You are on page 1of 19

POSITION AND COMPETENCY PROFILE

Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised

SENIOR SCIENCE RESEARCH SPECIALIST


Head of R & D Division, DepED - NSTIC
DepED National Science Teaching Instrumentation Center
Director III
All R & D Employees
JOB SUMMARY

Supervises the day-to-day operation of Research and Development Division


QUALIFICATIONS STANDARD
A. CSC Prescribed Qualifications
Education Bachelors degree relevant to the job
Experience 2 years of relevant experience
Eligibility Career Service Professional
Trainings 8 hours of relevant training
B. Preferred
Qualifications
Education Masters Degree units relevant to the job
Experience 2 years of relevant experience/5 years relevant teaching experience
Eligibility Career Service Professional
Trainings 16 hours of relevant training

PCP no. ____

Salary Grade
Effectivity Date

Revision Code

24

DUTIES AND RESPONSIBILITIES


1. Designs science experiments based on the curriculum.
2. Recommends apparatus needed to perform such experiments.
3. Helps design science teaching equipment prototypes.
4. Develops and conducts try-out on the teaching effectiveness of the science equipment prototypes.
5. Writes users manual for the prototypes produced.
6. Writes experiments manual.
7. Designs and conducts training courses for science teachers.
8. Conducts research on teaching effectiveness based on different teaching strategies/experiments.
9. Make researches/studies related to science equipment prototype production.
10. Prepares program of work and activities for Research and Development section.

Major and Final


Output (MFOs)

Key Result Areas


(KRAs)

Objectives

People Development
and Governance

Performance
Management and
Assesment

Outputs

Recommended within ninety (90)


calendar days of the current year, two
research and develoment staff for local
or overseas trainings, conferences,
seminars

Proposals to send
2 Research and
Development staff submitted to Director
within ninety (90) calendar days of the
current year to attend local or overseas
training, seminar, conference

Completed
Assignments

Individual Work Assignments Matrices of


Research and Develoment staffs submitted
to NSTIC director within fifteen (15) working

Individual
Work
for Research and

Major and Final


Output (MFOs)

Key Result Areas


(KRAs)

Objectives
Development staff within fifteen (15)
working days of the current year

Work monitoring conducted

Monitored work progress vis-a-vis


Individual
Work
Assignments
periodically
Submitted Individual Performance
Report of Research and Development
staff before the 45th day after ther
ating period

Individual Performance Appraisal Report of


Research and Development staffs submitted
to
NSTIC-PES Committee on or before
the 45th day after the rating period

Conducted annual updates on the


specifications of assigned *Science
or Mathematics Equipment (SME)
identified for procurement, by the end
of the first quarter of the current year

Updated specifications of SMEs submitted


to NSTIC Director by the end of the first
quarter of the current year

Prepared/reviewed manuscripts for


Student
Worksheets,
Teachers
Guides,
Improvised
Equipment
Construction Guides,
and Users
Manual for NSTIC Developed
Equipment
submitted to NSTIC
Director as per schedule set in the
Individual Work Assignment

Manuscripts for Student Worksheets,


Teachers Guides, Improvised Equipment
Construction Guides, and Users Manual
for
NSTIC
Developed
Equipment
submitted to NSTIC Director as per
schedule set in
the Individual Work
Assignment

Produced prototype SMEs as set in


the Individual Work Assignment

Prototype SMEs completed as set in the


Individual Work Assignment

Identified at least three *SMEs for


development
for the current year
within ten (10) working days of the
current year

List of SMEs with complete specifications

Learning Resources
Production

Research and
Development

days of the current year

Outputs

Major and Final


Output (MFOs)

Key Result Areas


(KRAs)

Objectives

Prepared concept paper containing


descriptions, diagrams, specification
requirements and discussion of
intended applications of assigned
SMEs for prototype design

Conducted in-house tests, school


tryouts of fabricated SMEs prototypes
with
corresponding
Student
Worksheets, Teachers guides as per
schedule set in Individual Work Plan

