,000.00

8,970.00
9,775.00
1,035.00
575.00

1,312.50
144,800.00

19,895.30
6,804.00
3,764.80

34,500.00
48,875.00
51,750.00
46,000.00

5,175.00
3,421.25
362.25
368.00

34,500.00
48,875.00
51,750.00
46,000.00

5,928.25
1,966.50
1,857.25
1,966.50
138.00

1,312.50
144,800.00

21,166.80
5,670.00
868.80

34,500.00
48,875.00
51,750.00
46,000.00

8,625.00
4,887.50
517.50
598.00

205

1,312.50
144,800.00

28,665.85
8,321.25
1,737.60

34,500.00
48,875.00
51,750.00
46,000.00

10,350.00
6,842.50
724.50
690.00

1,312.50

15,213.63
4,265.63

34,500.00
48,875.00
51,750.00
46,000.00

5,175.00
4,887.50
517.50
368.00

15,312,500.00
16,750.00
18,300.00

18,184,787.50
16,843,750.00
20,937.50
18,300.00

34,500.00
48,875.00
51,750.00
46,000.00

207,000.00
977,500.00
103,500.00
13,800.00

8,779,200.00
16,750.00
18,300.00

10,998,157.50
9,657,120.00
20,937.50
18,300.00

34,500.00
48,875.00
51,750.00
46,000.00

207,000.00
977,500.00
103,500.00
13,800.00

8,779,200.00
16,750.00

421,661.00
351,168.00
837.50

34,500.00
48,875.00

12,075.00
51,318.75

206

51,750.00
46,000.00

5,433.75
828.00

8,779,200.00
18,300.00

524,008.00
351,168.00
915.00

34,500.00
48,875.00
51,750.00
46,000.00

34,500.00
122,187.50
12,937.50
2,300.00

8,779,200.00
18,300.00

450,302.00
307,272.00
5,490.00

34,500.00
48,875.00
51,750.00
46,000.00

27,600.00
97,750.00
10,350.00
1,840.00

15,312,500.00
18,300.00

1,199,600.00
980,000.00
9,150.00

34,500.00
48,875.00
51,750.00
46,000.00

34,500.00
146,625.00
15,525.00
13,800.00

Plywood Rangkap rangka Kayu Bengkirai lbr s/d 90cm


8,779,200.00
16,750.00
18,300.00
98,550.00

458,322.50
219,480.00
502.50
9,150.00
98,550.00

34,500.00
48,875.00
51,750.00
46,000.00

20,700.00
97,750.00
10,350.00
1,840.00

8,779,200.00
16,750.00
18,300.00

470,490.02
224,747.52
502.50
9,150.00

Plywood rangkap, rangka expose kayu Bengkirai

207

98,550.00

98,550.00

34,500.00
48,875.00
51,750.00
46,000.00

27,600.00
97,750.00
10,350.00
1,840.00

15,312,500.00
16,750.00

1,047,762.50
918,750.00
2,512.50

34,500.00
48,875.00
51,750.00
46,000.00

17,250.00
97,750.00
10,350.00
1,150.00

8,779,200.00
16,750.00

655,764.50
526,752.00
2,512.50

34,500.00
48,875.00
51,750.00
46,000.00

17,250.00
97,750.00
10,350.00
1,150.00

208

Teakwood Rangkap Rangka Kayu Kelas I (jati)


15,312,500.00
16,750.00
18,300.00
98,550.00

624,895.00
382,812.50
502.50
5,490.00
98,550.00

34,500.00
48,875.00
51,750.00
46,000.00

27,600.00
97,750.00
10,350.00
1,840.00

Teakwood Rangkap Lapis Formika Rangka ekspose

610,811.50

8,779,200.00
16,750.00
18,300.00
98,550.00
252,500.00

219,480.00
502.50
1,464.00
98,550.00
126,250.00

34,500.00
48,875.00
51,750.00
46,000.00

27,600.00
122,187.50
12,937.50
1,840.00

8,779,200.00
72,300.00
130,680.00
16,750.00
18,300.00

454,517.00
131,688.00
72,300.00
156,816.00
3,350.00
9,150.00

34,500.00
48,875.00
51,750.00
46,000.00

10,350.00
63,537.50
6,727.50
598.00

8,779,200.00
72,300.00
252,500.00
16,750.00
18,300.00
53,100.00

441,471.00
131,688.00
72,300.00
126,250.00
3,350.00
9,150.00
10,620.00

EK DOUBLE UKURAN PINTU LAPIS ALUMINIUM ( KM/WC )

EK DOUBLE UKURAN PINTU LAPIS FORMIKA ( KM/WC )

