Slab No.

Total No. of Slab

1250

mm

10 @

175 c/c

1250

mm

D=

Y
200

L=

150 c/c

5000

mm

B=

8 @

4000

150

200 c/c

mm

200 mm

One way / Two way Slab


Project :Name of work :Sr.
No.

Discription

Dia of
bar in
mm
8

Nos. of
Bar

Length of bar
in mm

Wt. Of bar
Kg/Mt

Quantity In
Kg

28

5470

0.395

60.50

Main steel

Distribution Steel

26

4470

0.395

45.91

End Support Main steel (Top)

10
10

24
30

3120
3120

0.617
0.617

46.20
57.75

Total Quantity of steel

Dia of
Bar
8
10
12
16
20
25
32
Total

Kg.

Quantitity of all
beams (Kg)
106.4051
106.4051
103.9522 103.95216
0
0
0
0
0
0
0
0
0
0
210.3573 210.35726

Project :Name of work :Sr.


No.
1

Discription
Concrete

No
1

Length
in mm
5400

Width in Depth in
mm
mm
4400
150

Quantity in
Cu.mts.
3.564

mm