Quality Assurance

Training and
Development

Conducted sample and pre-delivery


inspections of procured SMEs (mass
produced and market items) as per
schedule set in the project
Prepared training design on the use
and improvisation of Science and
Mathematics equipment as per
schedule set
Implemented training design

Outputs

Concept papers, routing cards forwarded to


Design Section as per schedule set in the
Individual Work Assignment

Tryout tests report

Inspection reports

Training design and schedulle

Training report

Performance
Objectives

Completed
Individual
Work
Assignments
for
Research
and
Development staff
within fifteen (15)
working days of the
current year
Monitored work progress
vis-a-vis Individual Work
Assignments periodically
Submitted
Individual
Performance Report of
Research
and
Development staff on the
45th 59th day after the
rating period
Conducted
annual
updates
on
the
specifications
of
assigned *Science or
Mathematics
Equipment
(SME)
identified
for
procurement, by the end
of the first quarter of the
current year

Outstanding

(5)
Completed
Indicidual work
Assignment
within
15
working days
of the current
year

Indicators

Very Satisfactory

(4)
Completed
Indicidual work
Assignment
within
30
working days
of the current
year

Satisfactory

(3)
Completed
Indicidual work
Assignment
within
45
working days
of the current
year

Unsatisfactory

(2)
Completed
Indicidual work
Assignment
within
60
working days
of the current
year

Poor

(1)
Completed
Indicidual work
Assignment
within
90
working days
of the current
year

100%
individual
work
progress
monitored 3 days or
more
before
schedule
Report submitted on
the 25th day or less
after the rating
period

100%
individual
work
progress
monitored 1-2 days
before schedule

100%
individual
work
progress
monitored
on
schedule

100%
individual
work
progress
monitored 1-2 days
after schedule

100%
individual
work
progress
monitored 3 days or
more after schedule

Report submitted on
the 35th- 44th day
after the rating
period

Report submitted on
the 45th-59th day
after the
rating
period

Report submitted on
the 60th-74th day
after the rating
period

Report submitted on
the
75th
day
onwards after the
rating period

130% updates on
specifications
of
assigned
SMEs
conducted
more
than a week before
schedule

115-129% updates
on specifications of
assigned
SMEs
conducted within a
week
before
schedule

100-114% updates
on specifications of
assigned
SMEs
conducted
on
schedule

51-99% updates on
specifications
of
assigned
SMEs
conducted within a
week after schedule

50% updates on
specifications
of
assigned
SMEs
conducted
more
than a week after
schedule

Performance
Objectives

Prepared/reviewed

manuscripts for Student


Worksheets, Teachers
Guides,
Improvised
Equipment Construction
Guides,
and Users
Manual
for
NSTIC
Developed
Equipment
submitted to NSTIC
Director as per schedule
set in
the Individual
Work Assignment
Produced
prototype
SMEs
Identified at least three
*SMEs for development
for the current year within
ten (10) working days of
the current year
Prepared concept paper
containing descriptions,
diagrams, specification
requirements
and
discussion of intended
applications of assigned
SMEs for prototype
design

Outstanding

Indicators

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)
130% manuscripts
for
students
worksheets,
teachers guides, etc.
Prepared
and
reviewed more than
a week before
schedule

(4)
115-129%

manuscripts
for
students
worksheets,
teachers guides, etc.
Prepared
and
reviewed within a
week
before
schedule

(3)
100-114%

manuscripts
for
students
worksheets,
teachers guides, etc.
Prepared
and
reviewed
as
schedule

(2)
51-99% manuscripts
for
students
worksheets,
teachers guides, etc.
Prepared
and
reviewed a week
after schedule

(1)
50% manuscripts for
students
worksheets,
teachers guides, etc.
Prepared
and
reviewed more than
a
week
after
schedule

target
SMEs

115-129% of target
prototyes
SMEs
produced

100-114% of target
prototyes
SMEs
produced

51-99% of target
prototyes
SMEs
produced

At least 50% of
target
prototyes
SMEs produced

Identified at least 3
SMEs
for
development within
1-5 working days

Identified at least 3
SMEs
for
development within
6-9 working days

Identified at least 3
SMEs
for
development within
10 working days

Identified at least 3
SMEs
for
development within
11-15 working days

prepared 130% of
concept papers for
assigned SMEs

prepared 115-129%
of concept papers
for assigned SMEs

prepared 100-114%
of concept papers
for assigned SMEs

prepared 51-99% of
concept papers for
assigned SMEs

Identified at least 3
SMEs
for
development within
16 or more working
days
prepared at least
50% of concept
papers for assigned
SMEs