209

34,500.00
48,875.00
51,750.00
46,000.00

struksi Kuda-kuda Konvensional Kayu Bengkirai

17,250.00
63,537.50
6,727.50
598.00
10,792,120.00

8,779,200.00
16,200.00
16,750.00

9,657,120.00
243,000.00
13,400.00

34,500.00
48,875.00
51,750.00
46,000.00

138,000.00
586,500.00
62,100.00
92,000.00

15,312,500.00
16,200.00
16,750.00

18,482,350.00
16,843,750.00
243,000.00
93,800.00

34,500.00
48,875.00
51,750.00
46,000.00

207,000.00
977,500.00
103,500.00
13,800.00

8,779,200.00
16,200.00
16,750.00

10,427,850.00
9,657,120.00
243,000.00
50,250.00

34,500.00
48,875.00
51,750.00
46,000.00

82,800.00
351,900.00
37,260.00
5,520.00

struksi Kuda-kuda Ekspose Kayu Jati

210

ywood & Formika Rangka Kayu Bengkirai


8,779,200.00
16,750.00
18,300.00
98,550.00
252,500.00

644,404.82
172,072.32
502.50
5,490.00
49,275.00
252,500.00

34,500.00
48,875.00
51,750.00
46,000.00

27,600.00
122,187.50
12,937.50
1,840.00

15,312,500.00
16,750.00
18,300.00
98,550.00
252,500.00

850,967.50
300,125.00
502.50
21,960.00
98,550.00
252,500.00

34,500.00
48,875.00
51,750.00
46,000.00

34,500.00
127,075.00
13,455.00
2,300.00

8,779,200.00
8,779,200.00
16,750.00

120,378.74
75,501.12
31,605.12
4,187.50

34,500.00
48,875.00
51,750.00
46,000.00

3,450.00
4,887.50
517.50
230.00

8,779,200.00
8,779,200.00
16,750.00

126,699.76
75,501.12
37,926.14
4,187.50

34,500.00
48,875.00
51,750.00
46,000.00

3,450.00
4,887.50
517.50
230.00

gka Atap Genteng Keramik, Kayu Bengkirai

gka Atap Genteng Beton, Kayu Bengkirai

211

8,779,200.00
16,750.00

1,462,820.00
1,448,568.00
3,350.00

34,500.00
48,875.00
51,750.00
46,000.00

4,140.00
5,865.00
621.00
276.00

8,779,200.00
16,750.00

79,633.99
63,210.24
1,675.00

34,500.00
48,875.00
51,750.00
46,000.00

3,450.00
9,775.00
1,293.75
230.00

8,779,200.00
16,750.00

111,898.70
96,571.20
837.50

34,500.00
48,875.00
51,750.00
46,000.00

3,450.00
9,775.00
1,035.00
230.00

8,779,200.00
16,750.00

148,843.40
127,298.40
2,512.50

34,500.00
48,875.00
51,750.00
46,000.00

5,175.00
12,218.75
1,293.75
345.00

8,779,200.00
16,750.00

281,507.60
245,817.60
2,512.50

34,500.00
48,875.00
51,750.00

5,175.00
21,993.75
2,328.75

212

46,000.00

3,680.00

misah Teakwood Rangkap Rangka Kayu Bengkirai


8,779,200.00
16,750.00
98,550.00
18,300.00

373,196.60
245,817.60
2,512.50
84,753.00
10,248.00

34,500.00
48,875.00
51,750.00
46,000.00

5,175.00
21,993.75
2,328.75
368.00

15,312,500.00
16,750.00
22,800.00

231,652.50
107,187.50
1,675.00
3,420.00

34,500.00
48,875.00
51,750.00
46,000.00

20,700.00
87,975.00
9,315.00
1,380.00

98,550.00
16,750.00

52,771.05
39,420.00
8,375.00

34,500.00
48,875.00
51,750.00
46,000.00

862.50
3,665.63
388.13
59.80

17,050.00
3,281,300.00
16,750.00
6,500.00

78,752.70
25,575.00
45,938.20
837.50
19.50

34,500.00
48,875.00
51,750.00
46,000.00

3,450.00
2,443.75
258.75
230.00

213

mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87


1,312.50
171,950.00
246,850.00

689,220.95
324,187.50
106,731.82
182,669.00

34,500.00
48,875.00
51,750.00
46,000.00

56,925.00
13,440.63
1,449.00
3,818.00

1,312.50
171,950.00
246,850.00

748,973.22
362,250.00
101,696.14
185,046.07

34,500.00
48,875.00
51,750.00
46,000.00

80,643.75
14,231.25
1,288.00
3,818.00

1,312.50
171,950.00
246,850.00

752,164.78
392,437.50
98,134.32
185,960.33

34,500.00
48,875.00
51,750.00
46,000.00

56,925.00
13,440.63
1,449.00
3,818.00

1,312.50
171,950.00
246,850.00

651,829.39
301,875.00
109,679.54
187,788.85

34,500.00
48,875.00
51,750.00
46,000.00

41,400.00
9,775.00
1,035.00
276.00

1,312.50
171,950.00
246,850.00

783,491.34
427,875.00
93,344.29
188,154.56

mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78

mutu f'c=12,2 Mpa (K150), slum (122)cm, w/c = 0,72

a Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87

mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66

214

34,500.00
48,875.00
51,750.00
46,000.00

56,925.00
12,218.75
1,293.75
3,680.00

1,312.50
171,950.00
246,850.00

814,420.22
462,000.00
89,782.46
188,520.26

34,500.00
48,875.00
51,750.00
46,000.00

56,925.00
12,218.75
1,293.75
3,680.00

1,312.50
171,950.00
246,850.00

838,230.25
486,937.50
85,729.36
191,445.89

34,500.00
48,875.00
51,750.00
46,000.00

56,925.00
12,218.75
1,293.75
3,680.00

1,312.50
309,430.00
246,850.00

921,047.40
504,000.00
152,946.83
189,983.07

34,500.00
48,875.00
51,750.00
46,000.00

56,925.00
12,218.75
1,293.75
3,680.00

1,312.50
309,430.00
246,850.00

945,777.16
532,875.00
151,178.66
187,606.00

34,500.00
48,875.00
51,750.00
46,000.00

56,925.00
12,218.75
1,293.75
3,680.00

mutu f'c=16,9 MPa (K200), slum (122)cm,w/c = 0,61

mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58

mutu f'c=21,7 MPa (K250), slum (122)cm,w/c = 0,56

a Beton mutu f'c=24,0 MPa (K275), slum (122)cm, w/c = 0,53

215

mutu f'c=26,4 MPa (K300), slum (122)cm,w/c = 0,52


1,312.50
309,430.00
246,850.00

953,387.33
542,062.50
150,515.59
186,691.74

34,500.00
48,875.00
51,750.00
46,000.00

56,925.00
12,218.75
1,293.75
3,680.00

1,312.50
309,430.00
246,850.00

1,004,418.32
576,187.50
148,084.36
183,948.96

34,500.00
48,875.00
51,750.00
46,000.00

72,450.00
17,106.25
1,811.25
4,830.00

mutu f'c=28,8 MPa (K325), slum (122)cm,w/c = 0,49

216

mutu f'c=31,2 MPa (K350), slum (122)cm, w/c = 0,48


1,312.50
309,430.00
246,850.00

1,014,470.64
588,000.00
147,421.29
182,851.85

34,500.00
48,875.00
51,750.00
46,000.00

72,450.00
17,106.25
1,811.25
4,830.00

a=
11,100.00
17,850.00

12,561.00
11,655.00
267.75

34,500.00
48,875.00
51,750.00
46,000.00

241.50
342.13
36.23
18.40

110
125

1,381,710.00
1,570,125.00

18,550.00
17,850.00

20,112.55
19,477.50
178.50

34,500.00
48,875.00
51,750.00
46,000.00

172.50
244.38
25.88
13.80

2,062,500.00
16,750.00
22,000.00

122,914.00
82,500.00
5,025.00
2,200.00

34,500.00
48,875.00
51,750.00
46,000.00

17,940.00
12,707.50
1,345.50
1,196.00

g Sloof, Ringbalk, Kolom, Balok Lantai dengan Papan


2,062,500.00

868,710.00
824,175.00

217

16,750.00

6,700.00

34,500.00
48,875.00
51,750.00
46,000.00

10,350.00
24,437.50
2,587.50
460.00

2,062,500.00
16,750.00
22,000.00

133,226.50
92,812.50
5,025.00
2,200.00

34,500.00
48,875.00
51,750.00
46,000.00

17,940.00
12,707.50
1,345.50
1,196.00

2,062,500.00
16,750.00
22,000.00
3,281,300.00
135,200.00
35,700.00

303,664.00
82,500.00
6,700.00
4,400.00
49,219.50
47,320.00
71,400.00

34,500.00
48,875.00
51,750.00
46,000.00

22,770.00
16,128.75
1,707.75
1,518.00

2,062,500.00
16,750.00
22,000.00
3,281,300.00
135,200.00
35,700.00

313,507.90
82,500.00
6,700.00
4,400.00
59,063.40
47,320.00
71,400.00

34,500.00
48,875.00
51,750.00
46,000.00

22,770.00
16,128.75
1,707.75
1,518.00

218

2,062,500.00
16,750.00
22,000.00
3,281,300.00
135,200.00
35,700.00

446,464.00
82,500.00
6,700.00
4,400.00
49,219.50
47,320.00
214,200.00

34,500.00
48,875.00
51,750.00
46,000.00

22,770.00
16,128.75
1,707.75
1,518.00

2,062,500.00
16,750.00
22,000.00
3,281,300.00
135,200.00
35,700.00
5,000.00

355,145.50
61,875.00
6,700.00
4,400.00
65,626.00
47,320.00
107,100.00
20,000.00

34,500.00
48,875.00
51,750.00
46,000.00

22,770.00
16,128.75
1,707.75
1,518.00

2,062,500.00
16,750.00
22,000.00
3,281,300.00
135,200.00
35,700.00

281,939.00
61,875.00
6,700.00
3,300.00
49,219.50
47,320.00
71,400.00

34,500.00
48,875.00
51,750.00
46,000.00

22,770.00
16,128.75
1,707.75
1,518.00

2,062,500.00
16,750.00
35,700.00

90,595.50
54,450.00
10,050.00
17,850.00

219

34,500.00
48,875.00
51,750.00
46,000.00

5,175.00
2,443.75
258.75
368.00

3,281,300.00
2,062,500.00
16,750.00

139,725.85
55,782.10
49,500.00
6,700.00

34,500.00
48,875.00
51,750.00
46,000.00

10,350.00
7,331.25
7,762.50
2,300.00

3,281,300.00
135,200.00
16,750.00
34,500.00
48,875.00
51,750.00
46,000.00

130,930.25
55,782.10
46,914.40
6,700.00
4,140.00
7,331.25
7,762.50
2,300.00

220

asi Beton Bertulang (150 kg Besi + Bekisting)


2,062,500.00
16,750.00
22,000.00
11,100.00
17,850.00
1,312.50
171,950.00
261,250.00

3,317,198.38
412,500.00
25,125.00
8,800.00
1,748,250.00
40,162.50
441,000.00
92,853.00
211,612.50

34,500.00
48,875.00
48,875.00
48,875.00
51,750.00
46,000.00

182,850.00
13,440.63
63,537.50
51,318.75
13,558.50
12,190.00

2,062,500.00
16,750.00
22,000.00
11,100.00
17,850.00
1,312.50
171,950.00
261,250.00

4,116,359.38
556,875.00
33,500.00
13,200.00
2,331,000.00
53,550.00
441,000.00
92,853.00
211,612.50

34,500.00
48,875.00
48,875.00
48,875.00
51,750.00
46,000.00

194,925.00
13,440.63
76,245.00
68,425.00
16,715.25
13,018.00

2,062,500.00
16,750.00
22,000.00
11,100.00
17,850.00
1,312.50
171,950.00
261,250.00
3,281,300.00

7,414,725.63
825,000.00
67,000.00
44,000.00
3,496,500.00
80,325.00
441,000.00
92,853.00
211,612.50
492,195.00

Beton Bertulang (200 kg Besi + Bekisting)

m Beton Bertulang (300 kg Besi + Bekisting)

221

135,200.00
35,700.00

473,200.00
714,000.00

34,500.00
48,875.00
48,875.00
48,875.00
51,750.00
46,000.00

243,225.00
13,440.63
80,643.75
102,637.50
20,855.25
16,238.00

2,062,500.00
16,750.00
22,000.00
11,100.00
17,850.00
1,312.50
171,950.00
261,250.00
3,281,300.00
135,200.00
35,700.00

5,772,802.63
660,000.00
53,600.00
35,200.00
2,331,000.00
53,550.00
441,000.00
92,853.00
211,612.50
459,382.00
378,560.00
642,600.00

34,500.00
48,875.00
48,875.00
48,875.00
51,750.00
46,000.00

219,075.00
13,440.63
80,643.75
68,425.00
17,232.75
14,628.00

Beton Bertulang (200 kg Besi + Bekisting)

222

Beton Bertulang (150 kg Besi + Bekisting)


2,062,500.00
16,750.00
22,000.00
11,100.00
17,850.00
1,312.50
171,950.00
261,250.00
3,281,300.00
135,200.00
35,700.00

5,534,444.63
660,000.00
53,600.00
35,200.00
1,748,250.00
40,162.50
441,000.00
92,853.00
211,612.50
393,756.00
378,560.00
1,142,400.00

34,500.00
48,875.00
48,875.00
48,875.00
51,750.00
46,000.00

182,850.00
13,440.63
63,537.50
51,318.75
13,713.75
12,190.00

2,062,500.00
16,750.00
22,000.00
11,100.00
17,850.00
1,312.50
171,950.00
261,250.00
3,281,300.00
135,200.00
35,700.00

5,214,941.38
495,000.00
53,600.00
35,200.00
1,748,250.00
40,162.50
441,000.00
92,853.00
211,612.50
525,008.00
378,560.00
856,800.00

34,500.00
48,875.00
48,875.00
48,875.00
51,750.00
46,000.00

182,850.00
13,440.63
63,537.50
51,318.75
13,558.50
12,190.00

2,062,500.00
16,750.00
22,000.00

5,287,395.88
515,625.00
50,250.00
26,400.00

ng Beton Bertulang (150 kg Besi + Bekisting)

a Beton Bertulang (200 kg Besi + Bekisting)

223

11,100.00
17,850.00
1,312.50
171,950.00
261,250.00
3,281,300.00
135,200.00
35,700.00

2,331,000.00
53,550.00
441,000.00
92,853.00
211,612.50
344,536.50
338,000.00
499,800.00

