BILL OF QUANTITY PEKERJAAN STRUKTUR

PEKERJAAN JASA KONSULTANSI PERENCANAAN DETAIL TEKNIS 10 PASAR RAKYAT


PD. PASAR JAYA

BILL OF QUANTITY
PEKERJAAN STRUKTUR
GUDANG RANGKA BAJA 66 X 20 M

No

Uraian Pekerjaan

Satuan

Qty

Harga Satuan

Jumlah Harga

PEKERJAAN STRUKTUR
A

Pekerjaan Persiapan

Pekerjaan Direksi Keet & Gudang

m2

48.00

750,000

Air Kerja & Listrik Kerja

Bln

3.00

1,500,000

4,500,000

Mobilisasi Peralatan Dan Pekerja

Ls

1.00

15,000,000

15,000,000

Keselamatan Kerja K3 dan Rambu rambu

ls

1.00

5,000,000

5,000,000

36,000,000

Pekerjaan Galian & Pondasi

Galian tanah biasa sedalam 1 m

m3

24.19

65,000

1,572,480

Buang tanah sejauh 15 m

m3

14.52

45,000

653,184

Urug kembali tanah galian

m3

9.68

25,000

241,920

Urugan pasir urug

m3

1.45

275,000

399,300

Lantai kerja beton tumbuk 1:3:5; t. 50 mm

m2

1.45

42,500

61,710

Pilecap P1 uk. 300/1000/1000


6

-Beton Readymix K-300

m3

6.00

975,000

5,850,000

-Bekisting Pondasi

m2

28.80

245,000

7,056,000

kg

370.00

11,500

4,255,000

-Tulangan besi U-24


8

-dia. 10 mm
Kolom uk. 1000/1440/1000

-Beton Readymix K-300

m3

1.98

975,000

1,930,500

10

-Bekisting Kolom

m2

26.40

245,000

6,468,000

-Tulangan besi U-24


11

-dia. 8 mm

kg

85.32

11,500

981,180

12

-dia. 10 mm

kg

153.92

11,500

1,770,080

Pekerjaan Tie Beam

Galian tanah biasa sedelam 1 m

m3

44.64

65,000

2,901,600

Buang tanah sejauh 15 m

m3

17.86

45,000

803,520

Urug kembali tanah galian

m3

26.78

25,000

669,600

Urugan pasir urug

m3

4.65

275,000

1,278,750

Lantai kerja beton tumbuk 1:3:5; t. 50 mm

m2

93.00

42,500

3,952,500

Tiebeam TB1 uk. 200/400


6

-Beton Readymix K-300

m3

29.76

975,000

29,016,000

-Bekisting Pondasi

m2

297.60

245,000

72,912,000

-Tulangan besi U-24


8

-dia. 8 mm

kg

979.60

11,500

11,265,400

-dia. 12 mm

kg

1,990.20

11,500

22,887,300

Pekerjaan Plat lantai dasar

Pemadatan tanah

m2

1,320.00

7,500

9,900,000

Urugan pasir urug

m3

66.00

275,000

18,150,000

Lantai kerja beton tumbuk 1:3:5; t. 50 mm

m2

1,320.00

42,500

56,100,000

PT ARTEFAK ARKINDO

PARAF:

BILL OF QUANTITY PEKERJAAN STRUKTUR


PEKERJAAN JASA KONSULTANSI PERENCANAAN DETAIL TEKNIS 10 PASAR RAKYAT
PD. PASAR JAYA

No

Uraian Pekerjaan

Satuan

Qty

Harga Satuan

Jumlah Harga

Beton Readymix K-300

m3

264.00

975,000

257,400,000

Tulangan wiremesh M8-150

m2

1,320.00

71,000

93,720,000

Sub jumlah Rp.