130% of
prototyes
produced

Performance
Objectives

Conducted
in-house
tests, school tryouts of
fabricated
SMEs
prototypes
with
corresponding Student
Worksheets, Teachers
guides as per schedule
set in Individual Work
Plan
Conducted sample and
pre-delivery inspections
of procured SMEs (mass
produced and market
items) as per schedule
set in the project
Prepared training design
on the use
and
improvisation of Science
and
Mathematics
equipment
as
per
schedule set
Implemented
training
design

Outstanding

Indicators

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)
conducted 130% of
in-house
tests,
school tryouts for
SME
prototypes
more than a week
before schedule

(4)
conducted
115-
129% of in-house
tests, school tryouts
for SME prototypes
within a week before
schedule

(3)
conducted
100-
114% of in-house
tests, school tryouts
for SME prototypes
as per schedule

(2)
conducted 51-99%
of in-house tests,
school tryouts for
SME
prototypes
within a week after
schedule

(1)
conducted 50% and
below
in-house
tests, school tryouts
for SME prototypes
more than a week
after schedule

130% of samples
pre-delivery
inspection
conducted 3 days or
moe
before
schedule
130% of training
designs
prepared
more than a week
before schedule

115-129%
of
samples pre-delivery
inspection
conducted 1-2 days
before schedule

100-114%
of
samples pre-delivery
inspection
conducted as per
schedule

51-99% of samples
pre-delivery
inspection
conducted 1-2 days
after schedule

50% and below of


samples pre-delivery
inspection
conducted 3 days or
more after schedule

115-129% of training
designs
prepared
within a week before
schedule

100-114% of training
designs prepared on
schedule

51-99% of training
designs
prepared
within a week after
schedule

50% and below of


training
designs
prepared more than
a
week
after
schedule

130% of training
designs
implemented

115-129% of training
designs
implemented

100-114% of training
designs
implemented

51-99% of training
designs
implemented

50% and below of


training
designs
implemented

POSITION AND COMPETENCY PROFILE

Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised

SCIENCE RESEARCH SPECIALIST II


None
DepED National Science Teaching Instrumentation Center
Senior Science Research Specialist
None
JOB SUMMARY

PCP no. ____

Salary Grade

Revision Code

16

Effectivity Date

Makes researches/studies related to Science and Math teaching equipment prototype production, develops science equipment designs and conducts tryout on the teaching effectiveness of the science equipment prototype.

QUALIFICATIONS STANDARD
A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience
Eligibility
Trainings

Qualifications
Bachelors degree relevant to the job
1 year of relevant experience
Career Service Professional
4 hours of relevant training
Qualifications
Masteral units relevant to the job
2 Years teaching experience
Career Service Professional
8 hours of relevant training

DUTIES AND RESPONSIBILITIES


1. Designs science experiments based on the curriculum.
2. Recommends apparatus needed to perform experiments.
3. Helps design science teaching equipment prototypes.
4. Develops and conducts try-out on the teaching effectiveness of the science equipment prototype.
5. Writes users manual for the prototypes produced.
6. Writes manual of experiments.
7. Designs and conducts training courses for science teachers.
8. Conducts research on teaching effectiveness based on different teaching strategies/experiments.
9. Makes researches/studies related to science equipment prototype production.