34,500.00
48,875.00
48,875.00
48,875.00
51,750.00
46,000.00

194,925.00
13,440.63
76,245.00
68,425.00
16,715.25
13,018.00

2,062,500.00
16,750.00
11,100.00
17,850.00
1,312.50
171,950.00
261,250.00

64,124.95
4,125.00
167.50
33,300.00
8,032.50
5,250.00
1,031.70
2,351.25

34,500.00
48,875.00
48,875.00
48,875.00
51,750.00
46,000.00

6,210.00
977.50
977.50
977.50
310.50
414.00

Penguat Beton Bertulang (11 x 11) cm

224

2,062,500.00
16,750.00
11,100.00
17,850.00
1,312.50
171,950.00
261,250.00

75,892.68
6,187.50
335.00
39,960.00
892.50
7,218.75
1,547.55
3,918.75

34,500.00
48,875.00
48,875.00
48,875.00
51,750.00
46,000.00

10,246.50
1,612.88
1,612.88
1,612.88
517.50
230.00

897,850.00
34,500.00
48,875.00
51,750.00
46,000.00
13,750.00

1,002,572.50
897,850.00
86,250.00
12,218.75
5,175.00
460.00
618.75

952,875.00
34,500.00
48,875.00
51,750.00
46,000.00
13,750.00

1,057,597.50
952,875.00
86,250.00
12,218.75
5,175.00
460.00
618.75

994,250.00
34,500.00
48,875.00
51,750.00
46,000.00
13,750.00

1,098,972.50
994,250.00
86,250.00
12,218.75
5,175.00
460.00
618.75

34,500.00
48,875.00

1,010.97
34.50
48.88

175 READY MIX 6 M3 BERIKUT SLANG

225 READY MIX 6 M3 BERIKUT SLANG

300 READY MIX 6 M3 BERIKUT SLANG

225

51,750.00
46,000.00
49,450.00
40,250.00
150,000.00
4,500.00
20,000.00
13,750.00

10.35
4.60
9.89
805.00
30.00
45.00
20.00
2.75

19,400.00
34,500.00
48,875.00
51,750.00
46,000.00
150,000.00

44,747.50
21,340.00
2,070.00
1,466.25
776.25
345.00
18,750.00

18,500.00
34,500.00
48,875.00
51,750.00
46,000.00
150,000.00

43,757.50
20,350.00
2,070.00
1,466.25
776.25
345.00
18,750.00

33,000.00
4,500.00
20,000.00
34,500.00
48,875.00
51,750.00
46,000.00
150,000.00

39,998.13
1,320.00
135.00
80.00
345.00
244.38
258.75
115.00
37,500.00

SAN DENGAN LAS LISTRIK TEBAL KAWAT 4 MM

226

34,500.00
48,875.00
51,750.00
46,000.00
150,000.00

40,403.75
1,725.00
977.50
155.25
46.00
37,500.00

72,600.00
33,000.00
34,500.00
48,875.00
46,000.00

84,201.63
73,326.00
3,300.00
3,450.00
3,665.63
460.00

1,000.00

34,622.63
25,000.00

34,500.00
48,875.00
51,750.00
46,000.00

5,175.00
3,665.63
414.00
368.00

1,200.00

32,786.00
24,000.00

34,500.00
48,875.00
51,750.00
46,000.00

5,175.00
2,932.50
310.50
368.00

2,900.00
1,312.50
144,800.00

54,335.60
14,500.00
10,500.00
4,633.60

34,500.00
48,875.00
51,750.00
46,000.00

13,800.00
9,775.00
1,035.00
92.00

bes Gelombang (80 x 210 cm) x 5 mm

39,907.63
227

45,850.00
26,000.00

27,510.00
3,120.00

34,500.00
48,875.00
51,750.00
46,000.00

4,830.00
3,665.63
414.00
368.00

2,750.00
16,750.00

43,517.50
30,250.00
502.50

34,500.00
48,875.00
51,750.00
46,000.00

6,900.00
4,887.50
517.50
460.00

2,589.50
16,750.00

178,327.50
155,370.00
3,350.00

34,500.00
48,875.00
51,750.00
46,000.00

5,727.00
12,218.75
1,293.75
368.00

9,075.00
16,750.00
1,312.50
144,800.00

76,938.60
31,762.50
837.50
14,175.00
4,633.60

34,500.00
48,875.00
51,750.00
46,000.00

13,800.00
9,775.00
1,035.00
920.00

228

81,200.00
16,750.00
16,750.00
210,683.95

60,803.74
32,480.00
1,005.00
8,375.00
842.74

34,500.00
48,875.00
51,750.00
46,000.00

4,312.50
12,218.75
1,293.75
276.00

81,200.00
16,750.00

64,834.00
56,840.00
335.00

34,500.00
48,875.00
51,750.00
46,000.00

4,140.00
2,932.50
310.50
276.00

81,200.00
16,750.00

34,316.25
24,360.00
670.00

34,500.00
48,875.00
51,750.00
46,000.00

5,175.00
3,421.25
414.00
276.00

19,050.00
16,750.00

26,033.00
20,955.00
167.50

34,500.00
48,875.00
51,750.00
46,000.00

1,035.00
3,421.25
362.25
92.00

bes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm

35,619.00
72,300.00
229

27,112.50

16,750.00

502.50

34,500.00
48,875.00
51,750.00
46,000.00

2,415.00
4,887.50
517.50
184.00

15,312,500.00
16,750.00

295,175.00
229,687.50
167.50

34,500.00
48,875.00
51,750.00
46,000.00

20,700.00
39,100.00
4,140.00
1,380.00

82,500.00
22,800.00

38,920.50
30,030.00
2,508.00

34,500.00
48,875.00
51,750.00
46,000.00

3,450.00
2,443.75
258.75
230.00

7,600.00
16,750.00

12,713.00
7,980.00
167.50

34,500.00
48,875.00
51,750.00
46,000.00

1,725.00
2,443.75
258.75
138.00

git-langit Lambriziring Kayu Jati, tebal 6 mm

230

Langit-langit (1,00x1,00) m, kayu Bengkirai


8,779,200.00
16,750.00

160,687.18
135,199.68
3,350.00

34,500.00
48,875.00
51,750.00
46,000.00

5,175.00
12,218.75
1,293.75
3,450.00

6,125,000.00
16,750.00

76,937.50
51,450.00
3,350.00

34,500.00
48,875.00
51,750.00
46,000.00

5,175.00
12,218.75
1,293.75
3,450.00

8,779,200.00
16,750.00

170,863.46
143,100.96
4,187.50

34,500.00
48,875.00
51,750.00
46,000.00

6,900.00
14,662.50
1,552.50
460.00

584,450.00

759,474.25
584,450.00

34,500.00
48,875.00
51,750.00
46,000.00

113,850.00
53,762.50
51.75
7,360.00

123,750.00
1,312.50
144,800.00

325,870.50
123,750.00
7,875.00
1,448.00

34,500.00
48,875.00
51,750.00

34,500.00
73,312.50
77,625.00

Langit-langit (1,00x1,00) m, kayu Kruing

Langit-langit (60x60) cm, kayu Bengkirai

ASI, JALAN, SALURAN DAN BOX CULVERT

231

46,000.00

7,360.00

501,950.00
501,950.00
1,312.50
144,800.00

722,707.38
501,950.00
150,585.00
7,875.00
1,448.00

34,500.00
48,875.00
51,750.00
46,000.00

41,400.00
7,086.88
7,762.50
4,600.00

55,000.00
5,737.50
1,312.50
144,800.00
61,950.00

80,078.51
60,500.00
154.91
892.50
8,108.80
1,486.80

34,500.00
48,875.00
51,750.00
46,000.00

4,830.00
3,421.25
362.25
322.00

68,750.00
5,737.50
1,312.50
144,800.00
61,950.00

129,660.23
75,625.00
3,155.63
13,518.75
8,832.80
4,274.55

34,500.00
48,875.00
51,750.00
46,000.00

13,110.00
9,286.25
983.25
874.00

4,500.00
4,500.00

10,687.80
4,545.00
1,575.00

34,500.00
48,875.00
51,750.00
46,000.00

1,242.00
2,932.50
310.50
82.80

232

7,100.00
7,100.00

14,681.50
7,171.00
2,485.00

34,500.00
48,875.00
51,750.00
46,000.00

1,366.20
3,225.75
341.55
92.00

11,275.00
11,275.00

20,817.20
11,387.75
3,946.25

34,500.00
48,875.00
51,750.00
46,000.00

1,490.40
3,519.00
372.60
101.20

14,600.00
14,600.00

25,792.30
14,746.00
5,110.00

34,500.00
48,875.00
51,750.00
46,000.00

1,614.60
3,812.25
403.65
105.80

22,800.00
22,800.00

37,402.00
23,028.00
7,980.00

34,500.00
48,875.00
51,750.00
46,000.00

1,738.80
4,105.50
434.70
115.00

34,100.00
34,100.00

53,227.70
34,441.00
11,935.00

34,500.00
48,875.00
51,750.00
46,000.00

1,863.00
4,398.75
465.75
124.20

233

49,700.00
49,700.00

76,160.36
50,197.00
17,395.00

34,500.00
48,875.00
51,750.00
46,000.00

2,328.75
5,498.44
584.78
156.40

72,600.00
72,600.00

109,015.85
73,326.00
25,410.00

34,500.00
48,875.00
51,750.00
46,000.00

2,794.50
6,598.13
698.63
188.60

15,640.00
85,150.00
10,810.00
48,875.00
51,750.00
34,500.00
46,000.00
13,750.00

15,640.00
85,150.00
10,810.00
48,875.00
51,750.00
34,500.00
46,000.00
13,750.00

15,640.00
10,810.00
48,875.00
234

46,851.23
8,758.40
11,665.55
3,405.15
6,598.13
672.75
13,800.00
920.00
1,031.25
33,339.83
6,256.00
9,451.65
3,026.80
4,154.38
414.00
8,797.50
552.00
687.50
15,812.35
1,876.80
324.30
9,775.00

34,500.00
46,000.00
13,750.00

15,640.00
85,150.00
10,810.00
48,875.00
51,750.00
34,500.00
46,000.00
13,750.00

15,640.00
10,810.00
48,875.00
34,500.00
46,000.00
13,750.00

15,640.00
10,810.00

3,105.00
690.00
41.25
23,696.63
3,128.00
8,515.00
1,081.00
3,176.88
310.50
6,727.50
414.00
343.75
13,304.25
1,876.80
216.20
8,308.75
2,415.00
460.00
27.50
7,845.25
938.40
108.10

