1.0 Scope
This document provides
recommendations for
projecting long term lumen
maintenance of LED light
sources using data obtained
when testing them per IES
LM-80-08, IES Approved
Method for Measuring
Lumen Maintenance of
LED Light Sources.
The elapsed operating time over which the LED light source will maintain the
Time (hr)
(t ) B exp( t )
where:
F(t)
B
Model
1
2
3
4
5
6
7
8
Decay Rate
dI v
dt
dI v
dt
dI v
dt
dI v
dt
k1
k2 I v
k1 I v k 2 I v
k3
t
dI v
k
k1 3
dt
t
dI v
k 4 I v2
dt
dI v
I
k5 v
dt
t
dI v
I
k 2 I v k5 v
dt
t
Comment
I v I v0 k1 (t t 0 )
I v I v0 exp k2 (t t 0 )
k
k
I v I v0 1 exp k 2 (t t 0 ) 1
k2
k2
t
I v I v0 k3 ln 0
t
t
I v I v0 k1 (t t 0 ) k3 ln 0
t
I v0
Iv
1 I v0 k 4 (t t 0 )
Model 1 + Model 2
Model 1 + Model 4
I v I v0 t t 0
k5
I v I v0 exp k2 (t t 0 ) t t 0
(t t 0 )
I v I exp
k6
0
v
k7
k5
Model 2 + Model 7
B
ln 100
p
L p ( Dk )
where:
Lp
D
Adjustment of Results
6X Rule
Confidence band:
Students t-function, coefficients of the model, and the
estimated uncertainties of the coefficients
Estimated uncertainty of each data point:
component 1: standard deviation of the dataset for a given
time divided by the square root of the number
of points
component 2: the standard uncertainty of the measurement
system for relative measurements over the
time frame of the measurements
Analyze a matrix by adjusting these two components
Number of points:
6X
6000 hr
0.40 %
20 points
6X
6000 hr
1.0 %
20 points
Test fails: 6X is too large for 1.0 % system uncertainty and 20 points
4.1X
6000 hr
1.0 %
20 points
Test passes: Critical time 24600 hrs and fit determines 24680 hr
Sample size
Ea
i A exp
k
T
B s,i
where:
A = pre-exponential factor
Ea = activation energy (eV)
Ts,i = in-situ absolute temperature (K)
kB = Boltzmanns constant (8.6173x10-5 eV/K)
Ea ln 1 ln 2
1
1
kB
Ts , 2 Ts ,1
Ea
A 1 exp
k
T
B s,1
B0 B1B2
where:
B0
ln 100
p
Lp
Example Calculation
Sample#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
0
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1000
0.994
0.995
1.003
1.012
1.001
0.996
1.014
1.010
1.011
0.996
0.988
1.002
1.007
1.019
1.000
1.000
1.006
1.002
0.999
0.997
2000
0.983
0.998
1.004
1.017
1.003
1.004
1.019
1.015
1.016
0.998
0.991
1.002
1.012
1.025
1.008
1.008
1.014
1.005
1.001
1.005
3000
0.988
1.001
1.010
1.021
1.011
1.003
1.016
1.017
1.009
0.997
0.980
0.993
0.998
1.016
1.000
1.002
1.011
1.005
0.997
1.001
4000
0.962
0.977
0.989
0.991
0.985
0.979
0.988
0.990
0.984
0.977
0.960
0.968
0.976
0.995
0.980
0.973
0.984
0.980
0.974
0.978
5000
0.947
0.961
0.971
0.971
0.964
0.967
0.978
0.984
0.972
0.964
0.937
0.954
0.960
0.978
0.967
0.963
0.973
0.970
0.964
0.967
6000
0.943
0.958
0.966
0.970
0.958
0.957
0.968
0.972
0.960
0.949
0.934
0.951
0.955
0.975
0.967
0.951
0.967
0.969
0.962
0.972
Example Calculation
Time
0
1000
2000
3000
4000
5000
6000
B = 1.023
= 1.042 10-5
L70 = 36392 hr
Example Calculation
Sample#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
0
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1000
1.000
1.008
1.000
1.010
1.002
1.002
1.012
1.002
1.002
1.000
0.998
1.004
0.996
1.013
1.006
1.004
1.005
1.001
1.008
0.991
2000
0.974
1.003
0.981
1.006
0.992
1.003
1.014
0.997
1.003
0.984
0.963
0.997
0.981
1.002
0.991
0.997
0.999
0.987
1.001
0.973
3000
0.981
1.005
0.984
1.003
0.997
1.003
1.018
1.008
1.007
0.991
0.963
0.987
0.981
0.995
0.992
0.983
0.988
0.987
0.988
0.977
4000
0.967
0.986
0.955
0.979
0.977
0.980
1.001
0.987
0.989
0.974
0.941
0.961
0.957
0.968
0.961
0.953
0.962
0.950
0.962
0.944
5000
0.950
0.964
0.939
0.958
0.962
0.965
0.984
0.976
0.972
0.958
0.924
0.940
0.943
0.945
0.945
0.937
0.940
0.937
0.938
0.909
6000
0.909
0.942
0.914
0.937
0.933
0.946
0.963
0.948
0.947
0.926
0.890
0.924
0.917
0.930
0.919
0.919
0.922
0.911
0.924
0.895
Example Calculation
Time
0
1000
2000
3000
4000
5000
6000
B = 1.027
= 1.598 10-5
L70 = 23997 hr
Example Calculation
55C = 328.15 K
85C = 358.15 K
B1 = 1.023
B2 = 1.027
1 = 1.042 10-5
2 = 1.598 10-5
L70(6k) = 36392 hr
L70(6k) = 23997 hr
Ea ln 1 ln 2
1675.5K
1
1
kB
Ts , 2 Ts ,1
Ea
1.719 103
A 1 exp
k
T
B s,1
B0 B1B2 1.025
EPA ENERGY STAR Lamp Round Table
Example Calculation
Temperature Data Interpolation: L70 at 70C (343.15 K)
Ea
1.303 105
i A exp
k
T
B
s,
i
B0
ln 100
p
Lp
29277 hr
Questions?