Outputs
Major and Final
Output (MFOs)

Key Result Areas


(KRAs)

Objectives

Performance Managament
and Assesment

Learning
Production

Resources

Research and Development

Prepared
Individual
Work
Assignment
within ten (10) working days of the
current year

Individual Work Assignment submitted


to Research and Development Section
head by the 16th day of current year

Conducted annual updates on the


specifications of assigned *Science
or Mathematics Equipment (SME)
identified for procurement, by the end
of the first quarter of the current
year

Updated specifications of SMEs


submitted to NSTIC Director by the
end of the first quarter of the current
year

Prepared/reviewed manuscripts for


Student Worksheets, Teachers
Guides, Improvised Equipment
Construction Guides,
and Users
Manual for NSTIC Developed
Equipment
submitted to NSTIC
Director as per schedule set in the
Individual Work Assignment

Manuscripts for Student Worksheets,


Teachers
Guides, Improvised
Equipment Construction Guides, and
Users Manual for NSTIC Developed
Equipment
submitted to NSTIC
Director as per schedule set in the
Individual Work Assignment

Produced prototype SMEs

Prototype SMEs

Identified at least three *SMEs for


development
for the current year
within ten (10) working days of the
current year

List of SMEs and proposals

Prepared concept paper containing


descriptions, diagrams, specification
requirements and discussion of

Concept papers, routing cards


forwarded to
Design Section as
per schedule set in the
Individual
Work Assignment

Outputs
Major and Final
Output (MFOs)

Key Result Areas


(KRAs)

Objectives

Quality Assurance

Training

intended applications of assigned


SMEs for prototype design
Conducted in-house tests, school
tryouts of fabricated SMEs prototypes
with
corresponding
Student
Worksheets, Teachers guides as per
schedule set in Individual Work Plan
Conducted sample and pre-delivery
inspections of procured SMEs (mass
produced and market items) as per
schedule set in the project

Inspection report

Prepared training design on the use


and improvisation of Science and
Mathematics equipment as per
schedule set

Training design and schedule

Training report

Implemented training design

Performance

Prepared Individual Work Assignment


within ten (10) working days of the
current year

Tryout tests report

Objectives

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

Individual
Work
Assignment submitted
on or before the 10th
working day of the
current year

Individual
Work
Assignment
submitted on the
11th-15th
working
day of the current
year

Individual
Work
Assignment
submitted on the
16th-20th
working
day of the current
year

Individual
Work
Assignment
submitted on the
21st-25th
working
day of the current
year

(1)
Individual
Work
Assignment
submitted on the
26th-30th working
day of the current
year

Performance
Objectives

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

Conducted annual updates on the


specifications of
assigned
*Science
or
Mathematics
Equipment (SME) identified for
procurement, by the end of the
first quarter of the current year

conducted 130%
updates
on
specifications of
assigned SMEs

conducted 115129% updates


on specifications
of
assigned
SMEs

conducted 100-
114% updates on
specifications of
assigned SMEs

conducted 51-
99% updates on
specifications of
assigned SMEs

Prepared/reviewed manuscripts for


Student Worksheets, Teachers
Guides, Improvised Equipment
Construction Guides, and Users
Manual for NSTIC Developed
Equipment
submitted to NSTIC
Director as per schedule set in
the Individual Work Assignment

130% manuscripts
for
students
worksheets,
teachers guides,
etc. Prepared and
reviewed
as
schedule

115-129%
manuscripts for
students
worksheets,
teachers guides,
etc.
Prepared
and reviewed as
schedule

100-114%

manuscripts for
students
worksheets,
teachers guides,
etc.
Prepared
and reviewed as
schedule

51-99%
manuscripts for
students
worksheets,
teachers guides,
etc.
Prepared
and reviewed as
schedule

Conducted in-house tests, school


tryouts of fabricated SMEs
prototypes with corresponding
Student Worksheets, Teachers
guides as per schedule set in
Individual Work Plan

130% of in-house
tests,
school
tryouts for SME
prototypes
conducted

115-129% of inhouse
tests,
school tryouts for
SME prototypes
conducted

100-114% of inhouse
tests,
school tryouts for
SME prototypes
conducted

51-99% of inhouse
tests,
school tryouts for
SME prototypes
conducted

Conducted sample and pre-delivery


inspections of procured SMEs
(mass produced and market items)
as per schedule set in the project

conducted 130%
of samples predelivery inspection

conducted 115129% of samples


pre-delivery
inspection

conducted 100-
114% of samples
pre-delivery
inspection

conducted 5199% of samples


pre-delivery
inspection

Prepared training design on the

prepared 130% of

prepared

prepared

prepared 51-99%

115-

100-

conducted
50%
and
below updates
on
specifications
of
assigned
SMEs
50%
and
below
manuscripts
for
students
worksheets,
teachers
guides,
etc.
Prepared and
reviewed as
schedule
50%
and
below of inhouse tests,
school tryouts
for
SME
prototypes
conducted
conducted
50%
and
below
of
samples predelivery
inspection
prepared 50%