48,875.00
34,500.00
46,000.00
13,750.00

1,955.00
2,070.00
2,760.00
13.75

15,640.00
10,810.00
13,750.00

7,845.25
938.40
108.10
13.75

34,500.00
48,875.00
46,000.00

2,070.00
1,955.00
2,760.00

15,640.00
10,810.00
13,750.00

13,304.25
1,876.80
216.20
27.50

235

34,500.00
48,875.00
46,000.00

2,415.00
8,308.75
460.00

15,640.00
85,150.00
10,810.00
13,750.00

23,696.63
3,128.00
8,515.00
1,081.00
343.75

34,500.00
51,750.00
48,875.00
46,000.00

6,727.50
310.50
3,176.88
414.00

15,640.00
10,810.00
13,750.00

15,812.35
1,876.80
324.30
41.25

34,500.00
48,875.00
46,000.00

3,105.00
9,775.00
690.00

15,640.00
85,150.00
10,810.00
13,750.00

27,709.43
625.60
9,451.65
3,026.80
687.50

34,500.00
51,750.00
48,875.00
46,000.00

8,797.50
414.00
4,154.38
552.00

15,640.00
85,150.00
10,810.00
13,750.00

46,851.23
8,758.40
11,665.55
3,405.15
1,031.25

34,500.00
51,750.00
48,875.00
46,000.00

13,800.00
672.75
6,598.13
920.00

236

59,500.00
144,800.00
34,500.00
48,875.00
51,750.00
46,000.00
13,750.00

99,527.50
60,095.00
14,480.00
6,900.00
14,662.50
1,552.50
1,150.00
687.50

36,750.00
144,800.00
34,500.00
48,875.00
51,750.00
46,000.00
13,750.00

76,550.00
37,117.50
14,480.00
6,900.00
14,662.50
1,552.50
1,150.00
687.50

237

102,100.00
144,800.00
34,500.00
48,875.00
51,750.00
46,000.00
13,750.00

142,553.50
103,121.00
14,480.00
6,900.00
14,662.50
1,552.50
1,150.00
687.50

46,000.00
144,800.00
34,500.00
48,875.00
51,750.00
46,000.00
13,750.00

85,892.50
46,460.00
14,480.00
6,900.00
14,662.50
1,552.50
1,150.00
687.50

51,800.00
144,800.00
34,500.00
48,875.00
51,750.00
46,000.00
13,750.00

91,750.50
52,318.00
14,480.00
6,900.00
14,662.50
1,552.50
1,150.00
687.50

71,250
144,800
34,500.00
48,875.00
51,750.00
46,000.00
13,750.00

111,395.00
71,962.50
14,480.00
6,900.00
14,662.50
1,552.50
1,150.00
687.50

55,000.00
144,800.00
34,500.00
48,875.00
51,750.00
46,000.00
13,750.00

94,982.50
55,550.00
14,480.00
6,900.00
14,662.50
1,552.50
1,150.00
687.50

238

GISI / PENUTUP DENGAN ASPAL PANAS TEBAL 3 CM


246,850.00
248,950.00
261,250.00
97,100.00
34,500.00
46,000.00
8,500.00
3,300.00

49,450.00
40,250.00
10,000.00
34,500.00
4,500.00
20,000.00
20,000.00
20,000.00
20,050.00

hari

41,921.95
7,405.50
3,485.30
1,306.25
485.50
3,450.00
230.00
25,500.00
59.40

49,450.00
40,250.00
10,000.00
207,000.00
90,000.00
10,000.00
10,000.00
10,000.00
5,012.50
100,000.00
531,712.50
13,292,812.50

2 / 7.500
1 / 7.500
2/25000
0,25/2500

3,544.75
1,772.38
1,063.43
1,329.28

AN SHEET (LATASIR) TEBAL 1 CM JERENG


9,500.00
211,200.00
97,100.00
46,000.00
34,500.00

1,792,565.00
1,187,500.00
211,200.00
87,390.00
18,400.00
288,075.00

1,792,565.00
531,712.50
75,000.00
9,500.00

42,039.73
35,851.30
1,063.43
375.00
4,750.00

HEET TEBAL 2 CM JERENG ( 1 CM PADAT )

239

HEET TEBAL 3 CM JERENG ( 2 CM PADAT )


1,792,565.00
531,712.50
75,000.00
9,500.00

59,965.38
53,776.95
1,063.43
375.00
4,750.00

61,950.00
34,500.00
46,000.00
3,300.00

88,501.50
74,340.00
12,937.50
828.00
396.00

61,950.00
95,700.00
34,500.00
46,000.00
3,300.00

36,445.00
3,097.50
19,140.00
12,937.50
874.00
396.00

61,950.00
137,900.00
34,500.00
46,000.00
3,300.00

15,429.30
1,239.00
11,032.00
2,587.50
174.80
396.00

35,700.00

49,012.00
35,700.00

48,875.00
51,750.00
34,500.00
46,000.00
13,750.00

1,955.00
207.00
8,625.00
1,150.00
1,375.00

3,628,000.00
227,150.00

3,921,500.00
3,628,000.00
113,575.00

48,875.00
34,500.00
46,000.00
13,750.00

48,875.00
103,500.00
13,800.00
13,750.00

H ALAS JALAN TIAP 1 M3 LAPIS PASIR

240

5,208,000.00
227,150.00

5,504,950.00
5,208,000.00
113,575.00

48,875.00
34,500.00
46,000.00
13,750.00

48,875.00
106,950.00
13,800.00
13,750.00

5,926,000.00
227,150.00

6,258,602.50
5,926,000.00
136,290.00

48,875.00
34,500.00
46,000.00
13,750.00

53,762.50
110,400.00
18,400.00
13,750.00

7,298,000.00
227,150.00

7,734,400.00
7,298,000.00
227,150.00

48,875.00
34,500.00
46,000.00
13,750.00

58,650.00
113,850.00
23,000.00
13,750.00

10,652,000.00
227,150.00

11,214,912.50
10,652,000.00
340,725.00

48,875.00
34,500.00
46,000.00
13,750.00

63,537.50
117,300.00
27,600.00
13,750.00

19,060,000.00
227,150.00

19,863,000.00
19,060,000.00
567,875.00

48,875.00
34,500.00
46,000.00
13,750.00

68,425.00
120,750.00
32,200.00
13,750.00

241

21,970,000.00
227,150.00

22,785,937.50
21,970,000.00
567,875.00

48,875.00
34,500.00
46,000.00
13,750.00

73,312.50
124,200.00
36,800.00
13,750.00

4,010,000.00
227,150.00

4,270,005.00
4,010,000.00
102,217.50

48,875.00
34,500.00
46,000.00
13,750.00

48,875.00
83,662.50
11,500.00
13,750.00

1,908,000.00
227,150.00

2,168,005.00
1,908,000.00
102,217.50

48,875.00
34,500.00
46,000.00
13,750.00

48,875.00
83,662.50
11,500.00
13,750.00

18,500.00
16,100.00

27,692.00
21,275.00
966.00

34,500.00
48,875.00
51,750.00
46,000.00

2,070.00
2,932.50
310.50
138.00

19,400.00

27,761.00
22,310.00

34,500.00
48,875.00
51,750.00
46,000.00

2,070.00
2,932.50
310.50
138.00

242

ng Datar/Jurai , Seng BJLS 28 Lebar 90 cm


47,200.00
16,750.00
8,779,200.00

244,819.80
49,560.00
251.25
166,804.80

34,500.00
48,875.00
51,750.00
46,000.00

6,900.00
19,550.00
1,293.75
460.00

ng 1/2 Lingkaran 15 cm, Seng Plaat BJLS 30

87,572.00
54,850.00
16,750.00
16,200.00

57,592.50
167.50
8,100.00

34,500.00
48,875.00
51,750.00
46,000.00

5,175.00
14,662.50
1,552.50
322.00

66,800.00

92,330.00
66,800.00

34,500.00
48,875.00
51,750.00
46,000.00

345.00
24,437.50
517.50
230.00

66,800.00

91,783.75
66,800.00

34,500.00
48,875.00
51,750.00
46,000.00

172.50
24,437.50
258.75
115.00

7,150.00

15,809.50
7,150.00

34,500.00
48,875.00
51,750.00
46,000.00

517.50
7,331.25
776.25
34.50

243

7,150.00

13,130.00
7,150.00

34,500.00
48,875.00
51,750.00
46,000.00

345.00
4,887.50
517.50
230.00

244

5,950.00

17,910.00
5,950.00

34,500.00
48,875.00
51,750.00
46,000.00

690.00
9,775.00
1,035.00
460.00

19,500.00

28,159.50
19,500.00

34,500.00
48,875.00
51,750.00
46,000.00

517.50
7,331.25
776.25
34.50

10,450.00

21,996.00
10,450.00

34,500.00
48,875.00
51,750.00
46,000.00

690.00
9,775.00
1,035.00
46.00

10,450.00

24,882.50
10,450.00

34,500.00
48,875.00
51,750.00
46,000.00

862.50
12,218.75
1,293.75
57.50

96,250.00

114,534.50
105,875.00

34,500.00
48,875.00
51,750.00
46,000.00

517.50
7,331.25
776.25
34.50

956.00
1,312.50

57,924.30
25,334.00
13,650.00

245

144,800.00

1,954.80

34,500.00
48,875.00
51,750.00
46,000.00

9,315.00
6,353.75
672.75
644.00

77,137.50
1,312.50
144,800.00
11,250.00

584,275.38
534,562.88
12,862.50
6,516.00
14,625.00

34,500.00
48,875.00
51,750.00
46,000.00

8,625.00
5,865.00
621.00
598.00

48,750.00
1,312.50
144,800.00
11,250.00

136,069.75
57,866.25
13,125.00
6,516.00
16,875.00

34,500.00
48,875.00
51,750.00
46,000.00

21,390.00
17,106.25
1,811.25
1,380.00

246

1,818.87
1,312.50
144,800.00
11,250.00

128,278.50
48,200.00
13,650.00
6,516.00
18,225.00

34,500.00
48,875.00
51,750.00
46,000.00

21,390.00
17,106.25
1,811.25
1,380.00

607,450.00
1,312.50
144,800.00
11,250.00

710,162.38
643,897.00
10,749.38
6,516.00
7,312.50

34,500.00
48,875.00
51,750.00
46,000.00

21,390.00
17,106.25
1,811.25
1,380.00

874.00
1,312.50
144,800.00
11,250.00

138,474.65
46,322.00
12,206.25
2,606.40
30,937.50

34,500.00
48,875.00
51,750.00
46,000.00

20,700.00
21,993.75
2,328.75
1,380.00

1,818.87
1,312.50
144,800.00
11,250.00

140,352.65
48,200.00
12,206.25
2,606.40
30,937.50

34,500.00
48,875.00
51,750.00

20,700.00
21,993.75
2,328.75

247

46,000.00

1,380.00

607,450.00
16,750.00
1,312.50
144,800.00
11,250.00

741,941.50
619,599.00
33,500.00
16,327.50
3,620.00
7,312.50

34,500.00
48,875.00
51,750.00
46,000.00

24,840.00
31,768.75
3,363.75
1,610.00

91,900.00
1,312.50
144,800.00

163,267.38
101,090.00
15,421.88
5,068.00

34,500.00
48,875.00
51,750.00
46,000.00

21,390.00
17,106.25
1,811.25
1,380.00

241,800.00
65,625.00
144,800.00
58,300.00
34,500.00
48,875.00
51,750.00
46,000.00
13,750.00

