Professional Documents
Culture Documents
Packaging OPS
Packaging OPS
:-
:-
, .
Step-1
Step-2
Prepared
By
Checked
By
Approved
By
Step-3
, ,
,
,
Rev. Date
01.02.2016
Rev.No.
:-
MS/WFIM -05-3 OS 09
Origin Date
.
.
Step-4
Step-5
Step-
6
-: :
Yahama
HERO
HONDA
PPE'S
123 :-
FRONT BOX
REAR BOX
1. 5 "S" 2. 3. 4.
Legends :- I - Inspector ; O - Operator ; TL-Team Leader ; E-Engineer ; P- Past Prob. ; Q -Q-Points (Dwg +Spl. Char.) ; V- Vital Data Aggrement Points ; M-Manufacturing Quality Standard Points
FRONT
BOX
REAR BOX
:-
:-
FRONT BOX
REAR BOX
, ,
1.
2.
3.
4.
Retention Period :- 3 years
Q/WFM J04 01-2013
AXBXCX
1.
2.
3.
1.
4.
2.
5.
7.
6.
a.
8.
b.
c.
d.
e.d""""
9.
f.
""
);
2
3
()
10.
()
()
2
A-
N/TN
B-
C-
1/NN1
Y
2/T
2/T
4
a-
b-
Doc.No.
MODEL NAME
PROCESS NAME
MS/WFIM -05-3 OS 09
Origin Date
Rev.No.
Rev. Date
Operation Standard
Manual
operation
Prepared
By
Checked
By
Approved
By
Package
Package
Matters needing attention:
NO
.
item
Crates
2
3
4
WORK/FLOW INSTRUCTION
content
Step3
Step-2
Step-1
Packing ,
Transport Be careful, no rain, damp, throw throwing and violent collision.
Storage
Safety
Step-5
Step-4
PROCESS HISTORY
Rev.
no.
Changing points
Date
SAFETY PPE's
1234General instruction :- Before start of production activity pl. check the following :- 1. 5 's'. 2. Safety conditions. 3. Operator check sheet.
Legends :- W-Work Instuction ; F- Format ; C-Critical ; S- Significant ; I-Inspector ; O-Operator; Mn- Minor ; P- Past prob. ; Q-points; V- V.D.A. check points,
MS / WFIM 04 FO 20 , ISSUE 00 DEC 2015
NOTE:Abnormal situation
3. Unsafe condition
4. High rejection.
Retention Period :- 3 years
Doc.No.
:-
MS/WFIM -05-3 OS 09
Origin Date
01.02.2016
Rev.No.
Rev. Date
Prepared
By
Checked
By
Approved
By
:-
Step-1
Step-2
Step-2
, ,
FG : 2 ( ), 2 () ( 8 )
Step-3
Step-3
Step-4
:.
, .
5
6
, ,
,
,
Step5
Step6
(
)
Step7
.
.
( )
( 8 )
-: :
Yahama
HERO
HONDA
PPE'S
123 :-
FRONT BOX
REAR BOX
1. 5 "S" 2. 3. 4.
Legends :- I - Inspector ; O - Operator ; TL-Team Leader ; E-Engineer ; P- Past Prob. ; Q -Q-Points (Dwg +Spl. Char.) ; V- Vital Data Aggrement Points ; M-Manufacturing Quality Standard Points
FRONT
BOX
REAR BOX
:-
:-
FRONT BOX
REAR BOX
, ,
1.
2.
3.
4.
Retention Period :- 3 years
Doc.No.
ALL
PROCESS NAME
EQUIPMENT
NAME
MS/WFIM -05-3 OS 09
Origin Date
01.02.2016
Rev.No.
Operation Standard
Manual
operation
Rev. Date
Prepared
By
Checked
By
Approved
By
Packaging
Package
WORK/FLOW INSTRUCTION
Step-1
Step-2
Step-2
Step-3
Step-3
Step-4
Precautions:Sr.
Nio
Items
Description
Boxes
Packing
3
4
5
6
Transportat
Cartoon boxes should not suffering from raining, moisture
ion
Should be stored in a dry, non harmful gas, well ventilated
Storage
warehouse, can not be stored together with chemicals.
Safety
Step7
Put the pallet on the specific area defined in the FG ware-house. And also make
sure that the no. of boxes on the pallet should be as per standard. (8 Boxes in one
stack) & check that there should be only two pallets at one place.
TROLLEY
TROLLEY
PROCESS HISTORY
Rev.
no.
Changing points
Date
Yamaha
TROLLEY
HERO TROLLEY
PAST HISTORY
HONDA TROLLEY
SAFETY PPE's
123General instruction :-
FRONT BOX
REAR BOX
Before start of production activity pl. check the following :- 1. 5 'S'. 2. Safety conditions. 3. Operator check sheet. 4. Wear safety equipments.
Legends :- I - Inspector ; O - Operator ; TL-Team Leader ; E-Engineer ; P- Past Prob. ; Q -Q-Points (Dwg +Spl. Char.) ; V- Vital Data Aggrement Points ; M-Manufacturing Quality Standard Points
FRONT
BOX
REAR BOX
FRONT BOX
REAR BOX
3. Unsafe condition
4. High rejection.
Retention Period :- 3 years