Mechatronics System Design 2

Leo Rusli

2016-2017 Odd Semester

Weekly Progress Report


Class: _7A__

Project Title: FPGA Based Time Proportional PID Controller with Zero Crossing Detector
Progress from 21.11.2016 to 27.11.2016

1. What we did this past week (start with copy pasting TODO list from the previous progress report):
What
Finished the
ADC code and
test it on the
system

Percent
done
40%

RESULTS (include pictures /sketches / codes if relevant)


The program does not work.

2. Any problems encountered and solutions:


- The ADC does not work. Now I really do not know how to do it anymore. Only if I have someone to
consult the syntax and the hardware configuration.
3. Our plan for this coming week:
What
Finalizing the zero
crossing detector

When
Silent week

Where/How (optional)
Make the circuit

4. Schedule & Budget:


a. Are you on schedule? (Yes/No) -- If not, what needs to be done?
Not at all, as far as I realize it, it is impossible to finish this project now.

Mechatronics System Design 2


Leo Rusli

b. Are you still within budget? (Yes / No) -- If not, what needs to be done?
Yes.

2016-2017 Odd Semester