524,181.50
241,800.00
17,062.50
4,344.00
58,300.00
34,500.00
146,625.00
10,350.00
4,600.00
6,600.00

248

241,800.00
65,625.00
144,800.00
58,300.00
34,500.00
48,875.00
51,750.00
46,000.00
13,750.00

418,834.00
241,800.00
17,062.50
4,344.00
58,300.00
17,250.00
73,312.50
5,175.00
1,150.00
440.00

461,000.00
65,625.00
144,800.00
58,300.00
34,500.00
48,875.00
51,750.00
46,000.00
13,750.00

568,149.00
461,000.00
17,062.50
4,344.00
43,725.00
8,625.00
29,325.00
2,587.50
1,150.00
330.00

461,000.00
65,625.00
144,800.00
58,300.00
34,500.00
48,875.00
51,750.00
46,000.00
13,750.00

573,256.50
461,000.00
17,062.50
4,344.00
43,725.00
8,625.00
34,212.50
2,587.50
1,150.00
550.00

1,381,100.00
65,625.00
144,800.00
58,300.00
34,500.00
48,875.00
51,750.00
46,000.00
13,750.00

1,558,134.00
1,381,100.00
17,062.50
4,344.00
58,300.00
17,250.00
73,312.50
5,175.00
1,150.00
440.00
1,660,031.50

249

1,381,100.00
65,625.00
144,800.00
58,300.00
34,500.00
48,875.00
51,750.00
46,000.00
13,750.00

1,381,100.00
17,062.50
4,344.00
58,300.00
34,500.00
146,625.00
10,350.00
1,150.00
6,600.00

21,150.00
16,050.00
3,550.00

6,025.00
1,692.00
321.00
355.00

34,500.00
48,875.00
51,750.00
46,000.00

1,380.00
1,955.00
207.00
115.00

19,200.00
14,400.00
17,100.00

14,818.75
2,880.00
2,448.00
2,907.00

34,500.00
48,875.00
51,750.00
46,000.00

2,415.00
3,665.63
388.13
115.00

250

33,076.88
22,450.00
21,150.00
44,400.00
56,100.00

4,490.00
3,172.50
7,548.00
14,586.00

34,500.00
48,875.00
51,750.00
46,000.00

2,415.00
439.88
310.50
115.00
42,714.38

22,450.00
21,150.00
44,400.00
56,100.00

4,490.00
3,172.50
7,548.00
19,635.00

34,500.00
48,875.00
51,750.00
46,000.00

2,415.00
5,131.88
207.00
115.00
13,335.15

19,250.00
20,000.00
20,000.00

1,925.00
2,000.00
5,200.00

34,500.00
48,875.00
51,750.00
46,000.00

690.00
3,079.13
326.03
115.00

20,000.00
20,000.00

8,951.10
2,000.00
3,600.00

34,500.00
48,875.00
51,750.00
46,000.00

966.00
2,052.75
217.35
115.00

ok Lama (1lap.Plamir, 2lap Cat Penutup)

251

16,100.00
53,100.00

13,169.50
1,610.00
531.00

34,500.00
48,875.00
51,750.00
46,000.00

690.00
9,775.00
103.50
460.00

16,100.00
53,100.00
2,062,500.00

27,397.25
1,610.00
531.00
4,125.00

34,500.00
48,875.00
51,750.00
46,000.00

8,625.00
10,996.88
1,164.38
345.00

rmukaan Baja dg Meni Besi & Perancah

rmukaan Baja lapis Seng (Galvanis) secara

99,479.00
50,300.00
50,300.00
54,000.00

5,533.00
8,551.00
4,320.00

34,500.00
48,875.00
51,750.00
46,000.00

17,250.00
39,100.00
15,525.00
9,200.00

252

Rembang,

20,350.00
34,450.00
24,900.00
25,200.00
18,400.00
77,800.00
7,600.00
11,900.00
3,550.00
34,500.00
48,875.00
51,750.00
46,000.00

41,747.88
610.50
6,890.00
498.00
252.00
3,680.00
778.00
760.00
2,380.00
355.00
8,625.00
13,929.38
2,070.00
920.00

20,350.00
34,450.00
76,350.00
24,900.00
25,200.00
18,400.00
77,800.00
7,600.00
11,900.00
3,550.00
34,500.00
48,875.00
51,750.00
46,000.00

80,728.38
610.50
6,890.00
26,722.50
498.00
252.00
1,840.00
15,560.00
76.00
2,380.00
355.00
8,625.00
13,929.38
2,070.00
920.00

Januari 2011

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 19620715 199011 1 002

253

DAF TAR HAR GA SAT UAN PE K E


DINAS PEKERJAAN UMUM KABUPATEN REM
UNTUK TAHUN 2011

NO.

KODE

II

URAIAN PEKERJAAN
3
PEKERJAAN PERSIAPAN

A.1

1M' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m

A.2

1M' Pengukuran dan Pemasangan Bouwplank

A.3

1M2 Pembuatan Kantor Sementara dg Lantai Plesteran

A.4

1M2 Pembuatan Gudang Semen dan Alat-alat

A.5

1M2 Membersihkan Lapangan dan Perataan

A.6

1M2 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm

A.7

1M3 Bongkaran Beton Bertulang

A.8

1M3 Bongkaran Dinding Tembok Bata Merah

A.9

1 M3 MEMBONGKAR DINDING BATA / BATU (Batu / bata dipakai lagi)

A.10

1 M3 MEMBONGKAR DINDING BATA / BATU (bongkaran tidak dipakai lagi)

A.11

1M2 MEMBONGKAR PLESTERAN DINDING

A.12

1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran tidak dipakai lagi)

A.13

1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran dipakai lagi)

A.14

1M2 MEMBONGKAR RANGKA ATAP/RENG KASO (bongkaran tidak dipakai lag

A.15

1M2 MEMBONGKAR RANGKA ATAP / RENG KASO (bongkaran dipakai lagi)

A.16

1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran dipakai lagi)

A.17

1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran tidak dipakai

A.18

1M2 MEMBONGKAR PLAFOND (bongkaran dipakai lagi)

A.19

1M2 MEMBONGKAR PLAFOND (bongkaran tidak dipakai lagi)

PEKERJAAN TANAH

B.1

1M3 Galian Tanah Biasa Sedalam 1 m

B.2

1M3 Galian Tanah Keras Sedalam 1 m

B.3

1M3 Galian Tanah Cadas Sedalam 1 m

B.4

1M3 Galian Tanah Lumpur Sedalam 1 m

B.5

1M2 Pekerjaan Striping Setinggi 1 m

B.6

1M3 Membuang Tanah Sejauh 30 m'

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

254

NO.

KODE

URAIAN PEKERJAAN
3

B.7

1M3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)

B.8

1M3 Pemadatan Tanah

B.9

1M3 Urugan Pasir

B.9a

1M3 Urugan Tanah Biasa (Tanah Tersedia)

B.10

1M3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL

B.11

1M2 Pemasangan Lapisan Ijuk tebal 10 cm

B.12

1M3 Urugan Sirtu

B.13

1 M3 Galian Tanah Biasa Sedalam 2 meter

B.14

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 3 M' TENAGA MANUSIA

B.15

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 4 M' TENAGA MANUSIA

B.16

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 5 M' TENAGA MANUSIA

B.17

1 M3 PEK. GALIAN TANAH BANYAK TERDAPAT BATU-BATU BUNDAR


MAX KEDALAMAN 1 M' TENAGA MANUSIA

B.18

1 M3 PEK. GALIAN TANAH BERBATU MAX KEDALAMAN 1 M' TNG MANUSIA

B.19

1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 2 M' DENGAN ALAT EXAVATOR

B.20

1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 5 M' DENGAN ALAT EXAVATOR

B.21

MENGANGKUT HASIL GALIAN DENGAN DUMP TRUCK . M3/KM.

B.22

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRU


KURANG DARI 1,5 KM.

B.23

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRU


JARAK ANTARA 1,5 S/D 3 KM.

B.24

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRU


JARAK ANTARA 3 S/D 5 KM.

B.25

1 M3 MERATAKAN TANAH

B.26

1 M3 PEK. URUGAN TANAH PILIHAN

B.27

1 M3 PEK. LAPISAN PUDEL 1 KP : 3 TL

B.28

1 M3 PEK. LAPISAN PUDEL 1 KP : 5 PS

B.29

1 M3 MERATAKAN TANAH DAN DITIMBRIS

B.30

1 M2 MENGAMBIL DAN PASANGAN GEBALAN

B.31

1 M' MENGANGKUT GEBALAN RUMPUT

B.32

1 M2 PEKERJAAN GEBALAN RUMPUT SAMPAI TUMBUH

B.33

1 M2 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN (U/5000

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

255

NO.

