Professional Documents
Culture Documents
9024-78
Installation of main marine crosshead engines. Technical requirements.
5.9024-78
. .
WWW.RUSSIANGOST.COM
OST 5-9779-79
Installation of mechanism and equipment on the spherical pads. Typical technological process.
5-9779-79
. .
WWW.RUSSIANGOST.COM
OST 1 41737-78
Installation of mechanism into the lugs between the rockings or rocking and bracket and fastening by bolts. Typical operation of technological processes.
1 41737-78
.
.
WWW.RUSSIANGOST.COM
OST 1 41737-90
Installation of mechanism into the lugs between the rockings or rocking and bracket and fastening by bolts. Typical operation of technological processes.
1 41737-90
.
.
WWW.RUSSIANGOST.COM
OST 5.9814-80
Installation of mechanisms and equipment on rigid pads of plastic. Typical technical process.
5.9814-80
. .
WWW.RUSSIANGOST.COM
OST 5.95013-87
Installation of mechanisms and equipment on rigid pads with the layer of polymeric material. Typical technological process.
5.95013-87
. .
WWW.RUSSIANGOST.COM
OST 1 41928-79
Installation of mirror by loops on a partition and fastening by bolts and lock. Typical operation of technological process.
1 41928-79
. .
WWW.RUSSIANGOST.COM
WWW.RUSSIANGOST.COM
OST 1 41924-79
Installation of mirror on a partition or door and fastening by screws. Typical operation of technological process.
1 41924-79
. .
WWW.RUSSIANGOST.COM
OST 1 41226-88
Installation of onboard Air Navigation fire () into the hole of the plating by flange on the bracket by fastening by bolts (screws) and connection.
Typical technological operation.
1 41226-88
() , () .
.
WWW.RUSSIANGOST.COM
OST 1 42264-85
Installation of one or group of resistances of type -25 on the bolts with bushings and fastening by nuts. Typical operation of technological processes.
1 42264-85
-25 .
.
WWW.RUSSIANGOST.COM
OST 1 42261-85
Installation of one or group of resistances of type -25 on the stands and fastening by screws. Typical operation of technological processes.
1 42261-85
-25 . .
WWW.RUSSIANGOST.COM
OST 1 41456-73
Installation of oxygen system pipeline having soldered fittings. Copper pipe 5x1 mm size. Typical operations of the process.
1 41456-73
, . 51 .
.
WWW.RUSSIANGOST.COM
OST 1 41847-79
Installation of panel by pressure feet, brackets behind the frame corners and fastening by lock. Typical operation of technological processes.
1 41847-79
, . .
WWW.RUSSIANGOST.COM
OST 1 41855-79
Installation of panel on the guide of carcass and on the frame and fastening by bolts. Typical operation of technological processes.
1 41855-79
. .
WWW.RUSSIANGOST.COM
WWW.RUSSIANGOST.COM
OST 1 41860-79
Installation of panel to the carcass and fastening by bolts. Typical operation of technological processes.
1 41860-79
. .
WWW.RUSSIANGOST.COM
OST 1 41762-90
Installation of pedal by bracket to the carcass and fastening by bolts. Typical technological operation.
1 41762-90
. .
WWW.RUSSIANGOST.COM
OST 1 41836-79
Installation of permanent panel to the carcass and fastening by bolts. Typical operation of technological processes.
1 41836-79
. .
WWW.RUSSIANGOST.COM
OST 1 41867-79
Installation of permanent partition by dowels in the slots of the bracket and on the floor rails and fastening by bolts. Typical operation of technological
processes.
1 41867-79
.
.
WWW.RUSSIANGOST.COM
OST 1 41868-79
Installation of permanent partition by ribs or dowels in the slots of the rim and the floor panel and fastening by bolts. Typical operation of technological
processes.
1 41868-79
.
.
WWW.RUSSIANGOST.COM
OST 1 41870-79
Installation of permanent partition on the tray and on the floor or on the tray, on the floor by end face or on the end face of preously installed partition and
fastening by bolts. Typical operation of technological processes.
1 41870-79
,
. .
WWW.RUSSIANGOST.COM
OST 1 41865-79
Installation of permanent partition to the carcass bracket and on the floor and fastening by bolts. Typical operation of technological processes.