Performance
Objectives

use and improvisation of Science


and Mathematics equipment as per
schedule set
Implemented training design

Outstanding

Very Satisfactory

(5)
training designs

implemented
130% of training
designs

Indicators
Satisfactory

(4)
129% of training
designs

Implemented
115-129%
of
training designs

Unsatisfactory

(3)
114% of training
designs

implemented
100-114%
of
training designs

Poor

(2)
of
training
designs

implemented 5199% of training


designs

(1)
and below of
training
designs
implemented
50%
and
below
of
training
designs

POSITION AND COMPETENCY PROFILE

Position Title
Parenthetical Title
Office Unit
Reports to
Position Supervised

SCIENCE RESEARCH ASSISTANT


None
DepED National Science Teaching Instrumentation Center
Senior Science Research Specialist
None
JOB SUMMARY

PCP no. ____

Salary Grade
Effectivity Date

Assists in the development and design of science and math teaching equipment prototypes and experiment manuals.
A. CSC Prescribed
Education
Experience
Eligibility
Trainings
B. Preferred
Education
Experience
Eligibility
Trainings

QUALIFICATIONS STANDARD
Qualifications
Completion of two years studies in college
1 year of relevant experience
Career Service Sub-Professional
4 hours of relevant training
Qualifications
Completion of two years studies in college (Science course relevant to the job)
1 year of relevant experience
Career Service Sub-Professional
4 hours of relevant training

Revision Code

DUTIES AND RESPONSIBILITIES


1. Assists in the development and design of science and math teaching equipment prototypes
2. Assists in the preparation of experiments manual.
3. Assists in the classroom testing of science teaching equipment
4. Assists in the revision of teacher manuals.
5. Assists in the preparation of manuscripts for production.

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Administrative ServicesLogistic Support

Objectives

Outputs

Acted as Lab manager

Laboratory equipment provided

Issued and retrieved Science equipment

Issued science equipment retrieved

Prepared experiment set-ups for in-house


tests, tryout tests and quality control

Experiment set-ups prepared

Documented prototyping activities

Prototyping activities documented

Maintained files of prototype science


equipment stocks, chemicals, reference
materials

Files maintained

Documents issued to requesting parties

Issued documents to requesting parties

Major and Final Output


(MFOs)

Key Result Areas


(KRAs)

Organizational
Development and
Governance/Performanc
e Management and
Assessment

Objectives

Submitted Individual Work Assignment within


ten (10) working days of the current year

Submitted Indivividual Monthly Performance


Report to Research and Development Section

Submitted semi-annual performance appraisal


report to Research and Development Section
Conducted periodic inventory science
equipment as per schedule

Science and
Mathematics Equipment
Safekeeping and
Maintenance

Learning Resources
Production

Performed repair and maintenance activities of


science equipment
Assisted SSRS, SRS II in the annual updates
on the specifications of assigned SMEs
identified for procurement

Prepared improvised SME Constrction Guide

Prepared concept paper containing


descriptions, diagrams, specification
requirements and discussions of intended
applications of assigned SMEs

Attended coordination meetings with


Production Section
Conducted sample and pre-delivery
inspections of procured SMEs

Research and
Development

Quality Assurance

Training

Assisted in the conduct of training sessions as


per training design

Outputs

Inspection report

Training report

Performance
Objectives

Outstanding

Very Satisfactory

(5)
(4)
130%
of
laboratory 115-129%
of
equipment provided on
laboratory
time
equipment provided
on time
Issued
and
retrieved
Science 130%
of
laboratory 115-129%
of
equipment
equipment issued and
laboratory
retrieved after use
equipment issued
and retrieved after
use
Prepared experiment set-ups for in- prepared 130% of experiment prepared 115-129% of
house tests, tryout tests and quality
set ups
experiment set ups
control
Documented prototyping activities
documented
130%
of documented
115-
prototyping activities
129% of prototyping
activities
Acted as Lab manager