KODE

III

URAIAN PEKERJAAN
3
PEKERJAAN PONDASI

C.1

1M3 Pasang Pondasi Batu Kali 1Pc : 3 Ps

C.1a

1 M3 PASANGAN BATU BELAH 1 : 4

C.2

1M3 Pasang Pondasi Batu Kali 1Pc : 5 Ps

C.3

1M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 Ps

C.4

1M3 Pasang Pondasi Batu Kosong

C.5

1M3 Pasang Pondasi Siklop 60% Beton Camp. 1PC : 2PS : 3KR &
40% Batu Belah

IV

C.6

1M3 Pasang Pondasi Sumuran diameter 100 cm

C.7

1M' Pembuatan Tiang Pancang (40x40) cm, Beton Bertulang

C.8

SEBUAH TIANG PANCANG DICINCIN DAN DILANCIPKAN (KAYU HUTAN)

C.9

1 M' TIANG DIPANCANGKAN DIDALAM TANAH LUNAK

C.10

1 M' TIANG DIPANCANGKAN DIDALAM TANAH BIASA

C.11

1 M' TIANG DIPANCANGKAN DIDALAM TANAH KERAS

C.12

1 M' TIANG DIPANCANGKAN DIDALAM TANAH PASIR

C.13

1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 3 MM

C.14

1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 4 MM

C.15

1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 5 MM

P E K E R J AAN

DINDING

D.1

1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 2 Ps

D.2

1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Ps

D.3

1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps

D.4

1 M2 PASANGAN 1/2 BATA MERAH 1 : 4

D.5

1 M2 PASANGAN 1/2 BATA MERAH 1 : 5

D.6

1 M2 PASANGAN BATU TEMPEL + SIARAN

D.7

1 M3 PASANGAN BATA MERAH 1 PC : 2 PS

D.8

1 M3 PASANGAN BATA MERAH 1 PC : 4 PS

D.9

1 M3 PASANGAN BATA MERAH 1 PC : 3 KP : 10 PS

PEKERJAAN

PLESTERAN

E.1

1M2 Plesteran 1 Pc : 3 Ps Tebal 15 mm

E.2

1M2 Plesteran 1 Pc : 2 Kp : 8 Ps Tebal 15 mm

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

256

NO.

KODE

VI

URAIAN PEKERJAAN
3

E.3

1M2 Plesteran 1 Pc : 3 Kp : 10 Ps Tebal 15 mm

E.4

1M2 Plesteran 1 Pc : 3 Ps Tebal 20 mm

E.5

1M2 Berapen 1 Pc : 5 Ps Tebal 15 mm

E.6

1M' Plesteran Skoning 1 Pc : 2 Ps lebar 10 mm

E.7

1M2 Plesteran Ciprat 1 Pc : 2 Ps

E.8

1M2 Finishing Siar Pas. Batu Kali Adukan 1 Pc : 2 Ps

E.9

1M2 Acian

PEKERJAAN KAYU

F.1

1M3 Membuat Kosen Pintu & Jendela Kayu klas I

F.2

1M3 Membuat Kosen Pintu & Jendela Kayu Bengkirai

F.3

1M2 Membuat Pintu Klamp Standard Kayu Bengkirai

F.4

1M2 Membuat Daun Pintu Panel Kayu Bengkirai

F.5

1M2 Membuat Pintu & Jendela Kaca Kayu Bengkirai

F.6

1M2 Membuat Pintu & Jendela Jalusi Kayu Kelas I (Jati)

F.7

1M2 Membuat Pintu Plywood Rangkap rangka Kayu Bengkirai lbr s/d 90cm

F.8

1M2 Membuat Pintu Plywood rangkap, rangka expose kayu Bengkirai

F.9

1M2 Membuat Jalusi mati Kosen Kayu Kelas I (Jati)

F.10

1M2 Membuat Jalusi mati Kosen Kayu Bengkirai

F.11

1M2 Membuat Pintu Teakwood Rangkap Rangka Kayu Kelas I (jati)

F.12

1M2 Membuat Pintu Teakwood Rangkap Lapis Formika Rangka ekspose


Kayu Bengkirai

F.13

1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS ALUMINIUM ( K

F.14

1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS FORMIKA ( KM

F.15

1M3 Memasang Konstruksi Kuda-kuda Konvensional Kayu Bengkirai


Bentang 6 M

F.16

1M3 Memasang Konstruksi Kuda-kuda Ekspose Kayu Jati

F.17

1M3 Memasang Konstruksi Gording Kayu Bengkirai

F.18

1M2 Pasang Pintu Plywood & Formika Rangka Kayu Bengkirai

F.19

1M2 Pasang Pintu Formika Double, Rangka Kayu Jati

F.20

1M2 Memasang Rangka Atap Genteng Keramik, Kayu Bengkirai

F.21

1M2 Memasang Rangka Atap Genteng Beton, Kayu Bengkirai

F.22

1M2 Pasang Rangka Atap Sirap Kayu Bengkirai

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

257

NO.

KODE

VII

URAIAN PEKERJAAN
3

F.23

1M' Pasang Listplank Uk. (3x20)cm Kayu Bengkirai

F.24

1M' Pasang Listplank Uk. (3x30)cm Kayu Bengkirai

F.25

1M' Pasang Listplank Uk. 2x(3x20)cm Kayu Bengkirai

F.26

1M2 Pasang Rangka Dinding Pemisah Kayu Bengkirai

F.27

1M2 Pas. Dinding Pemisah Teakwood Rangkap Rangka Kayu Bengkirai

F.28

1M2 Pasang Dinding Lambriziring dari Papan jati

F.29

1M2 Pasang Plywood tebal 4mm unt Dinding

F.30

1M2 Pasang Dinding Bilik, Rangka Kayu Klas III / IV

PEKERJAAN BETON

G.1

1M3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87

G.2

1M3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78

G.3

1M3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (122)cm, w/c = 0,72

G.4

1M3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c =

G.5

1M3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66

G.6

1M3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (122)cm,w/c = 0,61

G.7

1M3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58

G.8

1M3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm,w/c = 0,56

G.9

1M3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (122)cm, w

G.10

1M3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (122)cm,w/c = 0,52

G.11

1M3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (122)cm,w/c = 0,49

G.12

1M3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (122)cm, w/c = 0,48

G.13

1KG Pembesian dg Besi Polos

G.13a

110 KG Besi Beton Terpasang (polos)

G.13b

125 KG Besi Beton Terpasang (polos)

G.14

1KG Kabel Presstresed Polos/strand

G.15

1M2 Pasang Bekisting untuk Pondasi

G.15a

1M3 Pasang Bekisting Sloof, Ringbalk, Kolom, Balok Lantai dengan Papan

G.16

1M2 Pasang Bekisting untuk Sloof

G.17

1M2 Pasang Bekisting untuk Kolom

G.18

1M2 Pasang Bekisting untuk Balok

G.19

1M2 Pasang Bekisting untuk Lantai

G.20

1M2 Pasang Bekisting untuk Dinding

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

258

NO.

KODE

VIII

URAIAN PEKERJAAN
3

G.21

1M2 Pasang Bekisting untuk Tangga

G.22

1 M2 Pasang Bekisting Jembatan Cor

G.23

1 M2 BEKESTING DENGAN PAPAN

G.24

1 M2 BEKESTING DENGAN MULTIPLEX 9 MM

G.25

1 M3 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)

G.26

1 M3 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)

G.27

1 M3 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)

G.28

1 M3 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)

G.29

1 M3 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)

G.30

1 M3 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)

G.31

1 M3 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)

G.32

1 M' Membuat Kolom Penguat Beton Bertulang (11 x 11) cm

G.33

1 M' Membuat Ring Balok Beton Bertulang (10 x 15) cm

G.34

1 M3 PAS. BETON K-175 READY MIX 6 M3 BERIKUT SLANG

G.35

1 M3 PAS. BETON K-225 READY MIX 6 M3 BERIKUT SLANG

G.36

1 M3 PAS. BETON K-300 READY MIX 6 M3 BERIKUT SLANG

G.37

1 KG PEK. ERECTION KONST. KUDA-KUDA BESI

G.38

1 KG PEKERJAAN BAJA IWF

G.39

1 KG PEKERJAAN KONSTUKSI BESI SIKU / PROFIL

G.40

1 CM PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL KAWAT 4 MM

G.41

1 TITIK MELUBANG KONSTRUKSI BESI DENGAN BOR

G.42

1 M2 PEKERJAAN WIREMESH M8

PEKERJAAN PENUTUP ATAP

H.1

1 M2 Pasang Atap Genteng Mantili Kecil

H.2

1 M2 Pasang Atap Genteng Mantili Besar

H.3

1 M' Pasang Genteng Bubung Mantili

H.4

1 M2 Pasang Atap Asbes Gelombang (80 x 210 cm) x 5 mm

H.5

1 M2 Pasang Atap Genteng Beton

H.6

1 M2 Pasang Atap Sirap

H.7

1 M' Pasang Nok Genteng Beton

H.8

1 M' Pasang Nok Sirap

H.9

1 M2 Pasang Atap Seng Gelombang

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

259

NO.

KODE

2
H.10

IX

URAIAN PEKERJAAN
3
1 M' Pasang Atap Nok Seng
PEKERJAAN LANGIT - LANGIT

I.1

1 M2 Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm

I.2

1 M2 Memasang Langit-langit Tripleks Uk (120x240) cm,


Tebal 3 mm, 4 mm & 6 mm

I.3

1 M2 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm

I.4

1 M2 Langit-langit Gypsum Board, tebal 9 mm

I.5

1 M' List Langit-Langit Kayu Profil

I.6

1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu Bengkirai

I.6a

1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu Kruing

I.7

1M2 Pasang Rangka Langit-langit (60x60) cm, kayu Bengkirai

PEKERJAAN SANITASI, JALAN, SALURAN DAN BOX CULVERT

J.1

1 UNIT Memasang Closet Duduk Porselin

J.2

1 UNIT Memasang Closet Jongkok

J.3

1 UNIT Memasang Wastafel

J.4

1 M' Memasang Pipa Beton, 15 cm - 20 cm

J.5

1 M' Memasang Pipa Beton, 30 cm - 100 cm

J.6

1 M' Memasang Pipa PVC type AW "

J.7

1 M' MEMASANG PIPA PVC type AW 3/4"

J.8

1 M' MEMASANG PIPA type AW PVC 1"

J.9

1 M' MEMASANG PIPA PVC type AW 11/4"

J.10

1 M' MEMASANG PIPA PVC type AW 11/2"

J.11

1 M' Memasang Pipa PVC type AW 2"

J.12

1 M' MEMASANG PIPA PVC type AW 21/2"

J.13

1 M' Memasang Pipa PVC type AW 3"

J.14

1M' PEMASANGAN PIPA PVC 150 mm

J.15

1M' PEMASANGAN PIPA PVC 100 mm

J.16

1M' PEMASANGAN PIPA PVC 50 mm

J.17

1M' PEMASANGAN PIPA PVC 45 mm

J.18

1M' PEMASANGAN PIPA PVC 40 mm

J.19

1M' PEMASANGAN PIPA PVC 25 mm

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

260

NO.