1 41865-79
. .
WWW.RUSSIANGOST.COM
WWW.RUSSIANGOST.COM
OST 1 41869-79
Installation of permanent strengthened partition by ribs or dowels in the slots of the rim and on the floor panels and fastening by bolts. Typical operation of
technological processes.
1 41869-79
.
.
WWW.RUSSIANGOST.COM
OST 1 41444-2002
Installation of pipe or tube of any configuration having a weld fittings. Typical operations.
1 41444-2002
, . .
WWW.RUSSIANGOST.COM
OST 1 41444-73
Installation of pipe or tube of any configuration having weld fittings. Typical operations.
1 41444-73
, . .
WWW.RUSSIANGOST.COM
OST 1 41448-2002
Installation of pipe with nipple connection with regulated points of connection. Typical operations of the process.
1 41448-2002
. .
WWW.RUSSIANGOST.COM
OST 1 41448-73
Installation of pipe with nipple connection with regulated points of connection. Typical operations of the process.
1 41448-73
. .
WWW.RUSSIANGOST.COM
OST 1 41446-2002
Installation of pipe with nipple connections with one rigidly fixed connection point. Typical operations of the process.
1 41446-2002
.
.
WWW.RUSSIANGOST.COM
OST 1 41446-73
Installation of pipe with nipple connections with one rigidly fixed connection point. Typical operations of the process.
1 41446-73
.
.
WWW.RUSSIANGOST.COM
WWW.RUSSIANGOST.COM
OST 1 41452-2002
Installation of pipe with nipple connections with one rigidly fixed connection point. Typical operations of the process.
1 41452-2002
.
.
WWW.RUSSIANGOST.COM
OST 1 41452-73
Installation of pipe with nipple connections with one rigidly fixed connection point. Typical operations of the process.
1 41452-73
.
.
WWW.RUSSIANGOST.COM
OST 1 41445-2002
Installation of pipe with nipple connections with rigidly fixed attachment point. Typical operations of the process.
1 41445-2002
.
.
WWW.RUSSIANGOST.COM
OST 1 41445-73
Installation of pipe with nipple connections with rigidly fixed attachment point. Typical operations of the process.
1 41445-73
.
.
WWW.RUSSIANGOST.COM
OST 1 41451-2002
Installation of pipe with nipple connections with rigidly fixed attachment point. Typical operations of the process.
1 41451-2002
.
.
WWW.RUSSIANGOST.COM
OST 1 41451-73
Installation of pipe with nipple connections with rigidly fixed attachment point. Typical operations of the process.
1 41451-73
.
.
WWW.RUSSIANGOST.COM
OST 1 41455-2002
Installation of pipe with nipple connections. Typical operations of the process.
1 41455-2002
. .
WWW.RUSSIANGOST.COM
WWW.RUSSIANGOST.COM
OST 1 41455-73
Installation of pipe with nipple connections. Typical operations of the process.
1 41455-73
. .
WWW.RUSSIANGOST.COM
OST 1 41450-73
Installation of pipeline of any configuration having a telescopic coupling or telescopic joints. Typical operations of the process.
1 41450-73
, .
.
WWW.RUSSIANGOST.COM
OST 1 41450-2002
Installation of pipeline of any configuration having telescopic coupling or telescopic joints. Typical operations of the process.
1 41450-2002
, .
.
WWW.RUSSIANGOST.COM
OST 1 41456-2002
Installation of pipeline oxygen system having soldered fittings. Copper pipe size 5x1 mm. Typical operation of the process.
1 41456-2002
, . 51 .
.
WWW.RUSSIANGOST.COM
OST 1 41447-2002
Installation of pipeline with nipple connections, connected to the pipes through loose fittings (pipe Group I of accuracy). Typical operations of the process.
1 41447-2002
, ( I ).
.
WWW.RUSSIANGOST.COM
OST 1 41453-2002
Installation of pipeline with nipple connections, connected to the pipes through loose fittings (pipe group II precision). Typical operations of the process.
1 41453-2002
, ( II ).
.
WWW.RUSSIANGOST.COM
OST 1 41447-73
Installation of pipeline with nipple connections, connected to the pipes through loose fittings. Typical operations of the process.
1 41447-73
, .
.