672,696,024

I. PEKERJAAN PONDASI & PERSIAPAN

II. PEKERJAAN ATAP


A

Pekerjaan Struktur Baja

Kolom KB1 WF 250x125X5X8

kg

8,131.20

18,500

150,427,200

Rangka Kuda-kuda WF 250X125X5X8

kg

4,065.60

18,500

75,213,600

Rangka Kuda-kuda WF 125x60x6x8

kg

475.20

18,500

8,791,200

Rangka Ikatan antar Kuda Kuda

kg

660.00

18,500

12,210,000

Gording C 125x50x20x3,2

kg

12,880.56

22,000

283,372,320

Trekstang Besi beton 12

kg

510.03

18,500

9,435,617

Ikatan angin Besi beton 12

kg

470.80

18,500

8,709,800

Besi siku L 40x40x4

kg

217.88

18,500

4,030,854

Baud 12

bh

520.00

22,500

11,700,000

- Base Plate t.16 mm

kg

233.13

24,500

5,711,563

10

- Stiffener t.10 mm

kg

609.84

24,500

14,941,080

- Angker Baut 19 p.600 mm

11

bh

144.00

45,000

6,480,000

12

Cat meni Besi

kg

28,918.24

3,000

86,754,727

13

Atap Zinkalum Spandex 0,35 mm

kg

1,632.00

59,000

96,288,000

14

Nok ZinKalum

68.00

45,000

3,060,000

15

Talang Air

m1

136.00

65,000

8,840,000

16

Plat Penutup Talang Rangka L 40x40x4

m1

136.00

45,000

6,120,000

17

Atao Canopy 6000x3000

m2

144.00

650,000

93,600,000

Pekerjaan Penggantian Atap Bangunan Lama

Bongkar Atap

m2

966.00

25,000

24,150,000

Atap Zinkalum Spandex 0,35 mm

m2

966.00

59,000

56,994,000

Nok ZinKalum

42.00

45,000

1,890,000

Talang Air

42.00

65,000

2,730,000
-

II. PEKERJAAN ATAP

Sub jumlah Rp.

971,449,960

III. PEKERJAAN LANTAI DAN DINDING


1

Pas. Batako 40x20x10

m3

873.20

87,500

76,405,000

Plesteran + Acian Dinding

m3

1,746.40

56,400

98,496,960

Kolom Praktis 10x10

m1

1,364.00

45,000

61,380,000

Pasangan Keramik Lantai 30x30 cm

m2

1,320.00

185,000

244,200,000

Pintu Besi Plat D1

m2

18.00

750,000

13,500,000

Pintu Besi Plat D2

m3

43.20

750,000

32,400,000

Kusen Jendela Alumunium

Bh

34.00

1,450,000

49,300,000

Pekerjaan Cat Dinding

m2

3,492.80

22,500

78,588,000

Ventilasi Wiremesh Rangka Siku 80x585

Unit

22.00

1,624,000

35,728,000

10

Rabat Beton Tritisan Keliling Bangunan

m1

176.00

245,000

43,120,000

PT ARTEFAK ARKINDO

PARAF:

BILL OF QUANTITY PEKERJAAN STRUKTUR


PEKERJAAN JASA KONSULTANSI PERENCANAAN DETAIL TEKNIS 10 PASAR RAKYAT
PD. PASAR JAYA

No

Uraian Pekerjaan

Satuan

III.PEKERJAAN LANTAI DAN DINDING

Qty

Harga Satuan
Sub jumlah Rp.

Jumlah Harga
733,117,960

IV. PEKERJAAN INSTALASI LISTRIK & AIR HUJAN


A

Pekerjaan Listrik
ttk

22.00

185,000

4,070,000

Lampu Kap Industri

Bh

22.00

145,000

3,190,000

Instalasi Stop Kontak NYM 3x2,5 mm

Ttk

11.00

245,500

2,700,500

Saklar seri

bh

8.00

45,000

360,000

Saklar Engkel

bh

4.00

32,500

130,000

Instalasi Penangkal Petir (Lightening Protection)

Unit

2.00

4,500,000

9,000,000

Box MCB

Unit

2.00

7,500,000

15,000,000

Kabel Toefoer

m1

32.00

87,500

2,800,000

Sub jumlah Rp.

37,250,500

Instalasi Titik Lampu NYM 2x2,5 mm

2
3

IV. PEKERJAAN INSTALASI LISTRIK & AIR HUJAN

REKAPITULASI
I. PEKERJAAN PONDASI & PERSIAPAN

672,696,024

II. PEKERJAAN ATAP

971,449,960

III.PEKERJAAN LANTAI DAN DINDING

733,117,960

IV. PEKERJAAN INSTALASI LISTRIK & AIR HUJAN

37,250,500

1.8 - PASAR BIDADARI

PT ARTEFAK ARKINDO

SUB TOTAL.....Rp.

PARAF:

2,414,514,444