KODE

URAIAN PEKERJAAN
3

J.20

1M' MEMASANG PIPA PVC 1"

J.21

1M' MEMASANG PIPA PVC 1 1/4"

J.22

1M' MEMASANG PIPA PVC 1 1/2"

J.23

1M' MEMASANG PIPA PVC 2"

J.24

1M' MEMASANG PIPA PVC 4"

J.25

1M' MEMASANG PIPA PVC 6"

J.26

1 M2 PASANG PAVING BLOK 6 CM K : 300

J.27

1 M2 PASANG PAVING BLOK 6 CM K : 175

J.28

1 M2 PASANG PAVING BLOK 8 CM K ; 300

J.29

1 M2 PASANG PAVING BLOK 8 CM K: 175

J.30

1 M2 PASANGAN PAVING BLOK WARNA 6 CM K: 175

J.30a

1 M2 PASANG PAVING BLOK 6 CM K: 250

J.31

1 M2 PASANGAN PAVING BLOK WARNA 8 CM K: 175

J.32

1 M2 LAPISAN PENGISI / PENUTUP DENGAN ASPAL PANAS TEBAL 3 CM

J.33

MENGGILAS JALAN 1 HARI DIPERLUKAN

J.34a

MENGGILAS 1 M2 LAPIS KULIT PENAHAN

J.34b

MENGGILAS 1 M2 LAPIS KULIT PERTEGARAN

J.34c

MENGGILAS LAPIS AUS ( PENETRASI )

J.34d

MENGGILAS RINGAN 1 M2 OPERPENTING

J.35

100 M2 PENGASPALAN SHEET (LATASIR) TEBAL 1 CM JERENG

J.36

1M2 ASPAL SAND SHEET TEBAL 2 CM JERENG ( 1 CM PADAT )

J.37

1M2 ASPAL SAND SHEET TEBAL 3 CM JERENG ( 2 CM PADAT )

J.38

1 M3 PASIR DIBAWAH ALAS JALAN TIAP 1 M3 LAPIS PASIR

J.39

1 M2 PAS ONDERLAG BATU BELAH TEBAL 15 CM

J.40

1 M2 PAS BATU LAPIS ATAS TEBAL 6 CM

J.41

1 BTG/4 M PENGADAAN DAN PEMASANGAN CERUCUK

J.42

1 UNIT BOX PRECAST 100 x 100 x 15,TERPASANG

J.43

1 UNIT BOX PRECAST 150 x 100 x 120 x 15,TERPASANG

J.44

1 UNIT BOX PRECAST 150 x 150 x 120 x 15,TERPASANG

J.45

1 UNIT BOX PRECAST 200 x 150 x 120 x 20,TERPASANG

J.46

1 UNIT BOX PRECAST 300 x 100 x 120 x 20,TERPASANG

J.47

1 UNIT BOX PRECAST 380 x 350 x 120 x 20,TERPASANG

J.48

1 UNIT BOX PRECAST 420 x 300 x 120 x 25,TERPASANG

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

261

NO.

KODE

XI

URAIAN PEKERJAAN
3

J.49

1 UNIT, RCP 800 x 2500, TERPASANG

J.50

1 UNIT, RCP 500 x 2500, TERPASANG

PEKERJAAN BESI & ALLUMUNIUM

K.1

1 Kg Memasang Besi Profil

K.2

1 Kg Memasang Rangka Kuda-kuda Baja IWF

K.3

1 M' Memasang Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm

K.4

1 M' Memasang Talang 1/2 Lingkaran 15 cm, Seng Plaat BJLS 30


Lebar 45 cm

XII

XIII

PEKERJAAN KUNCI dan KACA

L.1

1 BUAH Pasang Kunci Tanam Biasa

L.2

1 BUAH Pasang Kunci Tanam Kamar Mandi

L.3

1 BUAH Pasang Engsel Pintu

L.4

1 BUAH Pasang Engsel Jendela Kupu-kupu

L.5

1 BUAH Pasang Engsel Angin

L.6

1 BUAH Pasang Kait Angin

L.7

1 BUAH Pasang Kunci Selot

L.8

1 BUAH Pasang Kunci Lemari

L.9

1 M2 Pasang Kaca tebal 5 mm

PEKERJAAN PENUTUP LANTAI & DINDING

M.1

1 M2 Pasang lantai Ubin PC Abu-abu Uk. 20 x 20 cm

M.2

1 M2 Pasang lantai Ubin Granito Uk. 40 x 40 cm

M.3

1 M2 Pasang Lantai Keramik 30 x 30 cm

M.4

1 M2 Pasang Lantai Keramik 20 x 20 cm

M.5

1M2 Memasang Lantai Marmer ukuran 1.00x1.00 m

M.6

1 M2 Pasang Dinding Keramik 10x20 cm,

M.7

1 M2 Pasang Dinding Keramik 20x20 cm,

M.8

1M2 Memasang Dinding Marmer ukuran 1.00x1.00 m

M.9

1 M2 Pasang Dinding Batu Paros / Batu Tempel Hitam

M.10

1 M2 DINDING GRANIT IMPORT

M.11

1 M2 LANTAI GRANIT IMPORT

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

262

NO.

KODE

XIV

URAIAN PEKERJAAN
3

M.12

1 M2 LANTAI GRANITO UKURAN 60 X 60 POLISHED

M.13

1 M2 DINDING GRANITO UKURAN 60 X 60 POLISHED

M.14

1 M2 LANTAI MARMER ITALY

M.15

1 M2 DINDING MARMER ITALY

PEKERJAAN PENGECATAN

N.1

1 M2 Mendempul dan Menggosok Kayu

N.2

1 M2 Pengecatan Bidang Lama

N.3

1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)


1 lap.Cat Dasar & 2 lap.Cat Penutup

N.4

1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)


1 lap.Cat Dasar & 3 lap.Cat Penutup

N.5

1 M2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar


2 lap. Cat Penutup)

N.6

1 M2 Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup)

N.7

1 M2 Pengecatan Permukaan Baja dg Meni Besi

N.8

1 M2 Pengecatan Permukaan Baja dg Meni Besi & Perancah

N.9

1 M2 Pengecatan Permukaan Baja lapis Seng (Galvanis) secara


manual sistem 3 lapis Cat Konvensional dg tebal 200 um

N.10

1 M2 PLITURAN BANGUNAN ( BIASA )

N.11

1 M2 PLITURAN MEUBELAIR

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

263

F T AR H AR G A S AT U AN P E K E R J AAN
S PEKERJAAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011
edisi januari 2011

URAIAN PEKERJAAN

HARGA SATUAN

i Seng Gelombang Tinggi 2,00 m

386,835.10
101,667.38

Sementara dg Lantai Plesteran

1,182,872.00
1,013,965.25
5,750.00

ari Bambu Uk. 40 x 50 x 20 cm

37,572.05
245,329.50
231,529.50

NDING BATA / BATU (Batu / bata dipakai lagi)

107,640.00

NDING BATA / BATU (bongkaran tidak dipakai lagi)

78,200.00
4,887.50

NTENG / SIRAP (bongkaran tidak dipakai lagi)

3,910.00

NTENG / SIRAP (bongkaran dipakai lagi)

19,550.00

NGKA ATAP/RENG KASO (bongkaran tidak dipakai lagi)

9,918.75

NGKA ATAP / RENG KASO (bongkaran dipakai lagi)

13,225.00

DA-KUDA GORDING/BALOK (bongkaran dipakai lagi)

480,700.00

DA-KUDA GORDING/BALOK (bongkaran tidak dipakai lagi)

303,025.00

AFOND (bongkaran dipakai lagi)

20,125.00

AFOND (bongkaran tidak dipakai lagi)

5,865.00

15,640.00
35,972.00
54,510.00
43,470.00
1,955.00
11,845.00
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

264

URAIAN PEKERJAAN

HARGA SATUAN

hitung 1/3 kali indeks pekerjaan galian)

19,550.00
85,150.00
10,810.00
156,280.00
88,065.00
137,695.00
20,539.00

AH BIASA MAX KEDALAMAN 3 M' TENAGA MANUSIA

29,403.00

AH BIASA MAX KEDALAMAN 4 M' TENAGA MANUSIA

37,579.50

AH BIASA MAX KEDALAMAN 5 M' TENAGA MANUSIA

45,756.00

AH BANYAK TERDAPAT BATU-BATU BUNDAR

57,487.50

AH BERBATU MAX KEDALAMAN 1 M' TNG MANUSIA

30,750.00

AH MAX KEDALAMAN 2 M' DENGAN ALAT EXAVATOR 0,7 M3

6,586.63

AH MAX KEDALAMAN 5 M' DENGAN ALAT EXAVATOR 0,7 M3

8,544.52

GALIAN DENGAN DUMP TRUCK . M3/KM.

