Implementation Report

Hybrid Power solution

(TRS083-Mintar)
Study Result
PC
Area Structural
OK

OK

PT

Nego.
MTN

MTN

Equipment
Compatibility

Solution
Wind

Solar

Gen.

Old

Sun
Clearance

Maintenance
Manager

Contractor

Power
Manager

Date: 08/08/2016

M
an
ho
le

N
AC

AC

65

MTN Shelter

MAST FOR
SYRIATEL

300*300

S(3) 2G (900+1800)
(210) On 5m

Go To The
MW 0.6 (162)
Inspection Hole
On 6m

MAST
H= 6M

U(3) 3G (210)
On 5n

175*175

U(1) 3G (10)
On 5n

+ 20.00 M
380

S(1) 2G (900+1800)
(10) On 5m

225

U(2) 3G (100)
On 18n
S(2) 2G (900+1800)
(100) On 18m

310

C1
Generator

Generator

102

70

MW 0.3 (6)
On 5m

400

Room

F.T

Project

HPS Site

MTN

Site

Name
Code

Title
Drawing No.
Scale

Mintar
TRS 083
Current Plan
01

1/100 Date

Rev 0

M
an
ho
le

MAST FOR
SYRIATEL

Go To The
MW 0.6 (162)
On 5m
Inspection Hole

MAST
H= 6M

S(3) 2G (900+1800)
& 3G (210) On 5m
3RRUS On 1m
3RRUS On 1m

175*175

+ 20.00 M

Slab For
Batt cab

ERICSSON
( 6102 )

S(1) 2G (900+1800)
& 3G (10) On 5m

90

MW 0.3 (6)
On 5m

240

EC BOX

70
225

S(2) 2G (900+1800)
& 3G (100) On 18m
3RRUS

310

Generator

F.T

Generator

102

400

Room

F.T

Project

HPS Site

MTN

Site

Name
Code

Title
Drawing No.
Scale

Mintar
TRS 083
Telecom Equipment Plan
02

1/100 Date

Rev 0

M
an
ho
le

N
75
50

New Turbine
Controller Panel
MAST FOR
SYRIATEL

450

MAST
H= 6M

Go To The
MW 0.6 (162)
On 5m
Inspection Hole

330

S(3) 2G (900+1800)
& 3G (210) On 5m
3RRUS On 1m
3RRUS On 1m

175*175

+ 20.00 M

Slab For
Batt cab

ERICSSON
( 6102 )

S(1) 2G (900+1800)
& 3G (10) On 5m

90

MW 0.3 (6)
On 5m

240

EC BOX

BATT
CABINET

70
225

310

S(2) 2G (900+1800)
& 3G (100) On 18m

Generator

3RRUS

F.T

Generator

102

Room

F.T

Project

New Wind Turbine(1)on 4m

MTN

NEW MAST
H= 5M

New Wind Turbine(2)on 3m

HPS Site

Site

Name
Code

Title
Drawing No.
Scale

Mintar
TRS 083
HPS Equipment Plan
03

1/100 Date

Rev 0

M
an
ho
le

N
DOWN
New Turbine
Controller Panel
MAST FOR
SYRIATEL

MTN Solar Panel

Go To The
MW 0.6 (162)
On 5m
Inspection Hole

MAST
H= 6M
175*175

S(3) 2G (900+1800)
& 3G (210) On 5m
3RRUS On 1m
3RRUS On 1m

UP

+ 20.00 M

Slab For
Batt cab

ERICSSON
( 6102 )

S(1) 2G (900+1800)
& 3G (10) On 5m

90

MW 0.3 (6)
On 5m

240

EC BOX

BATT
CABINET

70
225

310

S(2) 2G (900+1800)
& 3G (100) On 18m

Generator

F.T

Generator

102

.
.

.

MTN

.
.

Room

F.T

3RRUS

Project

New Wind Turbine(1)on 4m

HPS Site

MTN

NEW MAST
H= 5M

New Wind Turbine(2)on 3m

Sun Clearance
A

( 90 % - 100 % )

( 75 % - 89 % )

( 60 % - 74 % )

(< 60 % )

Site

Name
Code

Title
Drawing No.
Scale

Mintar
TRS 083
Final Plan
04

1/100 Date

Rev 0

. 200 kg/cm
. 4000 kg/cm
-

330
DET 2

75

90

30

172.4

30 50

47.6 30

. 5 cm

266.6



20cm

236.6

TH=20 cm

DET 1

30

. 40 cm

65

93.4

202.4

78.4


10 .

SCALE: 1/100


. 50 cm

16
11
5
8 15 21

MTN
Name
Code

Mintar
TRS 083

Structural Details 1
Rev 0

Date

Site

Drawing Title
1/50

Scale

450

Anchor Detail
Scale 1/50

DET 2
Short legs Plate 2
)(Down Side
Scale 1/25

62.6

A
16
11
5

*C

80*50*15*2.6

90*50*15*2.6

1.5
Bolt 4M12
Gr: 8.8
Hole 14 mm

1.5
Bolt 4M12
Gr: 8.8
Hole 14 mm

21 15 9
DET 1
Short legs Plate 1
)(UP Side
Scale 1/25

330
50

172.4

30

Grout 5cm

30

30
C

47.6
C

2T14

. 200 kg/cm
. 4000 kg/cm
-

8/15

100

30

8/15
2T14

. 5 cm
10
8/15
L=100
20

20

20
10

10

20

Mintar
TRS 083

75

Rev 0

Date

1/50

10

30

236.6

78.4

20

100
4T14
L=190

60

8/15
4T14

T12@20

20

Section A-A
Scale 1/50

Site

Drawing Title
Scale

10

Grout 5cm

10
10

Structural Details 2

T12@20
L = 340
T12@20
L = 340

320

30

MTN
Name
Code

Section B-B
Scale 1/50

450

110


. 50 cm

320

10

20

. 40 cm

10 .

T12@20

4T14

Section C-C
Scale 1/25



20cm

120

440

440

T12@20
L = 460
T12@20
L = 460

10
10

Blade

Rotor Hub Center


124.6

Pipe 37.5
TH=4mm

Wing

A
Maximum Rotation Degree
360

Clamps

Distance Between Blade and


Tubes (18cm)

100

100

Weld S=8mm
Tube 80x40x4 mm

Tube 40x40x3 mm

Tube 80x40x4 mm

Side Elevation
Scale 1/25

Elevation -AScale 1/25

Front

Back

Wind Turbine Plan


Scale 1/25

Perspective

Rotor Hub
Center
Blade

Rotor Hub Center


Blade

GR 37
GR 8.8
12mm


.

S=8mm

Clamps

Pipe 37.5
TH=4mm

Tube 40x40x3 mm
100

100

Tube 80x40x4 mm


) (
.

MTN

Clamps
Elevation -BScale 1/25

Elevation -CScale 1/25

Weld S=8mm

Drawing Title
Scale

Wind Turbine Details


( On Mast )
1/100 Date
Rev 0

Mintar
TRS 083

) (330*450

MTN

)(100*155 BATT CABINET

MTN

0.5

MTN

MTN SOLAR PANEL

MTN

BATT CABINET

MTN

BATT CABINET

MTN

"4 5

MTN

) (1 Wind Turbine 4

MTN

) (2 Wind Turbine 3

MTN

10

Wind Turbine 2 )(2-1

MTN

Mintar
TRS 083

11

Wind Turbine

MTN

12

10

MTN

13

BATT CABINET

MTN

14

MTN

15

MTN

16

MTN

Wind Turbine

Wind Turbine 130 165