Professional Documents
Culture Documents
Excavators
Excavators
Excavator
.
o
Excavator
excavator
Hydraulic
Excavator
. Compact excavator
. .
Compact excavator
Subject: Engineering Tool and Operation
Page 1
Norton University
. Crawler excavator
Crawler excavator
Crawler excavator
Crawler excavator
Page 2
Norton University
. Suction excavator
Suction excavator
Suction excavator
Subject: Engineering Tool and Operation
Page 3
Norton University
Type of Bucket
Page 4
Norton University
Page 5
Norton University
Page 6
Norton University
1. :
2.
3.
h
)
L (
o
h< L
1.1
(/ )
(/3 )
swell ,FSW
1,185
35
0.74
(Clay,wet)
1,780
1,305
35
0.74
(Earth
, dry)
1,660
1,325
25
0.80
(Earth ,wet)
1,895
1,528
25
0.80
(Earth ,gravel)
1,895
1,575
20
0.83
(Gravel , dry)
1,660
1,475
12
0.89
(Gravel ,wet)
2,020
1,765
14
0.88
(Limestone)
2,610
1,630
60
0.63
2,490
1,565
60
0.63
(Sand
,dry)
1,540
1,340
15
0.87
(Sand ,wet)
1,600
1,400
15
0.87
(Shale)
2,072
1,470
40
0.71
Material
(Clay,dry)
Bank weight
1,600
Loose weight
Percent
Swell factor
Page 7
Norton University
= 1 100
= 1 100
SW : (percent swell)
Sh : (percent shrinkage)
B : (density of undisturbed earth, Kg/m3 )
L : (Kg/m3 )
C :
(density of compacted earth,Kg/m3 )
- 920kg/m3
- 800kg/m3
-
1050kg/m3
.(Sw)
= 1 100
B =920kg/m
L =800kg/m3
920
=> =
1 100 =15%
800
.
(Sh)
= 1 100
B =920kg/m
C =800kg/m3
920
=> = 1
100 =12%
1050
Subject: Engineering Tool and Operation
Page 8
Norton University
Department of Civil Engineering
3
920kg/m ,
760kg/m3,
1080 kg/m3
.(Sw)
920
1 100 =21%
= 1 100 =
760
.
(Sh)
920
100 =15%
= 1 100= 1
1080
(Production Cycle)
3600
60
(Volume Correction for loose volume to bank
volume)
1
, ()
; ,
900
1 +
Page 9
Norton University
Department of Civil Engineering
1.2 Crawler Excavator :
Load bucket
Swing loaded
Dump
Swing
(sec)
(sec)
bucket (sec)
Empty(sec)
<1
14
1-1.5
15
2-2.5
17
20
3.5
22
22
24
Bucket
capacity(m3)
Total cycle
(sec)
Fill factors(%)
sandy clay
100-110
Sand and gravel
95 110
(
) Rock poorly blasted
40 50
60 - 75
80 - 90
Page 10
Norton University
Department of Civil Engineering
1.3 ,,
hydraulic crawler
Stick
3)
(m
,A(m)
,B(m)
,C(m)
, D(m)
Stick
Stick
(Kg)
(Kg)
(Kg)
(Kg)
0.375
1.53-2.14
5.80-6.71
3.66-4.58
4.27-4.88
1305
1170
1305
1170
0.75
1.83-2.75
7.32-8.24
4.88-5.49
5.19-5.80
3195
2385
3240
2385
1.53-3.97
7.93-10.07
4.88-7.02
5.19-7.63
5760
4050
4185
4140
1.5
1.83-3.97
8.24-10.68
5.19-6.41
5.49-7.02
7695
4545
7965
4995
2.14-4.27
8.85-11.59
5.49-8.24
5.80-7.32
9630
6525
9720
6390
2.5
2.14-4.88
9.76-12.20
6.10-8.85
6.10-7.93
14670
9630
14175
10980
3.05-3.36
11.59-12.81
7.63-9.15
7.32-7.93
14805
11070
13815
11790
3.5
2.44-3.66
10.9811.90
7.02-8.24
6.41-6.71
14940
9855
14580
990
3.66
13.42
8.85
8.24
21555
15075
2.44-4.58
12.2014.03
7.93-9.76
7.63-7.93
15243
12375
14220
12420
1.4
Material
(Sandy clay)
100-110
95-110
(Rock-poorly blasted)
40-50
(Rock-well blasted)
60-75
80-90
Page 11
Norton University
Excavator crawler
(bucket capacity) 3 m
(sandy clay) 3 m 3.5m
(Bank
3 m
- 30-60%
- 1.3
3m3
7.63m-9.15m
- 3m =>
- 1.2
3m3
.(Load bucket) 7s
. (Swing loaded) 5s
.(dump load) 4s
. (Return Swing) 4s
=> (Cycle time) = 20s
- PP
50min
=
Q = 3m3
F = 1.05
3600
60
t = 20s
E = 45min
3600 3 1.05 50
1
= 3153
20
60 1 + 0.35
3
(Bank weight,m) 50min 315m
Page 12