4,880.46

ASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK

6,655.46

ASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK

11,071.29

ASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK

15,529.41
10,803.75
94,685.00
156,185.00
245,985.00
10,803.75
6,036.88
2,126.88

ALAN RUMPUT SAMPAI TUMBUH

24,201.88

LAT BESAR TANAH DARI LUAR DIPADATKAN (U/5000 M3)

97,549.00

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

265

URAIAN PEKERJAAN

HARGA SATUAN

4
537,823.00
482,133.50
459,741.20
382,586.10
188,625.90

lop 60% Beton Camp. 1PC : 2PS : 3KR &

2,057,336.90
567,137.60

ancang (40x40) cm, Beton Bertulang

734,601.50

NG DICINCIN DAN DILANCIPKAN (KAYU HUTAN)

12,528.75

GKAN DIDALAM TANAH LUNAK

66,377.50

GKAN DIDALAM TANAH BIASA

82,971.88

GKAN DIDALAM TANAH KERAS

99,566.25

GKAN DIDALAM TANAH PASIR

132,755.00

BRONJONG UNTUK KAWAT 3 MM

411,013.33

BRONJONG UNTUK KAWAT 4 MM

540,238.33

BRONJONG UNTUK KAWAT 5 MM

702,009.17

Tebal 1/2 bata, 1 Pc : 2 Ps

76,569.28

Tebal 1/2 bata, 1 Pc : 3 Ps

70,847.63

Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps

62,281.25
68,205.15
66,106.00
166,217.43
777,610.90
684,178.80

MERAH 1 PC : 3 KP : 10 PS

595,603.90

28,284.28
22,395.50
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

266

URAIAN PEKERJAAN

HARGA SATUAN

4
20,387.08
38,451.80
19,895.30
5,928.25
21,166.80

Batu Kali Adukan 1 Pc : 2 Ps

28,665.85
15,213.63

18,184,787.50

ntu & Jendela Kayu Bengkirai

10,998,157.50

mp Standard Kayu Bengkirai

421,661.00
524,008.00

endela Kaca Kayu Bengkirai

450,302.00

endela Jalusi Kayu Kelas I (Jati)

1,199,600.00

wood Rangkap rangka Kayu Bengkirai lbr s/d 90cm

458,322.50

wood rangkap, rangka expose kayu Bengkirai

470,490.02

i Kosen Kayu Kelas I (Jati)

1,047,762.50
655,764.50

kwood Rangkap Rangka Kayu Kelas I (jati)

624,895.00

kwood Rangkap Lapis Formika Rangka ekspose

610,811.50

PLEK DOUBLE UKURAN PINTU LAPIS ALUMINIUM ( KM/WC )

454,517.00

PLEK DOUBLE UKURAN PINTU LAPIS FORMIKA ( KM/WC )

441,471.00

ksi Kuda-kuda Konvensional Kayu Bengkirai

10,792,120.00

ksi Kuda-kuda Ekspose Kayu Jati

18,482,350.00

ksi Gording Kayu Bengkirai

10,427,850.00

od & Formika Rangka Kayu Bengkirai

644,404.82

ka Double, Rangka Kayu Jati

850,967.50

Atap Genteng Keramik, Kayu Bengkirai

120,378.74

Atap Genteng Beton, Kayu Bengkirai

126,699.76
1,462,820.00

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

267

URAIAN PEKERJAAN

HARGA SATUAN

4
79,633.99
111,898.70

. 2x(3x20)cm Kayu Bengkirai

148,843.40

ding Pemisah Kayu Bengkirai

281,507.60

ah Teakwood Rangkap Rangka Kayu Bengkirai

373,196.60
231,652.50
52,771.05

k, Rangka Kayu Klas III / IV

78,752.70

tu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87

689,220.95

tu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78

748,973.22

tu f'c=12,2 Mpa (K150), slum (122)cm, w/c = 0,72

752,164.78

rja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87

651,829.39

tu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66

783,491.34

tu f'c=16,9 MPa (K200), slum (122)cm,w/c = 0,61

814,420.22

tu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58

838,230.25

tu f'c=21,7 MPa (K250), slum (122)cm,w/c = 0,56

921,047.40

rja Beton mutu f'c=24,0 MPa (K275), slum (122)cm, w/c = 0,53

945,777.16

tu f'c=26,4 MPa (K300), slum (122)cm,w/c = 0,52

953,387.33

tu f'c=28,8 MPa (K325), slum (122)cm,w/c = 0,49

1,004,418.32

tu f'c=31,2 MPa (K350), slum (122)cm, w/c = 0,48

1,014,470.64
12,561.00
1,381,710.00
1,570,125.00
20,112.55
122,914.00

oof, Ringbalk, Kolom, Balok Lantai dengan Papan

868,710.00
133,226.50
303,664.00
313,507.90
446,464.00
355,145.50

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

268

URAIAN PEKERJAAN

HARGA SATUAN

4
281,939.00
90,595.50
139,725.85
130,930.25

Beton Bertulang (150 kg Besi + Bekisting)

3,317,198.38

on Bertulang (200 kg Besi + Bekisting)

4,116,359.38

eton Bertulang (300 kg Besi + Bekisting)

7,414,725.63

ton Bertulang (200 kg Besi + Bekisting)

5,772,802.63

ton Bertulang (150 kg Besi + Bekisting)

5,534,444.63

Beton Bertulang (150 kg Besi + Bekisting)

5,214,941.38

Beton Bertulang (200 kg Besi + Bekisting)

5,287,395.88

nguat Beton Bertulang (11 x 11) cm

64,124.95

k Beton Bertulang (10 x 15) cm

75,892.68

5 READY MIX 6 M3 BERIKUT SLANG

1,002,572.50

5 READY MIX 6 M3 BERIKUT SLANG

1,057,597.50

0 READY MIX 6 M3 BERIKUT SLANG

1,098,972.50

KONST. KUDA-KUDA BESI

1,010.97
44,747.50

STUKSI BESI SIKU / PROFIL

43,757.50

AN DENGAN LAS LISTRIK TEBAL KAWAT 4 MM

39,998.13

NSTRUKSI BESI DENGAN BOR

40,403.75
84,201.63

34,622.63
32,786.00
54,335.60

s Gelombang (80 x 210 cm) x 5 mm

39,907.63
43,517.50
178,327.50
76,938.60
60,803.74
64,834.00

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

269

URAIAN PEKERJAAN

HARGA SATUAN

4
34,316.25

(1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm

26,033.00

angit Tripleks Uk (120x240) cm,

35,619.00

angit Lambriziring Kayu Jati, tebal 6 mm

295,175.00
38,920.50
12,713.00

ngit-langit (1,00x1,00) m, kayu Bengkirai

160,687.18

ngit-langit (1,00x1,00) m, kayu Kruing

76,937.50

ngit-langit (60x60) cm, kayu Bengkirai

170,863.46

, JALAN, SALURAN DAN BOX CULVERT


759,474.25
325,870.50
722,707.38
80,078.51
129,660.23
10,687.80
14,681.50
20,817.20
25,792.30
37,402.00
53,227.70
76,160.36
109,015.85
46,851.23
33,339.83
15,812.35
23,696.63
13,304.25
7,845.25
file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

270

URAIAN PEKERJAAN

HARGA SATUAN

4
7,845.25
13,304.25
23,696.63
15,812.35
27,709.43
46,851.23
99,527.50
76,550.00
142,553.50
85,892.50

NG BLOK WARNA 6 CM K: 175

91,750.50
111,395.00

NG BLOK WARNA 8 CM K: 175

94,982.50

/ PENUTUP DENGAN ASPAL PANAS TEBAL 3 CM

41,921.95
531,712.50
3,544.75
1,772.38
1,063.43
1,329.28

SHEET (LATASIR) TEBAL 1 CM JERENG

1,792,565.00

T TEBAL 2 CM JERENG ( 1 CM PADAT )

42,039.73

T TEBAL 3 CM JERENG ( 2 CM PADAT )

59,965.38

ALAS JALAN TIAP 1 M3 LAPIS PASIR

88,501.50

BATU BELAH TEBAL 15 CM

36,445.00
15,429.30

DAN PEMASANGAN CERUCUK

49,012.00

00 x 100 x 15,TERPASANG

3,921,500.00

50 x 100 x 120 x 15,TERPASANG

5,504,950.00

50 x 150 x 120 x 15,TERPASANG

6,258,602.50

00 x 150 x 120 x 20,TERPASANG

7,734,400.00

00 x 100 x 120 x 20,TERPASANG

11,214,912.50

80 x 350 x 120 x 20,TERPASANG

19,863,000.00

20 x 300 x 120 x 25,TERPASANG

22,785,937.50

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

271

URAIAN PEKERJAAN

HARGA SATUAN

4
4,270,005.00
2,168,005.00

27,692.00
27,761.00

Datar/Jurai , Seng BJLS 28 Lebar 90 cm

244,819.80

/2 Lingkaran 15 cm, Seng Plaat BJLS 30

87,572.00

92,330.00
91,783.75
15,809.50
13,130.00
17,910.00
28,159.50
21,996.00
24,882.50
114,534.50

PC Abu-abu Uk. 20 x 20 cm

57,924.30
584,275.38
136,069.75
128,278.50

Marmer ukuran 1.00x1.00 m

710,162.38
138,474.65
140,352.65

Marmer ukuran 1.00x1.00 m

741,941.50

tu Paros / Batu Tempel Hitam

163,267.38
524,181.50
418,834.00

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

272

URAIAN PEKERJAAN

HARGA SATUAN

UKURAN 60 X 60 POLISHED

568,149.00

O UKURAN 60 X 60 POLISHED

573,256.50
1,558,134.00
1,660,031.50

6,025.00
14,818.75
33,076.88
42,714.38

Baru (1lap.Plamir, 1lap Cat Dasar

13,335.15

Lama (1lap.Plamir, 2lap Cat Penutup)

8,951.10
13,169.50

ukaan Baja dg Meni Besi & Perancah

27,397.25

ukaan Baja lapis Seng (Galvanis) secara

99,479.00

Konvensional dg tebal 200 um


41,747.88
80,728.38

Rembang,

Januari 2011

KEPALA DINAS PEKERJAAN UMUM


KABUPATEN REMBANG

Ir. MUJOKO, MT.


NIP. 19620715 199011 1 002

file:///var/www/apps/conversion/tmp/scratch_3/340328352.xlsx

273

You might also like