WWW.RUSSIANGOST.COM
WWW.RUSSIANGOST.COM
OST 1 41453-73
Installation of pipeline with nipple connections, connected to the pipes through loose fittings. Typical operations of the process.
1 41453-73
, .
.
WWW.RUSSIANGOST.COM
OST 1 41331-72
Installation of pipelines. Allowed length deviations (shortage).
1 41331-72
. ().
WWW.RUSSIANGOST.COM
OST 1 41332-72
Installation of pipelines. Allowed misalignment of axes (misalignment).
1 41332-72
. ().
WWW.RUSSIANGOST.COM
OST 1 41330-72
Installation of pipelines. Basic concepts and definitions.
1 41330-72
. .
WWW.RUSSIANGOST.COM
OST 1 41333-72
Installation of pipelines. Recalculation of permissible inaccuracies according to alignment chart.
1 41333-72
. .
WWW.RUSSIANGOST.COM
OST 1 41334-72
Installation of pipelines. Safety clearance for installed systems.
1 41334-72
. .
WWW.RUSSIANGOST.COM
OST 1 41433-73
Installation of piping systems Ensuring interchangeability of elements. Technical requirements for implementation of mounting points on airframe parts.
1 41433-73
. .
.
WWW.RUSSIANGOST.COM
WWW.RUSSIANGOST.COM
OST 1 41421-73
Installation of piping systems. Ensuring i interchangeability of elements. Classification of mounting points according to groups of accuracy.
1 41421-73
. .
.
WWW.RUSSIANGOST.COM
OST 1 41434-2000
Installation of piping systems. Ensuring interchangeability of elements Technical requirements for implementation of mounting points on airframe
assemblies and panels.
1 41434-2000
. .
.
WWW.RUSSIANGOST.COM
OST 1 41422-2000
Installation of piping systems. Ensuring interchangeability of elements. Classification of mounting points according to groups of accuracy.
1 41422-2000
. . .
WWW.RUSSIANGOST.COM
OST 1 41422-73
Installation of piping systems. Ensuring interchangeability of elements. Classification of mounting points according to groups of accuracy.
1 41422-73
. . .
WWW.RUSSIANGOST.COM
OST 1 41421-2000
Installation of piping systems. Ensuring interchangeability of elements. Classification of mounting points according to groups of accuracy.
1 41421-2000
. .
.
WWW.RUSSIANGOST.COM
OST 1 41431-2000
Installation of piping systems. Ensuring interchangeability of elements. General technical requirements for facilities conducting mounting points on the
product.
1 41431-2000
. .
.
WWW.RUSSIANGOST.COM
OST 1 41431-73
Installation of piping systems. Ensuring interchangeability of elements. General technical requirements for facilities conducting mounting points on the
product.
1 41431-73
. .
.
WWW.RUSSIANGOST.COM
WWW.RUSSIANGOST.COM
OST 1 41426-2000
Installation of piping systems. Ensuring interchangeability of elements. General technical requirements for the means of manufacturing of system elements.
1 41426-2000
. .
.
WWW.RUSSIANGOST.COM
OST 1 41426-73
Installation of piping systems. Ensuring interchangeability of elements. General technical requirements for the means of manufacturing of system elements.
1 41426-73
. .
.
WWW.RUSSIANGOST.COM
OST 1 41424-2000
Installation of piping systems. Ensuring interchangeability of elements. Main provisions for selection of coordination bases for system components on the
product.
1 41424-2000
. .
.
WWW.RUSSIANGOST.COM
OST 1 41424-73
Installation of piping systems. Ensuring interchangeability of elements. Main provisions for selection of coordination bases for system components on the
product.
1 41424-73
. .
.
WWW.RUSSIANGOST.COM
OST 1 41420-2000
Installation of piping systems. Ensuring interchangeability of elements. Main provisions.
1 41420-2000
. . .
WWW.RUSSIANGOST.COM
OST 1 41420-73
Installation of piping systems. Ensuring interchangeability of elements. Main provisions.
1 41420-73
. . .
WWW.RUSSIANGOST.COM
OST 1 41423-73
Installation of piping systems. Ensuring interchangeability of elements. Technical requirements designing of system elements.
1 41423-73
. . .
WWW.RUSSIANGOST.COM
WWW.RUSSIANGOST.COM