: After visiting 11 typhoon-ravaged barangays in OCAMPO and PILI, we (led by
VP Leni Gerona Robredo) wrapped up the day (it was already past 8pm) by meeting with the top officials of Camarines Sur II Electric Cooperative (CASURECO 2). I told Acting General Manager ORLANDO M. ANDRES (who can't speak Bikol) "na ngayon lang ito nangyari, lalong-lalo na sa NAGA area, na masyadong natatagalan ang pagbalik ng kuryente." He informed us that 5 teams from CAMARINES NORTE and SAMAR electric cooperatives would be augmenting the local work force this week to fast-track power restoration. We strongly urged him, though, to come up with SPECIFIC POWER RESTORATION TIMELINES (in other words, NUARIN TALAGA MAABOT AN KURYENTE) for the guidance of the consumers. Casureco 2