Indicators
Satisfactory

(3)
100-114%
of
laboratory
equipment
provided on time
100-114%
of
laboratory
equipment issued
and retried after
use
prepared 100-114%
of experiment set
ups
documented
100-
114%
of
prototyping
activities
files 100-114% of files
maintained

Unsatisfactory

Poor

(2)
(1)
51-99% of laboratory 50% and below
of
equipment
laboratory
equipment
provided on time
provided on time
51-99% of laboratory 50% and below
of
equipment issued
laboratory
equipment
and retrieved after
issued and retrieved
use
after use
prepared 51-99% of prepared 50% and below
experiment set ups
of experiment set ups
documented 51-99% documented at least 50%
of
prototyping
of prototyping activities
activities

Maintained files of prototype science 130% of files maintained


115-129% of
51-99%
of
files 50% and below of files
equipment
stocks,
chemicals,
maintained
maintained
maintained
reference materials
Issued documents to requesting parties issued 130% of requested issued 115-129% of issued 100-114% of issued 51-99% of issued at least 50% of
documents
requested
requested
requested
requested documents
documents
documents
documents
Submitted Individual Work Assignment 130% if Individual Work 115-129% if Individual 100-114%
if 51-99% if Individual 50% and below
if
within ten (10) working days of the
Assignment was submitted
Work Assignment
Individual
Work
Work Assignment
Individual
Work
current year
within 10 days
was submitted within
Assignment was
was
submitted
Assignment
was
30 days
submitted within 45
within 60days
submitted within 75 days

Performance
Objectives

Indicators

Outstanding

Very Satisfactory

Satisfactory

Unsatisfactory

Poor

(5)

(4)

(3)

(2)

(1)

days
Conducted periodic inventory science Conducted periodic inventory Conducted
periodic Conducted periodic Conducted periodic Conducted
periodic
equipment as per schedule
for 130% of the science
inventory
for
50%
and
inventory for 115inventory for 100inventory for 51equipment
below of the science
129% of the science
114%
of
the
99% of the science
equipment
equipment
science equipment
equipment
Performed repair and maintenance performed 130% of repair performed 115-129%
activities of science equipment
and maintenance activities
of
repair
and
maintenance
activities
Assisted SSRS, SRS II in the annual 130% assistance provided 115-129% assistance
updates on the specifications of
provided
assigned SMEs identified for
procurement
Prepared improvised SME Construction prepared 130% of improvised prepared 115-129% of
Guide
SME construction guide
improvised
SME
construction guide
Prepared concept paper containing prepared 130% of concept prepared 115-129% of
descriptions, diagrams, specification
papers
concept papers
requirements and discussions of
intended applications of assigned
SMEs
Conducted sample and pre-delivery conducted 130% sample and conducted 115-129%
inspections of procured SMEs
pre-delivery inspection
sample and predelivery inspection
Assisted in the conduct of training assisted in 130% of training assisted in 115-129%
sessions as per training design
sessions
of training sessions

performed 100-114% performed 51-99% of performed at least 50% of


of
repair
and
repair
and
repair and maintenance
maintenance
maintenance
activities
activities
activities
100-114% assistance 51-99% assistance 50% and below assistance
provided
provided
provided
prepared 100-114% prepared 51-99% of prepared 50% and below
of improvised SME
improvised SME
of improvised SME
construction guide
construction guide
construction guide
prepared 100-114% prepared 51-99% of prepared at least 50% of
of concept papers
concept papers
concept papers

conducted 100-114% conducted 51-99% conducted 50% and below


sample and presample and presample and pre-delivery
delivery inspection
delivery inspection
inspection
assisted in 100-114% assisted in 51-99% of assisted in at least 50% of
of training sessions
training sessions
training sessions

You might also like